TWI411192B - Power protection system and method - Google Patents

Power protection system and method Download PDF

Info

Publication number
TWI411192B
TWI411192B TW100115550A TW100115550A TWI411192B TW I411192 B TWI411192 B TW I411192B TW 100115550 A TW100115550 A TW 100115550A TW 100115550 A TW100115550 A TW 100115550A TW I411192 B TWI411192 B TW I411192B
Authority
TW
Taiwan
Prior art keywords
power protection
power
protection system
remote monitoring
decision center
Prior art date
Application number
TW100115550A
Other languages
Chinese (zh)
Other versions
TW201246740A (en
Inventor
Chin Tun Wang
Jin Shyr Yang
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to TW100115550A priority Critical patent/TWI411192B/en
Publication of TW201246740A publication Critical patent/TW201246740A/en
Application granted granted Critical
Publication of TWI411192B publication Critical patent/TWI411192B/en

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a power protection system, comprising: plural detectors for detecting power generation of multiple generators and loading of power distribution feeder; multiple digital input/output modules for detecting state of each generator, power distribution feeder, transmission line and breaker of transformer and controlling the breakers; a remote monitoring and control station comprising a communication module for receiving signals of state of the power generation, loading and breaker and transmitting the signals via the communication module; and a decision center for determining whether unloading the power distribution feeder or tripping the generators is necessary through real-time operation based on signal transmitted from the remote monitoring and control station. If the decision center determines unloading is necessary, a control instruction is generated and transmitted to the remote monitoring and control station so that the digital input/output modules trips the power distribution feeder or breaker of transformer.

Description

電力保護系統及方法Power protection system and method

本發明係關於一種電力保護系統及方法;特別是關於一種可即時運算並自動卸載之電力保護系統及方法。The present invention relates to a power protection system and method; and more particularly to a power protection system and method that can be instantaneously operated and automatically unloaded.

隨著時代的演進,舉凡食、衣、住、行,電力已成為生活中不可或缺之能源,其廣泛地應用在照明、運輸、電器及各式科技產品上,不僅改善了人類的生活,更促進了生活之便利。而電力公司考慮到設備故障、停用或環境變異等偶發事故所造成電力系統反應之問題,故針對偶發事故定義了兩種準則:With the evolution of the times, electricity has become an indispensable source of energy in the food, clothing, housing, and transportation. It is widely used in lighting, transportation, electrical appliances and various scientific and technological products, which not only improves human life, It also promotes the convenience of life. While the power company considers the problem of power system response caused by accidents such as equipment failure, decommissioning or environmental variability, two criteria are defined for accidental accidents:

一、N-1準則:當輸電線路、發電機組或變壓器之任一設備,於檢修或事故停用情況下,輸電系統仍可正常運轉。1. N-1 criterion: When any equipment of transmission line, generator set or transformer is in operation, the transmission system can still operate normally.

二、N-2準則:當任二回線(或任兩部最大發電機組)檢修或事故停用、任一回線及任一部最大發電機組檢修停用、任一回線及任一部最大發電組事故停用、任一回線檢修停用及任一部最大發電機組事故停用或任一回線事故及任一部最大發電機組檢修停用時,輸電系統仍可正常運轉。Second, the N-2 criteria: when the second line (or the two largest generator sets) overhaul or accident suspension, any return line and any of the largest generator set overhaul, any return line and any of the largest power generation group The transmission system can still operate normally when the accident is deactivated, any line maintenance is disabled, and any of the largest generator set accidents are disabled or any of the return line accidents and any of the largest generator sets are out of service.

有別於台灣本島電網架構,離島地區在獨立供電系統及經濟運轉前提下,電力系統為有限的N-1的備轉容量,因此對於電廠運轉調度及維護較為困難,因此當發生N-2以上極端事故時很難避免系統全黑,也就是由於突發性事故引發電力系統崩潰導致大停電事件,不僅造成居民恐慌,更使經濟蒙受重大損失。有鑑於此,電力公司為因應瞬間之電力不平衡所造成的問題,遂針對饋線建置低頻電驛,以在發電機出力(意即發電量)短缺,系統頻率下降時分段分批卸除必要之負載,藉此保護電力系統之穩定。Different from Taiwan's main island power grid architecture, the island's power system is limited to the N-1's reserve capacity under the premise of independent power supply system and economic operation. Therefore, it is difficult for power plant operation scheduling and maintenance, so when N-2 occurs or more In an extreme accident, it is difficult to avoid the system being completely black, that is, the power outage caused by a sudden accident caused a blackout, which not only caused residents to panic, but also caused major losses to the economy. In view of this, the power company is responsible for the problem caused by the instantaneous power imbalance, and the low-frequency power is built for the feeder to eliminate the shortage of generator output (meaning power generation) and to remove the system in batches. The necessary load to protect the stability of the power system.

然而,上述之低頻卸載策略有著反應時間慢、無法即時掌握發電機組出力狀態且卸載量沒有彈性等缺點,所以仍無法避免極端事故所造成系統全黑之發生。故綜觀前所述,亟需一種能夠快速偵測與控制機制,使能在發生系統極端事故時主動快速反應,並自動緊急卸除必要之負載的電力保護系統及方法,以克服先前技術低頻電驛卸載之缺點及時間上的限制,以降低系統全黑之機率。However, the above-mentioned low-frequency unloading strategy has the disadvantages of slow response time, inability to instantly grasp the output state of the generator set, and the inelasticity of the unloading, so that the blackout of the system caused by extreme accidents cannot be avoided. Therefore, as mentioned above, there is a need for a power protection system and method that can quickly detect and control mechanisms, enable active and rapid response in the event of extreme system accidents, and automatically remove the necessary load to overcome the prior art low frequency power.缺点 Unloading shortcomings and time constraints to reduce the chance of system blackout.

有鑒於先前技術以低頻電驛卸載所造成反應時間慢、無法判斷事故特性以及卸載量難以配合跳機出力狀態等缺點,本發明之目的係在提供一種電力保護系統及方法,以期克服現有技術之難點,而在發生極端事故時能快速反應,在最短時間內卸除必要之負載,進而降低因極端事故發生系統全停之機率,藉此保護電力系統。In view of the shortcomings of the prior art that the reaction time is slow due to low-frequency power unloading, the failure characteristics cannot be judged, and the unloading amount is difficult to match the power output state of the jumper, the object of the present invention is to provide a power protection system and method, in order to overcome the prior art. Difficulties, and in the event of extreme accidents, can quickly respond, remove the necessary load in the shortest time, and thus reduce the probability of system shutdown due to extreme accidents, thereby protecting the power system.

本發明提供一種電力保護系統,包含:複數個偵測器,用以分別偵測複數個發電機之發電量及配電饋線之負載量;複數個數位輸入/輸出模組,用以偵測各該發電機、配電饋線、輸電線與變壓器之斷路器的狀態以及控制該等斷路器;一遠端監控站,包含一通訊模組,用以接收上述發電量、負載量與斷路器的狀態之訊號並透過該通訊模組傳送;以及一決策中心,根據該遠端監控站所傳送之訊號,經由即時運算判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若該決策中心判斷是需要卸載時,則產生一控制指令並傳送至該遠端監控站,令該些數位輸出模組跳脫該些配電饋線或變壓器之斷路器。The present invention provides a power protection system including: a plurality of detectors for detecting a power generation of a plurality of generators and a load of a distribution feeder; and a plurality of digital input/output modules for detecting each The state of the circuit breaker of the generator, the distribution feeder, the power line and the transformer, and the control of the circuit breaker; a remote monitoring station comprising a communication module for receiving the signal of the power generation amount, the load amount and the state of the circuit breaker And transmitting through the communication module; and a decision center, according to the signal transmitted by the remote monitoring station, determining whether it is necessary to uninstall the distribution feeders or tripping the transformers through an instant operation, if the decision center determines that it needs to be uninstalled A control command is generated and transmitted to the remote monitoring station to cause the digital output modules to trip the circuit breakers of the distribution feeders or transformers.

本發明前述電力保護系統,其中該電力保護系統從偵測、傳送、運算到跳脫之運作時間係於200毫秒內完成。According to the foregoing power protection system of the present invention, the operation time of the power protection system from detection, transmission, operation to tripping is completed within 200 milliseconds.

本發明前述電力保護系統,其中該決策中心進一步根據該些訊號運算該電力保護系統之一緊急發電裕度,其中該緊急發電裕度為運轉發電機之總熱機備轉容量減去單一發電機之最大備轉容量。In the foregoing power protection system of the present invention, the decision center further calculates an emergency power generation margin of the power protection system according to the signals, wherein the emergency power generation margin is a total heat engine standby capacity of the running generator minus a single generator. Maximum reserve capacity.

本發明前述電力保護系統,其中該決策中心進一步根據一配電饋線卸載順序表,決定各該配電饋線之卸載順序。In the foregoing power protection system of the present invention, the decision center further determines an unloading sequence of each of the distribution feeders according to a distribution feeder unloading sequence table.

本發明前述電力保護系統,其中該決策中心進一步包含:至少一前端通訊處理器,具有乙太網路(Ethernet)通訊介面,用以即時從該遠端監控站接收該些訊號並判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若該決策中心判斷是需要卸載時,則該決策中心產生該控制指令並透過該乙太網路通訊介面傳送至該遠端監控站。The power protection system of the present invention, wherein the decision center further comprises: at least one front-end communication processor having an Ethernet communication interface for receiving the signals from the remote monitoring station and determining whether the device needs to be uninstalled The power distribution feeders or the transformers are tripped. If the decision center determines that the uninstallation is required, the decision center generates the control command and transmits the control command to the remote monitoring station through the Ethernet communication interface.

本發明前述電力保護系統,其中該決策中心進一步包含:一防火牆路由器,提供一遠端使用者登入監測及維護該電力保護系統。The foregoing power protection system of the present invention, wherein the decision center further comprises: a firewall router, providing a remote user login monitoring and maintaining the power protection system.

本發明前述電力保護系統,其中該決策中心包含:一圖控操作工作站,將該遠端監控站所傳送之訊號轉換為該電力保護系統之狀態與警示圖表。The foregoing power protection system of the present invention, wherein the decision center comprises: a picture control operation workstation, and converting the signal transmitted by the remote monitoring station into a state and a warning chart of the power protection system.

本發明前述電力保護系統,其中該決策中心進一步包含:一資料庫伺服器,定時儲存該些訊號,並於狀態變化時儲存該些訊號作為歷史與橫斷面資料。In the foregoing power protection system of the present invention, the decision center further includes: a database server that periodically stores the signals and stores the signals as historical and cross-sectional data when the state changes.

本發明前述電力保護系統,進一步包含:一線上模擬系統,用以從該資料庫伺服器存取該些訊號及圖表,以作模擬及分析。The power protection system of the present invention further includes: an on-line simulation system for accessing the signals and graphs from the database server for simulation and analysis.

本發明前述電力保護系統,其中該通訊模組包含光纖網路及交換器。The foregoing power protection system of the present invention, wherein the communication module comprises a fiber optic network and a switch.

本發明前述電力保護系統,其中各該偵測器係為一電力類比信號擷取設備,用以擷取各發電機及配電饋線的電力類比訊號。In the foregoing power protection system of the present invention, each of the detectors is a power analog signal acquisition device for extracting power analog signals of the generators and the distribution feeders.

本發明前述電力保護系統,其中該電力類比信號擷取設備係為一智慧型數位電表。In the foregoing power protection system of the present invention, the power analog signal acquisition device is a smart digital electricity meter.

本發明前述電力保護系統,其中該遠端監控站具有乙太網路(Ethernet)通訊介面,用以即時與該決策中心進行通訊。The foregoing power protection system of the present invention, wherein the remote monitoring station has an Ethernet communication interface for communicating with the decision center in real time.

另一方面,本發明提供一種電力保護方法,用以賦予一電力保護系統運作邏輯,該電力保護系統包含複數個偵測器、複數個數位輸入/輸出模組、一遠端監控站及一決策中心,該遠端監控站包含一通訊模組,該電力保護方法包含以下步驟:利用該些偵測器分別偵測複數個發電機之發電量及配電饋線之負載量;以該些數位輸入/輸出模組偵測各該發電機、配電饋線、輸電線與變壓器之斷路器的狀態;由該遠端監控站接收上述發電量、負載量與斷路器的狀態之訊號並透過該通訊模組傳送至該決策中心;利用該決策中心根據該遠端監控站所傳送之訊號,經由即時運算判斷是否需要卸載該些配電饋線或跳脫該些變壓器;當該決策中心判斷需要卸載時,則以該決策中心產生一控制指令並傳送該控制指令至該遠端監控站;以及由該些遠端監控站根據該控制指令,令該些數位輸出模組跳脫該些配電饋線或變壓器之斷路器。In another aspect, the present invention provides a power protection method for providing a power protection system operation logic, the power protection system including a plurality of detectors, a plurality of digital input/output modules, a remote monitoring station, and a decision The remote monitoring station includes a communication module, and the power protection method includes the following steps: respectively detecting the power generation of the plurality of generators and the load of the distribution feeder by using the detectors; The output module detects the state of each circuit breaker of the generator, the distribution feeder, the power line and the transformer; the remote monitoring station receives the signal of the power generation amount, the load amount and the state of the circuit breaker and transmits the signal through the communication module Go to the decision center; use the decision center to determine whether it is necessary to uninstall the distribution feeders or jump off the transformers according to the signals transmitted by the remote monitoring station; when the decision center determines that the uninstallation is required, The decision center generates a control command and transmits the control command to the remote monitoring station; and the remote monitoring station according to the control command, The plurality of digital output module trip distribution feeders in the plurality of circuit breakers.

本發明前述電力保護方法,其中該電力保護方法從偵測、傳送、運算到跳脫之運作時間係於200毫秒內完成。According to the foregoing power protection method of the present invention, the operation time of the power protection method from detection, transmission, operation to tripping is completed within 200 milliseconds.

本發明前述電力保護方法,其中該運作邏輯如下:當該些發電機之任何一者跳機時,則立即卸除相當於跳脫發電量之負載量。In the foregoing power protection method of the present invention, the operation logic is as follows: when any one of the generators is tripped, the load amount equivalent to the amount of trip power generation is immediately removed.

本發明前述電力保護方法,其中該運作邏輯如下:根據該些發電機之發電量及配電饋線之負載量自動運算出一卸載門檻值;當該些發電機之任何一者跳機時,則以該決策中心計算跳脫發電量是否大於該卸載門檻值;以及若跳脫發電量是大於該卸載門檻值時,則立即卸除一卸載量;其中該卸載量相當於該跳脫發電量減去該卸載門檻值之負載量。The foregoing power protection method of the present invention, wherein the operation logic is as follows: automatically calculating an unloading threshold according to the power generation amount of the generators and the load amount of the distribution feeder; when any one of the generators is tripped, The decision center calculates whether the trip power generation amount is greater than the unloading threshold value; and if the trip power generation amount is greater than the unloading threshold value, immediately cancels an unloading amount; wherein the unloading amount is equivalent to the tripping power generation amount minus the unloading threshold The amount of load.

本發明前述電力保護方法,其中該運作邏輯進一步包含以下步驟:根據該些訊號運算該電力保護系統之一緊急發電裕度,其中該緊急發電裕度為運轉發電機之總熱機備轉容量減去單一發電機之最大備轉容量;其中該決策中心係根據該緊急發電裕度與單一發電機之最大出力容量計算該卸載門檻值。In the foregoing power protection method of the present invention, the operation logic further includes the step of: calculating an emergency power generation margin of the power protection system according to the signals, wherein the emergency power generation margin is a total heat engine standby capacity of the running generator minus The maximum standby capacity of a single generator; wherein the decision center calculates the unloading threshold based on the emergency power generation margin and the maximum output capacity of the single generator.

本發明前述電力保護方法,進一步包含以下步驟:根據一配電饋線卸載順序表,決定各該配電饋線之卸載順序。The foregoing power protection method of the present invention further includes the step of determining an unloading sequence of each of the distribution feeders according to a distribution feeder unloading sequence table.

本發明前述電力保護方法,進一步包含以下步驟:以具有乙太網路(Ethernet)通訊介面之至少一前端通訊處理器,即時從該遠端監控站接收該些訊號並判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若判斷是需要卸載時,則產生該控制指令並透過該乙太網路通訊介面傳送至該遠端監控站。The foregoing power protection method of the present invention further includes the steps of: receiving, by the at least one front-end communication processor having an Ethernet communication interface, the signals from the remote monitoring station and determining whether the power distribution needs to be uninstalled. The feeders or the transformers are tripped. If it is determined that the unloading is required, the control command is generated and transmitted to the remote monitoring station through the Ethernet communication interface.

本發明前述電力保護方法,進一步包含以下步驟:透過一防火牆路由器,提供一遠端使用者登入監測及維護該電力保護系統。The foregoing power protection method of the present invention further includes the steps of: providing a remote user login monitoring and maintaining the power protection system through a firewall router.

本發明前述電力保護方法,進一步包含以下步驟:利用一圖控操作工作站將該遠端監控站所傳送之訊號轉換為該電力保護系統之狀態與警示圖表。The foregoing power protection method of the present invention further includes the step of converting the signal transmitted by the remote monitoring station into a state and a warning chart of the power protection system by using a graphic operation workstation.

本發明前述電力保護方法,進一步包含以下步驟:The foregoing power protection method of the present invention further includes the following steps:

藉由一資料庫伺服器,定時儲存該些訊號,並於狀態變化時儲存該些訊號作為歷史與橫斷面資料。The signals are stored periodically by a database server, and the signals are stored as historical and cross-sectional data when the state changes.

本發明前述電力保護方法,進一步包含以下步驟:建置一線上模擬系統,以從該資料庫伺服器存取該些訊號及圖表而作模擬及分析。The foregoing power protection method of the present invention further includes the steps of: constructing an on-line simulation system for accessing the signals and graphs from the database server for simulation and analysis.

本發明前述電力保護方法,其中該通訊模組包含光纖網路及交換器。The foregoing power protection method of the present invention, wherein the communication module comprises a fiber optic network and a switch.

本發明前述電力保護方法,其中各該偵測器係為一電力類比信號擷取設備,用以擷取各發電機及配電饋線的電力類比訊號。In the foregoing power protection method of the present invention, each of the detectors is a power analog signal acquisition device for extracting power analog signals of the generators and the distribution feeders.

本發明前述電力保護方法,其中該電力類比信號擷取設備係為一智慧型數位電表。In the foregoing power protection method of the present invention, the power analog signal acquisition device is a smart digital electricity meter.

本發明前述電力保護方法,其中該遠端監控站具有乙太網路(Ethernet)通訊介面,用以即時與該決策中心進行通訊。The foregoing power protection method of the present invention, wherein the remote monitoring station has an Ethernet communication interface for communicating with the decision center in real time.

本發明藉由提供一電力保護系統及方法,使能即時監控複數個發電廠及變電站之電力供應狀態,並利用自動卸載邏輯於發生極端事故時,能在極短時間內自動緊急卸除必要之負載,彌補先前技術低頻電驛卸載之缺陷及時間上之限制,以降低系統全黑之機率,藉此提高使用上的穩定性及安全性,進而增加產業上之實施利用。The invention provides a power protection system and method, enables real-time monitoring of the power supply status of a plurality of power plants and substations, and utilizes an automatic unloading logic to automatically and urgently remove the necessary emergency in a very short time in the event of an extreme accident. The load compensates for the defects and time constraints of the prior art low-frequency power-off unloading, so as to reduce the probability of the system being completely black, thereby improving the stability and safety of use, thereby increasing the implementation and utilization of the industry.

本發明係用來偵測複數個發電廠及變電站之電力供應狀態並即時提供訊號至一決策中心,使其依據一運作邏輯運作,以便能達到系統出力與負載之動態平衡。The invention is used for detecting the power supply status of a plurality of power plants and substations and immediately providing signals to a decision center to operate according to an operational logic so as to achieve a dynamic balance between system output and load.

請參考第一圖,顯示本發明之電力保護系統一實施例的系統架構圖。如圖所示,本發明之電力保護系統包含一決策中心10,且依發電廠或變電站所在地理位置的不同,在每一地理位置點皆裝設有一遠端監控站11、12、13、14、15、複數個數位輸入/輸出模組110、120、130、140、150、複數個偵測器111、121、131、141、151以及一通訊模組112、122、132、142、152,其中各個遠端監控站11、12、13、14、15包含各所屬之數位輸入/輸出模組110、120、130、140、150,該些數位輸入/輸出模組110、120、130、140、150係用以偵測各個發電機、配電饋線、輸電線及變壓器之斷路器的ON/OFF狀態;偵測器111、121、131、141、151可為一電力類比信號擷取設備,例如一智慧型數位電表,其係擷取各發電機及配電饋線的電力類比訊號,以偵測發電機之發電量及配電饋線之負載量;通訊模組112、122、132、142、152可包含光纖網路及交換器,用以將上述電力類比訊號以及各個斷路器的ON/OFF狀態之訊號傳送至所屬之遠端監控站11、12、13、14、15。各遠端監控站11、12、13、14、15可具有乙太網路(Ethernet)通訊介面,以即時與該決策中心10進行通訊。Referring to the first figure, a system architecture diagram of an embodiment of the power protection system of the present invention is shown. As shown, the power protection system of the present invention includes a decision center 10, and each remote location is equipped with a remote monitoring station 11, 12, 13, 14 depending on the geographical location of the power plant or substation. And 15, a plurality of digital input/output modules 110, 120, 130, 140, 150, a plurality of detectors 111, 121, 131, 141, 151 and a communication module 112, 122, 132, 142, 152, Each of the remote monitoring stations 11, 12, 13, 14, 15 includes a respective digital input/output module 110, 120, 130, 140, 150, and the digital input/output modules 110, 120, 130, 140 150 is used to detect the ON/OFF state of the circuit breaker of each generator, distribution feeder, power line and transformer; the detectors 111, 121, 131, 141, 151 can be a power analog signal extraction device, for example A smart digital electric meter that takes power analog signals of each generator and distribution feeder to detect the power generation of the generator and the load of the distribution feeder; the communication modules 112, 122, 132, 142, 152 may include a fiber optic network and a switch for classifying the above power analog signals and each The signal of the ON/OFF state of the circuit breaker is transmitted to the associated remote monitoring station 11, 12, 13, 14, 15. Each remote monitoring station 11, 12, 13, 14, 15 may have an Ethernet communication interface to communicate with the decision center 10 in real time.

如第一圖所示,該決策中心10包含2個前端通訊處理器101、102,其具有乙太網路(Ethernet)通訊介面,且兩者之間係以一通訊切換器103耦接以進行通訊,而各該前端通訊處理器101、102分別耦接一通訊模組1010、1020,以接收從該些遠端監控站11、12、13、14、15所傳送之訊號,其中該些通訊模組1010、1020也可包含光纖網路及交換器,使該決策中心10與該些遠端監控站11、12、13、14、15形成環狀(Ring)光纖乙太網路。As shown in the first figure, the decision center 10 includes two front-end communication processors 101 and 102, which have an Ethernet communication interface, and are coupled by a communication switch 103 for performing. Each of the front-end communication processors 101 and 102 is coupled to a communication module 1010 and 1020 for receiving signals transmitted from the remote monitoring stations 11, 12, 13, 14, and 15, wherein the communications are received. The modules 1010, 1020 can also include a fiber optic network and a switch, such that the decision center 10 and the remote monitoring stations 11, 12, 13, 14, 15 form a ring fiber optic Ethernet.

承接上述,在一些較佳實施例中,該電力保護系統可為以該些前端通訊處理器的其中之一為主進行運算處理,以另一台前端通訊處理器作為備用,或是兩台前端通訊處理器皆進行運算處理,端看使用者之設計而定。In the above preferred embodiment, the power protection system may perform arithmetic processing on one of the front-end communication processors, and use another front-end communication processor as a backup or two front ends. The communication processor performs arithmetic processing, depending on the design of the user.

此外,在此具體實施例中,各該前端通訊處理器101、102係根據該些遠端監控站11、12、13、14、15所立即傳送之訊號,以一運作邏輯即時運算判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若判斷是需要卸載時,則產生一控制指令並傳送至該些遠端監控站11、12、13、14、15的至少其中之一,令該些數位輸出模組110、120、130、140、150跳脫該些配電饋線或變壓器之斷路器,藉此避免於發生事故時系統全黑的情況。再者,本發明之電力保護系統從偵測、傳送、運算到跳脫之運作時間係於200毫秒(≦200 msec)內完成,使能達到立即保護之目的。In addition, in this embodiment, each of the front-end communication processors 101, 102 determines whether it is needed according to a signal that is immediately transmitted by the remote monitoring stations 11, 12, 13, 14, 15 by an operational logic. Unloading the distribution feeders or tripping the transformers, if it is determined that the uninstallation is required, generating a control command and transmitting to at least one of the remote monitoring stations 11, 12, 13, 14, 15 The digital output modules 110, 120, 130, 140, 150 trip the circuit breakers of the distribution feeders or transformers, thereby avoiding a blackout of the system in the event of an accident. Furthermore, the operation time of the power protection system of the present invention from detection, transmission, operation to tripping is completed within 200 milliseconds (≦200 msec), enabling immediate protection.

值得注意的是,在一些較佳實施例中,該電力保護系統之運作邏輯可分為兩種態樣,分別是發生非極端事故及發生極端事故時,非極端事故例如是但不限於在一預定時間(如8秒)內無連續跳停機;極端事故例如是但不限於在一預定時間(如8秒)內連續跳停機。當發生非極端事故時,也就是當該些發電機之任何一者跳機時,該電力保護系統可有兩種運作方式,一種是立即卸除相當於跳脫發電量之負載量,另一種是該決策中心10隨時計算該電力保護系統之一緊急發電裕度,並根據該些發電機之發電量及配電饋線之負載量自動運算出一卸載門檻值,當該決策中心10計算跳脫發電量大於該卸載門檻值才卸除相當於該跳脫發電量減去該卸載門檻值之負載量。其中該緊急發電裕度為運轉發電機之總熱機備轉容量減去單一發電機之最大備轉容量,而該卸載門檻值係由該決策中心10根據該緊急發電裕度與單一發電機之最大出力容量所計算得出。It should be noted that in some preferred embodiments, the operation logic of the power protection system can be divided into two aspects, that is, when a non-extreme accident occurs and an extreme accident occurs, the non-extreme accident is, for example but not limited to, There is no continuous jump stop within a predetermined time (eg, 8 seconds); extreme accidents are, for example, but not limited to, continuous jumps within a predetermined time (eg, 8 seconds). When a non-extreme accident occurs, that is, when any of the generators is tripped, the power protection system can operate in two ways, one is to immediately remove the load equivalent to the amount of trip power generation, and the other is The decision center 10 calculates an emergency power generation margin of the power protection system at any time, and automatically calculates an unloading threshold based on the power generation of the generators and the load of the distribution feeders, when the decision center 10 calculates that the trip power generation is greater than The unloading threshold value is discharged to a load amount equivalent to the tripped power generation amount minus the unloading threshold value. The emergency power generation margin is the total heat engine standby capacity of the running generator minus the maximum standby capacity of the single generator, and the unloading threshold is determined by the decision center 10 according to the emergency power generation margin and the maximum of the single generator. The output capacity is calculated.

另外,在一些較佳實施例中,該決策中心10可進一步根據一配電饋線卸載順序表,決定各該配電饋線之卸載順序,例如將有安裝低頻電驛之配電饋線排於前,而無低頻電驛之配電饋線排於後,以因應當發生極端事故時,能避免系統全黑。In addition, in some preferred embodiments, the decision center 10 may further determine an unloading sequence of each of the distribution feeders according to a distribution feeder unloading sequence table, for example, a distribution feeder having a low frequency power supply installed in front, without a low frequency The distribution feeder of the eMule is placed behind, so that the system can be completely blacked out due to extreme accidents.

續請參閱第一圖,上述前端通訊處理器101、102可進一步透過一網路交換式集線器104分別耦接一防火牆路由器105、一圖控操作工作站106以及一資料庫伺服器107。該防火牆路由器105係提供一遠端使用者登入監測及維護該電力保護系統;該圖控操作工作站106係將該遠端監控站11、12、13、14、15所傳送之訊號轉換為該電力保護系統之各類狀態與警示圖表;以及該資料庫伺服器107會定時(例如但不限於1小時1次)儲存該些訊號及圖表,並於狀態變化時儲存該些訊號及圖表,以作為歷史與橫斷面資料,以讓使用者查閱不同時間的訊號變化以及狀態變化時的各個訊號,而且,使用者能利用各類狀態與警示圖表達到快速監控該電力保護系統之目的。Continuing to refer to the first figure, the front-end communication processors 101 and 102 can be further coupled to a firewall router 105, a map operation workstation 106, and a database server 107 via a network switching hub 104. The firewall router 105 provides a remote user login to monitor and maintain the power protection system; the map control operating station 106 converts the signals transmitted by the remote monitoring stations 11, 12, 13, 14, 15 into the power Protecting various states and warning charts of the system; and the database server 107 stores the signals and graphs at regular intervals (for example, but not limited to 1 hour), and stores the signals and graphs when the state changes, as Historical and cross-sectional data to allow users to view signal changes and status changes at different times, and users can use various status and warning charts to quickly monitor the power protection system.

在一些較佳實施例中,該電力保護系統還進一步包含一線上模擬系統16,其包含一離線分析工作站160及一前端通訊處理器161,該線上模擬系統16係以區域網路的方式連接該決策中心10,用以從該資料庫伺服器107存取該些訊號及圖表(也就是歷史與橫斷面資料),以作模擬及分析,除了能讓電力公司的人員做為訓練之用,還能從模擬及分析的過程中改良該電力保護系統,以期能確實降低及避免系統全黑事故之發生。In some preferred embodiments, the power protection system further includes an on-line analog system 16 including an offline analysis workstation 160 and a front-end communication processor 161. The online analog system 16 is connected to the local area network. The decision center 10 is configured to access the signals and graphs (that is, historical and cross-sectional data) from the database server 107 for simulation and analysis, except that the personnel of the power company can be used for training. The power protection system can also be improved from the simulation and analysis process, in order to reliably reduce and avoid the system blackout.

儘管前述在說明本發明之電力保護系統的過程中,亦已同時說明本發明之電力保護方法的概念,但為求清楚起見,以下仍另繪示流程圖詳細說明。Although the foregoing concept of the power protection method of the present invention has been described in the course of explaining the power protection system of the present invention, for the sake of clarity, the flowchart will be described in detail below.

請參看第二圖,顯示本發明之電力保護方法一實施例的流程圖。首先如步驟210所示,利用該些偵測器分別偵測複數個發電機之發電量及配電饋線之負載量;接著如步驟220所示,以該些數位輸入/輸出模組偵測各該發電機、配電饋線、輸電線與變壓器之斷路器的狀態,例如斷路器的ON/OFF狀態;然後如步驟230所示,由該遠端監控站接收上述發電量、負載量與斷路器的狀態之訊號並透過該通訊模組傳送至該決策中心;接下來如步驟240所示,利用該決策中心根據該遠端監控站所傳送之訊號,經由即時運算判斷是否需要卸載該些配電饋線或跳脫該些變壓器;當該決策中心判斷是需要卸載時,則進行步驟250,否則進行步驟210;如步驟250所示,以該決策中心產生一控制指令並傳送該控制指令至該遠端監控站;最後如步驟260所示,由該些遠端監控站根據該控制指令,令該些數位輸出模組跳脫該些配電饋線或變壓器之斷路器。Referring to the second figure, a flow chart of an embodiment of the power protection method of the present invention is shown. First, as shown in step 210, the detectors are respectively used to detect the power generation of the plurality of generators and the load of the distribution feeders. Then, as shown in step 220, the digital input/output modules detect the respective The state of the circuit breaker of the generator, the distribution feeder, the transmission line, and the transformer, such as the ON/OFF state of the circuit breaker; then, as shown in step 230, the remote power monitoring station receives the power generation amount, the load amount, and the state of the circuit breaker. The signal is transmitted to the decision center through the communication module; then, as shown in step 240, the decision center uses the signal transmitted by the remote monitoring station to determine whether it is necessary to uninstall the distribution feeder or jump according to an instant operation. Removing the transformers; when the decision center determines that the uninstallation is required, proceeding to step 250, otherwise proceeding to step 210; as shown in step 250, generating a control command with the decision center and transmitting the control command to the remote monitoring station Finally, as shown in step 260, the remote monitoring stations cause the digital output modules to trip the circuit breakers of the distribution feeders or transformers according to the control command.

請參閱第三圖,顯示本發明一實施例之運作邏輯的流程圖。在本實施例中,當該電力保護系統接收到該些遠端監控站所傳來的訊號後,會根據一運作邏輯判斷是否需要進行卸載以及卸載的順序,以維持系統出力及負載之穩定。舉例來說,當發生非極端事故(如8秒內無連續跳停機)或極端事故(如8秒內連續跳停機)時,可選擇立即卸除相當於跳脫發電量之負載量,或是計算系統的扛載能力是否足夠以避免頻繁及不必要之卸載。本發明就一較佳實施例說明如下,首先如步驟310所示,根據該些發電機之發電量及配電饋線之負載量自動運算出一卸載門檻值,以避免頻繁地卸載,影響用電戶的權益。Referring to the third figure, a flow chart showing the operational logic of an embodiment of the present invention is shown. In this embodiment, after the power protection system receives the signals from the remote monitoring stations, it determines whether the order of unloading and unloading needs to be performed according to an operational logic to maintain system output and load stability. For example, when a non-extreme accident occurs (such as no continuous jump stop in 8 seconds) or an extreme accident (such as continuous jump stop within 8 seconds), you can choose to immediately remove the load equivalent to the amount of tripped power generation, or calculate Is the system's load capacity sufficient to avoid frequent and unnecessary unloading? The present invention is described as a preferred embodiment. First, as shown in step 310, an unloading threshold is automatically calculated according to the power generation of the generators and the load of the distribution feeders to avoid frequent unloading and affect the consumers. Rights.

接著如步驟320所示,當該些發電機之任何一者跳機時,則以該決策中心計算跳脫發電量是否大於該卸載門檻值;若跳脫發電量是大於該卸載門檻值時,則進行步驟330,否則進行步驟340。Then, as shown in step 320, when any one of the generators is tripped, the decision center calculates whether the trip power generation amount is greater than the unloading threshold value; if the trip power generation amount is greater than the unloading threshold value, then proceeding Step 330, otherwise step 340 is performed.

然後如步驟330所示,立即卸除相當於該跳脫發電量減去該卸載門檻值之負載量。Then, as shown in step 330, the amount of load corresponding to the amount of trip power generation minus the value of the unloading threshold is immediately removed.

或如步驟340所示,不卸載,因系統的扛載能力足以負載該跳脫發電量。Or, as shown in step 340, it is not unloaded because the load capacity of the system is sufficient to support the amount of trip power generation.

承接上述,當發生極端事故時(例如8秒內連續跳停機),若跳第1部發電機時,該決策中心計算該些發電機的扛載能力未能卸載時,則於跳第2部發電機時,必須立刻卸除該第1部發電機與該第2部發電機之總跳脫發電量之等量負載,以確保系統安全。但若跳第1部發電機時已卸載,則跳第2部發電機時只須卸除該第2部發電機相當之負載量即可,同理,熟悉此項技藝者當可輕易理解並可延伸至多個跳停機狀態。In the above, when an extreme accident occurs (for example, continuous jump within 8 seconds), if the first generator is skipped, the decision center calculates that the load capacity of the generators cannot be unloaded, then skips the second part. In the case of a generator, the same amount of load as the total trip power generation of the first generator and the second generator must be immediately removed to ensure system safety. However, if the first generator is unloaded, the second generator should only be removed from the load of the second generator. Similarly, those skilled in the art can easily understand and Can be extended to multiple trips.

上述的各步驟之詳細實施方式已於前述電力保護系統的敘述中詳細說明過了,在此便不再贅述。The detailed implementation of each of the above steps has been described in detail in the foregoing description of the power protection system and will not be described herein.

綜上所述,本發明之電力保護系統及方法至少具有下列優點:In summary, the power protection system and method of the present invention have at least the following advantages:

一、克服先前技術以低頻卸載策略卸載所造成反應時間慢、無法即時掌握發電機組出力狀態且卸載量沒有彈性之缺點。1. Overcoming the shortcomings of the previous technology that the low-frequency unloading strategy is unloaded, the reaction time is slow, the generator set output state cannot be grasped immediately, and the unloading amount is not elastic.

二、藉由決策中心以出力及負載之動態平衡為基礎,提供一運作邏輯,使能即時判斷事故的狀態(例如極端/非極端事故),並避免非必要之卸載,進而挽救系統全黑之發生。Second, the decision-making center provides an operational logic based on the dynamic balance of output and load, enabling instant judgment of the state of the accident (such as extreme/non-extreme incidents) and avoiding unnecessary unloading, thereby saving the system from blackout. occur.

以上所述僅為本發明之具體實施例而已,並非用以限定本發明之申請專利範圍;凡其它未脫離本發明所揭示之精神下所完成之等效改變或修飾,均應包含在下述之申請專利範圍內。The above description is only for the specific embodiments of the present invention, and is not intended to limit the scope of the claims of the present invention; all other equivalent changes or modifications which are not departing from the spirit of the present invention should be included in the following Within the scope of the patent application.

10...決策中心10. . . Decision center

11、12、13、14、15...遠端監控站11, 12, 13, 14, 15. . . Remote monitoring station

110、120、130、140、150...數位輸入/輸出模組110, 120, 130, 140, 150. . . Digital input/output module

111、121、131、141、151...偵測器111, 121, 131, 141, 151. . . Detector

112、122、132、142、152...通訊模組112, 122, 132, 142, 152. . . Communication module

101、102...前端通訊處理器101, 102. . . Front-end communication processor

103...通訊切換器103. . . Communication switcher

1010、1020...通訊模組1010, 1020. . . Communication module

104...網路交換式集線器104. . . Network switching hub

105...防火牆路由器105. . . Firewall router

106...圖控操作工作站106. . . Graphic control operation workstation

107...資料庫伺服器107. . . Database server

16...線上模擬系統16. . . Online simulation system

160...離線分析工作站160. . . Offline analysis workstation

161...前端通訊處理器161. . . Front-end communication processor

210~260...步驟210~260. . . step

310~340...步驟310~340. . . step

第一圖 顯示本發明之電力保護系統一實施例的系統架構圖。The first figure shows a system architecture diagram of an embodiment of a power protection system of the present invention.

第二圖 顯示本發明之電力保護方法一實施例的流程圖。The second figure shows a flow chart of an embodiment of the power protection method of the present invention.

第三圖 顯示本發明一實施例之運作邏輯的流程圖。The third figure shows a flow chart of the operational logic of an embodiment of the present invention.

10...決策中心10. . . Decision center

11、12、13、14、15...遠端監控站11, 12, 13, 14, 15. . . Remote monitoring station

110、120、130、140、150...數位輸入/輸出模組110, 120, 130, 140, 150. . . Digital input/output module

111、121、131、141、151...偵測器111, 121, 131, 141, 151. . . Detector

112、122、132、142、152...通訊模組112, 122, 132, 142, 152. . . Communication module

101、102...前端通訊處理器101, 102. . . Front-end communication processor

103...通訊切換器103. . . Communication switcher

1010、1020...通訊模組1010, 1020. . . Communication module

104...網路交換式集線器104. . . Network switching hub

105...防火牆路由器105. . . Firewall router

106...圖控操作工作站106. . . Graphic control operation workstation

107...資料庫伺服器107. . . Database server

16...線上模擬系統16. . . Online simulation system

160...離線分析工作站160. . . Offline analysis workstation

161...前端通訊處理器161. . . Front-end communication processor

Claims (28)

一種電力保護系統,包含:複數個偵測器,用以分別偵測複數個發電機之發電量及配電饋線之負載量;複數個數位輸入/輸出模組,用以偵測各該發電機、配電饋線、輸電線與變壓器之斷路器的狀態;一遠端監控站,包含一通訊模組,用以接收上述發電量、負載量與斷路器的狀態之訊號並透過該通訊模組傳送;以及一決策中心,根據該遠端監控站所傳送之訊號,經由即時運算判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若該決策中心判斷是需要卸載時,則該決策中心產生一控制指令並傳送至該遠端監控站,令該些數位輸出模組跳脫該些配電饋線或變壓器之斷路器。A power protection system includes: a plurality of detectors for detecting a power generation of a plurality of generators and a load of a distribution feeder; and a plurality of digital input/output modules for detecting each of the generators, The state of the circuit breaker of the distribution feeder, the power line and the transformer; a remote monitoring station comprising a communication module for receiving the signal of the power generation, the load and the state of the circuit breaker and transmitting the signal through the communication module; a decision center, according to the signal transmitted by the remote monitoring station, determines whether it is necessary to uninstall the distribution feeders or jump off the transformers through an instant operation, and if the decision center determines that the uninstallation is required, the decision center generates a control The instructions are transmitted to the remote monitoring station to cause the digital output modules to trip the circuit breakers of the distribution feeders or transformers. 如申請專利範圍第1項所述之電力保護系統,其中該電力保護系統從偵測、傳送、運算到跳脫之運作時間係於200毫秒內完成。The power protection system according to claim 1, wherein the operation time of the power protection system from detection, transmission, operation to tripping is completed within 200 milliseconds. 如申請專利範圍第1項所述之電力保護系統,其中該決策中心進一步根據該些訊號運算該電力保護系統之一緊急發電裕度,其中該緊急發電裕度為運轉發電機之總熱機備轉容量減去單一發電機之最大備轉容量。The power protection system of claim 1, wherein the decision center further calculates an emergency power generation margin of the power protection system according to the signals, wherein the emergency power generation margin is a total heat engine standby for operating the generator. Capacity minus the maximum standby capacity of a single generator. 如申請專利範圍第1項所述之電力保護系統,其中該決策中心進一步根據一配電饋線卸載順序表,決定各該配電饋線之卸載順序。The power protection system of claim 1, wherein the decision center further determines an unloading sequence of each of the distribution feeders according to a distribution feeder unloading sequence table. 如申請專利範圍第1項所述之電力保護系統,其中該決策中心進一步包含:至少一前端通訊處理器,具有乙太網路(Ethernet)通訊介面,用以即時從該遠端監控站接收該些訊號並判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若該前端通訊處理器判斷是需要卸載,則產生該控制指令並透過該乙太網路通訊介面傳送至該遠端監控站。The power protection system of claim 1, wherein the decision center further comprises: at least one front-end communication processor having an Ethernet communication interface for receiving the instant from the remote monitoring station And determining whether it is necessary to uninstall the distribution feeders or to trip the transformers. If the front-end communication processor determines that the uninstallation is required, the control command is generated and transmitted to the remote monitoring station through the Ethernet communication interface. . 如申請專利範圍第1項所述之電力保護系統,其中該決策中心進一步包含:一防火牆路由器,提供一遠端使用者登入監測及維護該電力保護系統。The power protection system of claim 1, wherein the decision center further comprises: a firewall router, providing a remote user login monitoring and maintaining the power protection system. 如申請專利範圍第1項所述之電力保護系統,其中該決策中心包含:一圖控操作工作站,將該遠端監控站所傳送之訊號轉換為該電力保護系統之狀態與警示圖表。The power protection system of claim 1, wherein the decision center comprises: a picture control operation workstation, and converting the signal transmitted by the remote monitoring station into a state and a warning chart of the power protection system. 如申請專利範圍第7項所述之電力保護系統,其中該決策中心進一步包含:一資料庫伺服器,定時儲存該些訊號,並於狀態變化時儲存該些訊號作為歷史與橫斷面資料。The power protection system of claim 7, wherein the decision center further comprises: a database server that periodically stores the signals and stores the signals as historical and cross-sectional data when the state changes. 如申請專利範圍第8項所述之電力保護系統,進一步包含:一線上模擬系統,用以從該資料庫伺服器存取該些訊號及圖表,以作模擬及分析。The power protection system of claim 8, further comprising: an on-line simulation system for accessing the signals and graphs from the database server for simulation and analysis. 如申請專利範圍第1項所述之電力保護系統,其中該通訊模組包含光纖網路及交換器。The power protection system of claim 1, wherein the communication module comprises a fiber optic network and a switch. 如申請專利範圍第1項所述之電力保護系統,其中各該偵測器係為一電力類比信號擷取設備,用以擷取各發電機及配電饋線的電力類比訊號。The power protection system of claim 1, wherein each of the detectors is a power analog signal acquisition device for extracting power analog signals of the generators and the distribution feeders. 如申請專利範圍第11項所述之電力保護系統,其中該電力類比信號擷取設備係為一智慧型數位電表。The power protection system of claim 11, wherein the power analog signal acquisition device is a smart digital electricity meter. 如申請專利範圍第1項所述之電力保護系統,其中該遠端監控站具有乙太網路(Ethernet)通訊介面,用以即時與該決策中心進行通訊。The power protection system of claim 1, wherein the remote monitoring station has an Ethernet communication interface for communicating with the decision center in real time. 一種電力保護方法,用以賦予一電力保護系統運作邏輯,該電力保護系統包含複數個偵測器、複數個數位輸入/輸出模組、一遠端監控站及一決策中心,該遠端監控站包含一通訊模組,該電力保護方法包含以下步驟:利用該些偵測器分別偵測複數個發電機之發電量及配電饋線之負載量;以該些數位輸入/輸出模組偵測各該發電機、配電饋線、輸電線與變壓器之斷路器的狀態;由該遠端監控站接收上述發電量、負載量與斷路器的狀態之訊號並透過該通訊模組傳送至該決策中心;利用該決策中心根據該遠端監控站所傳送之訊號,經由即時運算判斷是否需要卸載該些配電饋線或跳脫該些變壓器;當該決策中心判斷需要卸載時,則以該決策中心產生一控制指令並傳送該控制指令至該遠端監控站;以及由該些遠端監控站根據該控制指令,令該些數位輸出模組跳脫該些配電饋線或變壓器之斷路器。A power protection method for providing a power protection system operation logic, the power protection system comprising a plurality of detectors, a plurality of digital input/output modules, a remote monitoring station, and a decision center, the remote monitoring station The power protection method includes the following steps: detecting the power generation of the plurality of generators and the load of the distribution feeder by using the detectors; and detecting, by the digital input/output modules a state of a circuit breaker of a generator, a distribution feeder, a power line, and a transformer; receiving, by the remote monitoring station, a signal of the power generation amount, the load amount, and a state of the circuit breaker, and transmitting the signal to the decision center through the communication module; The decision center determines, according to the signal transmitted by the remote monitoring station, whether it is necessary to uninstall the distribution feeders or jump off the transformers through an instant operation; when the decision center determines that the uninstallation is required, the decision center generates a control command and Transmitting the control command to the remote monitoring station; and causing the digital output modules to jump according to the control command by the remote monitoring stations The distribution of these feeders in the circuit breaker. 如申請專利範圍第14項所述之電力保護方法,其中該電力保護方法從偵測、傳送、運算到跳脫之運作時間係於200毫秒內完成。The power protection method according to claim 14, wherein the operation time of the power protection method from detection, transmission, operation to tripping is completed within 200 milliseconds. 如申請專利範圍第14項所述之電力保護方法,其中該運作邏輯如下:當該些發電機之任何一者跳機時,則立即卸除相當於跳脫發電量之負載量。For example, in the power protection method described in claim 14, wherein the operation logic is as follows: when any one of the generators is tripped, the load equivalent to the amount of tripped power generation is immediately removed. 如申請專利範圍第14項所述之電力保護方法,其中該運作邏輯如下:根據該些發電機之發電量及配電饋線之負載量自動運算出一卸載門檻值;當該些發電機之任何一者跳機時,則以該決策中心計算跳脫發電量是否大於該卸載門檻值;以及若該決策中心判斷跳脫發電量是大於該卸載門檻值時,則立即卸除相當於該跳脫發電量減去該卸載門檻值之負載量。The power protection method according to claim 14, wherein the operation logic is as follows: automatically calculating an unloading threshold according to the power generation of the generators and the load of the distribution feeder; when any of the generators When the machine is tripped, the decision center calculates whether the trip power generation amount is greater than the unloading threshold value; and if the decision center determines that the trip power generation amount is greater than the unloading threshold value, immediately removes the equivalent of the trip power generation amount minus The load of the unloading threshold value. 如申請專利範圍第17項所述之電力保護方法,其中該運作邏輯進一步包含以下步驟:根據該些訊號運算該電力保護系統之一緊急發電裕度,其中該緊急發電裕度為運轉發電機之總熱機備轉容量減去單一發電機之最大備轉容量;其中該決策中心係根據該緊急發電裕度與單一發電機之最大出力容量計算該卸載門檻值。The power protection method of claim 17, wherein the operation logic further comprises the step of: calculating an emergency power generation margin of the power protection system according to the signals, wherein the emergency power generation margin is a running generator The total heat engine standby capacity minus the maximum standby capacity of the single generator; wherein the decision center calculates the unloading threshold based on the emergency power generation margin and the maximum output capacity of the single generator. 如申請專利範圍第14項所述之電力保護方法,進一步包含以下步驟:根據一配電饋線卸載順序表,決定各該配電饋線之卸載順序。The power protection method according to claim 14, further comprising the step of: determining an unloading sequence of each of the distribution feeders according to a distribution feeder unloading sequence table. 如申請專利範圍第14項所述之電力保護方法,進一步包含以下步驟:以具有乙太網路(Ethernet)通訊介面之至少一前端通訊處理器,即時從該遠端監控站接收該些訊號並判斷是否需要卸載該些配電饋線或跳脫該些變壓器,若該前端通訊處理器判斷是需要卸載時,則產生該控制指令並透過該乙太網路通訊介面傳送至該遠端監控站。The power protection method according to claim 14, further comprising the steps of: receiving, by the remote monitoring station, the signals from at least one front-end communication processor having an Ethernet communication interface; Determining whether it is necessary to uninstall the distribution feeders or to trip the transformers. If the front-end communication processor determines that the uninstallation is required, the control command is generated and transmitted to the remote monitoring station through the Ethernet communication interface. 如申請專利範圍第14項所述之電力保護方法,進一步包含以下步驟:透過一防火牆路由器,提供一遠端使用者登入監測及維護該電力保護系統。The power protection method according to claim 14, further comprising the step of providing a remote user login monitoring and maintaining the power protection system through a firewall router. 如申請專利範圍第14項所述之電力保護方法,進一步包含以下步驟:利用一圖控操作工作站將該遠端監控站所傳送之訊號轉換為該電力保護系統之狀態與警示圖表。The power protection method according to claim 14, further comprising the step of: converting the signal transmitted by the remote monitoring station into a state and a warning chart of the power protection system by using a graphic control operating workstation. 如申請專利範圍第22項所述之電力保護方法,進一步包含以下步驟:藉由一資料庫伺服器,定時儲存該些訊號,並於狀態變化時儲存該些訊號作為歷史與橫斷面資料。The power protection method according to claim 22, further comprising the steps of: storing the signals periodically by a database server, and storing the signals as historical and cross-sectional data when the state changes. 如申請專利範圍第23項所述之電力保護方法,進一步包含以下步驟:建置一線上模擬系統,以從該資料庫伺服器存取該些訊號及圖表而作模擬及分析。The power protection method according to claim 23, further comprising the steps of: constructing an on-line simulation system for accessing the signals and graphs from the database server for simulation and analysis. 如申請專利範圍第14項所述之電力保護方法,其中該通訊模組包含光纖網路及交換器。The power protection method of claim 14, wherein the communication module comprises a fiber optic network and a switch. 如申請專利範圍第14項所述之電力保護方法,其中各該偵測器係為一電力類比信號擷取設備,用以擷取各發電機及配電饋線的電力類比訊號。The power protection method of claim 14, wherein each of the detectors is a power analog signal acquisition device for extracting power analog signals of the generators and the distribution feeders. 如申請專利範圍第26項所述之電力保護方法,其中該電力類比信號擷取設備係為一智慧型數位電表。The power protection method according to claim 26, wherein the power analog signal acquisition device is a smart digital electricity meter. 如申請專利範圍第14項所述之電力保護方法,其中該遠端監控站具有乙太網路(Ethernet)通訊介面,用以即時與該決策中心進行通訊。The power protection method according to claim 14, wherein the remote monitoring station has an Ethernet communication interface for communicating with the decision center in real time.
TW100115550A 2011-05-04 2011-05-04 Power protection system and method TWI411192B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100115550A TWI411192B (en) 2011-05-04 2011-05-04 Power protection system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100115550A TWI411192B (en) 2011-05-04 2011-05-04 Power protection system and method

Publications (2)

Publication Number Publication Date
TW201246740A TW201246740A (en) 2012-11-16
TWI411192B true TWI411192B (en) 2013-10-01

Family

ID=48094620

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100115550A TWI411192B (en) 2011-05-04 2011-05-04 Power protection system and method

Country Status (1)

Country Link
TW (1) TWI411192B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3985824A1 (en) 2020-10-16 2022-04-20 Remotek Corporation Mobile communication based low-delay distributive power generation system assisting service device and method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI550999B (en) * 2015-10-22 2016-09-21 行政院原子能委員會核能研究所 Controller of frequency distributed detection and all-black prevention for microgrid
TWI758972B (en) * 2020-11-25 2022-03-21 台灣電力股份有限公司 Power safety protection system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW469361B (en) * 1999-03-09 2001-12-21 Kansai Electric Power Co Power system control apparatus and power system control method
TW480800B (en) * 1996-08-01 2002-03-21 Hitachi Ltd Protection system for power receiving station
TW552757B (en) * 2001-09-14 2003-09-11 Mitsubishi Electric Corp Power system management method and power system management system
TW200744280A (en) * 2006-05-18 2007-12-01 Univ Nat Kaohsiung Marine A data visualization system and methods for monitoring low frequency power oscillations

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW480800B (en) * 1996-08-01 2002-03-21 Hitachi Ltd Protection system for power receiving station
TW469361B (en) * 1999-03-09 2001-12-21 Kansai Electric Power Co Power system control apparatus and power system control method
TW552757B (en) * 2001-09-14 2003-09-11 Mitsubishi Electric Corp Power system management method and power system management system
TW200744280A (en) * 2006-05-18 2007-12-01 Univ Nat Kaohsiung Marine A data visualization system and methods for monitoring low frequency power oscillations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3985824A1 (en) 2020-10-16 2022-04-20 Remotek Corporation Mobile communication based low-delay distributive power generation system assisting service device and method

Also Published As

Publication number Publication date
TW201246740A (en) 2012-11-16

Similar Documents

Publication Publication Date Title
Abbaspour et al. A bi-level multi agent based protection scheme for distribution networks with distributed generation
WO2019242657A1 (en) Micro-grid reconstruction method and apparatus, micro-grid protection control center, and storage medium
CN106256066B (en) Distribution terminal and its judgment method with fault type arbitration functions
CN103475059B (en) Multiple-channel output cooperation control electric automobile integrated charger supervisory control system and method
US20040010350A1 (en) Distributed power generation system protection scheme
CN107846011A (en) A kind of distribution network failure restoration methods based on main distribution Collaborative Control
CN107453483A (en) A kind of dispatching of power netwoks control system
CN102324741B (en) Micro-power grid off-grid energy balance and control device and method
CN104362654B (en) Three-phase equilibrium electric power system and method and the modularization power distribution cabinet provided with the system
KR20130033806A (en) System for operating smart power grid
CN108599379B (en) Power monitoring system for micro-grid group
CN106655158A (en) Smart grid based distribution network self-healing control system and method
AU2012368224B2 (en) Systems and methods for blackout protection
CN107844891A (en) A kind of method for judging Power grid structure and changing and calculating schedule risk value
CN107994551A (en) The fast quick-recovery processing method of failure based on transmission & distribution collaboration
CN102118061A (en) Method and system for centralized control of regional power grid
TWI411192B (en) Power protection system and method
Mirsaeidi et al. Review and analysis of existing protection strategies for micro-grids
CN115378014A (en) Intelligent group string type energy storage system and energy storage device thereof
CN107910855B (en) A kind of connection applied to intelligent substation cuts small power supply device
KR102529524B1 (en) Control system and method for detecting ground fault
CN105305482A (en) Distributed-type power grid-connected monitoring system based on B/S architecture
CN108539740A (en) A kind of power grid accident anticipation simulation system and its method
CN103795141A (en) DC reclosing switch
Lai et al. Smart Grids to Revolutionize Chinese Cities: Challenges and Opportunities