本發明係關於一種工程算量系統及方法,尤其係關於一種利用工程圖檔所載資訊,用以計算工時、人力、原物料及金額之系統及方法。 The present invention relates to an engineering calculation system and method, and more particularly to a system and method for utilizing information contained in engineering drawings for calculating working hours, manpower, raw materials and amounts.
目前在營建工程圖檔之繪製,使用最廣泛的是電腦輔助設計(CAD)與建築資訊模型(BIM),這是因為CAD系統可繪製準確的向量圖文件,並可結合3D作多角度的檢視與設計,也可清楚的將繪製完成的CAD圖檔展開為爆炸圖,而BIM係利用工程在設計和建造過程中完全和充足資訊,直接定義解釋的工程資訊模型,然而目前市售營建工程算量軟體,僅可載入PDF圖檔或CAD繪製之工程圖檔,然後需重新繪製成BIM之工程圖檔,再由該算量軟體讀取BIM工程圖檔上所載資訊,利用該算量軟體進行物理量計算,藉此可得工程中所需之工時、人力、原物料及費用,惟,如直接將BIM工程圖檔載入該習知算量軟體,則會因市場上不同的BIM軟體,而產生工程圖檔格式相異,造成工程圖檔所載資訊遺失。 At present, the most widely used drawing files for engineering projects are Computer Aided Design (CAD) and Building Information Model (BIM). This is because the CAD system can draw accurate vector image files and can be combined with 3D for multi-angle viewing. And the design, can also clearly develop the completed CAD image file into an explosion map, and BIM system uses the complete and sufficient information in the design and construction process to directly define the engineering information model of the interpretation, but the current commercial construction project counts The software can only be loaded into the PDF image file or the CAD drawing engineering drawing file, and then need to be redrawn into the BIM engineering drawing file, and then the calculation software will read the information contained in the BIM engineering drawing file, and use the calculation amount. The physical quantity calculation of the software can be used to obtain the man-hours, labor, raw materials and expenses required in the project. However, if the BIM engineering drawing file is directly loaded into the conventional calculation software, it will be different from the BIM on the market. Software, and the format of the generated drawing file is different, causing the information contained in the drawing file to be lost.
前述習知工程算量軟體之缺點,係於載入CAD工程圖檔後, 須重新繪製成BIM工程圖檔,且無任何驗證機制,用以確認該重新繪製之BIM工程圖檔,或以直接方式載入習知工程算量軟體之BIM工程圖檔,所載資訊是否有遺漏,此外習知工程算量軟體之計算方式係計算物理量,就BIM工程圖檔所載資訊進行計算,而非依據政府對工程相關規範之計算方式,因此其無法精確算出工程中所需工時、人力、原物料及費用,且亦無法符合政府對工程之相關規範。習知工程算量軟體之方法不僅無法精確算量,以符合政府規範,且會耗費許多的時間和人力,造成人力及資源的浪費。 The shortcomings of the aforementioned conventional engineering calculation software are after loading the CAD engineering drawing file. It must be redrawn into a BIM engineering drawing file without any verification mechanism to confirm the redrawn BIM engineering drawing file, or directly load the BIM engineering drawing file of the conventional engineering calculation software. Missing, in addition, the calculation method of the conventional engineering calculation software is to calculate the physical quantity, and calculate the information contained in the BIM engineering drawing file, instead of calculating the calculation method according to the government's relevant engineering specifications, so it is impossible to accurately calculate the required working hours in the project. , manpower, raw materials and expenses, and can not meet the relevant government specifications for the project. The method of knowing the engineering software is not only impossible to accurately calculate, in order to comply with government regulations, and it will take a lot of time and manpower, resulting in waste of manpower and resources.
因此,需要一種創新且具進步性的工程算量之系統及方法,以解決上述問題。 Therefore, there is a need for an innovative and progressive engineering calculation system and method to solve the above problems.
本發明之目的在於提供一種工程算量系統,其載入至少一圖文資訊,以計算工程算量,其包括:一儲存模組,係包含至少一定義資訊及至少一表單,一辨識模組,係電性連接該儲存模組,其根據該儲存模組之該至少一定義資訊,用以辨識該圖文資訊之一部或全部,一轉換模組,係電性連接該儲存模組及該辨識模組,利用該至少一定義資訊轉換該至少一圖文資訊為至少一要素單元,一驗證模組,其電性連接該儲存模組,其依據該至少一圖文資訊訊驗證該至少一要素單元,一計算模組,係電性連接該儲存模組,其依據該至少一定義資訊計算該至少一要素單元,產生至少一數額,該數額係儲 存該表單。 An object of the present invention is to provide an engineering calculation system that loads at least one graphic information to calculate an engineering calculation, which includes: a storage module including at least one definition information and at least one form, and an identification module Electrically connecting the storage module to the at least one definition information of the storage module for identifying one or all of the graphic information, a conversion module electrically connecting the storage module and The identification module converts the at least one graphic information into at least one element unit by using the at least one definition information, and the verification module is electrically connected to the storage module, and the at least one graphic information is verified according to the at least one graphic information. An element unit, a computing module, electrically connected to the storage module, and calculating the at least one element unit according to the at least one definition information, generating at least one amount, the amount is stored Save the form.
本發明之目的在於提供一種工程算量方法,載入至少一圖文資訊,計算工程算量,包括以下步驟:(a)讀取預設至少一定義資訊及至少一表單;(b)根據該至少一定義資訊辨識該圖文資訊之一部或全部;(c)利用該至少一定義資訊轉換該至少一圖文資訊為至少一要素單元;(d)該至少一圖文資訊驗證該至少一要素單元;(e)該至少一定義資訊計算該至少一要素單元,產生至少一數額。 The object of the present invention is to provide an engineering calculation method, loading at least one graphic information, and calculating an engineering calculation, comprising the steps of: (a) reading at least one definition information and at least one form; (b) according to the And (c) converting the at least one graphic information into at least one element unit by using the at least one definition information; and (d) verifying the at least one graphic information by the at least one graphic information a feature unit; (e) the at least one definition information calculates the at least one element unit to generate at least one amount.
藉此,本發明利用轉換圖文資訊之技術,可直接讀出要素單元,並用以計算出工時、人力、原物料及金額等資訊,進而可節省大量之人力、時間與資源。如果再設置一警示模組,針對由外部載入之圖文資訊及轉換後之要素單元,進行定義判斷與驗證比對,進一步以警示訊息提醒資訊錯誤,更可以提高算量資訊之正確率。 Thereby, the invention can directly read out the element unit by using the technology of converting graphic information, and is used for calculating information such as working hours, manpower, raw materials and amount, thereby saving a large amount of manpower, time and resources. If a warning module is set up, the definition and verification comparison are performed on the graphic information and the converted element unit loaded by the external, and the warning message is further used to remind the information error, and the correct rate of the calculation information can be improved.
1‧‧‧工程算量系統 1‧‧‧Engineering System
11‧‧‧儲存模組 11‧‧‧ Storage Module
114‧‧‧定義資訊 114‧‧‧Definition information
116‧‧‧表單 116‧‧‧Form
12‧‧‧辨識模組 12‧‧‧ Identification Module
13‧‧‧轉換模組 13‧‧‧Transition module
14‧‧‧驗證模組 14‧‧‧ verification module
15‧‧‧計算模組 15‧‧‧Computation Module
16‧‧‧警示模組 16‧‧‧Warning module
18‧‧‧圖文資訊 18‧‧‧ Graphic Information
S21~S28‧‧‧本發明步驟 S21~S28‧‧‧ steps of the invention
圖1顯示本發明工程算量系統之方塊圖。 Figure 1 shows a block diagram of the engineering calculation system of the present invention.
圖2顯示本發明工程算量方法之流程圖。 Figure 2 is a flow chart showing the method of engineering calculation of the present invention.
請參考圖1係本發明工程算量系統之方塊圖。本發明工程算量系統1包括一儲存模組11、一辨識模組12、一轉換模組13、一驗證模組14、一計算模組15及一警示模組16。 Please refer to FIG. 1 which is a block diagram of the engineering calculation system of the present invention. The engineering calculation system 1 includes a storage module 11, an identification module 12, a conversion module 13, a verification module 14, a calculation module 15, and a warning module 16.
該儲存模組11係用以儲存至少一定義資訊114及至少一表單 116,該至少一定義資訊114包括政府工程算量規範之計算公式、圖例、圖式之線條、圖層、維度、字元、尺寸與符號等屬性定義檔,以及依據計算公式與定義檔撰寫之註解文字,該至少一表單具有至少一欄位,且儲存格式係XML、XLSX、XLS、CSV與ODS等格式儲存。 The storage module 11 is configured to store at least one definition information 114 and at least one form 116. The at least one definition information 114 includes a calculation formula of a government engineering calculation specification, a definition definition of a legend, a line, a layer, a dimension, a character, a size, and a symbol, and an annotation written according to the calculation formula and the definition file. Text, the at least one form has at least one field, and the storage format is stored in a format such as XML, XLSX, XLS, CSV, and ODS.
該辨識模組12係電性連接該儲存模組11,其依據該至少一定義資訊114及該至少一表單116辨識由外部載入之至少一圖文資訊18,其利用圖式之線條、圖層、維度、字元、尺寸與符號等屬性與圖例表辨識圖式被選取的範圍是否符合定義,該至少一圖文資訊18包含至少一圖式(未繪於圖式)或至少一字元(未繪於圖式),其中該至少一圖式係由線條、圖層、維度與尺寸等組成,其檔案格式為JPG檔、JPEG檔、GIF檔、BMP檔、TIF檔、TIFF檔、PNG檔、SVG檔、UFO檔、DXF檔、PCD檔、EPS檔、BIM檔、AI檔、CAD檔或是PDF檔,而該字元係為數字、字母、符號及其所組成之字串。 The identification module 12 is electrically connected to the storage module 11 , and the at least one graphic information 18 is externally loaded according to the at least one definition information 114 and the at least one form 116 , and the lines and layers of the drawing are utilized. Whether the attributes such as dimensions, characters, sizes, and symbols and the range of the legend table identification pattern are consistent with the definition, the at least one graphic information 18 includes at least one schema (not drawn in the schema) or at least one character ( Not shown in the figure), wherein the at least one pattern is composed of lines, layers, dimensions and dimensions, and the file format is JPG file, JPEG file, GIF file, BMP file, TIF file, TIFF file, PNG file, SVG file, UFO file, DXF file, PCD file, EPS file, BIM file, AI file, CAD file or PDF file, and the character is a string of numbers, letters, symbols and their characters.
該轉換模組13係電性連接該儲存模組11與該辨識模組12,其讀取該辨識模組12所辨識之該至少一圖文資訊18,且擷取該至少一圖文資訊18所載資訊,並轉換為至少一要素單元(未繪於圖式),將該至少一要素單元儲存至對應之該至少一表單116之表單。 The conversion module 13 is electrically connected to the storage module 11 and the identification module 12, and reads the at least one graphic information 18 recognized by the identification module 12, and captures the at least one graphic information 18 The information is contained and converted into at least one element unit (not shown in the drawing), and the at least one element unit is stored in a form corresponding to the at least one form 116.
該驗證模組14係電性連接該儲存模組11,其讀取儲存於該儲存模組11之該至少一要素單元,將該至少一要素單元與該至 少一圖文資訊18進行比對,用以驗證該轉換模組13所轉換之至少一要素單元與該至少一圖文資訊18所載資訊是否一致。 The verification module 14 is electrically connected to the storage module 11 and reads the at least one element unit stored in the storage module 11 , and the at least one element unit and the The less than one graphic information 18 is compared to verify whether the at least one element unit converted by the conversion module 13 is consistent with the information contained in the at least one graphic information 18.
該計算模組15係電性連接該儲存模組11,其分別讀取儲存於該儲存模組11之該至少一定義資訊114及該至少一要素單元,該至少一要素單元係依據該至少一定義資訊114之政府工程算量規範之計算公式進行計算。 The computing module 15 is electrically connected to the storage module 11 and respectively reads the at least one definition information 114 and the at least one element unit stored in the storage module 11, and the at least one element unit is based on the at least one element The calculation formula of the government engineering calculation specification defining the information 114 is calculated.
該警示模組16係電性連接該儲存模組11、該辨識模組12與該驗證模組14,在本發明中設置該警示模組16之目的係當該辨識模組12由外部載入該至少一圖文資訊18,及讀取該至少一資訊單元112之該至少一定義資訊114進行辨識時,當該至少一圖文資訊18如不符合該至少一資訊單元112之該至少一定義資訊114,則觸發該警示模組16產生一警示訊息,以要求重新載入至少一圖文資訊18,或當該驗證模組14分別讀取該辨識模組12載入之該至少一圖文資訊18,及該至少一資訊單元112儲存之至少一要素單元,當比對該至少一圖文資訊18與該至少一要素單元時,發現兩者所載資訊不一致,則觸發該警示模組16產生一警示訊息,要求重新填入正確之至少一要素單元,並儲存於對應之該至少一表單116,以取代錯誤之要素單元。 The warning module 16 is electrically connected to the storage module 11, the identification module 12 and the verification module 14. The purpose of setting the warning module 16 in the present invention is when the identification module 12 is externally loaded. When the at least one graphic information 18 is read and the at least one definition information 114 of the at least one information unit 112 is read, the at least one graphic information 18 does not meet the at least one definition of the at least one information unit 112. The information 114 triggers the warning module 16 to generate a warning message to request to reload at least one of the graphic information 18, or when the verification module 14 reads the at least one graphic loaded by the identification module 12 The information 18, and the at least one element unit stored by the at least one information unit 112, when comparing the at least one graphic information 18 with the at least one element unit, find that the information contained in the two is inconsistent, triggering the warning module 16 A warning message is generated to refill the correct at least one element unit and stored in the corresponding at least one form 116 to replace the wrong element unit.
請參考圖2係本發明工程算量方法之流程圖,並同時參酌圖1。本發明工程算量方法包括以下步驟。首先,步驟S21係載入外部圖文資訊18。於本實施例中,該辨識模組由外部載入 該至少一圖文資訊18,其包含至少一圖式(未繪於圖式)或至少一字元(未繪於圖式),其中該至少一圖式係由線條、圖層、維度與尺寸等組成,其檔案格式為JPG檔、JPEG檔、GIF檔、BMP檔、TIF檔、TIFF檔、PNG檔、SVG檔、UFO檔、DXF檔、PCD檔、EPS檔、BIM檔、AI檔、CAD檔或是PDF檔,而該字元係為數字、字母、符號及其所組成之字串。 Please refer to FIG. 2, which is a flowchart of the engineering calculation method of the present invention, and at the same time, FIG. The engineering calculation method of the present invention includes the following steps. First, step S21 loads the external graphic information 18. In this embodiment, the identification module is externally loaded. The at least one graphic information 18 includes at least one graphic (not drawn in the drawing) or at least one character (not drawn in the drawing), wherein the at least one graphic is composed of lines, layers, dimensions and dimensions, and the like. Composition, its file format is JPG file, JPEG file, GIF file, BMP file, TIF file, TIFF file, PNG file, SVG file, UFO file, DXF file, PCD file, EPS file, BIM file, AI file, CAD file Or a PDF file, and the characters are numbers, letters, symbols, and the strings they form.
步驟S22係讀取該至少一定義資訊114及該至少一表單116。於本實施例中,該儲存模組11儲存至少一定義資訊114及至少一表單116,該至少一定義資訊係政府工程算量規範之計算公式、圖例、定義圖式之線條、圖層、維度、字元、尺寸與符號之屬性定義檔,以及依據計算公式與定義檔撰寫之註解文字,該至少一表單具有至少一欄位,且該至少一表單之儲存格式係以XML、XLSX、XLS、CSV與ODS等格式儲存。 Step S22 reads the at least one definition information 114 and the at least one form 116. In this embodiment, the storage module 11 stores at least one definition information 114 and at least one form 116. The at least one definition information is a calculation formula, a legend, a definition line, a layer, a dimension, and a dimension of a government engineering calculation specification. An attribute definition file for characters, sizes, and symbols, and an annotation text written according to a calculation formula and a definition file, the at least one form having at least one field, and the storage format of the at least one form is XML, XLSX, XLS, CSV Stored in formats such as ODS.
步驟S23係一判斷步驟。以辨識該至少一圖文資訊18是否符合該至少一定義資訊114及該至少一表單116之定義。如果不符合定義,則進入步驟S28後,直接跳到步驟S21;如果符合定義,則進入步驟S24。於本實施例中,該辨識模組12可辨識範圍為該至少一圖文資訊18之全部或選取之局部,其依據該至少一定義資訊114及該至少一表單116,辨識由外部載入之至少一圖文資訊18,是否符合該至少一定義資訊114及該至少一表單116,如不符合該至少一定義資訊114及該至少一表單116,則觸發該警示模組16產生一警示訊息,以要求重新載入 至少一圖文資訊18(參考圖1虛線)。 Step S23 is a judging step. To identify whether the at least one graphic information 18 meets the definition of the at least one definition information 114 and the at least one form 116. If the definition is not met, the process proceeds to step S28, and the process directly proceeds to step S21; if the definition is met, the process proceeds to step S24. In this embodiment, the identification module 12 can identify all or part of the at least one graphic information 18, and the external identification is performed according to the at least one definition information 114 and the at least one form 116. At least one of the graphic information 18, whether the at least one definition information 114 and the at least one form 116 are met, if the at least one definition information 114 and the at least one form 116 are not met, the warning module 16 is triggered to generate a warning message. Reload with request At least one graphic information 18 (refer to the dotted line in Figure 1).
步驟S24係轉換圖文資訊為要素單元。於本實施例中,該轉換模組1讀取由該辨識模組12所辨識之該至少一圖文資訊18,並將該至少一圖文資訊18轉換為至少一要素單元。 Step S24 is to convert the graphic information into element units. In the embodiment, the conversion module 1 reads the at least one graphic information 18 recognized by the identification module 12, and converts the at least one graphic information 18 into at least one element unit.
步驟S25係將該至少一要素單元讀回資訊單元。於本實施例中,該轉換模組13將該至少一要素單元儲存至對應之該至少一表單116。 Step S25 is to read the at least one element unit back to the information unit. In this embodiment, the conversion module 13 stores the at least one element unit to the corresponding at least one form 116.
步驟S26係一判斷步驟。將該至少一要素單元與該至少一圖文資訊18進行比對,如果兩者所載資訊不一致,則進入步驟S28後,直接跳到步驟S24;如果兩者所載資訊一致,則進入步驟S27。於本實施例中,當比對該至少一圖文資訊18與該至少一要素單元時,發現兩者所載資訊不一致,則觸發該警示模組16產生一警示訊息,要求重新填入正確之至少一要素單元,並儲存於對應之該至少一表單(參考圖1虛線),以取代錯誤之要素單元。 Step S26 is a judging step. Comparing the at least one element unit with the at least one graphic information 18, if the information contained in the two does not match, the process proceeds to step S28, and the process directly proceeds to step S24; if the information contained in the two is consistent, the process proceeds to step S27. . In this embodiment, when the at least one graphic information 18 and the at least one element unit are found to be inconsistent, the warning module 16 is triggered to generate a warning message requesting to refill the correct information. At least one element unit is stored in the corresponding at least one form (refer to the dotted line of FIG. 1) to replace the wrong element unit.
步驟S27係依據預設資訊單元,將要素單元進行計算。於本實施例中,該計算模組15分別讀取該至少一定義資訊114及該至少一表單116,及該驗證模組14所比對之該至少一要素單元,該計算模組15係利用該至少一定義資訊114及該至少一表單116,並依據定義資訊中預設之計算公式,將該至少一要素單元進行計算。 Step S27 calculates the element unit according to the preset information unit. In the embodiment, the computing module 15 reads the at least one definition information 114 and the at least one form 116, and the at least one element unit that the verification module 14 compares, and the computing module 15 utilizes The at least one definition information 114 and the at least one form 116 are calculated according to a preset calculation formula in the definition information.
惟上述實施例僅為說明本發明之,方法及其功效,而非用以 限制本發明。因此,習於此技術領域之人士對上述實施例進行修改及變化仍不脫本發明之精神。本發明之權利範圍應如後述之申請專利範圍所列。 However, the above embodiments are merely illustrative of the present invention, methods and their effects, rather than Limit the invention. Therefore, those skilled in the art can make modifications and changes to the above embodiments without departing from the spirit of the invention. The scope of the invention should be as set forth in the appended claims.
1‧‧‧工程算量系統 1‧‧‧Engineering System
11‧‧‧儲存模組 11‧‧‧ Storage Module
112‧‧‧資訊單元 112‧‧‧Information unit
12‧‧‧辨識模組 12‧‧‧ Identification Module
13‧‧‧轉換模組 13‧‧‧Transition module
14‧‧‧驗證模組 14‧‧‧ verification module
15‧‧‧計算模組 15‧‧‧Computation Module
16‧‧‧警示模組 16‧‧‧Warning module
18‧‧‧圖文資訊 18‧‧‧ Graphic Information
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW104115780A TWI574167B (en) | 2015-05-28 | 2015-05-28 | A quantity calculation system and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW104115780A TWI574167B (en) | 2015-05-28 | 2015-05-28 | A quantity calculation system and method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
TW201642146A TW201642146A (en) | 2016-12-01 |
TWI574167B true TWI574167B (en) | 2017-03-11 |
Family
ID=58055618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW104115780A TWI574167B (en) | 2015-05-28 | 2015-05-28 | A quantity calculation system and method thereof |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI574167B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201328469Y (en) * | 2009-01-03 | 2009-10-21 | 张晓燕 | Convenient tool box for constructional engineering budget |
CN103150751A (en) * | 2013-01-10 | 2013-06-12 | 江苏易图地理信息工程有限公司 | Three-dimensional modeling method for achieving building inside and outside integration in digital map |
TW201445346A (en) * | 2013-05-27 | 2014-12-01 | Yu Tai Kun Building Co Ltd | Method of drawing construction mold |
-
2015
- 2015-05-28 TW TW104115780A patent/TWI574167B/en active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201328469Y (en) * | 2009-01-03 | 2009-10-21 | 张晓燕 | Convenient tool box for constructional engineering budget |
CN103150751A (en) * | 2013-01-10 | 2013-06-12 | 江苏易图地理信息工程有限公司 | Three-dimensional modeling method for achieving building inside and outside integration in digital map |
TW201445346A (en) * | 2013-05-27 | 2014-12-01 | Yu Tai Kun Building Co Ltd | Method of drawing construction mold |
Also Published As
Publication number | Publication date |
---|---|
TW201642146A (en) | 2016-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021042521A1 (en) | Contract automatic generation method, computer device and computer non-volatile storage medium | |
US20090109227A1 (en) | System and method for independent font substitution of string characters | |
CN113094770B (en) | Drawing generation method and device, computer equipment and storage medium | |
JP2015526808A5 (en) | ||
CN101689308B (en) | Imparting three-dimensional characteristics in a two-dimensional space | |
JP2014510963A (en) | Associating captured image data with a spreadsheet | |
CN103617296A (en) | Optimized display method of place name annotation image layer | |
CN110929477A (en) | Keyword variant determining method and device | |
CN106202111A (en) | The method of calibration of database data and device | |
CN112528616A (en) | Business form generation method and device, electronic equipment and computer storage medium | |
US20130307853A1 (en) | Electronic device and method for simulating three-dimensional model of workpiece | |
TWI574167B (en) | A quantity calculation system and method thereof | |
JP2011248622A (en) | Similar model searching system and work instruction reuse system | |
JP2009009230A5 (en) | ||
CN115203769A (en) | Graph alignment techniques for automatically labeling drawing dimensions | |
Han | Implementation of file-referring octree for huge 3D point clouds | |
US20130139046A1 (en) | Computing device and method for generating measurement report of objects | |
CN105590241A (en) | Self-adaptive electronic bill implementation method and system | |
CN110363206A (en) | Cluster, data processing and the data identification method of data object | |
CN113420843B (en) | Heat testing method, device, equipment and medium based on micro fluidized bed | |
US20130314414A1 (en) | Computing device and method of establishing coordinate systems on surfaces of objects | |
CN105930534B (en) | A kind of fragmentation of data reduction method based on cloud storage service price | |
CN112597262A (en) | Industry address serial number generation method and device based on spatial grid | |
US20200050658A1 (en) | Analysis device | |
CN106339518A (en) | Computation system and method for engineering cost |