TWM404868U - Assembly members for forming water-stop wall - Google Patents

Assembly members for forming water-stop wall Download PDF

Info

Publication number
TWM404868U
TWM404868U TW99224431U TW99224431U TWM404868U TW M404868 U TWM404868 U TW M404868U TW 99224431 U TW99224431 U TW 99224431U TW 99224431 U TW99224431 U TW 99224431U TW M404868 U TWM404868 U TW M404868U
Authority
TW
Taiwan
Prior art keywords
pair
templates
plastic
grouting assembly
positioning frame
Prior art date
Application number
TW99224431U
Other languages
Chinese (zh)
Inventor
Justin Chien
Original Assignee
Cosmay New Internat Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cosmay New Internat Inc filed Critical Cosmay New Internat Inc
Priority to TW99224431U priority Critical patent/TWM404868U/en
Publication of TWM404868U publication Critical patent/TWM404868U/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

M404868 五、新型說明: 【新型所屬之技術領域】 本新型是有關於一種建築用的組件,且特別是有關於 一種建造止水徵的組件。 【先前技術】 一般建築中會有許多防漏水的建築設計,止水墩的設 計就是其中的一種。止水墩可用於隔間牆的底部,藉以有 效阻絕隔間牆的漏水或滲水的問題。 習知大樓公寓中建造止水墩的方式,若以灌漿方式建 造,需先架構好模板再將止水墩之水泥漿(例如水泥、砂 與七理石的混合物)灌入模板之間,讓泥漿凝固後即可脫 模為一止水墩。若需要在同一大樓中的不同公寓中建造相 同設計或相同尺寸的止水墩,就必須重複架構模板,再重 複灌漿及脫模以建造止水墩。 然而,習知建造止水墩的方式,每次架構模板時,就 必須作大量的量測工作(例如量測兩模板之間的距離),且 重複使用的模板需要不斷的拆裝,上述兩種工作都需要許 多的工時,因此人力成本就會提高。 有鑑於此,在大樓公寓中建造止水墩的方式還需要更 創新的方式來解決上述的問題。 【新型内容】 因此,本新型之一目的是在提供一種改良的止水墩灌 3 M404868 漿組件。 依據上述之目的,提出一種止水墩灌漿組件,其包含 一對模板、一對條狀塑角材、複數定位框架以及複數固定 件。該對條狀塑角材位於該對模板之外側,並貼附於該對 模板底邊。定位框架用以定位該對模板之頂邊,且貼附於 ' 該對模板之外側面以及該對條狀塑角材之頂面。固定件用 以將該些定位框架固定於該對條狀塑角材之頂面。 依據本新型一實施例,固定件包含金屬釘或螺絲。 φ 依據本新型另一實施例,止水墩灌漿組件更包含一直 角框架,藉以定位該對模板與另一對模板之垂直連接處。 依據本新型另一實施例,定位框架為一厚度2毫米之 金屬板件。 依據本新型另一實施例,定位框架包含彼此對稱的一 對L形板,藉以貼附於該對模板之外側面以及該對條狀塑 角材之頂面。 依據本新型另一實施例,定位框架更包含一定位框, • 連接於該對L形板之間,且彎折以行成一對定位槽,藉以 ' 套合於該對模板之頂邊。 依據本新型另一實施例,定位框與該對L形板為一體 成形之金屬板件。 依據本新型另一實施例,該對模板為一對塑料模板。 依據本新型另一實施例,該對條狀塑角材為一對塑料 塑角材。 依據本新型另一實施例,每一該模板為一厚度10毫米 之塑料模板。 4 M404868 由上述可知,應用本新型之止水墩灌漿組件,建築工 人可以用較短時間及較方便的方式拆、裝止水墩灌漿組 件,且塑料模板不但重量較木材模板輕,且脫模後的止水 墩的牆面也較為平整。 【實施方式】 請參照第1圖’其繪示依照本新型一實施例的一種止 水墩灌漿組件之立體示意圖。第2圖係繪示第1圖之止水 φ 徵灌漿組件灌漿後之剖面示意圖。止水壞灌漿組件1 〇〇包 含模板(102a、102b)、塑角材(104a、104b)以及定位框 架106等。當建築工人欲以止水墩灌漿組件1〇〇建造一條 止水墩108時,至少需要一對模板(102a、l〇2b)、一對條 狀的塑角材(104a、104b)、複數定位框架1〇6以及複數固 定件(105a、105b)。 請參照第2圖,當一對模板(i〇2a、102b)直立的排 列於一地板101上時,藉一對條狀塑角材(104a、104b) • 貼附於模板(102a、10沘)外側的底邊,藉以定位模板 (102a、102b)的底邊的位置。接著,以複數定位框架1〇6 定位模板(102a、102b)之頂邊,且貼附於模板(1〇2a、 102b)之外側面以及條狀塑角材(1〇4a、1〇扑)之頂面。 最後,以複數固定件(l〇5a、l〇5b)將該些定位框架106 固定於該對條狀塑角材(l〇4a、1〇4b)之頂面,即可灌入 水泥漿(例如水泥、砂與七理石的混泥漿)於兩模板^ 1〇2a、 102b)之間以建造止水墩1〇8。止水墩1〇8可藉植筋u〇 與地板1〇1連接更穩固,以防止地板101與止水墩108之 5 M404868 連接面的漏水或滲水。由第2圖之剖面示意圖可知’建築 工人使用止水墩灌漿組件100時,只需以固定件(l〇5a、 105b)將定位框架106固定於條狀塑角材(104a、104b) 之頂面即可,不需另以固定件將定位框架106與模板 (102a、102b)固定。固定件(l〇5a、l〇5b)可以是金屬 釘或螺絲等,但不限於此。 請參照第1圖,止水墩108於門框區112之高度需降 低,因此可藉一對擋板(114a、114b)配合一對定位框架 φ ( 106a、106b)來達到門框區112之低止水墩的設計。具 體來說,先以定位框架(106a、106b)定義出門框區112 的寬度,擋板(114a、114b)分別插設於兩模板(102a、 102b)之間,且擋板U4a貼附於定位框架106a,而擋板 114b貼附於定位框架i〇6b。擋板(114a、114b)的底邊離 地板的高度即門框區U2之止水墩高度。當灌入水泥蒙 後,擋板(114a、114b)之間的門框區112,即可形成高度 較低的止水墩。 在上述實施例中’定位框架(1〇6、l〇6a、106b)為一 '厚度2毫米之金屬板件,但定位框架並不限於金屬板件。 模板(102a、102b)為一對塑料模板,其厚度約1〇毫米, 塑料之模板不但較木材模板重量輕,且脫模後的止水徵牆 面更為平整。模板(l〇2a、i〇2b)的材料亦不限於塑膠材 料。條狀塑角材(l〇4a、i〇4b )亦可為一對塑料塑角材, 有助於止水墩灌漿組件整體重量的減輕,因此易於被建築 工人所搬運。 請參照第3圖,其係繪示依照本新型一實施例的—種 6 M404868 止水墩灌漿組件之分解示意圖。定位框架106的設計需至 少達到兩個目的:(1)定位模板(102a、102b)之頂邊; 以及(2)貼附於模板(102a、102b)之外側面以及塑角材 (104a、丨〇朴)之頂面。因此,定位框架1〇6包含一定位 框106f以及一對彼此對稱的L形板106e。兩L形板l〇6e 彼此係鏡像對稱’且貼附於模板(102a、102b)之外側面 以及塑角材(l〇4a、l〇4b)之頂面。定位框106f連接於兩 L形板106e之間,且彎折以行成一對定位槽(l〇6c、l〇6d)。 φ 定位槽106c用以套合於模板l〇2a之頂邊,而定位槽l〇6d 用以套合於模板102b之頂邊。因為定位框架106之定位槽 的設計,所以不需要以螺絲或鋼釘將框架106與模板 (102a、102b)固定,就能將模板(102a、102b)的頂邊 定位,在拆、裝模板上亦更為省時與省工。當定位框架106 組立於模板(102a、102b)以及塑角材(104a、104b)後, 就如第2圖所繪示之狀態。此時,需以固定件(l〇5a、l〇5b) 將定位框架106固定於條狀塑角材(l〇4a、l〇4b)之頂面, 暴 使整個止水墩灌漿組件100能穩固的組立於地板1〇1上, . 可供灌入水泥衆(例如水泥、砂與七理石的混泥漿)於兩 模板(102a、102b)之間。 在上述實施例中,定位框106f以及兩彼此對稱的l形 板106e較佳為一體成形之金屬板件,但並不侷限於此。 請參照第4圖,其繪示依照本新型另一實施例的一種 止水墩灌漿組件之立體示意圖。此實施例之止水缴灌裝組 件100’與第1圖之止水墩灌漿組件100主要的差別在於止 水墩灌漿組件100,多了直角框架116。在本實施例中,一 7 M404868 對模板(102a、102b)與其他對模板的垂直連接處較第1 圖之實施例多,因此在每一模板之間的垂直連接處均套接 一直角框架116,藉以更精準的定位模板的位置。第1圖 之實施例亦可使用直角框架116以定位模板的垂直連接 處。 由上述本新型實施方式可知,應用本新型之止水墩灌 漿組件,建築工人可以用較短時間及較方便的方式拆、裝 止水墩灌漿組件,且塑料模板不但重量較木材模板輕,且 φ 脫模後的止水墩的牆面也較為平整。 雖然本新型已以實施方式揭露如上,然其並非用以限 定本新型,任何熟習此技藝者,在不脫離本新型之精神和 範圍内,當可作各種之更動與潤飾,因此本新型之保護範 圍當視後附之申請專利範圍所界定者為準。 【圖式簡單說明】 為讓本新型之上述和其他目的、特徵、優點與實施例 _ 能更明顯易懂,所附圖式之說明如下: ' 第1圖係繪示依照本新型一實施例的一種止水墩灌漿 組件之立體示意圖。 第2圖係繪示第1圖之止水墩灌漿組件灌漿後之剖面 示意圓。 第3圖係繪示依照本新型一實施例的一種止水墩灌漿 組件之分解示意圖。 第4圖係繪示依照本新型另一實施例的一種止水墩灌 漿組件之立體示意圖。 8 M404868 【主要元件符號說明】 100 :止水墩灌漿組件 100’ :止水墩灌漿組件 101 :地板 102a :模板 102b :模板 104a :塑角材 104b :塑角材 105a :固定件 105b ··固定件 106 :定位框架 106a :定位框架 106b :定位框架 106c :定位槽 106d :定位槽 106e : L形板 106f:定位框 108 :止水墩泥漿 110 :植筋 112 :門框墩座 114a :擋片 114b :擋片 116 :直角框架M404868 V. New description: [New technical field] The present invention relates to a building component, and in particular to a component for building a water stop sign. [Prior Art] There are many leak-proof architectural designs in general buildings, and the design of the water stop pier is one of them. Water stop piers can be used at the bottom of the partition wall to effectively prevent leakage or water seepage in the partition wall. The method of constructing the water stop pier in the Xizhi Building Apartment, if it is built by grouting, first construct the formwork and then pour the cement slurry of the water stop pier (for example, a mixture of cement, sand and slate) into the formwork. After the slurry solidifies, it can be demolded into a water pier. If it is necessary to construct a water stop pier of the same design or of the same size in different apartments in the same building, the formwork must be repeated and the grouting and demoulding must be repeated to construct the water stop pier. However, in the conventional way of constructing the water stop pier, each time the template is constructed, a large amount of measurement work must be performed (for example, measuring the distance between the two templates), and the reused template needs to be continuously disassembled, the above two All kinds of work require a lot of man-hours, so the labor cost will increase. In view of this, the way to construct a water pier in a building apartment requires a more innovative approach to solving the above problems. [New content] Therefore, one of the aims of the present invention is to provide an improved water stop pier irrigation 3 M404868 slurry assembly. According to the above object, a water stop pier grouting assembly is proposed, which comprises a pair of templates, a pair of strip-shaped plastic angle materials, a plurality of positioning frames and a plurality of fixing members. The pair of strip-shaped plastic angle members are located on the outer side of the pair of templates and attached to the bottom edges of the pair of templates. The positioning frame is used for positioning the top edge of the pair of templates, and is attached to the outer side of the pair of templates and the top surface of the pair of strip-shaped plastic angle materials. A fixing member is used to fix the positioning frames to the top surface of the pair of strip-shaped plastic angle members. According to an embodiment of the invention, the fixing member comprises a metal nail or a screw. φ According to another embodiment of the present invention, the water stop grouting assembly further includes a gusset frame for positioning the vertical connection of the pair of stencils to the other pair of stencils. According to another embodiment of the present invention, the positioning frame is a metal plate member having a thickness of 2 mm. In accordance with another embodiment of the present invention, the positioning frame includes a pair of L-shaped plates that are symmetrical to one another for attachment to the outer sides of the pair of stencils and the top surface of the pair of strip-shaped plastic angles. According to another embodiment of the present invention, the positioning frame further includes a positioning frame, and is connected between the pair of L-shaped plates and bent to form a pair of positioning grooves, so as to fit over the top edge of the pair of templates. According to another embodiment of the present invention, the positioning frame and the pair of L-shaped plates are integrally formed into a metal plate member. According to another embodiment of the present invention, the pair of templates is a pair of plastic templates. According to another embodiment of the present invention, the pair of strip-shaped plastic angle members are a pair of plastic plastic angle members. According to another embodiment of the present invention, each of the templates is a plastic template having a thickness of 10 mm. 4 M404868 It can be seen from the above that with the water stop pier grouting assembly of the present invention, the construction worker can disassemble and install the water pier grouting assembly in a shorter time and in a more convenient manner, and the plastic formwork is not only lighter than the wood formwork, but also demolded. The wall of the rear water stop pier is also relatively flat. [Embodiment] Please refer to FIG. 1 for a perspective view of a water stop pier grouting assembly according to an embodiment of the present invention. Fig. 2 is a schematic cross-sectional view showing the water stop φ slag grouting assembly after grouting in Fig. 1. The water stop grouting assembly 1 includes a template (102a, 102b), a plastic angle material (104a, 104b), and a positioning frame 106. When a construction worker wants to construct a water stop pier 108 with a water stop grouting assembly 1 , at least a pair of templates (102a, l〇2b), a pair of strip-shaped plastic angle materials (104a, 104b), a plurality of positioning frames are required. 1〇6 and a plurality of fixing members (105a, 105b). Referring to Fig. 2, when a pair of templates (i〇2a, 102b) are arranged upright on a floor 101, a pair of strip-shaped plastic angle members (104a, 104b) are attached to the template (102a, 10沘). The bottom edge of the outer side is used to position the bottom edge of the template (102a, 102b). Next, the top edge of the template (102a, 102b) is positioned by the plurality of positioning frames 1〇6, and attached to the outer side of the template (1〇2a, 102b) and the strip-shaped plastic angle material (1〇4a, 1〇) Top surface. Finally, the positioning frame 106 is fixed to the top surface of the pair of strip-shaped plastic angle materials (l〇4a, 1〇4b) by a plurality of fixing members (l〇5a, l〇5b), so as to be poured into the cement slurry (for example, cement). , the sand and the seven marble mixed mud) between the two templates ^ 1 〇 2a, 102b) to build a water stop pier 1 〇 8. The water stop piers 1〇8 can be more firmly connected to the floor 〇1 by the planting ribs 〇1 to prevent water leakage or water seepage of the joint surface of the floor 101 and the water stop pier 10 M404868. As can be seen from the cross-sectional view of Fig. 2, when the construction worker uses the water stop grouting assembly 100, the positioning frame 106 is only fixed to the top surface of the strip-shaped plastic angle members (104a, 104b) by fixing members (10a, 105b). That is, the positioning frame 106 and the template (102a, 102b) are not fixed by the fixing member. The fixing members (l〇5a, l〇5b) may be metal nails or screws, etc., but are not limited thereto. Referring to FIG. 1, the height of the water stop pier 108 in the door frame area 112 needs to be lowered. Therefore, the pair of baffles (114a, 114b) can be used to match the pair of positioning frames φ (106a, 106b) to achieve the low position of the door frame area 112. The design of the pier. Specifically, the width of the door frame region 112 is defined by the positioning frame (106a, 106b), and the baffles (114a, 114b) are respectively inserted between the two templates (102a, 102b), and the baffle U4a is attached to the positioning. The frame 106a is attached to the positioning frame i〇6b. The height of the bottom edge of the baffle (114a, 114b) from the floor is the height of the pier of the door frame area U2. When the cement is cast, the door frame area 112 between the baffles (114a, 114b) forms a lower water stop. In the above embodiment, the positioning frame (1〇6, l〇6a, 106b) is a metal plate member having a thickness of 2 mm, but the positioning frame is not limited to the metal plate member. The stencils (102a, 102b) are a pair of plastic stencils having a thickness of about 1 mm. The plastic stencil is not only lighter than the wood stencil, but also has a smoother wall after the demoulding. The material of the template (l〇2a, i〇2b) is also not limited to plastic materials. The strip-shaped plastic angle material (l〇4a, i〇4b) can also be a pair of plastic plastic angle materials, which helps to reduce the overall weight of the water stop grouting assembly and is therefore easy to be transported by the construction workers. Please refer to FIG. 3, which is a schematic exploded view of a 6 M404868 water stop pier grouting assembly according to an embodiment of the present invention. The design of the positioning frame 106 needs to achieve at least two purposes: (1) positioning the top edge of the template (102a, 102b); and (2) attaching to the outside of the template (102a, 102b) and the plastic angle (104a, 丨〇) The top of Park). Therefore, the positioning frame 1〇6 includes a positioning frame 106f and a pair of L-shaped plates 106e that are symmetrical with each other. The two L-shaped plates l〇6e are mirror-symmetrical to each other and attached to the outer faces of the outer faces of the stencils (102a, 102b) and the top surfaces of the plastic horns (10a, 4b, 4b). The positioning frame 106f is connected between the two L-shaped plates 106e and bent to form a pair of positioning grooves (l〇6c, l6d). The φ positioning groove 106c is for fitting on the top edge of the template 〇2a, and the positioning groove 〇6d is for fitting to the top edge of the template 102b. Because of the design of the positioning groove of the positioning frame 106, it is not necessary to fix the frame 106 and the template (102a, 102b) with screws or steel nails, and the top edge of the template (102a, 102b) can be positioned on the template. It also saves time and labor. When the positioning frame 106 is assembled to the templates (102a, 102b) and the plastic angle members (104a, 104b), it is in the state shown in Fig. 2. At this time, the positioning frame 106 is fixed to the top surface of the strip-shaped plastic angle materials (l〇4a, l〇4b) by fixing members (l〇5a, l〇5b), so that the entire waterstop grouting assembly 100 can be stabilized. The group is placed on the floor 1〇1. It can be poured into the cement (for example cement, sand and silty mud) between the two templates (102a, 102b). In the above embodiment, the positioning frame 106f and the two symmetrical plates 106e are preferably integrally formed metal plates, but are not limited thereto. Please refer to FIG. 4, which is a perspective view of a water stop pier grouting assembly according to another embodiment of the present invention. The main difference between the water stop filling assembly 100' of this embodiment and the water stop grouting assembly 100 of Fig. 1 is the water stop grouting assembly 100, which has a right angle frame 116. In this embodiment, a 7 M404868 pair of templates (102a, 102b) and other pairs of templates have more vertical connections than the embodiment of Figure 1, so that the vertical joints are nested at the vertical joints between each of the templates. 116, to more accurately locate the location of the template. The embodiment of Figure 1 can also use a right angle frame 116 to position the vertical connections of the formwork. It can be seen from the above-mentioned new embodiment that, by applying the water stop pier grouting assembly of the present invention, the construction worker can disassemble and install the water pier grouting component in a shorter time and in a more convenient manner, and the plastic template is not only lighter than the wood formwork, but also The wall surface of the water stop pier after φ demolding is also relatively flat. Although the present invention has been disclosed in the above embodiments, it is not intended to limit the present invention. Any one skilled in the art can make various changes and retouchings without departing from the spirit and scope of the present invention. The scope is subject to the definition of the scope of the patent application attached. BRIEF DESCRIPTION OF THE DRAWINGS In order to make the above and other objects, features, advantages and embodiments of the present invention more obvious and obvious, the description of the drawings is as follows: ' Figure 1 shows an embodiment in accordance with the present invention. A three-dimensional schematic diagram of a water stop pier grouting assembly. Fig. 2 is a schematic cross-sectional view showing the section of the water pier grouting assembly after the grouting of Fig. 1. Figure 3 is a schematic exploded view of a water stop pier grouting assembly in accordance with an embodiment of the present invention. Fig. 4 is a perspective view showing a water stop pier grouting assembly according to another embodiment of the present invention. 8 M404868 [Main component symbol description] 100: Water stop grouting assembly 100': water stop grouting assembly 101: floor 102a: template 102b: template 104a: plastic angle material 104b: plastic angle material 105a: fixing member 105b · fixing member 106 : positioning frame 106a: positioning frame 106b: positioning frame 106c: positioning groove 106d: positioning groove 106e: L-shaped plate 106f: positioning frame 108: water stop mud 110: planting bar 112: door frame podium 114a: blocking piece 114b: block Sheet 116: Right Angle Frame

Claims (1)

M404868 六、申請專利範圍: 1. 一種止水墩灌漿組件,至少包含: 一對模板; 一對條狀塑角材,位於該對模板之外側,並貼附於該 對模板底邊; 複數定位框架,用以定位該對模板之頂邊,且貼附於 該對模板之外側面以及該對條狀塑角材之頂面;以及 複數固定件,用以將該些定位框架固定於該對條狀塑 角材之頂面。 2. 如請求項1所述之止水墩灌漿組件,其中該固定 件包含金屬釘或螺絲。 3. 如請求項1所述之止水墩灌漿組件,更包含一直 角框架,藉以定位該對模板與另一對模板之垂直連接處。 4. 如請求項1所述之止水墩灌漿組件,其中該定位 框架為一厚度2毫米之金屬板件。 5. 如請求項1所述之止水墩灌漿組件,其中該定位 框架包含彼此對稱的一對L形板,藉以貼附於該對模板之 外側面以及該對條狀塑角材之頂面。 10 M404868 6. 如請求項5所述之止水墩灌漿組件,其中該定位 框架更包含一定位框,連接於該對L形板之間,且彎折以 行成一對定位槽,藉以分別套合於該對模板之頂邊。 7. 如請求項6所述之止水墩灌漿組件,其令該定位 框與該對L形板為一體成形之金屬板件。 . 8. 如請求項1所述之止水墩灌漿組件,其中該對模 # 板為一對塑料模板。 9. 如請求項1所述之止水墩灌漿組件,其中該對條 狀塑角材為一對塑料塑角材。 10.如請求項1所述之止水墩灌漿組件,其中該每一 該模板為一厚度10毫米之塑料模板。M404868 VI. Patent application scope: 1. A water stop pier grouting component, comprising at least: a pair of templates; a pair of strip-shaped plastic angle materials located on the outer side of the pair of templates and attached to the bottom edge of the pair of templates; a top edge of the pair of templates, and attached to the outer side of the pair of templates and a top surface of the pair of strip-shaped plastic angle materials; and a plurality of fixing members for fixing the positioning frames to the pair of strips The top surface of the plastic angle. 2. The water pier grouting assembly of claim 1, wherein the fixture comprises metal studs or screws. 3. The water pier grouting assembly of claim 1 further comprising a constant angle frame to position the vertical connection of the pair of templates to the other pair of templates. 4. The water pier grouting assembly of claim 1, wherein the positioning frame is a metal plate member having a thickness of 2 mm. 5. The water pier grouting assembly of claim 1, wherein the positioning frame comprises a pair of L-shaped plates that are symmetrical to each other for attachment to an outer side of the pair of stencils and a top surface of the pair of strip-shaped plastic horns. 10 M404868 6. The water pier grouting assembly of claim 5, wherein the positioning frame further comprises a positioning frame connected between the pair of L-shaped plates and bent to form a pair of positioning grooves, respectively Fit to the top edge of the pair of templates. 7. The water pier grouting assembly of claim 6, wherein the positioning frame and the pair of L-shaped plates are integrally formed of sheet metal members. 8. The water pier grouting assembly of claim 1, wherein the pair of dies are a pair of plastic stencils. 9. The water pier grouting assembly of claim 1, wherein the pair of strip-shaped plastic angle materials are a pair of plastic plastic angle members. 10. The water pier grouting assembly of claim 1, wherein each of the stencils is a plastic stencil having a thickness of 10 mm.
TW99224431U 2010-12-16 2010-12-16 Assembly members for forming water-stop wall TWM404868U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW99224431U TWM404868U (en) 2010-12-16 2010-12-16 Assembly members for forming water-stop wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW99224431U TWM404868U (en) 2010-12-16 2010-12-16 Assembly members for forming water-stop wall

Publications (1)

Publication Number Publication Date
TWM404868U true TWM404868U (en) 2011-06-01

Family

ID=45078706

Family Applications (1)

Application Number Title Priority Date Filing Date
TW99224431U TWM404868U (en) 2010-12-16 2010-12-16 Assembly members for forming water-stop wall

Country Status (1)

Country Link
TW (1) TWM404868U (en)

Similar Documents

Publication Publication Date Title
US8025267B2 (en) Concrete sideform system
US3662507A (en) Preformed building wall construction
US8955282B2 (en) Soloarmar construction engineering system
AU2018200694A1 (en) Formwork
AU2007321755A1 (en) Sideform securing system
KR20100027628A (en) Wall panels of a prefabricated bathroom
TWM404868U (en) Assembly members for forming water-stop wall
US20080236083A1 (en) Modular Concrete Wall System
KR100519037B1 (en) Mortar plasterer
AU2011253896B2 (en) Improvements in or relating to concrete forming and methods therefor
JPH08165727A (en) Construction panel body and joint method thereof
US9630340B2 (en) System of forming walls with exterior applied finish panels
JP2017031782A (en) Transparent temporary frame structure for forming reinforced concrete building
TWM434798U (en) Water-stop wall and assembly members for forming the same
CN104131697A (en) Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system
KR20150073443A (en) Construction structure of reinforced concrete building and construction method thereof
JP2002047660A (en) Foundation execution method for house or the like and foundation form panel
KR200425791Y1 (en) Assemble form tile and tile holder
TWI790613B (en) Adjustable trim structure on the top and bottom of building formwork
TWI537458B (en) Water-stop wall and manufacturing method thereof
KR101252808B1 (en) Waterproof system
JPH0242811Y2 (en)
KR20180000932A (en) Cast Frame Using Steel production side gutter
RU74148U1 (en) DEVICE FOR BUILDING WALLS OF BUILDINGS FROM LIGHT CONCRETE
KR20150019081A (en) Plate type implement for forming automatically masonry joint in concrete-block work

Legal Events

Date Code Title Description
MK4K Expiration of patent term of a granted utility model