TWM301742U - Assembling structure of hammer - Google Patents

Assembling structure of hammer Download PDF

Info

Publication number
TWM301742U
TWM301742U TW95209032U TW95209032U TWM301742U TW M301742 U TWM301742 U TW M301742U TW 95209032 U TW95209032 U TW 95209032U TW 95209032 U TW95209032 U TW 95209032U TW M301742 U TWM301742 U TW M301742U
Authority
TW
Taiwan
Prior art keywords
hammer
handle
combination
joint portion
perforation
Prior art date
Application number
TW95209032U
Other languages
Chinese (zh)
Inventor
Sheng-Yan Lai
Original Assignee
Sheng-Yan Lai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sheng-Yan Lai filed Critical Sheng-Yan Lai
Priority to TW95209032U priority Critical patent/TWM301742U/en
Publication of TWM301742U publication Critical patent/TWM301742U/en

Links

Landscapes

  • Percussive Tools And Related Accessories (AREA)

Description

M301742 入、新型說明: 【新型所屬之技術領域】 本創作乃係有關一種鐵鍵之組合結橋 不苒尤指可提升錘體部與握把 部之間的契合度之組合結構。 【先前技術】 常用的親大多係由錘體與握把之組合結構請先參閱圖一翔二 所示,其中該鐵鍵(10)係由一錘體(11)與一柄桿(⑵ 組成,在該錘體(11)開設有一穿孔(13),且該穿孔(13)係 製成錐狀,將該柄桿(12)-端組設在該錘體(丄工)之办孔(1 3)中’細銷釘(14)獻該柄桿(12)頂端處,:該柄桿 (12)頂端處擴張而填滿該錘體(工丄)之穿孔(工3 ),讓該柄浐 (12)與錘體(11)嵌制在一起。 ” ^ 干 雖然上述之組合結構有簡練合、組裝容轉功效,在使用 有些許的缺陷: 習知之該麵(i 〇 )係藉轉釘(i 4 )嵌人該柄桿(丄2 ) 頂端處’迫使該柄桿(i 2)端面擴張而填滿在該錘體U的穿 孔(13)中’因操作者使用該鐵鍵(i 〇)時,大部分係以弧擺的 方式作動,因此長期在這種操作狀態下,容易使該相桿(12)結合 於穿孔(13)處’遭受擠屋而產生損壞,造成該錘體(^)會與 該柄桿(1 2 )脫離,造成操作者使用上的危險。 曰 有鑒於上述習知鐵鍵之組合結構之缺失,故,如何能開發出不易 發生麵她桿之間_,為时麵$減者錢追奴目標。 M301742 【新型内容】 本創作之主要目的’乃在提供-種魏之組合結構,該鐵鍵係由 -錘體及-柄桿所構成,該錘體頂端中央處開設有—矩形穿孔,且該 穿孔可供柄桿-端組設在該麵之穿孔中,並儀翁欽該柄桿頂 端處,使該柄桿頂端因受到擠壓而填滿緊迫於該錘體之穿孔,讓該柄 桿與該錘體嵌制在-起,而在驗體底端延設有—結合部,該結合部 設有-容槽,該容娜與該麵之穿孔麵,該結合部側邊開設有— 結合孔’且該結合孔健透⑽容射,並融狀元料設過該鐘 體之結合孔顧定馳桿上’㈣賴體與柄桿義結合之目的。 【實施方式】 為使貴審查員能更易於了解本創作之結構及所能達到之功效, 茲配合圖式說明如后: 首先請參閱圖四所示,本創作之該鐵鎚(3 〇)具有一錘體(3 1)及一柄桿(3 2)。 該鐘體(3 1 ),其頂端出開設有一穿孔(3 1 1 ),該錘體(3 1 )底端中央處延設有一結合部(3 1 2 ),且該結合部(3 1 2 )設 有一谷槽(3 1 3 ),該容槽(3 1 3 )係與錘體(3丄)之穿孔(3 1 1)相通’係該結合部(3 1 2 )之側邊設有一穿透至該容槽(3 1 3 )之結合孔(3 :L 4);該錘體(3 1) —端形成一矩形的錘擊部 (3 3 )’該錘體(3 1)在錘擊部(3 3 )的另一端形成漸斜式的砌 磚部(3 4); ^ _干(3 2 )’其係為一桿體,該柄桿(3 2 ) —端係組設在該 M3 01742 ί垂體(31 )之該容槽(312)中; 該固定元件(S ) ’係可為_、崎錄釘,_定元件⑻ 係穿設在該結合部(3 1 2 )之結合孔(3 i 4 ),顧定在該柄 2)上; 次請參_五、六聯,本_該鐵鍵(3 Q)於實施時,將該 柄桿(32卜端組設在該錘體(31)之穿孔(3ιι)中,係將 銷釘U)欲入該柄桿(3 2 )頂端處,該翁(A)形狀係三角錐 馨狀,因頂端受到擠壓而填滿緊迫於該錘體(3 i)之穿孔(3丄丄), 而該錘體(3 1)底端中央處延設有—結合部(3 i 2 ),且該結合部 (312)之侧邊設有-穿透至該結合部(3工2)之容槽(3丄3) 之結合孔(3 1 4 ) ’ 定树(s )係穿設在該結合部(3工2 ) 之、,〜孔(3 1 4 )上,並固定在該柄桿(3 2 )上,藉此來固定該 錘體(31)與該柄桿(3 2)。 • 本創作之功效在於,#由於錘擊部(3 3)之本體上開設一穿孔 (311),並於錘擊部(33)底端中央延設一結合部(312), 且該結合部(312)之側邊上設有—穿透之結合孔(3丨4),當 柄杯(3 2)穿設於該穿孔(3 i工)時,利用銷釘(a)釘入柄桿 (3 2 )之頂端’可令柄桿(3 2 )之頂端因鎖釘⑷之擠崖而殖 結返f於錘擊部⑻)之穿孔(3⑴周壁,在利用固定元件 A ^)牙設於結合部(312)之結合孔(314)上,以加強錘擊 3 )與柄彳干(3 2 )之結合強度,並使賴婦有較佳之應力, r到增加該频使用上安全性之功效。 M301742 、’’不上所述’本創作本創作藉由上述構造確已能達成所訴求之g的 :功=應:符合新穎性及進步性之要件,爰依法提出新型專利之申 請’祈請責衫員之_,祕軒專利之私,至感德便。 【圖式簡單說明】 圖一係習知鐵鎚之分解剖面圖。 圖二係習知鐵鎚之組合剖面圖。 圖三係本創作立體分解圖。 _圖四係本創作外觀組合立體圖。 圖五係本創作組合剖面圖。【主要元件符號說明】1 1錘體 1 3穿孔 3 1鐘體 3 1 2結合部 3 1 4結合孔 3 2柄桿 3 4彻磚部 1鐵鍵 2 0鎖合元件 3鐵鎚 1 2柄桿 1 4銷釘 3 1 1穿孔 3 1 3容槽 3 3錘擊部 A鎖釘 S固定元件 8M301742 In, new description: [New technical field] This creation is a combination of a kind of iron bond bridge. It is a combination structure that can improve the fit between the hammer body and the grip. [Prior Art] The commonly used pro-majority consists of a combination of a hammer and a grip. Please refer to Figure 1 and Figure 2, where the iron key (10) consists of a hammer (11) and a handle ((2)). a hole (13) is formed in the hammer body (11), and the through hole (13) is formed into a taper shape, and the handle (12)-end is assembled in the hole of the hammer body (completed) 1 3) The middle pin (14) is provided at the top end of the shank (12), and the tip of the shank (12) is expanded to fill the piercing of the hammer (worker 3), so that the handle浐(12) is embedded with the hammer body (11). ” ^ Dry Although the above-mentioned combined structure has the functions of simple assembly and assembly and transfer, there are some defects in use: the face of this knowledge (i 〇) is borrowed The nail (i 4 ) is embedded in the shank (丄 2 ) at the top end to force the end of the shank (i 2) to expand and fill in the perforation (13) of the hammer U 'because the operator uses the iron key ( i 〇), most of them are operated by arc pendulum. Therefore, in this operation state for a long time, it is easy to cause the phase rod (12) to be combined with the perforation (13) to suffer damage from the squeezing house, resulting in the hammer. Body (^) Disengaged from the shank (1 2 ), causing danger to the operator. 鉴于 In view of the lack of the above-mentioned conventional combination of the iron key, how can it be developed that it is not easy to occur between the faces of the _, the time surface M301742 [New content] The main purpose of this creation is to provide a combination of Wei, which consists of a hammer and a shank, at the center of the top of the hammer. a rectangular perforation is provided, and the perforation is provided in the perforation of the surface of the shank, and the end of the shank is filled at the top end of the shank, so that the top end of the shank is filled and pressed against the hammer The perforation of the body is such that the shank and the hammer body are embedded in the body, and a joint portion is extended at the bottom end of the test body, and the joint portion is provided with a groove, and the through hole of the face and the face, The side of the joint is provided with a joint hole and the joint hole is well-jawn (10), and the melted element is disposed through the joint hole of the bell body and the purpose of the combination of the 'fourth' body and the stem. Ways: In order to make it easier for your examiner to understand the structure of the creation and the effect it can achieve, The schematic description is as follows: First, as shown in Figure 4, the hammer (3 〇) of the present invention has a hammer body (3 1) and a stem (3 2). The bell body (3 1 ), A through hole (3 1 1 ) is defined in the top end, a joint portion (3 1 2 ) is extended at the center of the bottom end of the hammer body (3 1 ), and the joint portion (3 1 2 ) is provided with a valley groove (3 1 3 ) The pocket (3 1 3 ) is in communication with the perforation (3 1 1) of the hammer body (3丄), and the side of the joint portion (3 1 2 ) is provided with a penetration to the pocket (3 1 3) a joint hole (3: L 4); the hammer body (3 1) ends forming a rectangular hammer portion (3 3 ) 'the hammer body (3 1) at the hammer portion (3 3 ) One end forms a gradually inclined brickwork (3 4); ^ _ dry (3 2 )' is a rod body, and the stem (3 2 ) is end-mounted in the M3 01742 ί pit (31) In the pocket (312); the fixing element (S)' can be a _, a snail, and the singular element (8) is passed through a coupling hole (3 i 4 ) of the joint (3 1 2), Gu Ding is on the handle 2); the second is _ five, six joints, the _ the iron key (3 Q) is implemented, the handle (the 32 end set is set in the hammer 31) In the perforation (3 ιι), the pin U) is intended to be inserted into the top end of the shank (3 2 ), and the shape of the stalk (A) is triangular-shaped, and is filled with the tip to be pressed and pressed against the hammer. a hole (3 )) of the body (3 i), and a joint portion (3 i 2 ) is disposed at the center of the bottom end of the hammer body (31), and the side of the joint portion (312) is provided with - a coupling hole (3 1 4 ) that penetrates into the groove (3丄3) of the joint portion (3) 3, the fixed tree (s) is threaded through the joint portion (3), and the hole is (3 1 4) is attached to the shank (32) to fix the hammer (31) and the shank (32). The effect of the present invention is that a perforation (311) is formed in the body of the hammering portion (3 3), and a joint portion (312) is extended in the center of the bottom end of the hammering portion (33), and the joint portion is The side of the (312) is provided with a through-hole (3丨4), and when the handle cup (32) is inserted through the hole (3), the pin (a) is used to nail the handle ( 3 2) The top of the handle can be used to make the top end of the stem (3 2 ) due to the crushing of the locking nail (4) and the back of the hammering part (8). (3 (1) peripheral wall, using the fixing element A ^) The bonding hole (314) of the joint portion (312) is used to strengthen the bonding strength between the hammering 3) and the stem (3 2 ), and the Lai woman has better stress, and the safety of the frequency is increased. efficacy. M301742, ''Not on the above'. This creation has indeed achieved the desired g by the above construction: Gong = should: meet the requirements of novelty and progressiveness, and apply for a new patent in accordance with the law' The blame of the shirt _, the secret of the secret Xuan patent, to the sense of virtue. [Simple description of the diagram] Figure 1 is an exploded sectional view of a conventional hammer. Figure 2 is a sectional view of a combination of conventional hammers. Figure 3 is a three-dimensional exploded view of the creation. _ Figure 4 is a three-dimensional view of the creation of this creation. Figure 5 is a cross-sectional view of the creation combination. [Main component symbol description] 1 1 Hammer 1 3 Perforation 3 1 Bell body 3 1 2 Joint 3 1 4 Binding hole 3 2 Shank 3 4 Bricks 1 Iron key 2 0 Locking element 3 Hammer 1 2 handle Rod 1 4 pin 3 1 1 perforation 3 1 3 pocket 3 3 hammering part A locking nail S fixing element 8

Claims (1)

M301742 九、申請專利範園: 1 ·一種鐵鎚之組合結構,鐵鎚係由一錘體與一柄桿所組成,該 鐘體頂端巾央處設有—穿孔,該穿孔可供柄桿穿設,該柄桿之頂為以 銷釘釘入’令柄桿之頂端可填滿並迫緊於料之賤,於錘體之底端 延设有-結合部,該結合部具有—容槽,鮮獅與穿孔相通,其特 徵在於·該結合部之瓣設有—結合孔,該結合孔射供映元件穿 设過柄桿,以達到錘體與柄桿結合之目的者。 2·如申請第1項所述之一種鐵鎚之組合結構,其中,該固定元 件係可為插鎖者。 3 ·如中請第1項所述之-種峨之組合結構,其中,該 件係可為鉚釘者。 4·如申請第1項所述之一種鐵鎚之組合 件係可為拉釘者。 。、,構,其中,該固定元M301742 IX. Application for Patent Park: 1 · A combination of hammers, the hammer consists of a hammer and a handle, and the end of the bell body is provided with a perforation, which can be worn by the handle The top of the handle is pinned into the end of the handle bar to fill and press the material, and a joint portion is extended at the bottom end of the hammer body, and the joint portion has a receiving groove. The fresh lion is in communication with the perforation, and is characterized in that: the flap of the joint portion is provided with a joint hole, and the joint hole is provided through the handle rod to achieve the purpose of combining the hammer body and the stem. 2. A combination of hammers according to claim 1, wherein the fixed component is a mortise locker. 3 · The combination structure of the type described in item 1 of the above, wherein the piece can be a rivet. 4. A combination of hammers as claimed in claim 1 may be a puller. . , the structure, wherein the fixed element
TW95209032U 2006-05-25 2006-05-25 Assembling structure of hammer TWM301742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW95209032U TWM301742U (en) 2006-05-25 2006-05-25 Assembling structure of hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW95209032U TWM301742U (en) 2006-05-25 2006-05-25 Assembling structure of hammer

Publications (1)

Publication Number Publication Date
TWM301742U true TWM301742U (en) 2006-12-01

Family

ID=38220905

Family Applications (1)

Application Number Title Priority Date Filing Date
TW95209032U TWM301742U (en) 2006-05-25 2006-05-25 Assembling structure of hammer

Country Status (1)

Country Link
TW (1) TWM301742U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111775105A (en) * 2020-06-10 2020-10-16 胡嘉强 Hammer assembly quality

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111775105A (en) * 2020-06-10 2020-10-16 胡嘉强 Hammer assembly quality

Similar Documents

Publication Publication Date Title
WO2008150656A3 (en) Brick tie anchor and drive tool
CA2353059C (en) Hammer
TWM301742U (en) Assembling structure of hammer
TWM296772U (en) Hammer with adjustable fulcrum for pulling out nail
CN201467625U (en) Steel spade
TWM313580U (en) Head structure of universal pliers
TWI587991B (en) Multi-purpose hammer
US19945A (en) Kigidly the ends of metal beams
CN207847278U (en) Lock core sleeve
JP2006001065A5 (en)
TWI337920B (en) Ultrasonic wheel structure for a torque wrench
TWM373258U (en) Hand tool
CN201350622Y (en) Self-locking butt-clamping type tool handle
KR200385863Y1 (en) Convenient hammer
TW201102589A (en) Hand tool
JP2009030381A (en) Stone-material connecting structure
TWM532347U (en) Brick hammer
CN208106326U (en) A kind of drill bit of rock drilling
TWI292309B (en)
TWM458289U (en) Hammer for use in nailing formworks
CN206764696U (en) A kind of multifunctional vertical nail puller
TWM658259U (en) Hand tool grip assembly structure
CN203266585U (en) Multifunctional hammer
KR101889169B1 (en) a functional hand tools
CN100354536C (en) Multifunction traction nail

Legal Events

Date Code Title Description
MM4K Annulment or lapse of a utility model due to non-payment of fees