TWM604331U - Ceiling equipment belt structure - Google Patents

Ceiling equipment belt structure Download PDF

Info

Publication number
TWM604331U
TWM604331U TW109208896U TW109208896U TWM604331U TW M604331 U TWM604331 U TW M604331U TW 109208896 U TW109208896 U TW 109208896U TW 109208896 U TW109208896 U TW 109208896U TW M604331 U TWM604331 U TW M604331U
Authority
TW
Taiwan
Prior art keywords
frame
equipment belt
ceiling
belt structure
vent
Prior art date
Application number
TW109208896U
Other languages
Chinese (zh)
Inventor
柯新國
Original Assignee
巨懋工程企業有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 巨懋工程企業有限公司 filed Critical 巨懋工程企業有限公司
Priority to TW109208896U priority Critical patent/TWM604331U/en
Publication of TWM604331U publication Critical patent/TWM604331U/en

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

一種天花板設備帶結構,具有第一框體,兩側分別設有第二框體,內部分別具有第一空間與第二空間,並分別具有第一開口與第二開口,第二框體底部具有通風口與連接口,並在第二開口處設有第一連接板,而複數的吊座兩側分別設有連接至第一連接板的第二連接板,藉此,第一框體內設置燈具,外部連接集風箱,集風箱的第一導風管連接空調管,各第二框體的連接孔分別連接消防電子感測器與消防裝置,且設備帶兩端可相互連接延伸,達成整合不同管路,簡化輕鋼架設備配置的結構。A ceiling equipment belt structure is provided with a first frame body, a second frame body is provided on both sides, a first space and a second space are respectively provided inside, and a first opening and a second opening are respectively provided, and the bottom of the second frame body has The vent and the connecting port are provided with a first connecting plate at the second opening, and two connecting plates connected to the first connecting plate are respectively provided on both sides of the plurality of hangers, whereby the first frame is provided with lamps , The outside is connected to the wind box, the first air duct of the wind box is connected to the air conditioning pipe, the connection holes of each second frame are respectively connected to the fire electronic sensor and the fire protection device, and the two ends of the equipment belt can be connected to each other to achieve Integrate different pipelines to simplify the structure of light steel frame equipment configuration.

Description

天花板設備帶結構Ceiling equipment belt structure

本創作係有關於一種天花板輕鋼架結構,特別是指一種整合不同管路,簡化輕鋼架設備配置的天花板設備帶結構。This creation is about a ceiling light steel frame structure, especially a ceiling equipment belt structure that integrates different pipelines and simplifies the configuration of light steel frame equipment.

現在的裝潢設計中,特別是無塵室、辦公室、賣場等大坪數空間內的裝潢設計,大多會選擇輕鋼架結構,利用輕鋼架組成網格狀,然後以金屬桿固定在樓層板底面,網格內便可依照設計的需求,設置燈具、消防設備(如:灑水器、偵煙器等)、連接空調管路、循環扇等裝置,且輕鋼架與樓層板底面具有一定的第二空間,上述各項裝置的管路、線路會在第二空間內進行佈線、配管,剩餘未使用的網格,依產業別需求,便可以放置如無塵天花板、甘蔗板、矽酸鈣板等,遮蔽樓層板底面的水泥牆及橫樑,達到室內美觀的效果。In the current decoration design, especially the decoration design in large spaces such as clean rooms, offices, stores, etc., most of them choose light steel frame structure, using light steel frame to form a grid, and then fix it on the bottom of the floor slab with metal rods In the grid, lamps, fire-fighting equipment (such as sprinklers, smoke detectors, etc.), air-conditioning pipes, circulating fans, etc. can be installed according to the needs of the design, and the light steel frame and the bottom of the floor plate have a certain degree In the second space, the pipelines and lines of the above devices will be wired and piping in the second space. The remaining unused grids can be placed according to the needs of the industry, such as dust-free ceilings, sugarcane boards, and calcium silicate. Boards, etc., cover the concrete walls and beams on the bottom of the floor slabs to achieve a beautiful indoor effect.

但,對應不同的格局配置時,輕鋼架的網格會顯得相當凌亂,且備置空間內的管路、線路也會相當凌亂,不僅不美觀,也不利於設備的維修與檢測。However, when corresponding to different layout configurations, the grid of the light steel frame will appear quite messy, and the pipelines and lines in the preparation space will also be quite messy, not only unsightly, but also not conducive to equipment maintenance and testing.

有鑑於習用有上述缺點,創作人乃針對前述缺點研究改進之道,終於有本創作產生。In view of the above-mentioned shortcomings of traditional use, the creators researched and improved ways to address the above-mentioned shortcomings, and finally got the original creation.

本創作主要目的在於,提供一種整合不同管路的天花板設備帶結構。The main purpose of this creation is to provide a ceiling equipment belt structure that integrates different pipelines.

本創作次要目的在於,提供一種簡化輕鋼架設備配置的天花板設備帶結構。The secondary purpose of this creation is to provide a ceiling equipment belt structure that simplifies the configuration of light steel frame equipment.

為達成上述目的及功效,本創作所採行的技術手段包括:一第一框體、複數的第二框體、一集風箱、以及,複數的吊座,其中:In order to achieve the above-mentioned purposes and effects, the technical means adopted in this creation include: a first frame, a plurality of second frames, a bellows, and a plurality of hangers, of which:

所述第一框體內部具有一第一空間,並朝下具有對內相通的一第一開口。The first frame has a first space inside and a first opening communicating with the inside downwards.

所述各第二框體分別設置在前述第一框體兩側,各第二框體內部具有一第二空間,並朝上具有對內相通的一第二開口,底部一側具有延伸至第二框體中段處的一通風口,另一側設有一連接孔,且各第二框體在第二開口處跨設有複數的第一連接板。The second frame bodies are respectively arranged on both sides of the first frame body, each second frame body has a second space inside, and has a second opening communicating with each other upward, and the bottom side has a second opening extending to the first frame. A vent at the middle section of the two frame bodies is provided with a connecting hole on the other side, and each second frame body is provided with a plurality of first connecting plates at the second opening.

所述集風箱一側的底部設置在前述第一框體上,另一側延伸一第一導風管,並在第一導風管同一側的底部延伸一第二導風管。以及,The bottom of one side of the air collecting box is arranged on the first frame body, a first air guide tube extends on the other side, and a second air guide tube extends at the bottom of the same side of the first air guide tube. as well as,

所述各吊座兩側分別彎折後延伸一第二連接板,而分別連接至前述第二框體的第一連接板。The two sides of each hanger are respectively bent to extend a second connecting plate, and are respectively connected to the first connecting plate of the aforementioned second frame.

藉此,前述第一框體內供設置一預設燈具,集風箱的第一導風管連接一預設空調管,以及,各第二框體的連接孔分別連接一預設消防電子感測器、與一消防裝置,且設備帶兩端可相互連接延伸,達成整合不同管路,簡化輕鋼架設備配置的結構。Thereby, a preset lamp is provided in the aforementioned first frame, the first air duct of the wind box is connected to a preset air conditioning pipe, and the connecting holes of each second frame are respectively connected to a preset fire protection electronic sensor The two ends of the equipment belt can be connected and extended to achieve the integration of different pipelines and simplify the structure of light steel frame equipment configuration.

依上述結構,其中該第一框體的第一開口設置一燈罩。According to the above structure, the first opening of the first frame is provided with a lampshade.

依上述結構,其中該第二框體底部的通風口為網狀、格狀或柵狀結構。According to the above structure, the vent at the bottom of the second frame body has a mesh, grid or grid structure.

依上述結構,其中該集風箱底部的第二導風管延伸至前述第二框體底部的通風口。According to the above structure, the second air duct at the bottom of the air collecting box extends to the vent at the bottom of the second frame.

依上述結構,其中該預設空調管的氣體進入集風箱底部的第二導風管,並引導至前述第一框體一側的第二框體內,經所述第二框體的通風口朝室內排出;則室內氣體向上進入第一框體另一側的第二框體,經所述第二框體的通風口排入設備帶與一預設天花板之間,達成氣體循環的結構。According to the above structure, the gas of the preset air-conditioning pipe enters the second air duct at the bottom of the wind box, and is guided to the second frame on the side of the first frame, through the vent of the second frame Discharge into the room; the indoor air enters the second frame on the other side of the first frame upwards, and is discharged into the space between the equipment belt and a predetermined ceiling through the vent of the second frame to achieve a gas circulation structure.

依上述結構,其中該第一框體、第二框體兩端分別設有一第一蓋板、與一第二蓋板。According to the above structure, a first cover plate and a second cover plate are respectively provided at both ends of the first frame body and the second frame body.

依上述結構,其中該設備帶包括一固定桿,一端連接前述吊座,另一端供連接至一預設天花板。According to the above structure, the equipment belt includes a fixing rod, one end is connected to the aforementioned hanger, and the other end is connected to a predetermined ceiling.

依上述結構,其中該第二框體側壁設有一連通孔。According to the above structure, the side wall of the second frame body is provided with a communicating hole.

依上述結構,其中該第二框體底部外側分別設有一凸緣。According to the above structure, a flange is respectively provided on the outer side of the bottom of the second frame.

為使本創作的上述目的、功效及特徵可獲得更具體的瞭解,依各附圖說明如下:In order to obtain a more detailed understanding of the above-mentioned purposes, effects and features of this creation, the descriptions are as follows according to the drawings:

請參閱第全部附圖所示,可知本創作的結構主要包括:一第一框體1、複數的第二框體2、一集風箱3、複數的吊座4、與複數的固定桿5,其中:Please refer to all the attached drawings. It can be seen that the structure of this creation mainly includes: a first frame 1, a plurality of second frames 2, a set of bellows 3, a plurality of hangers 4, and a plurality of fixed rods 5. ,among them:

所述第一框體1內部具有一第一空間11,並朝下具有對內相通的一第一開口12,兩端分別設有一第一蓋板13,並由第一開口12處延設一燈罩14(附參閱圖5所示)。The first frame 1 has a first space 11 inside, and has a first opening 12 communicating with each other downwards. A first cover 13 is provided at both ends, and a first cover 13 extends from the first opening 12. The lampshade 14 (see Figure 5).

所述各第二框體2、2a分別設置在前述第一框體1兩側,各第二框體2內部具有一第二空間21、21a,並朝上具有對內相通的一第二開口22、22a,兩端分別設有一第二蓋板23、23a,底部一側具有延伸至第二框體2中段處的一通風口24、24a,且通風口24、24a為網狀、格狀或柵狀結構;各第二框體2、2a底部另一側設有一連接孔25、25a,相同於連接孔25、25a處的側壁上設有一連通孔26、26a,且各第二框體2、2a在第二開口22、22a處跨設有複數的第一連接板27、27a,另在底部外側分別設有一凸緣28、28a。The second frame bodies 2, 2a are respectively arranged on both sides of the aforementioned first frame body 1, and each second frame body 2 has a second space 21, 21a inside, and has a second opening communicating with each other upwards. 22, 22a, both ends are respectively provided with a second cover 23, 23a, the bottom side has a vent 24, 24a extending to the middle section of the second frame 2, and the vent 24, 24a is meshed and grid-shaped Or a grid structure; each second frame body 2, 2a is provided with a connecting hole 25, 25a on the other side of the bottom, and a connecting hole 26, 26a is provided on the side wall of the same connecting hole 25, 25a, and each second frame The bodies 2, 2a are provided with a plurality of first connecting plates 27, 27a at the second openings 22, 22a, and a flange 28, 28a is respectively provided on the outside of the bottom.

所述集風箱3一側的底部設置在前述第一框體1上,另一側延伸一第一導風管31,且與第一導風管31同一側的底部延伸一第二導風管32,且延伸至前述第二框體2底部的通風口24。以及,The bottom of one side of the air collecting box 3 is arranged on the first frame body 1, the other side extends a first air guide tube 31, and the bottom of the same side as the first air guide tube 31 extends a second air guide The tube 32 extends to the vent 24 at the bottom of the second frame 2. as well as,

所述各吊座4兩側分別彎折後延伸一第二連接板41,而分別連接至前述第二框體2的第一連接板27;以及,The two sides of each hanger 4 are respectively bent to extend a second connecting plate 41, and are respectively connected to the first connecting plate 27 of the aforementioned second frame 2; and,

所述各固定桿5一端連接前述吊座4,另一端供連接至一預設天花板。One end of each of the fixing rods 5 is connected to the aforementioned hanger 4, and the other end is connected to a predetermined ceiling.

前述第一框體1兩側與第二框體2、2a之間,可以是一體成形的結構,或是透過螺絲、鉚釘、焊接、卡扣等組合結構,將第二框體2、2a分別設置在第一框體1的兩側,在一個較佳的實施例中,前述各第一連接板27、27a設置在第二框體2、2a的第二開口22時,能透過螺絲、鉚釘等組合結構,將第一框體1、第二框體2、2a組合再一起,續將前述各吊座4的第二連接板41分別對應第二框體2、2a的第一連接板27、27a組合;接著,天花板依據所需要的規劃與配置,分別在適當的位置設置固定桿5之後,固定桿5的一端緊密的固定在天花板內,另一端分別固定在吊座4,據此,便完成了本創作設備帶組合在天花板的結構。The two sides of the aforementioned first frame body 1 and the second frame bodies 2, 2a can be an integrally formed structure, or through a combination of screws, rivets, welding, buckles, etc., the second frame bodies 2, 2a can be separated They are arranged on both sides of the first frame body 1. In a preferred embodiment, when the aforementioned first connecting plates 27, 27a are arranged in the second openings 22 of the second frame bodies 2, 2a, they can pass through screws and rivets. Combine the first frame body 1, the second frame body 2, 2a together, and continue to connect the second connecting plate 41 of the aforementioned hanger 4 to the first connecting plate 27 of the second frame body 2, 2a, respectively. , 27a combination; then, according to the required planning and configuration of the ceiling, after the fixed rods 5 are set at appropriate positions, one end of the fixed rod 5 is tightly fixed in the ceiling, and the other end is fixed to the hanger 4. According to this, This completes the structure of the creative equipment belt combined on the ceiling.

上述組合完成後(請同時配合參閱圖5、6),第一框體1內部可供設置日光燈管、LED燈管、LED燈條等燈具,當燈具設置完畢後,再以燈罩14覆蓋在第一開口12;而空調管6(如中央空調的氣體管路)連接至集風箱3的第一導風管31,將氣體引入集風箱3中,氣體經集風箱3底部的第二導風管32,並引導至第一框體1一側的第二框體2內,經所述第二框體2的通風口24朝室內排出;則室內氣體向上進入第一框體1另一側的第二框體2a,經所述第二框體2a的通風口24a排入設備帶與天花板之間,達成氣體循環的結構;各第二框體2、2a的連接孔25、25a分別連接一預設消防電子感測器(例如偵煙器7)、與一消防裝置(例如灑水器8),且設備帶兩端可相互連接延伸,達成整合不同管路,簡化輕鋼架設備配置的結構。且前述第二框體2底部外側分別設有凸緣28,因此,可配合施工時的輕鋼架結構,放置無塵天花板、矽酸鈣板、木板、甘蔗板、水泥板、石膏板等隔間板9。After the above combination is completed (please refer to Figures 5 and 6 at the same time), the first frame 1 can be equipped with fluorescent tubes, LED tubes, LED light bars and other lamps. When the lamps are set up, cover the first frame with lampshade 14 An opening 12; and the air-conditioning pipe 6 (such as the gas pipeline of the central air-conditioning) is connected to the first air guide pipe 31 of the wind box 3, and the gas is introduced into the wind box 3, and the gas passes through the second wind box 3 at the bottom The air duct 32 is guided into the second frame 2 on the side of the first frame 1, and is discharged into the room through the vent 24 of the second frame 2; then the indoor air enters the first frame 1 upwards The second frame body 2a on one side is discharged between the equipment belt and the ceiling through the vent 24a of the second frame body 2a to achieve a gas circulation structure; the connecting holes 25, 25a of each second frame body 2, 2a Connect a preset fire-fighting electronic sensor (such as smoke detector 7) and a fire-fighting device (such as sprinkler 8) respectively, and the two ends of the equipment belt can be connected to each other to achieve the integration of different pipelines and simplify the light steel frame The structure of the device configuration. In addition, flanges 28 are respectively provided on the outer side of the bottom of the second frame body 2, so it can be matched with the light steel frame structure during construction to place dust-free ceilings, calcium silicate boards, wooden boards, sugarcane boards, cement boards, gypsum boards, etc. Between the board 9.

綜合以上所述,本創作的天花板設備帶結構確實為一具新穎性及進步性的創作,爰依法提出申請新型專利;惟上述說明的內容,僅為本創作的較佳實施例說明,舉凡依本創作的技術手段與範疇所延伸的變化、修飾、改變或等效置換者,亦皆應落入本創作的專利申請範圍內。Based on the above, the ceiling equipment belt structure of this creation is indeed a novel and progressive creation, and I filed a new patent application in accordance with the law; however, the content of the above description is only a description of the preferred embodiment of this creation. Any changes, modifications, alterations or equivalent replacements extended by the technical means and scope of this creation shall also fall within the scope of the patent application for this creation.

1:第一框體 11:第一空間 12:第一開口 13:第一蓋板 14:燈罩 2,2a:第二框體 21,21a:第二空間 22,22a:第二開口 23,23a:第二蓋板 24,24a:通風口 25,25a:連接孔 26,26a:連通孔 27,27a:第一連接板 28,28a:凸緣 3:集風箱 31:第一導風管 32:第二導風管 4:吊座 41:第二連接板 5:固定桿 6:空調管 7:偵煙器 8:灑水器 9:隔間板 1: The first frame 11: The first space 12: first opening 13: The first cover 14: lampshade 2, 2a: second frame 21, 21a: second space 22, 22a: second opening 23, 23a: second cover 24, 24a: vent 25, 25a: connecting hole 26, 26a: connecting hole 27, 27a: the first connecting plate 28, 28a: flange 3: wind box 31: The first air duct 32: The second air duct 4: hanger 41: The second connecting plate 5: fixed rod 6: Air conditioning pipe 7: Smoke detector 8: Sprinkler 9: Compartment board

[圖1]是本創作較佳實施例的立體圖。 [圖2]是本創作較佳實施例的立體分解圖。 [圖3]是[圖2]中a部分的放大圖。 [圖4]是本創作較佳實施例的另一角度立體分解圖。 [圖5]是本創作較佳實施例的使用時剖視圖。 [圖6]是本創作較佳實施例的使用時立體圖。 [Figure 1] is a three-dimensional view of a preferred embodiment of this creation. [Figure 2] is a three-dimensional exploded view of the preferred embodiment of this creation. [Figure 3] is an enlarged view of part a in [Figure 2]. [Figure 4] is another perspective exploded view of the preferred embodiment of this creation. [Figure 5] is a cross-sectional view of the preferred embodiment of this creation when in use. [Figure 6] is a three-dimensional view of the preferred embodiment of this creation when in use.

1:第一框體 1: The first frame

13:第一蓋板 13: The first cover

2,2a:第二框體 2, 2a: second frame

21,21a:第二空間 21, 21a: second space

22,22a:第二開口 22, 22a: second opening

23,23a:第二蓋板 23, 23a: second cover

27,27a:第一連接板 27, 27a: the first connecting plate

28,28a:凸緣 28, 28a: flange

3:集風箱 3: wind box

31:第一導風管 31: The first air duct

32:第二導風管 32: The second air duct

4:吊座 4: hanger

41:第二連接板 41: The second connecting plate

5:固定桿 5: fixed rod

6:空調管 6: Air conditioning pipe

7:偵煙器 7: Smoke detector

8:灑水器 8: Sprinkler

9:隔間板 9: Compartment board

Claims (10)

一種天花板設備帶結構,所述設備帶至少包括: 一第一框體,內部具有一第一空間,並朝下具有對內相通的一第一開口; 複數的第二框體,分別設置在前述第一框體兩側,各第二框體內部具有一第二空間,並朝上具有對內相通的一第二開口,底部一側具有延伸至第二框體中段處的一通風口,另一側設有一連接孔,且各第二框體在第二開口處跨設有複數的第一連接板; 一集風箱,一側的底部設置在前述第一框體上,另一側延伸一第一導風管,並在第一導風管同一側的底部延伸一第二導風管;以及, 複數的吊座,兩側分別彎折後延伸一第二連接板,而分別連接至前述第二框體的第一連接板; 藉此,前述第一框體內供設置一預設燈具,集風箱的第一導風管連接一預設空調管,以及,各第二框體的連接孔分別連接一預設消防電子感測器、與一消防裝置,且設備帶兩端可相互連接延伸,達成整合不同管路,簡化輕鋼架設備配置的結構。 A ceiling equipment belt structure, the equipment belt at least includes: A first frame with a first space inside and a first opening communicating with the inside downwards; A plurality of second frame bodies are respectively arranged on both sides of the aforementioned first frame body. Each second frame body has a second space inside, and has a second opening communicating with each other upward, and the bottom side has a second opening extending to the first frame. A vent at the middle section of the two frames, a connecting hole is provided on the other side, and each second frame is provided with a plurality of first connecting plates at the second opening; A wind box with a bottom on one side arranged on the first frame, a first air duct extending on the other side, and a second air duct extending at the bottom on the same side of the first air duct; and, A plurality of hanging bases are respectively bent on both sides and extend a second connecting plate, which is respectively connected to the first connecting plate of the aforementioned second frame; Thereby, a preset lamp is provided in the aforementioned first frame, the first air duct of the wind box is connected to a preset air-conditioning pipe, and the connecting holes of each second frame are respectively connected to a preset fire protection electronic sensor The two ends of the equipment belt can be connected and extended to achieve the integration of different pipelines and simplify the structure of light steel frame equipment configuration. 如請求項1所述之天花板設備帶結構,其中該第一框體的第一開口設置一燈罩。The ceiling equipment belt structure of claim 1, wherein a lampshade is provided in the first opening of the first frame. 如請求項1所述之天花板設備帶結構,其中該第二框體底部的通風口為網狀、格狀或柵狀結構。The ceiling device belt structure according to claim 1, wherein the vent at the bottom of the second frame body is a mesh, grid or grid structure. 如請求項1所述之天花板設備帶結構,其中該集風箱底部的第二導風管延伸至前述第二框體底部的通風口。The ceiling equipment belt structure according to claim 1, wherein the second air duct at the bottom of the air collecting box extends to the vent at the bottom of the second frame. 如請求項1所述之天花板設備帶結構,其中該預設空調管的氣體進入集風箱底部的第二導風管,並引導至前述第一框體一側的第二框體內,經所述第二框體的通風口朝室內排出;則室內氣體向上進入第一框體另一側的第二框體,經所述第二框體的通風口排入設備帶與一預設天花板之間,達成氣體循環的結構。The ceiling equipment belt structure according to claim 1, wherein the gas of the preset air-conditioning pipe enters the second air duct at the bottom of the air collecting box, and is guided to the second frame on the side of the first frame. The vent of the second frame is discharged into the room; the indoor air enters the second frame on the other side of the first frame upward, and is discharged into the equipment belt and a preset ceiling through the vent of the second frame. In between, the structure of gas circulation is achieved. 如請求項1所述之天花板設備帶結構,其中該第一框體、第二框體兩端分別設有一第一蓋板、與一第二蓋板。The ceiling equipment belt structure of claim 1, wherein the first frame and the second frame are respectively provided with a first cover and a second cover. 如請求項1所述之天花板設備帶結構,其中該設備帶包括一固定桿,一端連接前述吊座,另一端供連接至一預設天花板。The ceiling equipment belt structure according to claim 1, wherein the equipment belt includes a fixing rod, one end is connected to the aforementioned hanger, and the other end is connected to a preset ceiling. 如請求項1所述之天花板設備帶結構,其中該第二框體側壁設有一連通孔。The ceiling equipment belt structure according to claim 1, wherein the side wall of the second frame body is provided with a communicating hole. 如請求項1所述之天花板設備帶結構,其中該第二框體底部外側分別設有一凸緣。The ceiling equipment belt structure of claim 1, wherein a flange is respectively provided on the outer side of the bottom of the second frame. 如請求項1所述之天花板設備帶結構,其中該集風箱包覆一防火保溫材料。The ceiling equipment belt structure according to claim 1, wherein the wind box is covered with a fireproof and heat-insulating material.
TW109208896U 2020-07-13 2020-07-13 Ceiling equipment belt structure TWM604331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW109208896U TWM604331U (en) 2020-07-13 2020-07-13 Ceiling equipment belt structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW109208896U TWM604331U (en) 2020-07-13 2020-07-13 Ceiling equipment belt structure

Publications (1)

Publication Number Publication Date
TWM604331U true TWM604331U (en) 2020-11-21

Family

ID=74203709

Family Applications (1)

Application Number Title Priority Date Filing Date
TW109208896U TWM604331U (en) 2020-07-13 2020-07-13 Ceiling equipment belt structure

Country Status (1)

Country Link
TW (1) TWM604331U (en)

Similar Documents

Publication Publication Date Title
US11142907B2 (en) Acoustic systems for lighting in suspended ceilings
JP4467981B2 (en) Modular service unit
US2659808A (en) Combination luminous and acoustical ceiling
US3227063A (en) Ceiling air diffuser
US8756888B2 (en) Modular building panel and duct system
US3442058A (en) Concrete floor construction with duct-forming voids
CN108005294A (en) A kind of the ceiling plate mounting and fixing support
US2854565A (en) Luminous sound absorbing ceiling
TWM604331U (en) Ceiling equipment belt structure
JP6859226B2 (en) Humidity control unit
US3380552A (en) Acoustical panel with honeycomb core and ventilation passageways
US3094285A (en) Ceiling illuminating system
JP6342178B2 (en) Building air conditioning
JP6576881B2 (en) Building air conditioning
US3210534A (en) Environmental control system
CN205481540U (en) Ventilation system
KR102760168B1 (en) Multi-storey barn with vertical ventilation room
CN211400126U (en) Tower type laminar flow air supply ceiling structure
CN221761091U (en) Building decoration furred ceiling
JP2015168920A (en) Ventilation structure for building
AU2006246325C1 (en) Air duct
US20130239493A1 (en) Suspended ceiling panel system for residential and commercial buildings
CN117684682A (en) Assembled wall system integrating ventilation and illumination
JP7042162B2 (en) office building
CN120119752A (en) A suspended ceiling structure with luminous soft film and construction method thereof