TWM520973U - Hand tool frame structure - Google Patents

Hand tool frame structure Download PDF

Info

Publication number
TWM520973U
TWM520973U TW105201838U TW105201838U TWM520973U TW M520973 U TWM520973 U TW M520973U TW 105201838 U TW105201838 U TW 105201838U TW 105201838 U TW105201838 U TW 105201838U TW M520973 U TWM520973 U TW M520973U
Authority
TW
Taiwan
Prior art keywords
tool
sleeve
frame
frame body
parts
Prior art date
Application number
TW105201838U
Other languages
Chinese (zh)
Inventor
yu-dong Zhu
Original Assignee
Zhu ying xian
Zhu Li Tang
Zhu Bo Ming
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhu ying xian, Zhu Li Tang, Zhu Bo Ming filed Critical Zhu ying xian
Priority to TW105201838U priority Critical patent/TWM520973U/en
Publication of TWM520973U publication Critical patent/TWM520973U/en

Links

Landscapes

  • Toys (AREA)

Description

手工具架體結構 Hand tool frame structure

本創作係與一手工具架體結構有關,尤指一種手工具架體結構係設有架體、複數第一套合柱、第一工具組及第二工具組,該架體係設有第一滑軌,該第一滑軌上係可滑設複數第一套合柱、第一工具組之第一套合件、第二工具組之第三套合件,使該手工具架體結構不僅係可供套筒結構相套設,該手工具架體結構亦可組設有具有四角頭之第一工具及具有四角槽之第二工具,該手工具架體結構套設各手工具時係具有擴充性及實用性。 The creation department is related to the structure of the one-hand tool frame, in particular, a hand tool frame structure is provided with a frame body, a plurality of first set of columns, a first tool set and a second tool set, and the frame system is provided with a first slide. a rail, the first rail is slidably provided with a plurality of first set of columns, a first set of the first tool set, and a third set of the second tool set, so that the hand tool frame structure is not only The sleeve structure can be sleeved, and the hand tool frame structure can also be provided with a first tool having a quadrangular head and a second tool having a four-corner groove. The hand tool frame structure is provided with each hand tool Scalability and practicality.

按吾人先前所知,習用手工具架體結構,如美國專利案號:6092656,該美國專利案結構係在於:一本體10,該本體10係呈片體狀,該本體10係延伸凸設有容置部11,該容置部11上係設有複數凸桿12,該每二個凸桿12間係具適當間距13,本體10之容置部11二端係設有第一扣合部20,第一扣合部20係呈勾體狀;一卡制件1,該卡制件1之長度係配合本體10之容置部11之長度相組設,該卡制件1上下二端係設有第二扣合部23,該第二扣合部23係與本體10之第一扣合部20相配合扣設,使該卡制件1係與本體10相組設,該卡 制件1一側係設有複數套合塊5,該每一套合塊5係與每一凸桿12位置相對正;複數個手工具體3,該手工具體3一端係與套合塊5相套設,手工具體3另端係套設於凸桿12上,手工具體3係限位於套合塊5及凸桿12間。 As is known in the prior art, the utility model has a hand tool body structure, such as the U.S. Patent No. 6,092,656, which is based on a body 10 having a body shape, the body 10 being extended and convex. The accommodating portion 11 is provided with a plurality of protruding rods 12, and each of the two protruding rods 12 is provided with a proper spacing 13 , and the receiving portion 11 of the body 10 is provided with a first fastening portion at both ends thereof. 20, the first fastening portion 20 is in the shape of a hook; a clamping member 1, the length of the clamping member 1 is matched with the length of the receiving portion 11 of the body 10, and the upper and lower ends of the clamping member 1 The second fastening portion 23 is coupled to the first fastening portion 20 of the main body 10, so that the card member 1 is assembled with the body 10, and the card is assembled. A plurality of sets of blocks 5 are arranged on one side of the workpiece 1 , and each set of the joints 5 is relatively perpendicular to each of the protruding rods 12; a plurality of manuals are specific 3, and the manual specific 3 ends are combined with the sleeve 5 The sleeve is manually set on the other end of the sleeve 12, and the manual 3 is limited between the sleeve 5 and the protrusion 12.

但此專利案結構之缺失係在於:該本體10之第一扣合部20係與卡制件1之第二扣合部23相扣合,使該卡制件1與本體10相組設,該每一手工具體3係套設於每一套合塊5及每一凸桿12上,使該手工具體3係限位於套合塊5及凸桿12間,該本體10之每一間距13及每一凸桿12與每一套合塊5間之距離係僅能供手工具體3套設,該手工具體3係為套筒,但該手工具架體結構上係僅能套合套筒結構而無法供其他手工具件相套設,如接桿、扳手、F柄扳手...等,其實用性及擴充性係較為不足。 However, the missing structure of the patent system is that the first fastening portion 20 of the body 10 is engaged with the second fastening portion 23 of the clamping member 1, so that the clamping member 1 is assembled with the body 10. Each of the manual specific 3 series sleeves is disposed on each of the assemblages 5 and each of the ribs 12, so that the manual specific 3 is limited between the ferrule 5 and the ribs 12, and the spacing of the body 10 is 13 And the distance between each of the protruding rods 12 and each of the sets of blocks 5 can only be set by hand 3, the manual specific 3 series is a sleeve, but the hand tool frame body structure can only fit the sleeve The structure is not suitable for other hand tools, such as posts, wrenches, F-handle wrenches, etc., and its practicality and expandability are insufficient.

另美國專利US8517188B2,即台灣專利I380886,專利名稱手工具吊架(二),該專利結構,請輔以美國公報之第一圖所示,該手工具吊架之套柱23亦係僅能組設具有四角槽之手工具件如套筒,而亦具有相同缺失。 Another US patent US8517188B2, namely Taiwan Patent I380886, patent name hand tool hanger (2), the patent structure, please be accompanied by the first figure of the US Gazette, the set of the hand tool hanger 23 can only be grouped A hand tool with a square slot, such as a sleeve, is provided with the same missing.

有鑑於上述習用手工具架體結構之缺失,本創作人藉多年從事相關行業之製造經驗,終於有一能解決習用弊端之手工具架體結構之產品問世。 In view of the lack of the structure of the above-mentioned hand tool holder, the creator has been engaged in the manufacturing experience of related industries for many years, and finally has a product that can solve the drawbacks of the hand tool frame structure.

習用之手工具架體係僅能與套筒相組設而不具擴充性,本創作係與一手工具架體結構有關,尤指一種手工具架體結構係設有架體、複數第一套合柱、第一工具組及第二工具組,該架體係設有第一滑軌,該第一滑軌上係可滑設複數第一套合柱、第一工具組之第一套合件、第二工具組之第三套合件,使該手工具架體結構不僅係可供套筒結構相套設,該手工具架體結構亦可組設有具有四角頭之第一工具及具有四角槽之第二工具,手工具架體結構套設各手工具時係具有擴充性及實用性。 The conventional hand tool holder system can only be assembled with the sleeve without expansion. The creation department is related to the structure of the one-hand tool frame, especially a hand tool frame structure with a frame body and a plurality of first set of columns. The first tool set and the second tool set, the frame system is provided with a first sliding rail, and the first sliding rail is slidably provided with a plurality of first set of columns, a first set of the first tool set, and a first set The third set of the second tool set enables the hand tool body structure not only to be sleeved for the sleeve structure, but the hand tool frame structure can also be provided with a first tool having a quadrangular head and a square slot The second tool, the hand tool body structure, is flexible and practical when arranging each hand tool.

一種手工具架體結構,其係包括:一架體係設有第一滑軌;複數第一套合柱,該每一第一套合柱係可與架體相組設,該第一套合柱一端係設有第二滑軌以與第一滑軌相滑設,該第一套合柱另端係設有第一套合部,該第一套合部係可供設有一規格四角槽之手工具件相套合;一第一工具組係組設於架體一側,該第一工具組係包括第一工具及第一套合件;該第一工具係為具有規格四角頭之手工具結構,該第一工具係包括第一握柄及第二套合部,該第二套合部係呈規格之四角頭狀;該第一套合件係與架體及第一工具相組設;一第二工具組係組設於架體之另側,該第二工具組係包括至少一第二工具及第三套合件;該第二工具係為具有四角槽之手工具結構,該第二工具係包括第二握柄及第四套合部,該第四套合部係呈四角槽狀;該第三套合件係與架體及第二工具相組設。 A hand tool frame structure includes: a system with a first slide rail; a plurality of first sleeves, each of the first set of pillars can be combined with the frame body, the first sleeve A second sliding rail is disposed at one end of the column to be slidably disposed with the first sliding rail, and the first sleeve is provided with a first fitting portion at the other end, and the first sleeve portion is provided with a standard square slot The first tool set is disposed on one side of the frame body, and the first tool set includes a first tool and a first set of parts; the first tool set has a standard four-corner head In the hand tool structure, the first tool comprises a first handle and a second sleeve, the second sleeve is in the shape of a quadrangular head; the first sleeve is coupled to the frame and the first tool a second tool set is disposed on the other side of the frame, the second tool set includes at least one second tool and a third set; the second tool is a hand tool structure having a four-corner groove The second tool system includes a second handle and a fourth sleeve portion, wherein the fourth sleeve portion has a four-corner groove shape; the third sleeve member is combined with the frame body and the second work Phase group setting.

該架體係設有第一滑軌,該第一滑軌上係可滑設複數第一套合柱、第一工具組之第一套合件、第二工具組之第 三套合件,使該手工具架體結構不僅係可供套筒結構相套設,該手工具架體結構亦可組設有具有四角頭之第一工具及具有四角槽之第二工具,該手工具架體結構套設各手工具時係具有擴充性及實用性。該第一工具係組設於第一套合件上,該第一套合件係設有第三滑軌,該第三滑軌係可與第一滑軌相滑設,使該第一工具組與架體相組設。該第二工具係與第三套合件相組設,第三套合件之第五滑軌係可與第一滑軌相滑設,使該第二工具組與架體相組設。第一工具組係設於架體一側,第二工具組係設於架體另側,使該架體及複數第一套合柱係設於第一工具組及第二工具組間具有平衡結構。 The rack system is provided with a first sliding rail, and the first sliding rail is slidably provided with a plurality of first set of columns, a first set of the first tool set, and a second set of tools The three sets of fittings enable the hand tool body structure not only to be sleeved for the sleeve structure, but also the first tool having a four-corner head and the second tool having a four-corner groove. The hand tool body structure has the expandability and practicability when arranging each hand tool. The first tool is assembled on the first set of parts, and the first set of parts is provided with a third slide rail, and the third slide rail is slidable with the first slide rail to make the first tool The group is assembled with the frame body. The second tool set is assembled with the third set of components, and the fifth slide rail of the third set of parts is slidable with the first slide rail, so that the second tool set is assembled with the frame body. The first tool set is disposed on one side of the frame body, and the second tool set is disposed on the other side of the frame body, so that the frame body and the plurality of first set of column columns are balanced between the first tool set and the second tool set. structure.

為使 鈞局委員及熟習此項技藝人士對本創作之功效完全瞭解,茲配合圖式及圖號就本創作之結構、組成說明於後,惟以下所述者僅為用來解釋本創作之實施例,並非企圖據以對本創作做任何形式上之限制,是以凡是在本創作之精神下,所做的任何修飾變更接仍應屬於本創作之保護範圍。 In order to enable the members of the Board and those skilled in the art to fully understand the effects of this creation, the structure and composition of the creation are described in conjunction with the drawings and drawings, but the following are only used to explain the implementation of this creation. For example, it is not intended to impose any form of restriction on the creation of this creation. Any modification made in the spirit of this creation should still be covered by this creation.

10‧‧‧架體 10‧‧‧ ‧ body

11‧‧‧第一滑軌 11‧‧‧First slide rail

12‧‧‧第一結合部 12‧‧‧ First Joint Department

20‧‧‧第一套合柱 20‧‧‧First set of columns

21‧‧‧第二滑軌 21‧‧‧Second rail

22‧‧‧第一套合部 22‧‧‧First set of joints

30‧‧‧第一工具組 30‧‧‧First Tool Set

31‧‧‧第一工具 31‧‧‧ first tool

311‧‧‧第一握柄 311‧‧‧First grip

312‧‧‧第二套合部 312‧‧‧Second set of joints

32‧‧‧第一套合件 32‧‧‧First set of fittings

321‧‧‧第三滑軌 321‧‧‧ third slide

322‧‧‧第一容槽 322‧‧‧first capacity

33‧‧‧第二套合件 33‧‧‧Second set of fittings

331‧‧‧第四滑軌 331‧‧‧fourth rail

332‧‧‧板體 332‧‧‧ board

333‧‧‧第三套合部 333‧‧‧ Third set of joints

40‧‧‧第二工具組 40‧‧‧Second Tool Set

41‧‧‧第二工具 41‧‧‧Second tool

411‧‧‧第二握柄 411‧‧‧second grip

412‧‧‧第四套合部 412‧‧‧Fourth Joint Department

42‧‧‧第三套合件 42‧‧‧ third set of fittings

421‧‧‧第五滑軌 421‧‧‧ fifth slide

422‧‧‧第二容槽 422‧‧‧Second capacity

43‧‧‧第二套合柱 43‧‧‧Second set of columns

431‧‧‧第六滑軌 431‧‧‧ sixth slide

432‧‧‧第五套合部 432‧‧‧The fifth set of joints

44‧‧‧第四套合件 44‧‧‧Fourth set of parts

441‧‧‧第七滑軌 441‧‧‧ seventh slide

442‧‧‧組設部 442‧‧‧ Department

50‧‧‧封閉件組 50‧‧‧Closet group

51‧‧‧封閉件 51‧‧‧Closed

511‧‧‧第一套槽 511‧‧‧ first set of slots

512‧‧‧第二結合部 512‧‧‧Second junction

52‧‧‧結合件 52‧‧‧Connected parts

第一圖、係本創作手工具架體結構之立體分解圖。 The first figure is an exploded view of the body structure of the hand tool.

第二圖、係本創作手工具架體結構之立體組合圖。 The second figure is a three-dimensional combination diagram of the body structure of the hand tool.

第三圖、係本創作手工具架體結構第一工具組之立體圖。 The third figure is a perspective view of the first tool set of the body structure of the hand tool.

第四圖、係本創作手工具架體結構第二工具組之立體圖。 The fourth figure is a perspective view of the second tool set of the body tool body structure.

第五圖、係本創作手工具架體結構之上視圖。 The fifth figure is a top view of the body structure of the original hand tool.

第六圖、係本創作第五圖A-A處之剖視圖。 The sixth picture is a cross-sectional view of the fifth figure A-A of this creation.

第七圖、係本創作第五圖B-B處之剖視圖。 The seventh figure is a cross-sectional view of the fifth drawing B-B of the present creation.

第八圖、係本創作第二實施例之立體圖。 The eighth figure is a perspective view of the second embodiment of the present creation.

第九圖、係本創作第三實施例之立體圖。 The ninth drawing is a perspective view of a third embodiment of the present creation.

第十圖、係本創作第三實施例之上視圖。 The tenth figure is a top view of the third embodiment of the present creation.

第十一圖、係本創作第四實施例之上視圖。 The eleventh figure is a top view of the fourth embodiment of the present creation.

首先請參閱第一圖至第四圖所示,第一圖係本創作手工具架體結構之立體分解圖,第二圖係本創作手工具架體結構之立體組合圖,第三圖係本創作手工具架體結構第一工具組30之立體圖,第四圖係本創作手工具架體結構第二工具組40之立體圖,本創作係關於一種手工具架體結構,其係包括:一架體10,該架體10係設有一長度,該架體10係設有二第一滑軌11,該二第一滑軌11係分設於架體10二側,二個第一滑軌11相對架體10係呈對稱狀,該每一第一滑軌11係呈凹槽狀,該第一滑軌11之長度係與架體10之長度相同,該架體10之二端部處係設有複數第一結合部12,該第一結合部12係呈圓孔狀,第一結合部12之數目係為三個,架體10係為鋁擠型結構;複數第一套合柱20,該每一第一套合柱20係可與架體10相組設,該第一套合柱20一端係設有第二滑軌21,該第二滑軌21係與第一滑軌11相滑設,使該每一第一套合柱20係可於架體10上滑移,該第一套合柱20 另端係設有第一套合部22,該第一套合部22係可供設有一規格四角槽之手工具件相套合,該第一套合部22之斷面係呈圓體狀,該手工具件係為套筒件;一第一工具組30,請輔以第三圖所示,該第一工具組30係組設於架體10一側,該第一工具組30係包括第一工具31、第一套合件32及第二套合件33;該第一工具31係為具有規格四角頭之手工具結構,該第一工具31係包括第一握柄311及第二套合部312,該第二套合部312係呈規格之四角頭狀,該第一工具31具有一長度,該第一工具31係為一套筒扳手結構或棘輪扳手結構;該第一套合件32係與架體10及第一工具31相組設,該第一套合件32一端係設有第三滑軌321,該第三滑軌321係與第一滑軌11相滑設,使該第一套合件321可於架體10上滑移,該第一套合件32另端係設有第一容槽322,該第一容槽322係供第一握柄311相容設,該第一容槽322係呈弧形槽狀;該第二套合件33係與架體10及第一工具31相組設,該第二套合件33係設有第四滑軌331,該第四滑軌331係與第一滑軌11相滑設,使該第二套合件33可於架體10上滑移,該第二套合件33係設有板體332,該板體332係與第四滑軌331相連接,該板體332係設有第三套合部333,該第三套合部333係供第一工具31之第二套合部312相套合,該第三套合部333係呈四角槽狀;當該第一工具組30組設後即如第三圖所示,該第一工具31 之第一握柄311及第二套合部312係分別與第一套合件32之第一容槽322及第二套合件33之第三套合部333相組設,且該第一套合件32之第三滑軌321及第二套合件33之第四滑軌331皆與架體10之第一滑軌11相滑設後,即可使該第一工具組30組設於架體10一側,且該第一工具組30係可於架體10上滑移;一第二工具組40,請輔以第四圖所示,該第二工具組40係組設於架體10之另側,該第二工具組40係與第一工具組30相平行,該第二工具組40係包括至少一第二工具41、第三套合件42、第二套合柱43及第四套合件44;該第二工具41係為具有四角槽之手工具結構,該第二工具41係包括第二握柄411及第四套合部412,該第四套合部412係呈四角槽狀,該第二工具41之數目係為二個,一第二工具41係為長度較長之接桿結構,另一第二工具41係為長度較短之接桿結構,該第二工具41係可為轉接頭結構或浮動接頭結構;該第三套合件42係與架體10及第二工具41相組設,該第三套合件42一端係設有第五滑軌421,該第五滑軌421係與架體10之第一滑軌11相滑設,使該第三套合件42係可於架體10上滑移,該第三套合件42係設有第二容槽422,該第二容槽422係供第二工具41之第二握柄411相容設,該第二套合件42之第二容槽422係呈弧形槽狀,該第一套合件32係設於架體10之一側,該第三套合件42係設於架體10之另側,該第三套合件42係與第一套合件32呈反向設置於架體10上,該第三套合件42係與第一套合件32結構相同; 該第二套合柱43係與第二工具41相套設,該第二套合柱43一端係設有第六滑軌431,該第二套合柱43另端係設有第五套合部432,該第二套合柱43之第五套合部432係與第二工具41之第四套合部412相套合,該第五套合部432之斷面係呈圓體狀,該第二套合柱43係與第一套合柱20結構相同;該第四套合件44係與架體10及第二套合柱43相組設,該第四套合件44係設有第七滑軌441,該第七滑軌441係與第一滑軌11相滑設,使該第四套合件44係可於架體10上滑移,該第四套合件44係設有組設部442,該組設部442係組設於第二套合柱43之第六滑軌431處,該組設部442係呈似T形狀;當該第二工具組40組設後即如第四圖所示,該第二工具41之第二握柄411及第四套合部412係分別與第三套合件42之第二容槽422及第二套合柱43之第五套合部432相組設,該第四套合件44之組設部442係組設於第二套合柱43之第六滑軌431處,該第三套合件42之第五滑軌421及第四套合件44之第七滑軌441係皆與架體10之第一滑軌11相滑設後,即可使該第二工具組40與架體10相組設,該第二工具組40係與第一工具組30相互遠離;二封閉件組50,該每一封閉件組50係包括封閉件51及結合件52;該封閉件51係避免第一套合柱20脫出架體10外,該封閉件51係組設於架體10之二端,該封閉件51係設有第一套槽511,該第一套槽511係與第一滑軌11相套設,使該第一滑軌11端部係呈封閉狀,該封閉件51上 係設有第二結合部512,該第二結合部512係與架體10之第一結合部12相對正,一封閉件51係設有二第二結合部512,另一封閉件51係設有一第二結合部512,設有二第二結合部512之封閉件51係設有握持部,該握持部係供手握持;該結合件52係結合於架體10之第一結合部12及封閉件51之第二結合部512處,使該架體10與封閉件51相組設,該結合件52之數目係配合第一結合部12及第二結合部512之數目,該結合件52係可為鉚釘或各螺紋件。 First, please refer to the first to fourth figures. The first picture is the exploded view of the body structure of the hand tool. The second picture is the three-dimensional combination of the body structure of the hand tool. The third picture is the same. A perspective view of the first tool set 30 of the hand tool body structure is created, and the fourth figure is a perspective view of the second tool set 40 of the hand tool body structure. The present invention relates to a hand tool frame structure, which includes: a frame The body 10 is provided with a length. The frame 10 is provided with two first slide rails 11. The two first slide rails 11 are respectively disposed on two sides of the frame body 10, and the two first slide rails 11 are disposed. The frame body 10 is symmetrical, and each of the first slide rails 11 has a groove shape. The length of the first slide rail 11 is the same as the length of the frame body 10. The two ends of the frame body 10 are The first joint portion 12 is formed in a circular hole shape, the number of the first joint portions 12 is three, and the frame body 10 is an aluminum extruded structure; the plurality of first joint columns 20 Each of the first set of posts 20 can be assembled with the frame 10, and the first set of posts 20 is provided with a second slide 21 at one end, and the second slide 21 is Slide 11 is slidably disposed relative to the first set of each of the engaging posts 20 may be on the sliding member 10, the first set of the commissure posts 20 The other end portion is provided with a first sleeve portion 22, and the first sleeve portion 22 is sleeved by a hand tool member provided with a standard four-corner groove. The first sleeve portion 22 has a circular cross section. The first tool set 30 is assembled on the side of the frame body 10, and the first tool set 30 is a first tool set 30, as shown in the third figure. The first tool 31 is a hand tool structure having a quadrangular head, and the first tool 31 includes a first handle 311 and a first tool 31. The second set of parts 312 is in the shape of a quadrangular head, the first tool 31 has a length, and the first tool 31 is a socket wrench structure or a ratchet wrench structure; The sleeve member 32 is assembled with the frame body 10 and the first tool 31. The first sleeve member 32 is provided with a third slide rail 321 at one end thereof, and the third slide rail 321 is slidable with the first slide rail 11 The first sleeve member 321 is slidable on the frame body 10. The first sleeve member 32 is provided with a first receiving groove 322 at the other end. The first receiving groove 322 is for the first handle 311. Compatible, the first tank 3 The second sleeve member 33 is assembled with the frame body 10 and the first tool 31, and the second sleeve member 33 is provided with a fourth slide rail 331. The fourth slide rail is provided. The 331 series is slidably disposed on the first sliding rail 11 so that the second fitting member 33 can slide on the frame body 10. The second fitting member 33 is provided with a plate body 332, and the plate body 332 is coupled to the first body. The four slide rails 331 are connected to each other, and the third sleeve portion 333 is fitted with the second sleeve portion 312 of the first tool 31, and the third sleeve portion 312 is engaged with the third sleeve portion 312. The portion 333 is in the shape of a square groove; when the first tool set 30 is assembled, as shown in the third figure, the first tool 31 The first handle 311 and the second sleeve portion 312 are respectively assembled with the first pocket 322 of the first sleeve member 32 and the third sleeve portion 333 of the second sleeve member 33, and the first The third slide rail 321 of the sleeve member 32 and the fourth slide rail 331 of the second sleeve member 33 are all slidably disposed with the first slide rail 11 of the frame body 10, so that the first tool set 30 can be assembled. On the side of the frame body 10, the first tool set 30 can be slid on the frame body 10; a second tool set 40, as shown in the fourth figure, the second tool set 40 is assembled on the frame On the other side of the frame body 10, the second tool set 40 is parallel to the first tool set 30, and the second tool set 40 includes at least one second tool 41, a third set member 42, and a second set of columns. 43 and the fourth set of fittings 44; the second tool 41 is a hand tool structure having a four-corner groove, the second tool 41 includes a second handle 411 and a fourth sleeve portion 412, the fourth sleeve portion The 412 series has a quadrangular groove shape, the number of the second tools 41 is two, one second tool 41 is a longer length post structure, and the other second tool 41 is a shorter length post structure. The second tool 41 can be a joint structure Or a floating joint structure; the third set member 42 is assembled with the frame body 10 and the second tool 41, and the third set member 42 is provided with a fifth slide rail 421 at one end, and the fifth slide rail 421 is The first sliding member 42 is slidably disposed on the frame body 10, and the third component member 42 is slidably disposed on the frame body 10. The third component member 42 is provided with a second receiving groove 422. The second pocket 422 is compatible with the second grip 411 of the second tool 41, and the second pocket 422 of the second sleeve 42 is in the shape of an arc groove. The first sleeve 32 is attached to the second sleeve 32. One side of the frame body 10 is disposed on the other side of the frame body 10, and the third component piece 42 is disposed on the frame body 10 opposite to the first component piece 32. The third set of fittings 42 has the same structure as the first set of fittings 32; The second set of posts 43 is sleeved with the second tool 41. The second set of posts 43 is provided with a sixth slide rail 431 at one end, and the second sleeve is provided with a fifth sleeve at the other end. The fifth portion 432 of the second set of posts 43 is engaged with the fourth sleeve portion 412 of the second tool 41. The fifth portion of the second set portion 432 has a circular shape. The second set of columns 43 is identical in structure to the first set of columns 20; the fourth set of parts 44 is assembled with the frame 10 and the second set of columns 43 , and the fourth set of parts 44 is provided There is a seventh slide rail 441, the seventh slide rail 441 is slidably disposed with the first slide rail 11, so that the fourth sleeve member 44 can be slidable on the frame body 10. The fourth sleeve member 44 is attached. An assembly portion 442 is disposed on the sixth slide rail 431 of the second sleeve column 43. The assembly portion 442 is shaped like a T; when the second tool set 40 is assembled Then, as shown in the fourth figure, the second handle 411 and the fourth sleeve portion 412 of the second tool 41 are respectively corresponding to the second pocket 422 and the second sleeve column 43 of the third sleeve member 42. The fifth set of joints 432 are assembled, and the set of portions 442 of the fourth set of joints 44 are assembled to the second set of columns 43. At the sixth slide rail 431, the fifth slide rail 421 of the third sleeve member 42 and the seventh slide rail 441 of the fourth sleeve member 44 are all slidably disposed with the first slide rail 11 of the frame body 10, The second tool set 40 can be assembled with the frame body 10, the second tool set 40 is away from the first tool set 30; the second set of parts 50, each of the set of closures 50 includes a closure The closure member 51 is configured to prevent the first sleeve 20 from coming out of the frame 10. The closure member 51 is disposed at two ends of the frame body 10. The closure member 51 is provided with a first sleeve. a slot 511, the first sleeve 511 is sleeved with the first slide rail 11, so that the end of the first slide rail 11 is closed, and the closure member 51 is closed. The second joint portion 512 is opposite to the first joint portion 12 of the frame body 10, and one closure member 51 is provided with two second joint portions 512, and the other seal member 51 is provided. There is a second joint portion 512, and the closure member 51 provided with the second joint portion 512 is provided with a grip portion for holding by the hand; the joint member 52 is coupled to the first joint of the frame body 10. The second joint portion 512 of the portion 12 and the closure member 51 is configured to assemble the frame body 10 with the closure member 51. The number of the coupling members 52 is matched with the number of the first joint portion 12 and the second joint portion 512. The coupling member 52 can be a rivet or a respective threaded member.

當該架體10、複數第一套合柱20、第一工具組30、第二工具組40及封閉件組50相組設後,即如第二圖所示,該每一第一套合柱20係組設於架體10上,該第一工具組30及第二工具組40係分別組設於架體10之二側,該封閉件組50係組設於架體10之第一滑軌11之二端,使該第一滑軌11呈封閉狀。 After the frame body 10, the plurality of first set of columns 20, the first tool set 30, the second tool set 40, and the closure group 50 are assembled, as shown in the second figure, each of the first sets The column 20 is assembled on the frame body 10. The first tool set 30 and the second tool set 40 are respectively disposed on two sides of the frame body 10. The block set 50 is first assembled on the frame body 10. The two ends of the slide rail 11 make the first slide rail 11 closed.

請繼續參閱第五圖至第七圖所示,第五圖係本創作手工具架體結構之上視圖,第六圖係本創作第五圖A-A處之剖視圖,第七圖係本創作第五圖B-B處之剖視圖,由圖示可清楚所示,該每一第一套合件20之第二滑軌21係滑設於架體10之第一滑軌11上,使該每一第一套合柱20係可於架體10上滑移,該第一套合部22係可供設有一規格四角槽之套筒相套合,該第一工具組30及第二工具組40係分別組設於架體10之二側,該第一工具組30之第一工具31係與第一套合件32及第二套合件33相組設,該第一套合件32之第三滑軌321與第二套合件33之第四滑軌331係滑設於第一滑軌11上,使該第一工具組30與架體10相組設且可於架體10上滑移,該第二工具組40之 第二工具41係與第三套合件42、第二套合柱43及第四套合件44相組設,該第二工具41之第二握柄411係容設於第三套合件42之第二容槽422處,該第二工具41之第四套合部412係與第二套合柱43之第五套合部432相套合,該第四套合件44之組設部442係組設於第二套合柱43之第六滑軌431處,該第三套合件42之第五滑軌421與第四套合件44之第七滑軌係滑設於第一滑軌11上,使該第二工具組40與架體10相組設且可於架體10上滑移,該封閉件組50之封閉件51係組設於架體10之第一滑軌11二端,使該第一滑軌11呈封閉狀。 Please continue to refer to the fifth to seventh figures. The fifth picture is the top view of the body structure of the hand tool. The sixth picture is the cross-sectional view of the fifth picture of the fifth picture of this creation. The seventh picture is the fifth of the creation. BB is a cross-sectional view of the first slide member 21 of each frame member 10, which is slidably disposed on the first slide rail 11 of the frame body 10, so that each of the first The sleeve 20 is slidable on the frame 10, and the first sleeve 22 is sleeved by a sleeve having a standard four-corner groove. The first tool set 30 and the second tool set 40 are respectively The first tool 31 of the first tool set 30 is assembled with the first set member 32 and the second set member 33, and the third set of the first set member 32 is disposed on the second side of the frame body 10. The slide rail 321 and the fourth slide rail 331 of the second sleeve member 33 are slidably disposed on the first slide rail 11, so that the first tool set 30 is assembled with the frame body 10 and can be slid on the frame body 10. , the second tool set 40 The second tool 41 is assembled with the third sleeve member 42, the second sleeve member 43 and the fourth sleeve member 44. The second handle 411 of the second tool 41 is received in the third sleeve member. The second sleeve portion 412 of the second tool 41 is engaged with the fifth sleeve portion 432 of the second sleeve column 43 and the fourth sleeve member 44 is assembled. The portion 442 is disposed at the sixth sliding rail 431 of the second set of pillars 43. The fifth sliding rail 421 of the third fitting member 42 and the seventh sliding rail of the fourth fitting member 44 are slidably disposed at the second sliding rail 431. On the slide rail 11, the second tool set 40 is assembled with the frame body 10 and can be slid on the frame body 10. The closure member 51 of the block set 50 is assembled on the first slide of the frame body 10. The two ends of the rail 11 make the first slide rail 11 closed.

請繼續參閱第八圖所示,第八圖係本創作第二實施例之立體圖,在此實施例中,由圖示可清楚所示,該第一工具組30之第一工具31係為F柄扳手結構,該第一工具組30之第一工具31亦可為滑桿結構或L桿扳手結構。 Please refer to the eighth figure, which is a perspective view of the second embodiment of the present invention. In this embodiment, as clearly shown by the figure, the first tool 31 of the first tool set 30 is F. The first tool 31 of the first tool set 30 can also be a slide bar structure or an L-bar wrench structure.

請繼續參閱第九圖及第十圖所示,第九圖係本創作第三實施例之立體圖,第十圖係本創作第三實施例之上視圖,由圖示可清楚所示,該手工具架體結構係為二組狀,亦即係設有二個架體10,二個架體10間係呈相平行狀,該二架體10間係設有二連接桿,使該二架體10相連接結合,該連接桿係與封閉件51呈一體狀,一手工具架體結構之第一套合柱20之第一套合部22、第一工具31之第二套合部312及第二工具41之第四套合部412之規格係為四分,另一手工具架體結構之第一套合柱20之第一套合部22、第一工具31之第二套合部312及第二工具41之第四套合部412之規格係為三分。 Please refer to the ninth and tenth drawings, the ninth drawing is a perspective view of the third embodiment of the present creation, and the tenth drawing is a top view of the third embodiment of the present creation, which is clearly shown by the figure, the hand The tool frame body structure is two-group, that is, two frame bodies 10 are provided, and the two frame bodies 10 are in parallel, and the two frame bodies 10 are provided with two connecting rods, so that the two frames are provided. The body 10 is coupled and coupled to the closure member 51. The first sleeve portion 22 of the first set of posts 20 of the first hand tool frame structure, the second sleeve portion 312 of the first tool 31 and The fourth sleeve portion 412 of the second tool 41 has a specification of four points, the first sleeve portion 22 of the first sleeve 20 of the other hand tool frame structure, and the second sleeve portion 312 of the first tool 31. The specification of the fourth nesting portion 412 of the second tool 41 is three points.

同理該手工具架體結構係為三組,一手工具架體結構之第一 套合柱20之第一套合部22、第一工具31之第二套合部312及第二工具41之第四套合部412之規格係為四分,另一手工具架體結構之第一套合柱20之第一套合部22、第一工具31之第二套合部312及第二工具41之第四套合部412之規格係為三分,另一手工具架體結構之第一套合柱20之第一套合部22、第一工具31之第二套合部312及第二工具41之第四套合部412之規格係為二分規格。 Similarly, the structure of the hand tool frame is three sets, and the first hand tool body structure is the first. The first sleeve portion 22 of the sleeve 20, the second sleeve portion 312 of the first tool 31, and the fourth sleeve portion 412 of the second tool 41 are four-pointed, and the other hand tool body structure is The first sleeve portion 22 of the set of posts 20, the second sleeve portion 312 of the first tool 31, and the fourth sleeve portion 412 of the second tool 41 are three-pointed, and the other hand tool frame structure is The specifications of the first set portion 22 of the first set of posts 20, the second set portion 312 of the first tool 31, and the fourth set portion 412 of the second tool 41 are two-point specifications.

請繼續參閱第十一圖所示,第十一圖係本創作第四實施例之上視圖,該實施例係無設有第二套合柱43及第四套合件44,該封閉件組50之封閉件51係為一吊牌結構,該封閉件51上係可供貼設有商標、規格或其它標示。 Please continue to refer to FIG. 11 , which is a top view of the fourth embodiment of the present invention. The embodiment is provided with no second set of posts 43 and a fourth set of members 44 . The closure member 51 of the 50 is a tag structure, and the closure member 51 is affixed with a trademark, a specification or other indication.

本創作另一實施例,該第二工具組40之第二套合柱43係與第四套合件44呈一體狀,亦即第二套合柱43係設有第五套合部432及第七滑軌441。 In another embodiment of the present invention, the second set of posts 43 of the second tool set 40 is integrally formed with the fourth set of members 44, that is, the second set of posts 43 is provided with a fifth set of portions 432 and The seventh slide rail 441.

本創作另一實施例,該第一套合柱20之第一套合部22斷面亦可為四角形狀,同理該第二套合柱43之第五套合部432斷面亦可為四角形狀。 In another embodiment of the present invention, the first sleeve portion 22 of the first sleeve column 20 may have a quadrangular shape. Similarly, the fifth sleeve portion 432 of the second sleeve portion 43 may have a cross section. Square shape.

本創作另一實施例,該第一工具組30係不設有第二套合件33,該第一工具組30係設有至少二個第一套合件32,二個第一套合件32係平行組設於第一工具31之第一握柄311處,使該第一工具組30係設於架體10一側。 In another embodiment of the present invention, the first tool set 30 is not provided with the second set member 33, and the first tool set 30 is provided with at least two first sleeve members 32 and two first sleeve members. The 32-series are arranged in parallel at the first grip 311 of the first tool 31, so that the first tool set 30 is attached to the side of the frame body 10.

本創作另一實施例,該第二工具組40設有二個第二工具41時,一第二工具41係為接桿結構,另一第二工具41係可為浮動接頭結構或 轉接頭結構。 In another embodiment of the present invention, when the second tool set 40 is provided with two second tools 41, one second tool 41 is a post structure, and the other second tool 41 is a floating joint structure or Adapter structure.

本創作之手工具架體結構係具有下述之優點: The hand tool body structure of the present invention has the following advantages:

1、該架體10係設有第一滑軌11,該第一滑軌11上係可滑設複數第一套合柱20、第一工具組30之第一套合件32及第二套合件33、第二工具組40之第三套合件42及第四套合件44,使該手工具架體結構不僅係可供套筒結構相套設,該手工具架體結構亦可組設有具有四角頭之第一工具31及具有四角槽之第二工具41,該手工具架體結構套設各手工具時係具有擴充性及實用性。 1. The frame body 10 is provided with a first sliding rail 11 , and the first sliding rail 11 is slidably provided with a plurality of first sleeves 20 , a first sleeve 32 of the first tool set 30 and a second sleeve The fitting member 33, the third fitting member 42 of the second tool set 40, and the fourth fitting member 44 enable the hand tool body structure not only to be sleeved for the sleeve structure, but also the hand tool frame structure The first tool 31 having a quadrangular head and the second tool 41 having a four-corner groove are provided, and the hand tool frame structure has the expandability and practicability when the hand tools are sleeved.

2、該第一工具31係組設於第一套合件32及第二套合件33上,該第一套合件32及第二套合件33係分別設有第三滑軌321及第四滑軌331,該第三滑軌321及第四滑軌331係可與第一滑軌11相滑設,使該第一工具組30與架體10相組設。 2, the first tool 31 is set on the first set of parts 32 and the second set of parts 33, the first set of parts 32 and the second set of parts 33 are respectively provided with a third slide rail 321 and The fourth slide rail 331 and the third slide rail 331 and the fourth slide rail 331 are slidable with the first slide rail 11 to assemble the first tool set 30 and the frame body 10.

3、該第二工具41係與第三套合件42及第二套合柱43相組設,該第二套合柱43係與第四套合件44相組設,該第三套合件42之第五滑軌421及第四套合件44之第七滑軌441係可與第一滑軌11相滑設,使該第二工具組40與架體10相組設。 3. The second tool 41 is assembled with the third set of parts 42 and the second set of columns 43. The second set of columns 43 is assembled with the fourth set of parts 44, the third set of The fifth slide rail 421 of the member 42 and the seventh slide rail 441 of the fourth sleeve member 44 are slidable with the first slide rail 11 to assemble the second tool set 40 with the frame body 10.

4、該第一工具組30係設於架體10一側,該第二工具組40係設於架體10另側,使該架體10及複數第一套合柱20係設於第一工具組30及第二工具組40間具有平衡結構。 4. The first tool set 30 is disposed on one side of the frame body 10, and the second tool set 40 is disposed on the other side of the frame body 10, so that the frame body 10 and the plurality of first set of columns 20 are first set. The tool set 30 and the second tool set 40 have a balanced structure.

5、該封閉件51係組設於架體10之二端,使該第一滑軌11係呈封閉狀,使該第一套合柱20、第一工具組30及第二工具組40係無法脫出第一滑軌11外。 5. The closing member 51 is disposed at two ends of the frame body 10, so that the first sliding rail 11 is closed, so that the first set of the column 20, the first tool set 30 and the second tool set 40 are It is impossible to take out the first slide rail 11 outside.

綜上所述,本創作之手工具架體結構係具有實用性、新穎性及進步性,誠能符合新型專利之申請要件,爰依法提出申請。 In summary, the hand tool body structure of this creation is practical, novel and progressive, and can meet the application requirements of the new patent, and apply in accordance with the law.

10‧‧‧架體 10‧‧‧ ‧ body

11‧‧‧第一滑軌 11‧‧‧First slide rail

12‧‧‧第一結合部 12‧‧‧ First Joint Department

20‧‧‧第一套合柱 20‧‧‧First set of columns

21‧‧‧第二滑軌 21‧‧‧Second rail

22‧‧‧第一套合部 22‧‧‧First set of joints

30‧‧‧第一工具組 30‧‧‧First Tool Set

31‧‧‧第一工具 31‧‧‧ first tool

311‧‧‧第一握柄 311‧‧‧First grip

312‧‧‧第二套合部 312‧‧‧Second set of joints

32‧‧‧第一套合件 32‧‧‧First set of fittings

321‧‧‧第三滑軌 321‧‧‧ third slide

322‧‧‧第一容槽 322‧‧‧first capacity

33‧‧‧第二套合件 33‧‧‧Second set of fittings

331‧‧‧第四滑軌 331‧‧‧fourth rail

332‧‧‧板體 332‧‧‧ board

333‧‧‧第三套合部 333‧‧‧ Third set of joints

40‧‧‧第二工具組 40‧‧‧Second Tool Set

41‧‧‧第二工具 41‧‧‧Second tool

411‧‧‧第二握柄 411‧‧‧second grip

412‧‧‧第四套合部 412‧‧‧Fourth Joint Department

42‧‧‧第三套合件 42‧‧‧ third set of fittings

421‧‧‧第五滑軌 421‧‧‧ fifth slide

422‧‧‧第二容槽 422‧‧‧Second capacity

43‧‧‧第二套合柱 43‧‧‧Second set of columns

431‧‧‧第六滑軌 431‧‧‧ sixth slide

432‧‧‧第五套合部 432‧‧‧The fifth set of joints

44‧‧‧第四套合件 44‧‧‧Fourth set of parts

441‧‧‧第七滑軌 441‧‧‧ seventh slide

442‧‧‧組設部 442‧‧‧ Department

50‧‧‧封閉件組 50‧‧‧Closet group

51‧‧‧封閉件 51‧‧‧Closed

511‧‧‧第一套槽 511‧‧‧ first set of slots

512‧‧‧第二結合部 512‧‧‧Second junction

52‧‧‧結合件 52‧‧‧Connected parts

Claims (21)

一種手工具架體結構,其係包括:一架體,該架體係設有第一滑軌;複數第一套合柱,該每一第一套合柱係可與架體相組設,該第一套合柱一端係設有第二滑軌,該第二滑軌係與第一滑軌相滑設,使該每一第一套合柱係可於架體上滑移,該第一套合柱另端係設有第一套合部,該第一套合部係可供設有一規格四角槽之手工具件相套合;一第一工具組,該第一工具組係組設於架體一側,該第一工具組係包括第一工具及第一套合件;該第一工具係為具有規格四角頭之手工具結構,該第一工具係包括第一握柄及第二套合部,該第二套合部係呈規格之四角頭狀,該第一工具具有一長度;該第一套合件係與架體及第一工具相組設,該第一套合件一端係設有第三滑軌,該第三滑軌係與第一滑軌相滑設,使該第一套合件係可於架體上滑移,該第一套合件另端係設有第一容槽,該第一容槽係供第一握柄相容設;該第一工具之第一握柄係與第一套合件之第一容槽,該第一套合件之第三滑軌係與架體之第一滑軌相滑設後,即可使該第一工具組組設於架體一側,且該第一工具組係可於架體上滑移;一第二工具組,該第二工具組係組設於架體之另側,該第二工具組係與第一工具組相平行,該第二工具組係包括至少一第二工具及第三套合件;該第二工具係為具有四角槽之手工具結構,該第二工具係包括第二握 柄及第四套合部,該第四套合部係呈四角槽狀;該第三套合件係與架體及第二工具相組設,該第三套合件一端係設有第五滑軌,該第五滑軌係與架體之第一滑軌相滑設,使該第三套合件係可於架體上滑移,該第三套合件係設有第二容槽,該第二容槽係供第二工具之第二握柄相容設;該第二工具之第二握柄係與第三套合件之第二容槽,該第三套合件之第五滑軌係與架體之第一滑軌相滑設後,即可使該第二工具組與架體相組設,該第二工具組係與第一工具組相互遠離。 A hand tool frame structure includes: a frame body, the frame system is provided with a first sliding rail; and a plurality of first sleeves are assembled, and each of the first set of pillars can be assembled with the frame body, a second sliding rail is disposed at one end of the first set of the column, and the second sliding rail is slidably disposed with the first sliding rail, so that each of the first clamping pillars can slide on the frame, the first The first end of the sleeve is provided with a first sleeve portion, and the first sleeve portion is sleeved by a hand tool member provided with a standard square groove; a first tool set, the first tool set is assembled On the side of the frame, the first tool set includes a first tool and a first set of parts; the first tool is a hand tool structure having a quadruple head, the first tool set includes a first handle and a first a second set of joints, wherein the second set of parts is in the shape of a quadrangular head, the first tool has a length; the first set of parts is assembled with the frame body and the first tool, the first set of parts One end of the piece is provided with a third sliding rail, and the third sliding rail is slidably disposed with the first sliding rail, so that the first fitting member can be slidable on the frame body, and the first sleeve is attached to the frame. Set a first slot is provided for the first handle; the first handle of the first tool is coupled to the first pocket of the first sleeve, and the third sleeve is the third After the slide rail system is slidably disposed with the first slide rail of the frame body, the first tool set can be assembled on one side of the frame body, and the first tool set can be slid on the frame body; a tool set, the second tool set is disposed on the other side of the frame, the second tool set is parallel to the first tool set, and the second tool set includes at least one second tool and a third set of parts The second tool is a hand tool structure having a square slot, and the second tool system includes a second grip a handle and a fourth set of joints, wherein the fourth set of parts is in the shape of a square groove; the third set of parts is assembled with the frame body and the second tool, and the third set part is provided with a fifth end a slide rail, the fifth slide rail is slidably disposed with the first slide rail of the frame body, so that the third sleeve member is slidable on the frame body, and the third sleeve member is provided with a second cavity The second pocket is compatible with the second grip of the second tool; the second grip of the second tool is coupled to the second pocket of the third sleeve, and the third sleeve is After the five slide rails are slid with the first slide rail of the frame body, the second tool set can be assembled with the frame body, and the second tool set is away from the first tool set. 如請求項1所述之手工具架體結構,其中,該一工具組係設有第二套合件,該第二套合件係與架體及第一工具相組設,該第二套合件係設有第四滑軌,該第四滑軌係與第一滑軌相滑設,使該第二套合件可於架體上滑移,該第二套合件係設有板體,該板體係與第四滑軌相連接,該板體係設有第三套合部,該第三套合部係供第一工具之第二套合部相套合,該第三套合部係呈四角槽狀。 The hand tool frame structure of claim 1, wherein the tool set is provided with a second set of components, the second set of parts is assembled with the frame body and the first tool, and the second set is The assembly is provided with a fourth slide rail, and the fourth slide rail is slidably disposed with the first slide rail, so that the second sleeve member can slide on the frame body, and the second sleeve member is provided with a plate. The plate system is connected to the fourth sliding rail, and the plate system is provided with a third fitting portion, wherein the third fitting portion is engaged with the second fitting portion of the first tool, and the third fitting portion is The department is in the shape of a square groove. 如請求項2所述之手工具架體結構,其中,該第二工具組係設有第二套合柱及第四套合件;該第二套合柱係與第二工具相套設,該第二套合柱一端係設有第六滑軌,該第二套合柱另端係設有第五套合部,該第二套合柱之第五套合部係與第二工具之第四套合部相套合,該第四套合件係與架體及第二套合柱相組設,該第四套合件係設有第七滑軌,該第七滑軌係與第一滑軌相滑設,使該第四套合件係可於架體上滑移,該第四套合件係設有組設部,該組設部係組設於第二套合柱之第六滑軌處。 The hand tool frame structure of claim 2, wherein the second tool set is provided with a second set of columns and a fourth set of parts; the second set of columns is sleeved with the second tool, The second set of columns is provided with a sixth sliding rail at one end, and the second sleeve is provided with a fifth fitting portion at the other end, and the fifth sleeve portion of the second sleeve is combined with the second tool The fourth set of joint parts is assembled, and the fourth set of parts is assembled with the frame body and the second set of the column, the fourth set of parts is provided with a seventh slide rail, and the seventh slide rail system is The first slide rail is slidably disposed such that the fourth set of parts is slidable on the frame body, and the fourth set of parts is provided with an assembly portion, and the set of the set parts is set on the second set of column The sixth slide. 如請求項3所述之手工具架體結構,其中,該架體之二端部處係設 有複數第一結合部,該第一結合部係呈圓孔狀,設有二封閉件組,該每一封閉件組係包括封閉件及結合件;該封閉件係避免第一套合柱脫出架體外,該封閉件係組設於架體之二端,該封閉件係設有第一套槽,該第一套槽係與第一滑軌相套設,使該第一滑軌端部係呈封閉狀,該封閉件上係設有第二結合部,該第二結合部係與架體之第一結合部相對正;該結合件係結合於架體之第一結合部及封閉件之第二結合部處,使該架體與封閉件相組設。 The hand tool frame structure according to claim 3, wherein the two ends of the frame are tied There is a plurality of first joint portions, the first joint portion is in the shape of a round hole, and is provided with two sets of seals, each of which comprises a closure member and a joint member; the closure member prevents the first set of joints from coming off The first part of the slot is provided with a first sleeve, and the first sleeve is sleeved with the first slide rail, so that the first slide rail end is disposed at the two ends of the frame body. The part is closed, and the second connecting portion is disposed on the closing member, the second joint portion is opposite to the first joint portion of the frame body; the joint member is coupled to the first joint portion of the frame body and closed At the second joint of the piece, the frame body and the closing member are assembled. 如請求項4所述之手工具架體結構,其中,該架體係設有二第一滑軌,該二第一滑軌係分設於架體二側,二個第一滑軌相對架體係呈對稱狀,該每一第一滑軌係呈凹槽狀。 The hand tool frame structure according to claim 4, wherein the frame system is provided with two first slide rails, and the two first slide rails are respectively disposed on two sides of the frame body, and the two first rail rail relative frame systems are provided. In a symmetrical shape, each of the first slide rails has a groove shape. 如請求項4所述之手工具架體結構,其中,該第一滑軌之長度係與架體之長度相同,該架體係為鋁擠型結構。 The hand tool frame structure according to claim 4, wherein the length of the first slide rail is the same as the length of the frame body, and the frame system is an aluminum extruded structure. 如請求項4所述之手工具架體結構,其中,該第一套合部之斷面係呈圓體狀。 The hand tool frame structure according to claim 4, wherein the first sleeve portion has a circular cross section. 如請求項4所述之手工具架體結構,其中,該第一工具係為一套筒扳手結構或棘輪扳手結構。 The hand tool frame structure of claim 4, wherein the first tool is a socket wrench structure or a ratchet wrench structure. 如請求項4所述之手工具架體結構,其中,該第一容槽係呈弧形槽狀。 The hand tool frame structure according to claim 4, wherein the first container has an arc-shaped groove shape. 如請求項4所述之手工具架體結構,其中,該第一工具之第一握柄及第二套合部係分別與第一套合件之第一容槽及第二套合件之第三套合部相組設,且該第一套合件之第三滑軌及第二套合件之第四滑軌皆與架體之第一滑軌相滑設後,使該第一工具組組設於架體一側,且該第一工具組係 可於架體上滑移。 The hand tool frame structure of claim 4, wherein the first handle and the second sleeve portion of the first tool are respectively corresponding to the first pocket and the second sleeve of the first kit The third set of joints is assembled, and the third slide rail of the first set of parts and the fourth slide rail of the second set of parts are all slid with the first slide rail of the frame body, so that the first The tool set is disposed on one side of the frame body, and the first tool set is It can slide on the frame. 如請求項4所述之手工具架體結構,其中,該第二工具之數目係為二個,一第二工具係為長度較長之接桿結構,另一第二工具係為長度較短之接桿結構。 The hand tool frame structure of claim 4, wherein the number of the second tools is two, one second tool is a longer length post structure, and the other second tool is a shorter length Post structure. 如請求項4所述之手工具架體結構,其中,該第二工具係可為轉接頭結構或浮動接頭結構。 The hand tool frame structure of claim 4, wherein the second tool system is a adapter structure or a floating joint structure. 如請求項4所述之手工具架體結構,其中,該第二套合件之第二容槽係呈弧形槽狀。 The hand tool frame structure of claim 4, wherein the second pocket of the second sleeve member has an arcuate groove shape. 如請求項4所述之手工具架體結構,其中,該第三套合件係與第一套合件結構相同。 The hand tool frame structure of claim 4, wherein the third set of parts is identical in structure to the first set of parts. 如請求項4所述之手工具架體結構,其中,該組設部係呈似T形狀。 The hand tool frame structure according to claim 4, wherein the set portion has a T-like shape. 如請求項4所述之手工具架體結構,其中,該第五套合部之斷面係呈圓體狀,該第二套合柱係與第一套合柱結構相同。 The hand tool frame structure according to claim 4, wherein the fifth portion of the portion is in a circular shape, and the second portion of the column is identical to the first set of columns. 如請求項4所述之手工具架體結構,其中,該第二工具之第二握柄及第四套合部係分別與第三套合件之第二容槽及第二套合柱之第五套合部相組設,該第四套合件之組設部係組設於第二套合柱之第六滑軌處,該第三套合件之第五滑軌及第四套合件之第七滑軌係皆與架體之第一滑軌相滑設後,即可使該第二工具組與架體相組設,該第二工具組係與第一工具組相互遠離。 The hand tool frame structure of claim 4, wherein the second handle and the fourth sleeve portion of the second tool are respectively corresponding to the second pocket and the second sleeve of the third sleeve The fifth set of joint parts is assembled, the set of the fourth set of parts is set at the sixth slide rail of the second set of joints, and the fifth slide rail and the fourth set of the third set of joint parts After the seventh sliding rail system of the fitting is slid with the first sliding rail of the frame body, the second tool set can be assembled with the frame body, and the second tool set is away from the first tool set. . 如請求項4所述之手工具架體結構,其中,該第一工具組之第一工具係為F柄扳手結構、滑桿結構或L桿扳手結構。 The hand tool frame structure of claim 4, wherein the first tool of the first tool set is a F-shank structure, a slide bar structure or an L-bar wrench structure. 如請求項4所述之手工具架體結構,其中,該手工具架體結構係為 二組狀,亦即係設有二個架體,二個架體間係呈相平行狀,該二架體間係設有二連接桿,使該二架體相連接結合,該連接桿係與封閉件呈一體狀,一手工具架體結構之第一套合柱之第一套合部、第一工具之第二套合部及第二工具之第四套合部之規格係為四分,另一手工具架體結構之第一套合柱之第一套合部、第一工具之第二套合部及第二工具之第四套合部之規格係為三分。 The hand tool frame structure according to claim 4, wherein the hand tool frame structure is The two groups are arranged in two frames, and the two frames are in parallel. The two frames are provided with two connecting rods, so that the two bodies are connected and joined. Forming integrally with the closure member, the specification of the first set of the first set of the first set of the first frame of the first hand tool frame structure, the second set of the first tool and the fourth set of the second tool are four points The specification of the first set of the first set of pillars of the other hand tool frame structure, the second set of the first tool and the fourth set of the second tool are three points. 如請求項4所述之手工具架體結構,其中,該手工具架體結構係為三組狀,一手工具架體結構之第一套合柱之第一套合部、第一工具之第二套合部及第二工具之第四套合部之規格係為四分,另一手工具架體結構之第一套合柱之第一套合部、第一工具之第二套合部及第二工具之第四套合部之規格係為三分,另一手工具架體結構之第一套合柱之第一套合部、第一工具之第二套合部及第二工具之第四套合部之規格係為二分規格。 The hand tool frame structure according to claim 4, wherein the hand tool frame body structure is a three-group shape, the first set of the first set of the first hand-fitted column of the one-hand tool frame structure, and the first tool The specification of the second set of the second set of fittings and the second set of the second set is four points, the first set of the first set of the first hand of the tool frame structure, the second set of the first tool and The specification of the fourth set of the second tool is three points, the first set of the first set of the other hand tool frame structure, the second set of the first tool and the second tool The specifications of the four sets of joints are two-point specifications. 如請求項4所述之手工具架體結構,其中,該第二工具組之第二套合柱係與第四套合件呈一體狀,亦即第二套合柱係設有第五套合部及第七滑軌。 The hand tool frame structure according to claim 4, wherein the second set of column parts of the second tool set and the fourth set of parts are integrated, that is, the second set of the column is provided with a fifth set. Joint and seventh slide.
TW105201838U 2016-02-04 2016-02-04 Hand tool frame structure TWM520973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW105201838U TWM520973U (en) 2016-02-04 2016-02-04 Hand tool frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW105201838U TWM520973U (en) 2016-02-04 2016-02-04 Hand tool frame structure

Publications (1)

Publication Number Publication Date
TWM520973U true TWM520973U (en) 2016-05-01

Family

ID=56509600

Family Applications (1)

Application Number Title Priority Date Filing Date
TW105201838U TWM520973U (en) 2016-02-04 2016-02-04 Hand tool frame structure

Country Status (1)

Country Link
TW (1) TWM520973U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI714065B (en) * 2019-04-23 2020-12-21 謝志堅 Tool shelf
TWI729381B (en) * 2019-04-23 2021-06-01 謝志堅 Placement shelf of tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI714065B (en) * 2019-04-23 2020-12-21 謝志堅 Tool shelf
TWI729381B (en) * 2019-04-23 2021-06-01 謝志堅 Placement shelf of tool

Similar Documents

Publication Publication Date Title
CN207092446U (en) A kind of nut and holding tool
TWM520973U (en) Hand tool frame structure
TWI409150B (en) Cylindrical hand hanger with high structural strength
US5201109A (en) Method and apparatus for detachably joining two members
TWI555616B (en) Toolbar structure
MX2021012237A (en) Clamp for formwork for vertical castings.
TWI329053B (en)
US20140360320A1 (en) Multi-jointed driving tool apparatus
CN104299507A (en) Connection type demonstration instrument
TWM461524U (en) Hand tool frame structure
TW201813787A (en) Frame body structure of hand tool can be assembled and mounted with the third tool and the fourth tool to have expandability and usability when it is fitted with each hand tool
TWM481107U (en) Hose clamp pliers structure
TW201317094A (en) Hand tool frame structure
TWI572466B (en) Fixed column structure
TWM558697U (en) Tool rack structure
TW201728417A (en) Ratchet wrench structure for saving the component cost by only including a main body, a plurality of ratchets, a gear set and an elastic element
CN216781773U (en) Toolbox is used in building electrical design drawing
TW201544271A (en) Fixed column structure
TWM537009U (en) Hand tool frame structure
JP6273319B2 (en) Positionable hand tool holder
TW201300211A (en) Frame body structure of hand tool
TWM559230U (en) Tool rack structure
TWM560373U (en) Connection rod to replace tool
TW201808550A (en) Connecting rod structure comprises a plurality of first assemblies that are sequentially connected in a sleeved mode
TWM512478U (en) Tool box structure

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees