TWM631950U - Bridge side push construction device - Google Patents

Bridge side push construction device Download PDF

Info

Publication number
TWM631950U
TWM631950U TW111205433U TW111205433U TWM631950U TW M631950 U TWM631950 U TW M631950U TW 111205433 U TW111205433 U TW 111205433U TW 111205433 U TW111205433 U TW 111205433U TW M631950 U TWM631950 U TW M631950U
Authority
TW
Taiwan
Prior art keywords
bridge
slide rail
construction
construction device
sliding
Prior art date
Application number
TW111205433U
Other languages
Chinese (zh)
Inventor
陳鴻山
Original Assignee
萬德營造有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 萬德營造有限公司 filed Critical 萬德營造有限公司
Priority to TW111205433U priority Critical patent/TWM631950U/en
Publication of TWM631950U publication Critical patent/TWM631950U/en

Links

Images

Abstract

一種新建橋樑側推施工裝置,主要係包含一滑軌,以及置於該滑軌內之側推件及複數之滑動件、連桿。其中,該滑軌兩側係分別設有連續排列之斜狀U形槽;該側推件係為一千斤頂,其後端係設有一供扣持於滑軌之斜狀U形槽之反力座桿;該等滑動件係設有複數之螺紋千斤頂;該等連桿則連接該等滑動件。俾於施工時,將側推施工裝置置於新建橋樑兩端下方,藉由滑動件之螺紋千斤頂頂持於新建橋樑,再藉由側推件的伸張推動滑動件,並於收縮時構成反作用力,使側推件向前移動,進而使其反力座桿扣持於前一斜狀U形槽。藉此,使新建橋樑得以漸進移動至施工位置,從而使新建橋樑更新的施工更具效率。The utility model relates to a side thrust construction device for a newly built bridge, which mainly comprises a slide rail, a side thrust piece placed in the slide rail, and a plurality of sliding pieces and connecting rods. Among them, the two sides of the slide rail are respectively provided with continuous inclined U-shaped grooves; the side pusher is a jack, and its rear end is provided with a reaction force for the inclined U-shaped grooves to be fastened to the slide rail. The seat post; the sliding parts are provided with a plurality of threaded jacks; the connecting rods are connected to the sliding parts. During construction, the side pushing construction device is placed under the two ends of the new bridge, and the threaded jack of the sliding piece is used to hold the new bridge, and then the sliding piece is pushed by the extension of the side pushing piece, and a reaction force is formed when it shrinks. , so that the side pusher moves forward, so that the reaction force seat post is buckled in the front inclined U-shaped groove. Thereby, the new bridge can be gradually moved to the construction position, thereby making the construction of the new bridge renewal more efficient.

Description

橋樑側推施工裝置Bridge side push construction device

本創作係有關一種橋樑側推施工裝置,尤指一種使新舊橋樑更新的施工更具效率之橋樑側推施工裝置。This creation relates to a bridge side thrust construction device, especially a bridge side thrust construction device that makes the renovation of old and new bridges more efficient.

按;一般之橋樑於使用相當之時間後,由於老舊、強度不足,會影響行車安全性,因此其舊橋需更新改建。惟有些橋樑需維持原有通車功能,為避免耗資改道興建臨時替代道路橋樑及需快速完成更換橋樑,若採用於舊橋旁邊預組整座橋樑,常因重量太重無法以吊車起重機將整座橋樑吊起安裝、或施工環境限制無法以吊車吊裝新建橋樑,則在施工期間需徵租大面積施工用地、開闢施工便道、架設施工便橋或是事前架設固定式天車等傳統工法,除增加作業困擾、增加施工成本、增加施工工期。Press; after a certain period of use, the general bridge will be old and insufficient in strength, which will affect the driving safety, so the old bridge needs to be renovated. However, some bridges need to maintain the original function of opening to traffic. In order to avoid costly diversion to build temporary replacement road bridges and the need to quickly complete the replacement of bridges, if the whole bridge is pre-assembled next to the old bridge, it is often too heavy to lift the whole bridge with a crane. If the bridge is hoisted and installed, or the new bridge cannot be hoisted by a crane due to the limitations of the construction environment, it is necessary to rent a large area of construction land, open up a construction access road, erect a construction access bridge or erect a fixed crane in advance and other traditional construction methods during the construction period. trouble, increase the construction cost, and increase the construction period.

再者;傳統的施工方法需開闢臨時便道便橋,可能大幅增加用地破壞環境增加成本,亦可能因新橋於河中落墩影響防洪能力、破壞美麗環境,以及中斷橋樑的運輸、影響行車安全,甚至完全阻礙了居民與觀光客的交通便利性,實也為新舊橋樑更新的困擾。申請人有鑑於此,經不斷研究、實驗,遂萌生設計一種橋樑側推施工裝置,使新舊橋樑的更新施工更具效率,減少施工範圍降低環境破壞,且可達到撙節工程費之目的。Furthermore, the traditional construction method needs to open up temporary access roads and bridges, which may greatly increase the cost of land use and damage to the environment. It may also affect the flood control ability, damage the beautiful environment, interrupt the transportation of the bridge, affect the traffic safety, or even completely It hinders the convenience of transportation for residents and tourists, and it is also a problem for the renewal of old and new bridges. In view of this, the applicant, after continuous research and experimentation, came up with the design of a bridge side thrust construction device, which makes the renovation of old and new bridges more efficient, reduces the construction scope, reduces environmental damage, and can achieve the purpose of saving engineering costs.

本創作之主要目的,即在提供一種橋樑側推施工裝置,使新建橋樑的施工更具效率,且可撙節經費及不影響正常行車。The main purpose of this creation is to provide a bridge side push construction device, which makes the construction of the new bridge more efficient, saves the cost and does not affect the normal traffic.

前述之橋樑側推施工裝置,係包含一滑軌,以及置於該滑軌內之側推件及複數之滑動件、連桿。其中,該滑軌兩側係分別設有連續排列之斜狀U形槽;該側推件係為一千斤頂,其後端係設有一供扣持於滑軌之斜狀U形槽之反力座桿;該等滑動件係設有複數之螺紋千斤頂;該等連桿則連接該等滑動件。俾於施工時,將側推施工裝置置於新建橋樑兩端下方,藉由滑動件之螺紋千斤頂頂持於新建橋樑,再藉由側推件的伸張推動滑動件,並於收縮時構成反作用力,使側推件向前移動,進而使其反力座桿扣持於前一斜狀U形槽。藉此,使新建橋樑得以漸進移動至施工位置,從而使新建橋樑的施工更具效率。The aforementioned bridge side thrust construction device includes a slide rail, a side thrust piece and a plurality of sliding pieces and connecting rods arranged in the slide rail. Among them, the two sides of the slide rail are respectively provided with continuous inclined U-shaped grooves; the side pusher is a jack, and its rear end is provided with a reaction force for the inclined U-shaped grooves to be fastened to the slide rail. The seat post; the sliding parts are provided with a plurality of threaded jacks; the connecting rods are connected to the sliding parts. During construction, the side pushing construction device is placed under the two ends of the new bridge, and the threaded jack of the sliding piece is used to hold the new bridge, and then the sliding piece is pushed by the extension of the side pushing piece, and a reaction force is formed when it shrinks. , so that the side pusher moves forward, so that the reaction force seat post is buckled in the front inclined U-shaped groove. Thereby, the new bridge can be gradually moved to the construction position, thereby making the construction of the new bridge more efficient.

前述之橋樑側推施工裝置,其中該滑軌係概呈凹狀,其兩側之垂直部係分別設有連續間隔排列之鯊魚齒部,使兩鯊魚齒部間構成斜狀U形槽。In the above-mentioned bridge side pushing construction device, the slide rail is generally concave, and the vertical parts on both sides are respectively provided with continuous and spaced shark teeth, so that an oblique U-shaped groove is formed between the two shark teeth.

前述之橋樑側推施工裝置,其中該滑軌的內面,係塗佈有二氧化鉬或黃油,以減低磨擦係數。In the aforementioned bridge side thrust construction device, the inner surface of the slide rail is coated with molybdenum dioxide or butter to reduce the coefficient of friction.

前述之橋樑側推施工裝置,其中該側推件伸縮桿端部係設有一固定部,以供連接滑動件,後端之反力座桿係橫向固定於側推件的後端面。In the aforementioned bridge side thrust construction device, the end of the side thruster telescopic rod is provided with a fixing portion for connecting the sliding element, and the rear reaction force seat rod is laterally fixed to the rear end surface of the side thruster.

前述之橋樑側推施工裝置,其中該等滑動件兩端係分別設有突耳,以供分別連接側推件及連桿。In the aforementioned bridge side thrust construction device, lugs are respectively provided at both ends of the sliding members for connecting the side thrust member and the connecting rod respectively.

前述之橋樑側推施工裝置,其中該等滑動件底緣係設有高密度聚乙烯板(HDPE),或鐵氟龍板或拋光鋼板以提高滑動件的耐磨性。In the aforementioned bridge side thrust construction device, the bottom edges of the sliding parts are provided with high-density polyethylene (HDPE), or Teflon plates or polished steel plates to improve the wear resistance of the sliding parts.

請同時參閱圖1及圖2,並配合圖3、圖4及圖5,係為本創作之立體圖及側視圖,以及側推件立體圖、滑動件立體圖、連桿立體圖。如圖所示,本創作係包含一滑軌1,以及置於該滑軌1內,可於該滑軌1內滑動之側推件2及第一滑動件3、第二滑動件3a,以及第一連桿4、第二連桿4a。其中,該滑軌1係概呈凹狀,其兩側之垂直部係分別設有連續間隔排列之鯊魚齒部10,使兩鯊魚齒部10間構成斜狀U形槽11,垂直部的下緣,係設有間隔排列之複數個固定片12。於本實施例,該滑軌1的內面,係塗佈有二氧化鉬或黃油,以減低磨擦係數。Please refer to FIG. 1 and FIG. 2 at the same time, in conjunction with FIG. 3, FIG. 4 and FIG. 5, which are the perspective view and side view of this creation, as well as the perspective view of the side pusher, the slider, and the connecting rod. As shown in the figure, the present invention includes a slide rail 1 , a side pusher 2 , a first slide member 3 , a second slide member 3 a which are placed in the slide rail 1 and can slide in the slide rail 1 , and The first connecting rod 4 and the second connecting rod 4a. The slide rail 1 is generally concave, and the vertical parts on both sides are respectively provided with shark tooth parts 10 arranged in a continuous interval, so that an oblique U-shaped groove 11 is formed between the two shark tooth parts 10, and the lower part of the vertical part is The edge is provided with a plurality of fixed pieces 12 arranged at intervals. In this embodiment, the inner surface of the slide rail 1 is coated with molybdenum dioxide or butter to reduce the coefficient of friction.

該側推件2係為一千斤頂,其伸縮桿21端部係設有一固定部22,後端係設有一供扣持於滑軌1之斜狀U形槽11之反力座桿23,使該反力座桿23橫向固定於側推件2的後端面。The side pusher 2 is a jack, the end of the telescopic rod 21 is provided with a fixing part 22, and the rear end is provided with a reaction force seat rod 23 for being fastened to the inclined U-shaped groove 11 of the slide rail 1, so that the The reaction force seat post 23 is laterally fixed on the rear end surface of the side pusher 2 .

該第一滑動件3及第二滑動件3a,係分別設有複數之螺紋千斤頂31、31a,並於兩端分別設有突耳32、32a,以供分別連接側推件2之固定部22,以及第一連桿4及第二連桿4a之固定部41、41a;底緣係設有高密度聚乙烯板(HDPE)33、33a,藉由高密度聚乙烯板(HDPE)33較大鋼性及高機械強度的特性,以提高第一滑動件3及第二滑動件3a的耐磨性。The first sliding member 3 and the second sliding member 3a are respectively provided with a plurality of threaded jacks 31, 31a, and both ends are respectively provided with lugs 32, 32a for connecting the fixing portion 22 of the side push member 2 respectively , and the fixing parts 41, 41a of the first link 4 and the second link 4a; the bottom edge is provided with high-density polyethylene (HDPE) 33, 33a, and the high-density polyethylene (HDPE) 33 is larger The characteristics of rigidity and high mechanical strength can improve the wear resistance of the first sliding member 3 and the second sliding member 3a.

該第一連桿4及第二連桿4a,係於一端分別設有固定部41、41a,以供分別連接於第一滑動件3及第二滑動件3a之突耳32、32a。The first connecting rod 4 and the second connecting rod 4a are respectively provided with fixed portions 41 and 41a at one end for connecting to the lugs 32 and 32a of the first sliding member 3 and the second sliding member 3a, respectively.

藉由前述構件的組合,構成橋樑側推施工裝置A。俾於架設新建橋樑施工作業時,將本橋樑側推施工裝置A置於新建橋樑兩端下方,藉由第一滑動件3之螺紋千斤頂31頂持於新建橋樑,再藉由側推件2的伸張推動第一滑動件3、第一連桿4及第二連桿4a、第二滑動件3a,並於收縮時構成反作用力,使側推件2向前移動,進而使其反力座桿23扣持於滑軌1的前一斜狀U形槽11。藉此,使橋樑得以漸進移動至施工位置,從而使新建橋樑的施工更具效率。The bridge side thrust construction device A is constructed by the combination of the aforementioned components. For the purpose of erecting a new bridge, the side thrust construction device A of the bridge is placed under the two ends of the new bridge, supported on the new bridge by the threaded jack 31 of the first sliding member 3, and then supported by the side thrust member 2. The first sliding member 3, the first connecting rod 4, the second connecting rod 4a and the second sliding member 3a are stretched and pushed, and form a reaction force when retracted, so that the side push member 2 moves forward, thereby causing its reaction force to the seat post 23 is fastened to the front oblique U-shaped groove 11 of the slide rail 1. In this way, the bridge can be gradually moved to the construction position, thereby making the construction of new bridges more efficient.

請參閱圖6,係為本創作置於橋樑狀態圖。敬請配合圖1,如圖所示,本創作於施工時,係於原舊橋5的位置設置一施工構台6,以利於施工人員及機具進場作業,並將橋樑側推施工裝置A分別置於新建橋樑7的兩端下方適當位置,並藉由固定片12固定於地面。Please refer to Figure 6, which is a bridge state diagram for this creation. Please cooperate with Figure 1. As shown in the figure, during the construction of this project, a construction platform 6 is set at the position of the original old bridge 5, so as to facilitate the construction personnel and equipment to enter the site, and push the construction device A on the side of the bridge respectively. It is placed in an appropriate position under the two ends of the newly built bridge 7, and is fixed to the ground by the fixing piece 12.

請參閱圖7,係為本創作頂持新建橋樑狀態圖。如圖所示,本創作於設置完成橋樑側推施工裝置A後,係於該第一滑動件3及第二滑動件3a之螺紋千斤頂31、31a上緣,置入適當數量之襯墊8以供調整頂升。於本實施例,該等襯墊8係為橡膠墊及鐵板。Please refer to Figure 7, which is a state diagram of a newly built bridge supported by this creation. As shown in the figure, in the present invention, after the installation of the bridge side thrust construction device A is completed, the upper edges of the threaded jacks 31 and 31a of the first sliding member 3 and the second sliding member 3a are fastened, and an appropriate number of pads 8 are placed to For adjusting jacking. In this embodiment, the pads 8 are rubber pads and iron plates.

請參閱圖8,係為本創作拆除舊橋狀態圖。敬請配合圖6,如圖所示,本創作於前述完成橋樑側推施工裝置A之定位作業後,係將原舊橋5拆除(拆除原舊橋5之橋體、基座、橋墩),俾進行後續新建橋樑7的側推作業。Please refer to Figure 8, which is the state diagram of the dismantling of the old bridge for this work. Please cooperate with Figure 6. As shown in the figure, after the completion of the positioning operation of the bridge side thrust construction device A, the original old bridge 5 was dismantled (removal of the bridge body, base and pier of the original old bridge 5), In order to carry out the lateral push operation of the subsequent new bridge 7.

請同時參閱圖9及圖10,係為本創作之推移狀態圖。敬請配合圖1至圖5,本創作於側推作業時,係啟動其中之側推件2,由於側推件2之反力座桿23係扣持於滑軌1之斜狀U形槽11底緣以構成定位,使側推件2的伸縮桿21向前伸張得以推動第一滑動件3、第一連桿4及第二連桿4a、第二滑動件3a,使該第一滑動件3及第二滑動件3a於滑軌1內向前滑動。由於新建橋樑7係頂持於該第一滑動件3及第二滑動件3a的螺紋千斤頂31、31a上緣,因此可將新建橋樑7往前推動一段距離。Please refer to FIG. 9 and FIG. 10 at the same time, which are the transition state diagrams of this creation. Please cooperate with Fig. 1 to Fig. 5. During the side push operation, the side pusher 2 is activated. Since the reaction force seat post 23 of the side pusher 2 is fastened to the inclined U-shaped groove of the slide rail 1 The bottom edge of 11 is formed to form a positioning, so that the telescopic rod 21 of the side pusher 2 is stretched forward to push the first sliding member 3, the first connecting rod 4, the second connecting rod 4a, and the second sliding member 3a, so that the first sliding member 3, the first connecting rod 4, the second connecting rod 4a, and the second sliding member 3a can slide The sliding member 3 and the second sliding member 3a slide forward in the sliding rail 1 . Since the newly built bridge 7 is supported on the upper edges of the threaded jacks 31 and 31a of the first sliding member 3 and the second sliding member 3a, the newly built bridge 7 can be pushed forward for a certain distance.

請同時參閱圖11及圖12,係為本創作之另一推移狀態圖。本創作當側推件2的伸縮桿21收縮時,將會構成反作用力,又由於該滑軌1的垂直部係設為斜狀U形槽11,該反作用力會將側推件2向前拉,使原扣持於後一斜狀U形槽11的反力座桿23向前滑過斜狀U形槽11的坡面,進而越過鯊魚齒部10落於前一斜狀U形槽11。而當側推件2的伸縮桿21再次向前伸張以推動第一滑動件3、第一連桿4及第二連桿4a、第二滑動件3a時,該第一滑動件3及第二滑動件3a於滑軌1內同樣向前滑動一段距離,藉此,於重複前述之步驟下使新新建橋樑7得以漸進移動至原舊橋之施工位置,從而使新建橋樑7的施工更具效率。Please refer to FIG. 11 and FIG. 12 at the same time, which are another transition state diagram of the present invention. In this invention, when the telescopic rod 21 of the side pusher 2 shrinks, a reaction force will be formed, and since the vertical part of the slide rail 1 is set as an oblique U-shaped groove 11, the reaction force will push the side pusher 2 forward. Pull, so that the reaction force seat post 23 originally buckled in the rear inclined U-shaped groove 11 slides forward through the slope of the inclined U-shaped groove 11, and then crosses the shark tooth 10 and falls into the previous inclined U-shaped groove. 11. When the telescopic rod 21 of the side pusher 2 is stretched forward again to push the first sliding member 3, the first link 4, the second link 4a, and the second sliding member 3a, the first sliding member 3 and the second The sliding member 3a also slides forward a certain distance in the sliding rail 1, whereby the new bridge 7 can be gradually moved to the construction position of the old bridge by repeating the above steps, so that the construction of the new bridge 7 is more efficient. .

請參閱圖13,係為本創作推移完成狀態圖。如圖所示,本創作於橋樑側推施工裝置A將新建橋樑7推至預定位置後,即可供銜接原有之道路,進而完成新建橋樑7之架設施工作業。本創作之施工可提升結構及行車安全,新建橋樑7於河中不落墩以提升防洪能力,施工中不需設臨時便橋、不需大幅擴建替代道路,且可利用夜間封鎖拆除舊橋,當天即可完成新舊橋樑拆換,降低對交通的影響,有效提升工程效益,並減少對環境破壞,樽節工程經費。Please refer to Figure 13, which is a state diagram of the completion of this creation. As shown in the figure, after the bridge side pushing construction device A pushes the new bridge 7 to a predetermined position, it can be connected to the original road, and then the erection of the new bridge 7 is completed. The construction of this creation can improve the structure and driving safety. The new bridge 7 will not drop piers in the river to improve the flood control capacity. During the construction, there is no need to set up a temporary bridge, and there is no need to significantly expand the alternative road, and the old bridge can be demolished by night blockade. It can complete the replacement of old and new bridges, reduce the impact on traffic, effectively improve project benefits, reduce environmental damage, and save project costs.

前述實施例,僅為說明本創作之較佳實施方式,而非限制本創作之範圍,凡經由些微修飾、變更,仍不失本創作之要義所在,亦不脫本創作之精神範疇。The foregoing examples are only to illustrate the preferred implementations of the present creation, rather than limiting the scope of the present creation. All modifications and changes are made without losing the essence of the present creation, nor deviating from the spirit of the present creation.

綜上所述,本創作以設有斜狀U形槽之滑軌,配合設於滑軌內之側推件及複數之滑動件、連桿,構成新建橋樑側推施工裝置。使新舊橋樑更新施工更具效率,且可撙節經費及不影響正常行車。為一實用之設計,誠屬一俱新穎性之創作,爰依法提出專利之申請,祈  鈞局予以審查,早日賜准專利,至感德便。To sum up, this creation uses a slide rail with an oblique U-shaped groove, a side pusher and a plurality of slide pieces and connecting rods arranged in the slide rail to form a side push construction device for a new bridge. It makes the renovation and construction of old and new bridges more efficient, saves money and does not affect normal traffic. It is a practical design, and it is a creation of novelty. I should file a patent application in accordance with the law, and I pray that the bureau will review it and grant the patent as soon as possible.

1:滑軌 10:鯊魚齒部 11:斜狀U形槽 12:固定片 2:側推件 21:伸縮桿 22:固定部 23:反力座桿 3:第一滑動件 31:螺紋千斤頂 32:突耳 33:高密度聚乙烯板(HDPE) 3a:第二滑動件 31a:螺紋千斤頂 32a:突耳 33a:高密度聚乙烯板(HDPE) 4:第一連桿 41:固定部 4a:第二連桿 41a:固定部 5:舊橋 6:施工構台 7:新建橋樑 8:襯墊 A:橋樑側推施工裝置 1: slide rail 10: Shark Tooth 11: Oblique U-shaped groove 12: Fixed piece 2: Side pusher 21: Telescopic rod 22: Fixed part 23: Reaction Seatpost 3: The first slide 31: Threaded Jack 32: Lugs 33: High Density Polyethylene Board (HDPE) 3a: Second slider 31a: Threaded Jack 32a: lug 33a: High Density Polyethylene (HDPE) 4: The first link 41: Fixed part 4a: Second Link 41a: Fixed part 5: Old Bridge 6: Construction platform 7: New bridges 8: padding A: Bridge side push construction device

圖1係本創作之立體圖。 圖2係本創作之側視圖。 圖3係本創作之側推件立體圖。 圖4係本創作之滑動件立體圖。 圖5係本創作之連桿立體圖。 圖6係本創作置於橋樑狀態圖。 圖7係本創作頂持新建橋樑狀態圖。 圖8係本創作拆除舊橋狀態圖。 圖9及圖10係本創作之推移狀態圖。 圖11及圖12係本創作之另一推移狀態圖。 圖13係本創作推移完成狀態圖。 Figure 1 is a perspective view of this creation. Figure 2 is a side view of this creation. Figure 3 is a perspective view of the side pusher of this creation. Figure 4 is a perspective view of the slider of this creation. Figure 5 is a perspective view of the connecting rod of this creation. Figure 6 is a state diagram of this creation being placed on a bridge. Figure 7 is a state diagram of the newly built bridge supported by this creation. Figure 8 is the state diagram of the dismantling of the old bridge in this project. Figures 9 and 10 are state diagrams of the transition of this creation. 11 and 12 are another transition state diagram of the present invention. Figure 13 is a state diagram of the completion of this creation.

1:滑軌 1: slide rail

10:鯊魚齒部 10: Shark Tooth

11:斜狀U形槽 11: Oblique U-shaped groove

12:固定片 12: Fixed piece

2:側推件 2: Side pusher

22:固定部 22: Fixed part

23:反力座桿 23: Reaction Seatpost

3:第一滑動件 3: The first slide

31:螺紋千斤頂 31: Threaded Jack

32:突耳 32: Lugs

3a:第二滑動件 3a: Second slider

31a:螺紋千斤頂 31a: Threaded Jack

32a:突耳 32a: lug

4:第一連桿 4: The first link

4a:第二連桿 4a: Second Link

A:橋樑側推施工裝置 A: Bridge side push construction device

Claims (5)

一種橋樑側推施工裝置,包含:一滑軌,係概呈凹狀,其兩側之垂直部係分別設有連續排列之斜狀U形槽;一側推件,係為一千斤頂,其後端係設有一供扣持於該滑軌之該斜狀U形槽之反力座桿;至少兩滑動件,係設有複數之螺紋千斤頂,其兩端係分別連接該側推件及連桿;至少兩連桿,係供分別連接於該等滑動件;俾於架設新建橋樑施工作業時,將橋樑側推施工裝置置於新建橋樑兩端下方,藉由該滑動件之該螺紋千斤頂頂持於該新建橋樑,再藉由該側推件的伸張推動該等滑動件,並於收縮時構成反作用力,使該側推件向前移動,進而使該反力座桿扣持於該滑軌的該前一斜狀U形槽,藉此,使該新建橋樑得以漸進移動至施工位置。 A bridge side pushing construction device, comprising: a sliding rail, which is roughly concave, and the vertical parts on both sides are respectively provided with continuous oblique U-shaped grooves; The end is provided with a reaction force seat post for being fastened to the inclined U-shaped groove of the slide rail; at least two sliding parts are provided with a plurality of threaded jacks, and the two ends are respectively connected to the side pusher and the connecting rod ; At least two connecting rods are respectively connected to the sliding pieces; for the construction of a new bridge, the side pushing construction device of the bridge is placed under both ends of the new bridge, and the threaded jack of the sliding piece is used to hold it. On the newly built bridge, the sliding members are pushed by the extension of the side pusher, and a reaction force is formed when the side pusher is retracted, so that the side pusher moves forward, so that the reaction force seatpost is fastened to the slide rail The former oblique U-shaped groove, whereby the new bridge can be gradually moved to the construction position. 如請求項1所述之橋樑側推施工裝置,其中,該滑軌之該垂直部的下緣,係設有間隔排列之複數個固定片,以供固定於地面。 The side-thrusting construction device for a bridge as claimed in claim 1, wherein the lower edge of the vertical portion of the slide rail is provided with a plurality of fixing pieces arranged at intervals for fixing to the ground. 如請求項1所述之橋樑側推施工裝置,其中,該滑軌的內面,係塗佈有二氧化鉬或黃油,以減低磨擦係數。 The bridge side thrust construction device according to claim 1, wherein the inner surface of the slide rail is coated with molybdenum dioxide or butter to reduce the coefficient of friction. 如請求項1所述之橋樑側推施工裝置,其中,該側推件之反力座桿,係橫向固定於該側推件的後端面。 The bridge side thrust construction device according to claim 1, wherein the reaction force seat post of the side thrust member is laterally fixed on the rear end surface of the side thrust member. 如請求項1所述之橋樑側推施工裝置,其中,該等滑動件的底緣,係設有高密度聚乙烯板(HDPE)或鐵氟龍板或拋光鋼板,以提高耐磨性。 The bridge side thrust construction device as claimed in claim 1, wherein the bottom edges of the sliding parts are provided with high-density polyethylene (HDPE), Teflon or polished steel plates to improve wear resistance.
TW111205433U 2022-05-25 2022-05-25 Bridge side push construction device TWM631950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW111205433U TWM631950U (en) 2022-05-25 2022-05-25 Bridge side push construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111205433U TWM631950U (en) 2022-05-25 2022-05-25 Bridge side push construction device

Publications (1)

Publication Number Publication Date
TWM631950U true TWM631950U (en) 2022-09-11

Family

ID=84613524

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111205433U TWM631950U (en) 2022-05-25 2022-05-25 Bridge side push construction device

Country Status (1)

Country Link
TW (1) TWM631950U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI825741B (en) * 2022-05-25 2023-12-11 萬德營造有限公司 Bridge side push construction device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI825741B (en) * 2022-05-25 2023-12-11 萬德營造有限公司 Bridge side push construction device

Similar Documents

Publication Publication Date Title
US4301565A (en) Method and system for the removal and replacement of a bridge
CN209854553U (en) Assembled concrete anticollision barrier based on ultrahigh performance concrete is connected
TWM631950U (en) Bridge side push construction device
CN110485467B (en) Assembled recyclable rectangular working well with preset detachable door opening and sliding type rear wall and construction method thereof
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN210031458U (en) Large-span height difference tie bar arch structure pushing mechanism
JP3711355B2 (en) Bridge erection method
CN108221711A (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN211006318U (en) Assembled pier
TWI825741B (en) Bridge side push construction device
CN117328331A (en) Pier-beam hinged non-penetrating prestress self-resetting bridge anti-seismic system
CN108755606B (en) Arch dam supporting girder template structure and construction method
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN207435878U (en) A kind of Liftable type steel trestle structure
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method
CN111794079B (en) Temporary bridge capable of passing through vehicles based on bridge construction
CN212404881U (en) Bridge box girder large-span pushing and sliding system
CN209891083U (en) Strutting arrangement is used in bridge construction
CN209907191U (en) Assembled concrete crash barrier based on grout muffjoint
CN211285505U (en) Forward slope mountain-climbing channel structure
TW202346684A (en) Lateral push construction method for bridges capable of improving work safety, reducing the construction scope and environmental damage and saving funds without affecting the traffic
CN111549681A (en) Bridge box girder large-span pushing and sliding system and construction method
CN207714162U (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN112031495A (en) Prefabricated cabin transformer substation assembled steel structure foundation and construction splicing method thereof
CN111997074A (en) Interim assembled concrete retaining platform subassembly

Legal Events

Date Code Title Description
GD4K Issue of patent certificate for granted utility model filed before june 30, 2004