1335831 八、發明說明: - 【發明所屬之技術領域】 - 本發明係關於一種大型多人拔河機與製造方法,尤指 一種可以不受限於人數、節省製造成本、考量安全性與^ 省空間的大型多人拔河機與製造方法。 、 【先前技術】 • 於目前生活中,運動之種類不勝牧舉,如田徑運動、 ,類運動等’且不論是於學校或是公司行號,皆會成立許 多j動社團,藉以使學生或是上班族於課業或工作之餘, 可藉由運動以舒展身心。 以所謂之拔河運動為例,其係分為兩組人員,且每一 組具有相同之人數,同時,兩組人員分別站立於繩索之兩 側再於繩索之中段鄉上一記號,而兩組之人員則分別施 :繩索使繩索朝向己方拉拔移動,最後藉由記號移動 至哪一組,則判定該組獲勝。 由此可知,每一組之人員必須具有協調性,並同心協 ·=才能發揮最大力4 ’以使繩索朝向己方移動。因此,平 常之練習乃是於拔河運動中獲勝之不二法門。 欲進行拔河運動之訓練,最傳統的方法就是尋找兩組 )員,並使兩組人員反覆地拉拔繩索,此乃是最簡單也是 最傳統的訓練方式。 然而,如上所述,於進行拔河訓練時,需利用較大之 場地才能進行,例如學校操場,而於天候良好之情況下尚 可進行訓練,若碰到天候狀況不佳時,拔河訓練即會被迫 中斷。 1335831 般人=會之人數最好“ 有事等。因… 0素而無法參與訓練,例如生病、臨時 相對地使訓練效;::::作法順利進行, 2方面,冑作一台這樣的大型多人 費甚:。戶斤以如何考量到成本,也是一項重要議題 樣的機具要應付多人的力量瞬間爆發,其體積應該不^ 小°因此在室内空間的運用上,將要充分考量。 d1335831 VIII. Description of the invention: - [Technical field to which the invention pertains] - The present invention relates to a large-scale multi-person tug-of-warmer and a manufacturing method, and in particular to a type that can be free from limited number of people, saves manufacturing costs, considers safety and saves space. Large multi-person tug-of-war machine and manufacturing method. [Previous technology] • In the current life, the types of sports are not so good, such as athletics, sports, etc., and whether it is in the school or the company number, there will be many clubs to enable students or It is the office worker who can relax his body and mind by exercising. Taking the so-called tug-of-war movement as an example, the system is divided into two groups of people, and each group has the same number. At the same time, the two groups of people stand on both sides of the rope and then mark the middle section of the rope, and the two groups The personnel are separately applied: the rope pulls the rope toward the other side, and finally, by which group the mark moves, it is determined that the group wins. It can be seen that each group of personnel must be coordinated and work together to make the maximum force 4 ′ to move the rope towards itself. Therefore, the usual practice is the only way to win in the tug-of-war. The most traditional way to train tug-of-war is to find two groups of staff and to have the two groups repeatedly pull the ropes. This is the simplest and most traditional form of training. However, as mentioned above, when conducting tug-of-war training, it is necessary to use a larger venue, such as a school playground, and training can still be carried out in a good weather. If the weather is not good, the tug-of-war training will be Forced to interrupt. 1335831 Ordinary people = the number of people in the meeting is best. "There is something to do. Because of... I can't participate in training, such as getting sick and temporarily making training effective;:::: The practice goes smoothly, 2 aspects, making one such large Many people are very expensive: How to consider the cost to the household, it is also an important issue. The machine should cope with the power of many people in an instant, and its volume should not be small. Therefore, in the use of indoor space, it will be fully considered. d
【發明内容] 本發明之一種大型多人拔河機與製造方法,其主要目 的係在於除了可提供單人進行拔河訓練之外,亦可提供多 人同時進行拔河訓練,如此除了無須費心再去拼湊人數之 於夕人同時進行訓練之之狀態下,亦可於訓練過程 中培養彼此之默契與協調性。 本發明之一種大型多人拔河機與製造方法,其另—目 的係在於可提供一節省材料,並同時兼顧安全的訓練器材。 本發明之一種大型多人拔河機與製造方法,其再—目 的係在於可節省不受訓練時的空間,以維持該空間的安全 性。 χ 一種大型多人拔河機’包括:至少二前樑,係以垂直 之勢直立;至少二後樑,係以垂直之勢直立;一頂樑結構, 係分別與該二前樑與該二後樑以彼此互相垂直的方位在四 支樑之各端連結;一底部’係分別與該二前樑與該二後襟 以彼此互相垂直的方位在四支樑與該頂樑結構相連結之各 端的相反端連結;一第一滑輪,係經由一固定滑輪結構而 固定於二前樑一適當位置,一第二滑輪,係裝設於頂樑結 1335831 與一直立式樑,該側面上弧型樑之一端與該直立式樑之一 端以呈現-角度之勢相連結,且直立式襟之另一端則抵靠 並連結該直立式固定裝置’並以該抵靠處為圓心以進行樞 轉,側面上弧型樑之另-端則以可增加或減少的方式連社 至少一強力彈性元件,該強力彈性元件之另一端則連4 :第二直立式固定裝置’該側面孤型枢架係穿設於該側面 弧型穿孔’且恰坐落於該弧型滾珠軸承上。 -種製造大型多人拔河機的方法,包括:⑴提供一 =直:Π具有一门型樑與二下側樑,且該二下側樑分 垂:並連結於於該门型樑之一橫樑與二上側樑交接處; ,設置一滾輪軸承;:== = 強承’而㈣框架外延伸’·及(5)將至少一 直=::::端以增加或減少其數量的方式連結於該 式固疋裝置上’另一端連結至該纜繩。 -直多Γ河機的方法,包括:⑴提供-第 型穿孔底部具;一弧= 朱::面弧型穿孔’且該側面弧 襟之一端與該直立式樑二弧型 另一端抵靠並連結該直丄定=結並 則以可增加或減少的方式連…名之另-端 將該強力彈性元件之另…一強力彈性元件;及(5) π丨土干 < 另—端遠社 — _ 置,該側面弧型框架係穿設於該:面弧型:孔立式固定裝 於該弧型滾珠軸承上。 垔牙孔,且恰坐落 1335831 【實施方式】 請同時參考第一圖與第二圖,係本發明一種大型多人 拔河機之第一較佳實施例正視圖與側視圖。其中,一種大 型多人拔珂機1,包括:至少二前樑11,係以垂直之勢直立; -至少二後樑12,係以垂直之勢直立;一頂樑結構13,係分 •別與該二前樑Π與該二後樑12以彼此互相垂直的方位在四 支樑之各端連結;一底部14,係分別與該二前樑U與該二 後樑12以彼此互相垂直的方位在四支樑丨丨、i 2與該頂樑結 構13相連結之各端的相反端連結;一第一滑輪ι9β,係經由 一固定滑輪結構19A而固定於二前樑!〗一適當位置;一第二 滑輪19D,係裝設於頂樑結構13一適當位置;一配重塊盛盤 17,係裝設於該底部14之上,且介於四支樑丨丨、12之間, 且具有一直立式孔,以容許一固定銷19通過;一導引結構 16係以如一則樑Π之左右對稱裝設方式分部在底部14之 上;複數個緩衝器15,係平均裝設於底部14之上;一纜繩 19C,其中段部分係跨設於該第二滑輪19D上的徑向凹槽, 其一端可跨設於該第一滑輪19B上的徑向凹槽而伸出該大 •型多人拔河機1外;一配重塊欖繩連結裝置19E,該纜蠅19c 之另一端係連結於該配重塊纜繩連結裝置丨9E,且具有一直 立式孔,以谷許該固定銷19通過;一調整式配重塊19F,係 可於其上固定至少一重量較輕的配重塊(圖中未示),以於 重量訓練時需要少量增加重量時使用,且具有一直立式 - 孔’以谷許固定銷19通過;及複數個配重塊1 8 a與18 B,係 具有不同重量的配重塊,且各具有一直立式孔,以容許固 定銷19通過;其中,該配重塊盛盤17可先盛裝該複數個大 小配重塊18A與18B’最上層可再堆疊該調整式配重塊 1 州 831 J除可郎省材料的成本外,也可在安全部分上有加強的部 分。 請參考第五圖,係本發明一種大型多人拔河機之第三 較佳實施例側視圖。該大型多人拔河機3包括:一第—直立 式固定裝置3 1 ’係具有一側面弧型穿孔3丨丨,且該側面弧型 穿孔3 11底部具有一弧型滾珠軸承3丨3 ; 一侧面弧形框架 33 ’係具有一側面上弧型樑33丨與一直立式樑333,該側面 上弧型樑331之一端與該直立式樑333之一端以呈現一角度 Θ之勢相連結,且直立式樑333之另一端則抵靠並連結該直 立式固定裝置3 1,並以該抵靠處,即一樞紐結構333丨,為 圓心以進行樞轉,側面上弧型樑331之另一端則以可增加或 減少的方式連結至少一強力彈性元件35,本實施例具有三 ,,該強力彈性元件35之另一端則連結至一第二直立式固 定裝置37,該側面弧型框架33係穿設於該側面弧型穿孔 3 11,且恰坐落於該弧型滾珠軸承313上。其中,該第一直 立式固定裝置31與第二直立式固定裝置37係二牆壁 力彈性元件35係強力彈簧。如上所述,本實施例可在不進 订訓練時,將直立式樑333緊貼於直立式固 了可以節省空間外,更可以顧庸 除 又J 乂願應到不運動時的安全性。 請參考第六圖,係本發明第二較佳 流程圖。該製造大型多人拔河機 表k万沄 別垂直並連結於於該门型標之一二二側襟分 (2)將該每一上側樑固著於固 貝'梁乂接處’ 端係呈-板狀頭端;(3)以水泥與; 滾輪軸承於該橫摔上.冓支持,(4)设置一 (5)將—纜绳跨置於該滾輪軸承,而 1335831 【圖式簡單說明】 第一圖係本發明一種大型多人拔河機之第一較佳實施例正視圖; 第二圖係本發明第一較佳實施例侧視圖; 第三圖係本發明一種大型多人拔河機之第二較佳實施例立體圖式; 第四圖係第二較佳實施例之詳細側視圖; 第五圖係本發明一種大型多人拔河機之第三較佳實施例側視圖; 第六圖係本發明第二較佳實施例之製造方法流程圖;及 第七圖係本發明第三較佳實施例之製造方法流程圖。 1335831 【主要元件符號說明】 1大型多人拔河機 11前樑 12後樑 1 3頂樑結構 14底部 1 5緩衝器 16導引結構 1 7配重塊盛盤 1 8 A大配重塊 1 8β λ)、酉己;ί i鬼 1 8 1 A固定銷 1 9固定銷 1 9 A固定滑輪結構 19B第一滑輪 19C纜繩 19D第二滑輪 19E酉己重塊纜繩連結裝置 19F調整式配重塊 2大型多人拔河機 21框架 2 1 1门型樑 2 111上側樑 2 1 1 3橫樑 2111A板狀頭端 2 1 3下側樑 1335831 23直立式固定裝置 25滚輪軸承 27纜繩 29強力彈性元件 28連結結構 24水泥 26強化結構 3大型多人拔河機 31第一直立式固定裝置 3 11側面弧型穿孔 3 1 3弧型滾珠軸承 33側面弧形框架 33 1側面上弧型樑 333直立式樑 333 1樞紐結構 Θ角度 3 5強力彈性元件 37第二直立式固定裝置 (1)〜(6)第二較佳實施例 (1,)〜(5,)第三較佳實施例SUMMARY OF THE INVENTION A large-scale multi-person tug-of-warmer and manufacturing method of the present invention mainly aims at providing tug-of-war training for a single person in addition to providing single-person tug-of-war training, so that it is not necessary to bother to patch together. In the state where the number of people is training at the same time, the tacit understanding and coordination of each other can be cultivated during the training. A large multi-person tug-of-warmer and method of manufacture of the present invention is additionally provided with a material that saves material while at the same time providing safe training equipment. A large multi-person tug-of-warmer and manufacturing method of the present invention is further aimed at saving space in the absence of training to maintain the safety of the space. χ A large multi-person tug-of-war machine' includes: at least two front girders, erected in a vertical direction; at least two rear girders, standing upright in a vertical direction; a top beam structure, respectively, with the two front sills and the second The beams are joined at each end of the four beams in mutually perpendicular directions; a bottom portion is respectively connected to the four beam and the top beam structure in an orientation perpendicular to the two front beams and the two rear ridges The opposite end of the end is connected; a first pulley is fixed to a suitable position of the two front beams via a fixed pulley structure, and a second pulley is mounted on the top beam joint 1358831 and the vertical beam, the side is curved One end of the beam is connected to one end of the upright beam at a presenting-angled position, and the other end of the upright type abuts against and connects the upright fixture 'and pivots with the abutment centered, The other end of the curved beam on the side is connected to at least one strong elastic element in an increase or decrease manner, and the other end of the strong elastic element is connected to 4: the second vertical fixing device Wear on the side of the arc-shaped perforation And just on the arc ball bearing. - A method for manufacturing a large multi-person tug-of-warmer machine, comprising: (1) providing a = straight: a sill having a door beam and two lower side sills, and the two lower side sills are sag: and are coupled to one of the sill beams The intersection of the beam and the two upper side beams; set a roller bearing;: == = strong bearing 'and (4) the outer extension of the frame '· and (5) will at least always =:::: end to increase or decrease the number of links The other end of the solid-state device is connected to the cable. - A method of directly multi-channel machine, comprising: (1) providing - a perforated bottom piece; an arc = Zhu:: face-arc perforation ' and one end of the side arc is abutting the other end of the two-arc type of the upright beam And connecting the straight === 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结 结Yuanshe - _, the side arc frame is worn in the: surface arc type: the hole is vertically fixed on the arc type ball bearing.垔 , , 13 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 358 Wherein, a large multi-person plucking machine 1 comprises: at least two front sills 11 erected in a vertical direction; at least two rear sills 12 are erected in a vertical direction; and a top beam structure 13 is categorized. And the two front beams and the two rear beams 12 are connected at each end of the four beams in an orientation perpendicular to each other; a bottom portion 14 and the two front beams U and the two rear beams 12 are perpendicular to each other The azimuth is connected at opposite ends of the ends of the four beams, i 2 and the top beam structure 13; a first pulley ι9β is fixed to the two front beams via a fixed pulley structure 19A! a suitable position; a second pulley 19D is mounted on the top beam structure 13 at a suitable position; a weight plate 17 is mounted on the bottom portion 14 and is interposed between the four beams, Between 12, and has a vertical hole to allow a fixed pin 19 to pass; a guiding structure 16 is divided into a bottom symmetrical arrangement as a beam yoke; a plurality of buffers 15, The cable is mounted on the bottom portion 14; a cable 19C, wherein the segment portion spans a radial groove disposed on the second pulley 19D, and one end thereof can span a radial groove provided on the first pulley 19B. And extending out of the large multi-person tug-of-war machine 1; a heavy-duty rope connecting device 19E, the other end of the cable 19c is coupled to the counterweight cable connecting device 丨9E, and has a vertical hole The fixed weight 19 is passed through; the adjustable weight 19F can be fixed with at least one light weight weight (not shown) to increase the weight when weight training is required. Used, and has a vertical - hole 'to pass through the fixed pin 19; and a plurality of weights 1 8 a and 18 B The weights have different weights, and each has a vertical hole to allow the fixing pin 19 to pass through; wherein the weight plate 17 can first hold the plurality of size weights 18A and 18B' Re-stacking the adjusted weight 1 State 831 J can also have a reinforced portion on the safety portion in addition to the cost of the material. Referring to Figure 5, a side view of a third preferred embodiment of a large multi-person tug-of-warmer is provided. The large multi-person tug-of-warmer 3 comprises: a first vertical fixing device 3 1 ' having a side arc-shaped perforation 3 丨丨, and the side curved perforation 3 11 has an arc-shaped ball bearing 3 丨 3 at the bottom; The side curved frame 33' has an arc-shaped beam 33丨 on one side and an upright beam 333, and one end of the curved beam 331 on the side is connected with one end of the vertical beam 333 at an angle of an angle. And the other end of the upright beam 333 abuts and joins the upright fixture 3 1, and pivots with the abutment, that is, a hinge structure 333丨, and the other side of the curved beam 331 One end is connected to at least one strong elastic member 35 in an increase or decrease manner. In this embodiment, there is three, and the other end of the strong elastic member 35 is coupled to a second vertical fixing device 37. The side curved frame 33 is attached. The arcuate through hole 311 is disposed on the side and is located on the arc type ball bearing 313. The first vertical fixing device 31 and the second vertical fixing device 37 are two wall force elastic members 35 which are strong springs. As described above, in the present embodiment, when the training is not performed, the vertical beam 333 can be attached to the upright type to save space, and the safety can be avoided when it is not exercised. Please refer to the sixth figure, which is a second preferred flow chart of the present invention. The large-scale multi-person tug-of-war machine is vertically connected and connected to one or two sides of the door type (2). The upper side beam is fixed to the solid beam 'beam joint' end system. - plate-shaped head end; (3) with cement and; roller bearing on the cross-fall. 冓 support, (4) set one (5) will - cable straddle the roller bearing, and 1335831 [simple figure BRIEF DESCRIPTION OF THE DRAWINGS The first drawing is a front view of a first preferred embodiment of a large multi-person tug-of-warmer according to the present invention; the second drawing is a side view of a first preferred embodiment of the present invention; and the third drawing is a large multi-person tug-of-war of the present invention. The second preferred embodiment is a perspective view of the second preferred embodiment; the fifth is a side view of a third preferred embodiment of the large multi-person tug-of-warmer of the present invention; The flowchart of the manufacturing method of the second preferred embodiment of the present invention; and the seventh diagram is a flow chart of the manufacturing method of the third preferred embodiment of the present invention. 1335831 [Description of main components] 1 large multi-person tug-of-war machine 11 front beam 12 rear beam 1 3 top beam structure 14 bottom 1 5 bumper 16 guiding structure 1 7 counterweight holding plate 1 8 A large weighting block 1 8β λ), 酉 ;; ί i ghost 1 8 1 A fixing pin 1 9 fixing pin 1 9 A fixed pulley structure 19B first pulley 19C cable 19D second pulley 19E 重 heavy block cable connecting device 19F adjusting weight 2 Large multi-person tug-of-war machine 21 frame 2 1 1 door beam 2 111 upper side beam 2 1 1 3 beam 2111A plate-shaped head end 2 1 3 lower side beam 1365381 23 upright fixture 25 roller bearing 27 cable 29 strong elastic element 28 connection Structure 24 cement 26 reinforced structure 3 large multi-person tug-of-war machine 31 first vertical fixture 3 11 side arc perforation 3 1 3 arc ball bearing 33 side curved frame 33 1 side upper curved beam 333 vertical beam 333 1 pivot structure Θ angle 3 5 strong elastic element 37 second vertical fixing device (1) ~ (6) second preferred embodiment (1,) ~ (5,) third preferred embodiment