Bulkheads Adapted To Foundation Construction
(AREA)
Abstract
Method for arrangement of wall in earth includes formation of trench under protection of walls with clay mortar and supply of hardening material to trench. To increase stability at construction of straight and large radii walls in earth trench is formed with separate sections that are curvilinear in shape with small radius of curvature, with convex side directed to side of outer lateral load.
UA4492706A1988-10-101988-10-10Method for arrangement of wall in earth and bit for its implementation
UA14266A1
(en)
Underground structural work, particularly for building tunnels, underpasses, carparks and the like, a process for its production and a prefabricated element for such structure
Machine for and method of continuously disintegrating a rock or the like and taking away disintegrated output for use in mining,earth moving and tunnel driving