五、新型說明: 【新型所屬之技術領域】 3本創義錢於-軌車拆紅餘技良更糾言之特别 .士、、致套.且件〃側之鐵套推擠套件上形成有卡抵結構,使提高拆襄 4車軸襯或軸承等心軸部之效率者。 【先前技術】 复目前市面上—般汽車鐵套拆裝工具組,請參閱第i、2圖所示, =之域,主嫩汽車_嶋咖(Μ)順 穿4-螺桿(20)’並於 -寬鐵套件(22)及-窄鐵套件(2 ^(1〇)兩側分別接設有 外夂驻Μ女碑, 1 ),又於鐵套件(2 1 ) ( 2 2 ) 卜各“有-·件(2 3 ), 轉位移。 以3)係可於螺桿(20)上旋 次’關於鐵套拆裝工具組之操 裳工具與桿體(i 〇 )部件社;^第3 ' 4圖所示,當鐵套拆 (⑴外⑻處,且寬物I 1)綱於心轴部 於心軸部π 之内部套合寬度應大 窄鐵套件(21)之外緣庙 則抵頂於心軸部(11)外側,且 载套件(21)之外緣應小於心轴部 _( 1 1 )進行拆卸操作時,得㈣”鐵二=二此,當欲對心 (2 3 ),並轉動寬鐵套件(2 2 _牛(2 i )該端之螺旋件 3 1 )推擠桿體(i 〇 ) μ 。為之螺旋件(2 3 ),使寬鐵套件(2 推跡體no)向窄鐵套件(21 因窄鐵套件(川之樓抵而&法_ /㈣’而心車由部(⑴則 移動,心當桿體(10)因推擠而越 M409987 接近乍鐵套件(2 1)時,則代表桿體(i 〇 )與心軸部(1 1)亦接近 .脫離狀態’故相反的,若欲裝設心轴部i)時,則需將桿體(1〇) 推擠靠撒於心轴部(1 1 )。 再者°月參第5、6 ' 7圖所示,其鐵套件(2 1 )( 2 2 )較常見之 '、,°構主要財’其—為鐵套件(2 1)( 2 2 )之-側面直接形賴合結構, '而僅留有供螺旋件(2 3 )與螺桿(2 0 )穿設之孔洞(2 1 1 )( 2 2 1 ); 為鐵套件(2 1)(22)外增設-蓋體(2 4),而蓋體(2 • 4)上亦留有供螺旋件(2 3)與螺桿(2 0)穿設之孔洞(24 1);其 三之結構,為鐵套件(2 1 )( 2 2 )外增設-適用於多規格之推擠件(2 軸件(2 5 )上亦留有供螺旋件(2 3 )與螺桿(2 0 )穿設之 孔洞(2 51)。 ,=述_咖構雖可連_裝心軸部之目的,但仍有以下缺點: 山” ’由於細作鐵套拆裝工具需固定單邊鐵套螺旋件,並旋轉控制另 旋件爾以順利拆裝心轴部是以操作者雙手皆需手持工具 辦加操轴部裝設之機件大多設於車體底盤或空間狹窄處,故將大幅 a - _度及麻須性,據以降低作業之效率者。 手手設之機件多為較大型或較重之汽車部件,是以以雙 但若辦加人U僅有上錢作困難之問題外,亦有作業安全性之虞慮, 加崎決改善者响料f,_料彡㈣·#之_,故應有待設法 【新型内容】 4 WU9987 鏗於習知汽車鐵套拆紅具於使用上仍存 改進,並研發出摘作,其主卿針對如第^創作人乃加以研究 組之改良新結構®斤不的汽車鐵套拆裝工具 • 稱使其達到極具使用效率之便利功能。 -種汽車鐵麵裝王具组之以,主 或增設之推擠件或蓋體所、累掉、鐵套件、螺旋件 周圍,預設m個社之卡辭置,胁科^叙螺桿穿孔 應於卡接裝置及其數量之卡抵件Γ侧之螺旋件上設有相對 之作業時,盆鐵套件^ 行拆裝車轴觀或轴承等心轴部 菜-其鐵套件或推擠件之_端即可透過卡 接合,達到有效固定單邊鐵套件,並使另邊之鐵麵齡螺件之卡抵件 進而大幅提升作業之效率及便利性者。 仃累疑推擠動作, 本案達成目軌蚁_,軸峨 旋件卡抵叙接合,^生單_套制定之㈣,^之賴裝置與螺 手持工具轉動鐵套件或推擠件之另端螺旋件,即可達知作者僅需單 效果,據以降低操作之困難度及麻須性者。 套件向内推擠之 本案達成目的及功效之二,蕻 m 9由鐵套件或推擠件得以單邊固 4,姆者於作業時得以單手扶持該健物, 邊以之結構 並確保作業之安全性者。 3加刼作之穩定性, 實施方式】 為使進步對於本創作之技術手段及 施例如后 功效之瞭詳,僅配合圓示詳述實 首先,請參閲第8圖、第Q願丄 於 第9圖所不,本創作之鐵套工具短(3〇) 5 M409987 構文良上主要係透過—螺桿(3 1)、鐵套件(3 及推擠件(3 3) J 2 )、螺旋件(3 4) J之組成進行說明;其中,所述螺桿( 車軸襯輪承等桿體(4 Q )之_ ( 4 可穿設於汽 擠件(3 3 )及_株r q 而鐵套件(3 2 )、推 及螺方疋件(34)則依序裝置於心軸部 (31)上;而所述_件(33)之螺桿穿孔(3 )兩側之螺桿 有一個或-個以上之卡接裝置(3 3 i ),又於2) ,係預設 有相對應於卡接I置(q 1> 、丨之螺旋件(3 4 )上設 下接裝置(33 1)及其數量之卡抵件V. New description: 【New technology field】 3 The creation of the money in the rail-car demolition red and the better and more eloquent special. Shi, Zhi Zhi. And the side of the iron sleeve push kit formed There is a snap-in structure, which improves the efficiency of the mandrel portion such as the axle lining or the bearing. [Prior Art] In the current market, the car iron sleeve disassembly tool group, please refer to the figures i and 2, = domain, the main tender car _ 嶋 Μ (Μ) 顺 wear 4-screw (20)' And on the - wide iron kit (22) and - narrow iron kit (2 ^ (1 〇) on both sides of the outer 夂 夂 夂 , ,, 1), and in the iron kit (2 1) (2 2) Each has "--piece (2 3), rotation displacement. 3) can be screwed on the screw (20) 'About the iron sleeve disassembly tool set of tools and rod body (i 〇) parts company; ^ As shown in Fig. 3 '4, when the iron sleeve is removed ((1) outside (8), and the wide object I 1), the inner sleeve width of the mandrel portion at the mandrel portion π should be narrower than the outer edge of the iron kit (21). The temple is placed on the outside of the mandrel part (11), and the outer edge of the carrying set (21) should be smaller than the mandrel part _(1 1 ) for the disassembly operation, (4) "iron two = two, when the heart is right (2 3 ), and turn the wide iron kit (2 2 _ cattle (2 i ) screw 3 1 at the end) to push the rod (i 〇) μ. For the screw (2 3 ), make the wide iron kit (2 sway body no) to the narrow iron kit (21 due to the narrow iron kit (Chuanzhilou and & _ / (4)' and the car by the Ministry ((1) Then move, when the rod body (10) is pushed, the M409987 is close to the cymbal kit (2 1), it means that the rod body (i 〇) is close to the mandrel part (1 1). If the mandrel part i) is to be installed, the rod body (1〇) needs to be pushed against the mandrel part (1 1 ). In addition, as shown in the fifth and sixth paragraphs of the month, Its iron kit (2 1 ) ( 2 2 ) is more common, and the structure is the main asset of the iron kit (2 1) ( 2 2 ) - the side directly depends on the structure, 'only for the left a hole (2 1 1 ) (2 2 1 ) through which the screw (2 3 ) and the screw (20) are inserted; a cover body (2 4) for the iron kit (2 1) (22), and the cover body (2 • 4) There are also holes (24 1) for the screw (2 3) and the screw (20); the structure of the third is added to the iron kit (2 1 ) ( 2 2 ) - It is suitable for pushers with multiple specifications (the 2 shaft parts (2 5 ) also have holes (2 51) for the screw (2 3 ) and the screw (2 0) to be worn. Although it can be connected to the purpose of the mandrel part, it still has the following disadvantages: “Mountain” “Because of the fine iron sleeve disassembly tool, it is necessary to fix the single-sided iron sleeve spiral piece, and rotate the other rotating parts to smoothly disassemble the mandrel part. Most of the parts that are required by the operator to hold the tools and handle the shaft parts are mostly located in the chassis of the vehicle body or in a narrow space, so the a- _ degree and the whisker will be greatly reduced, so as to reduce the efficiency of the operation. Most of the hand-operated parts are larger or heavier auto parts. It is a double-handed problem, but it is difficult to work hard, and there are also operational safety concerns. The improvement of the material f, _ material 四 (four) · # _, it should be managed [new content] 4 WU9987 习 习 习 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车 汽车For the creator of the creator, the improved new structure of the research group, the detachment tool for the car, is said to be a convenient function for the use of the car. Main or additional push or cover body, tired, iron kit, spiral around, preset m Resignation, the threatening section of the screw should be placed on the screw on the side of the card-clamping device and the number of the card-receiving part. When the opposite operation is performed, the pot iron assembly is disassembled and the axle part of the bearing or the bearing is included. The dish--the end of the iron kit or the pusher can be joined by the card to achieve the effective fixing of the single-sided iron kit, and the card of the iron-faced screw of the other side can greatly improve the efficiency and convenience of the work.仃 仃 推 推 推 推 , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , The end screw can be used by the author to achieve only a single effect, so as to reduce the difficulty of operation and the need for hemp. The kit pushes inwardly to achieve the purpose and effect of the case. The 蕻m 9 can be unilaterally fixed by the iron kit or the pusher. The person can support the body with one hand during the operation, and the structure and operation are ensured. Security. 3 The stability of the work, the implementation method] In order to make progress on the technical means of this creation and the effect of the post-effects, only the details of the circle are detailed. First, please refer to Figure 8, Q. Figure 9 is not, the iron sleeve tool of this creation is short (3〇) 5 M409987 The main structure is through-screw (3 1), iron kit (3 and pusher (3 3) J 2 ), screw (3 4) The composition of J is explained; wherein the screw (the axle liner bearing the rod body (4 Q ) _ (4 can be worn on the steam extrusion (3 3 ) and the _ strain rq and the iron kit ( 3 2), push and screw element (34) is sequentially arranged on the mandrel portion (31); and the screw on both sides of the screw perforation (3) of the piece (33) has one or more screws The card-connecting device (3 3 i ) is further provided with a corresponding connection device (33 1) corresponding to the card-connecting I (q 1 > Number of cards
心軸部(川之拆峨時,其推擠件(33)=是《當進行 置朗旋件(34)之卡抵件(3 :可透過卡接裝 單邊之鐵套件(32),而使另邊之_( «有效固定 推擠動作者。 *以順暢的執打螺旋之 1=二1 0 A 1 1圖所示’其上述結構亦可適用於側邊直接封 l個Γ 上,使其螺桿穿孔(3 2 2 )之顺亦可設有-個 :之卡接裝置(3 2 1 );而若為鐵套件(3 2 )與蓋體(3 5 ) 時,則將其卡接裝置(351)設置於蓋體(Μ)螺桿穿孔 __=:Γ養(34)执件(341),即可達 再者,請參閱第i 2圖所示,其相反於上述卡抵結構之配置,而是將 -牛(3 3 3 )凸叹於推擠件(3 3)之螺桿穿孔(3 3 2)周圍,並 於螺旋件(3 4 )之對軸預設有相接應之卡接裝置(3 4 3 ),是以在 操作上亦可產生卡抵之狀態者。 又,請參閱第13 1 4圖所不,此二圓示中,該螺旋件(3 4 )與 6 M409987 蓋體(3 5)或鐵套件(3 2)之卡抵結構主要係將螺旋件(3 4)凸 伸之e件(3 4 2)施以五角型或正方形等多邊形體並使蓋體(3 5) 或鐵套件(3 2 )之螺桿穿孔(3 5 2 )( 3 2 2 )配置相對應之多邊形,结 構’據以透過多邊形體之相互限位,而達到卡抵固定之目的者。 疋以*上文中的敘述可讓熟悉此種方法之人了解到此創作更多的優 點,而在紐呈驗敘魏有_的雛_,關單地勤職能執行 現有創作的最佳模式之圖示來加以說明;而其中數個細項也可㈣許多明The mandrel part (the pusher (33) = when it is unpacked, the card is a piece of the arranging piece (32). And make the other side _ ( « Effective fixed push actor. * With a smooth execution of the spiral 1 = two 10 A 1 1 picture] 'The above structure can also be applied to the side directly sealed l Γ , the screw perforation (3 2 2 ) can also be provided with one: the snap-on device (3 2 1 ); and if the iron kit (3 2) and the cover (3 5), then The snap-on device (351) is disposed on the cover (Μ) screw perforation __=: support (34) holder (341), which can be reached again, as shown in Figure i, which is opposite to the above card In response to the configuration of the structure, the - cow (3 3 3 ) is slanted around the screw perforation (3 3 2) of the pusher (3 3), and the phase is pre-set on the opposite axis of the screw (3 4 ) The corresponding snap-on device (3 4 3 ) is in a state in which the card can also be generated in operation. Also, please refer to the figure 13 1 4, in the two-round display, the screw (3 4 ) The card with the 6 M409987 cover (3 5) or the iron kit (3 2) is mainly used to project the screw (3 4) The e-piece (3 4 2) is applied with a polygonal body such as a pentagon or a square, and the corresponding hole is configured by the screw perforation (3 5 2 ) ( 3 2 2 ) of the cover body (3 5) or the iron kit (3 2 ). The structure 'according to the mutual limitation of the polygons to achieve the purpose of the card to fix. 疋 The above description can make people familiar with this method understand more advantages of this creation, and The narrative of Wei’s _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
顯不同的觀點來純m所有⑽㈣不會_原有賴作原理,故 上述之圖示及敘述是作為本質上的說明,而非限制。 M409987 【圖式簡單說明】 第1圖:係習用鐵套工具組拆裝狀態分解示意圖。 第2圖:係習用鐵套工具組拆裝狀態立體示意圖。 第3圖:係習用鐵套工具組拆裝動作示意圖1。 第4圖:係習用鐵套工具組拆裝動作示意圖2。 第5圖:係習用鐵套件組結構示意圖1。 第6圖:係習用鐵套件組結構示意圖2。 第7圖:係習用鐵套件組結構示意圖3。 第8圖:係本創作鐵套工具組拆裝狀態分解示意圖。 第9圖:係本創作鐵套工具組拆裝狀態示意圖。 第10圖:係本創作鐵套件組卡抵結構示意圖1。 第11圖:係本創作鐵套件組卡抵結構示意圖2。 第12圖:係本創作鐵套件組卡抵結構示意圖3。 第13圖:係本創作鐵套件組卡抵結構示意圖4。 第14圖:係本創作鐵套件組卡抵結構示意圖5。 【主要元件符號說明】 (10)桿體 (2 0)螺桿 (211)孔洞 (2 21)孔洞 (24)蓋體 (11)心軸部 (21)窄鐵套件 (2 2)寬鐵套件 (2 3)螺旋件 (2 41)孔洞 M409987It is obvious that m (10) and (4) are not based on the principle of the original, so the above illustrations and narratives are illustrative and not limiting. M409987 [Simple description of the diagram] Fig. 1 is a schematic diagram of the disassembly and assembly state of the iron sleeve tool set. Fig. 2 is a perspective view showing the disassembly and assembly state of the iron set tool set. Figure 3: Schematic diagram of the disassembly and assembly of the iron sleeve tool set. Figure 4: Schematic diagram of the disassembly and assembly of the iron sleeve tool set. Figure 5: Schematic diagram of the structure of the conventional iron kit group. Figure 6: Schematic diagram of the structure of the conventional iron kit group. Figure 7: Schematic diagram of the structure of the conventional iron kit group. Figure 8: This is a schematic diagram of the disassembly and assembly state of the iron set tool set. Figure 9: This is a schematic diagram of the disassembly and assembly state of the iron set tool set. Figure 10: This is the schematic diagram of the structure of the iron set of the iron set. Figure 11: This is the schematic diagram of the structure of the iron set of the iron set. Figure 12: This is the schematic diagram of the structure of the iron set of the iron set. Figure 13: This is the schematic diagram of the structure of the iron set of the iron set. Figure 14: This is the schematic diagram of the structure of the iron set of the iron set. [Main component symbol description] (10) Rod body (20) Screw (211) Hole (2 21) Hole (24) Cover body (11) Mandrel part (21) Narrow iron kit (2 2) Wide iron kit ( 2 3) Spiral piece (2 41) hole M409987
(2 5)推擠件 (3 Ο)鐵套工具組 (3 2)鐵套件 (3 2 2)螺桿穿孔 (3 3)推擠件 (3 3 2 )螺桿穿孔 (3 4)螺旋件 (3 4 2)管件 (3 5)蓋體 (3 5 2 )螺桿穿孔 (4 0)桿體 (2 51)孔洞 (31)螺桿 (3 21)卡接裝置 (3 31)卡接裝置 (3 3 3 )卡抵件 (3 41)卡抵件 (343)卡接裝置 (3 51)卡接裝置 (41)心軸部(2 5) pusher (3 Ο) iron sleeve tool set (3 2) iron kit (3 2 2) screw perforation (3 3) pusher (3 3 2) screw perforation (3 4) screw (3 4 2) Pipe fittings (3 5) Cover body (3 5 2) Screw perforation (40) Rod body (2 51) Hole (31) Screw (3 21) Clamping device (3 31) Clamping device (3 3 3 ) card offset (3 41) card contact (343) snap device (3 51) snap device (41) mandrel
99