TWI312973B - A system and method for allocating output - Google Patents
A system and method for allocating output Download PDFInfo
- Publication number
- TWI312973B TWI312973B TW93128996A TW93128996A TWI312973B TW I312973 B TWI312973 B TW I312973B TW 93128996 A TW93128996 A TW 93128996A TW 93128996 A TW93128996 A TW 93128996A TW I312973 B TWI312973 B TW I312973B
- Authority
- TW
- Taiwan
- Prior art keywords
- schedule
- actual
- server
- logistics
- export
- Prior art date
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
1312973 五、發明說明(1) 【發明所屬之技術領域】 本發明係關於一種物流管理系統及方法,特別係關於 一種進行出貨自動排配之系統及方法。 【先前技術】 企業管理的電腦化是當今企業增加競爭力的必要手段 ,物流倉儲公司可以通過電腦化,將進出貨物的管理納入 到更先進的管理軌道,提高管理水平及日常業務的處理效 率,並使資訊的採集與統計達到及時、準確的目的。 如中國國家知識產權局於2 0 0 3年2月5日公開的申請號 為0 1 1 2 0 1 4 3 . 6的專利申請,其名稱為”物流進、出貨計算 機自動化管理系統及方法'',該專利申請揭露:一種物流 進、出貨計算機自動化管理系統,至少包括:一進貨處理 模塊,通過一進/退貨通知單,產生一進貨驗收單及進貨 入庫單,進行進貨處理;一棟貨處理模塊,是根據一客戶 提供的出貨通知單,經排車及儲位最佳化後進行揀貨處 理;及一出貨處理模塊,是在該揀貨處理後,根據排車後 打印的出貨單裝車,並確認裝車結果,待出車結束後確認 出車結果,以完成出貨處理。 但該專利申請存在缺點為:其只能自動完成入庫及出 貨之棟貨作業,但不能進行對出貨進行自動排配。因此需 提供一種出貨自動排配系統及方法,其可以對企業内一段 時間内的出貨進行自動排配。 【發明内容】 本發明之主要目的在於提供一種出貨自動排配系統及1312973 V. INSTRUCTION DESCRIPTION OF THE INVENTION (1) Technical Field of the Invention The present invention relates to a logistics management system and method, and more particularly to a system and method for automatic shipment scheduling. [Prior Art] The computerization of enterprise management is a necessary means for enterprises to increase their competitiveness. Logistics warehousing companies can computerize and integrate the management of inbound and outbound goods into a more advanced management track, improving management level and processing efficiency of daily business. And make the collection and statistics of information to a timely and accurate purpose. For example, the patent application filed by the State Intellectual Property Office of China on February 5, 2003 is 0 1 1 2 0 1 4 3 . 6 and its name is “Logistics import and shipment computer automation management system and method”. '', the patent application discloses: a logistics import and export computer automation management system, at least: a purchase processing module, through an entry / return notice, generate a purchase acceptance form and purchase receipt, for the purchase processing; The lord handling module is based on a shipping notice provided by a customer, and is sorted after the platooning and storage are optimized; and a shipping processing module is after the arranging process, according to the platooning The printed shipping order is loaded and confirmed, and the result of the loading is confirmed after the end of the vehicle to complete the shipping process. However, the patent application has the disadvantage that it can only automatically complete the warehousing and shipping of the lorry. Work, but can not automatically arrange the shipment. Therefore, it is necessary to provide a shipment automatic allocation system and method, which can automatically arrange shipments within a certain period of time in the enterprise. The main purpose of the invention is to provide a shipping automatic dispensing system and
1312973 五、發明說明(2) 方法,其可自 本發明揭 依據轉運公司 器提供的出口 位於企業内交 戶的交貨需求 ,以適時、適 器分別藉由一 流伺服 交管資 資料、 相連, 預計的 考。此 每條船 的航線 預計的 。料號 貨數量 進度排 庫中。 預計出 預計的 包括: 器位於 料庫包括 動生成出貨排 露一種出貨自 (Forwarder ) 貨櫃資料生成 管部門中,交 ,以滿足客戶 地、適量、適 網路與一轉運 企業物流部門 料號地 實際出口貨櫃資料 其包括 船期資 預計的 的出發 、搶位 船期資 地點對 等資訊 配的預 預計出 口貨櫃 船期表 預計下 一船期表。轉 訊給物 船期資 地、目 物流 訊對物 照資料 。交管 計每曰 口貨櫃 資訊。 生成相 個月中 流伺服 訊包括 的地、 伺月艮器 流貢料 包括每 部門人 出口貨 資料包 物流伺 應的預 每天船 配計劃。 動排配系統,其中物流伺服器 提供的船期資訊及交管伺服 相應的出貨計劃。交管伺服器 管部門主要職責在於:接到客 需求為原則,安排出貨與交貨 質的滿足客戶需要。物流伺服 公司及一交管伺服器相連。物 内。其中與交管伺服器相連的 點對照資料、一預計出口貨櫃 。一物流資料庫與物流伺服器 運公司於每月末時提供下個月 器以供其企業内部出貨排配參 有:下個月中每天船只數量、 出發時間、預計到達時間、走 根據轉運公司提供的下一個月 庫中的船期表進行相應的維護 一訂單中各料號的出貨地、出 員根據預計的船期表,及生產 櫃數量,並將它存入交管資料 括交管部門人員排配出的每曰 服器根據預計出口貨櫃數量及 計出貨計劃。該預計出貨計劃 只數量、每條船的出發地、目1312973 V. Inventive Note (2) Method, which can be based on the delivery demand of the exporter located in the enterprise provided by the transfer company according to the invention, and is connected by the first-class servo communication information in a timely and appropriate manner. Test. This route for each ship is expected. Item No. Quantity of goods Progress schedule. Expected to include: The device is located in the library, including the dynamic generation of shipments, and a shipment from the (Forwarder) container data generation management department, to meet the customer's land, the right amount, the network and a transfer enterprise logistics department. The actual export container information of the land is expected to include the scheduled departure time of the ship, and the pre-expected export container schedule of the matching information of the position of the ship is expected to be the next schedule. The transfer of the ship to the ship, the land, the logistics, and the information. Traffic control information for each container. The pre-daily ship distribution plan for each department's export goods package logistics service is included in the flow of the month. The dynamic dispatching system, in which the logistics server provides the schedule information and the corresponding delivery plan of the traffic control servo. The main responsibility of the traffic management department is to receive the customer demand principle and arrange the shipment and delivery quality to meet the customer's needs. The logistics servo company is connected to a traffic server. Inside. The point is compared with the point of contact with the traffic server, and an estimated export container. A logistics database and logistics server shipping company will provide the next month at the end of each month for their internal shipments to participate in the allocation: the number of vessels per day, departure time, estimated arrival time, and the company according to the forwarding company. The provided shipping schedule in the next month will be maintained accordingly. The place of shipment of each item in the order will be based on the expected schedule and the number of cabinets, and will be deposited in the traffic control department. Each server that is dispatched by personnel is based on the estimated number of exported containers and the planned shipping schedule. The estimated shipping plan is only the quantity, the departure place of each ship, and the destination.
1312973 五、發明說明(3) 的地、出發時間、預計到達時間、走的航線、艙位、每條 船上應放的貨櫃數量、料號等。物流部門依據預計出貨計 劃向轉運公司訂搶,轉運公司在收到物流伺服器的訂艙單 後反饋實際船期資訊,其包括每條船實際可供的艙位數量 〇 物流伺服器根據反饋的實際船期資訊重新對船期表進 行相應的維護以得到一實際的船期表。交管部門人員根據 實際的船期表,及生產進度排配的實際出口貨櫃數量,並 將它存入交管資料庫中。實際出口貨櫃資料包括交管部門 人員排配出的每日實際出口貨櫃資訊。物流伺服器根據實 際的船期表及實際出口貨櫃數量生成實際出貨計劃。 其中,物流伺服器包括:一船期資訊維護模組、一預 計出貨計劃生成模組、及一實際出貨計劃生成模組。交管 伺服器包括:一料號地點維護模組、一預計出口貨櫃記錄 模組、及一實際出口貨櫃記錄模組。 其中,船期資訊維護模組用於依據轉運公司提供船期 資訊維護相應的企業内部所需的船期表。預計出口貨櫃記 錄模組根據記錄交管部門人員根據生產現場的生產進度及 預計的船期表排配的每個料號每日出口貨櫃數量;預計出 貨計劃生成模組根據預計每日出口貨櫃數量及船期表生成 相應的預計出貨計劃。物流部門依據預計出貨計劃向轉運 公司訂艙,同時轉運公司將實際的船期資訊反饋給物流伺 服器。實際出口貨櫃記錄模組記錄交管部門人員根據生產 進度與實際的船期表重新排配的每個料號的每曰出口貨櫃1312973 V. Description of the invention (3) Land, departure time, estimated arrival time, route, class, number of containers to be placed on each ship, item number, etc. The logistics department subscribes to the forwarding company according to the expected shipping plan. The forwarding company feeds back the actual shipping information after receiving the booking form of the logistics server, which includes the actual number of available slots per ship. The logistics server responds according to the feedback. The actual schedule information is re-maintained for the schedule to obtain an actual schedule. The traffic control department personnel will allocate the actual number of export containers according to the actual schedule and the production schedule, and deposit it in the traffic management database. The actual export container information includes daily actual export container information distributed by the traffic control department personnel. The logistics server generates an actual shipping plan based on the actual schedule and the actual number of exported containers. The logistics server includes: a ship schedule information maintenance module, a pre-shipment plan generation module, and an actual shipment plan generation module. The traffic management server includes: a item location maintenance module, an estimated export container record module, and an actual export container record module. Among them, the ship schedule information maintenance module is used to maintain the schedule information required by the corresponding company according to the shipping company's ship schedule information. It is expected that the export container record module will export the number of containers per day according to the record of the production department and the expected schedule according to the production schedule of the production department; the expected shipment plan generation module is based on the estimated number of daily export containers. And the schedule to generate the corresponding expected shipping plan. The logistics department books the transfer company based on the expected shipping schedule, and the transfer company feeds back the actual shipping information to the logistics server. The actual export container record module records each export container of each item number re-arranged by the personnel of the traffic control department according to the production schedule and the actual schedule.
1312973 五 數 a 維 如 資 錄 排 昭 計 艙 可 ( 成 的 關 環 提 相 交 戶 發明說明(4) 莖°貫際出k έ十劃生成模組根據貫際的船期表及實際出 貨櫃數量生成實際的出貨計劃。料號地點維護模組用於 護每一訂單中各料號的出貨地點及出貨數量等資訊。 本發明還提供一種出貨自動排配方法,該方法包括有 下步驟:(a )依據轉運公司提供的下一月的預計船期 訊相應的對企業内部所需之船期表進行維護;(b )記 ::m=f計的船期表及生产現場的生產進度 以上排配的每曰出里、(C )曰預汁出貨計劃生成模組按 劃;(d )物流甸口貨櫃數置及船期表生成預計的出貨 ,轉運公司反於丧^'器依據預计出貨計劃向運轉公司訂 供的艙位儲量際可供的船期資訊;(e)依據實際 f )記錄實際每日維護企業内部所需之實際的船期表; 模組依據實際船髮出口貨櫃數量;(§ )實際出貨計劃生 實際的出貨計書彳4表及貫際母日出口貨櫃數量生成相應 利用本發明的 部門的工作致率,。、统及方法,可提高企業内出貨排配相 實施方式】 如第—圖所示’ 乂 境圖,其中物涂i係為本發明出貨自動排配系統之應用 供的船期資訊及二服器1依據轉運公司(F〇rwarder ) 2 應的出貨計則=g伺服器3提供的出口貨櫃資料生 :部門主要夂;管词服器3位於企業内交管部門中成 而求為原則,於:接到客戶的交貨需求,以滿1312973 Five-digit a-dimensional such as the record of the Zhaozhao cabin can be (formed by the customs of the ring to submit the invention description (4) stems and stipulations out of the έ 10 plan generation module according to the continuous schedule and the actual number of shipping cabinets The actual shipping plan is generated. The item number location maintenance module is used to protect information such as the shipping location and the shipping quantity of each item number in each order. The present invention also provides a shipping automatic arrangement method, which includes The following steps: (a) According to the expected shipping schedule of the next month provided by the transshipment company, the corresponding schedule for the internal maintenance of the enterprise shall be maintained; (b) record:: m=f schedule and production site The production schedule is arranged above each output, (C) 曰 pre-salt shipment planning module is generated; (d) the number of logistics containers and the schedule of the ship generate the expected shipment, and the transshipment company is against The funeral information of the ship's reserves available to the operating company based on the expected shipping plan; (e) record the actual schedule of the actual daily maintenance of the enterprise according to the actual f); The group is based on the actual number of exported containers; (§) actual shipments Table 4 Number of left foot and consistent international date parent container outlet raw actual ship design document generation and utilization of the corresponding sector of the present invention induced rate. , system and method, can improve the implementation method of shipment and distribution phase in the enterprise] As shown in the figure--the diagram of the environment, where the material coating is the shipping information for the application of the automatic distribution system of the invention and The second server 1 is based on the shipping plan of the transport company (F〇rwarder) 2 = the export container information provided by the server 3: the main department of the department; the service server 3 is located in the enterprise's internal traffic control department. Principle, in: to receive the customer's delivery needs, to full
挪出貨與交貨,以適時、適地、適量客 1312973 五、發明說明(5) 適質的滿足客戶需要。物流伺服器1分別藉由一網路與一 轉運公司2及一交管伺服器3相連。物流伺服器1位於企業 物流部門内。其中與交管伺服器3相連的交管資料庫5包括 :一料號地點對照資料5 0、一預計出口貨櫃資料52、一實 際出口貨櫃資料5 4。一物流資料庫6與物流伺服器1相連, 其包括一船期表6 0。轉運公司2於每月末時提供下個月預 計的船期資訊給物流伺服器1以供其企業内部出貨排配參 考。此預計的船期資訊包括有:下個月中每天船只數量、 每條船的出發地、目的地、出發時間、預計到達時間、走 的航線、艙位。物流伺服器1根據轉運公司2提供的下一個 月預計的船期資訊對物流資料庫2中的船期表進行相應的 維護。料號地點對照資料5 0包括每一訂單中各料號的出貨 地、出貨數量等資訊。交管部門人員根據預計的船期表, 及生產進度排配的預計每日出口貨櫃數量,並將它存入交 管資料庫5中。預計出口貨櫃資料5 2包括交管部門人員排 配出的每日預計出口貨櫃資訊。物流伺服器1根據預計出 口貨櫃數量及預計的船期表生成相應的預計出貨計劃。該 預計出貨計劃包括:預計下個月中每天船只數量、每條船 的出發地、目的地、出發時間、預計到達時間、走的航 線、艙位、每條船上應放的貨櫃數量、料號等。物流部門 依據預計出貨計劃向轉運公司2訂艙,轉運公司2在收到物 流伺服器1的訂艙單後反饋實際船期資訊,其包括每條船 實際可供的艙位數量。 物流伺服器1根據反饋的實際船期資訊重新對船期表Move shipments and delivery to timely, appropriate, and appropriate customers 1312973 V. Inventions (5) Appropriate to meet customer needs. The logistics server 1 is connected to a transport company 2 and a traffic server 3 by a network, respectively. The logistics server 1 is located in the corporate logistics department. The traffic management database 5 connected to the traffic management server 3 includes: a material number location comparison data 50, an estimated export container information 52, and an actual export container information 54. A logistics database 6 is connected to the logistics server 1, which includes a schedule 60. The Transit Company 2 provides the scheduled shipping information for the next month to the Logistics Server 1 at the end of each month for its internal shipment scheduling reference. The estimated schedule information includes: the number of boats per day in the next month, the departure point, destination, departure time, estimated arrival time, route and class of each boat. The logistics server 1 performs maintenance on the schedule in the logistics database 2 based on the expected shipping schedule information provided by the transfer company 2 for the next month. The item number location comparison data 5 0 includes information such as the shipping place and shipping quantity of each item number in each order. The traffic control department personnel shall allocate the estimated number of daily export containers according to the estimated schedule and the production schedule, and store it in the traffic control database 5. It is expected that the export container information 5 2 includes daily expected export container information distributed by the traffic control personnel. The Logistics Server 1 generates a corresponding estimated shipping plan based on the estimated number of exported containers and the estimated shipping schedule. The estimated shipping plan includes: expected number of ships per day in the next month, departure point, destination, departure time, estimated arrival time, route, class, number of containers to be placed on each ship, item number Wait. The logistics department books the transfer company 2 according to the expected shipping plan. The transfer company 2 feeds back the actual ship schedule information after receiving the booking form of the logistics server 1, which includes the actual number of seats available for each ship. The logistics server 1 re-schedules the schedule according to the actual schedule information of the feedback.
第10頁 1312973 五、發明說明(6) 進行相應的維護以得到一實際的船期表。交管部門人員根 據貫際的船期表’及生產進度排配的實際出口貨櫃數量, 並將它存入交管資料庫5中。實際出口貨櫃資料54包括交 管部門+人員排配出的每日實際出口貨櫃資訊。物流伺服器 1根據貫際的船期表及實際出口貨櫃數量生成實際出貨計 劃。 一如第二圖所示’為本發明出貨自動排配系統之功能模 組示意圖。物流伺服器1包括:一船期資訊維護模組丨〇、 一預計出貨計劃生成模組i 2、及一實際出貨計劃生成模組 1 4。=官伺服器3包括:一料號地點維護模組3 〇、一預計 出口貨櫃=錄模組32、及一實際出口貨櫃記錄模組34。其 I維=ί訊維護模組1 〇用於依據轉運公司2提供船期資 ;莫』粑:的企業2部所需的船期表。預計出口貨櫃記錄 权組3 2根據記錄交管部門 σ 雜呌μ如* * 丨門人貝根據生產現場的生產進度及 = = Ϊ 的母個料號每日出口貨植數量;預計出 ^ j成換组12根據預計每日出口貨櫃數量及船期表生 成相應的預計出貨計劃。物ά ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 切机部門依據預計出貨計劃向轉 運公司2訂驗,同時轉運公+ Α司2將貫際的船期資訊反饋給物 流伺服器1。f際出口貨櫃記錄模組34記錄交管部門人員 根據生產進,與實際的船期表重新排配的每個料號的每曰 出口 =櫃數ϊ。實際^貨計劃生成模組i 4根據實際的船期 表及實際出口貨櫃f量生成實際的出貨計劃。料號地點維 護模組30用於維護母一訂單中各料號的出貨地點及出貨數 量等資訊。Page 10 1312973 V. INSTRUCTIONS (6) Carry out appropriate maintenance to obtain an actual schedule. The traffic control department personnel will allocate the actual number of export containers according to the continuous schedule and production schedule, and store it in the traffic management database 5. The actual export container information 54 includes daily actual export container information from the traffic control department + personnel. The logistics server 1 generates an actual shipping plan based on the continuous schedule and the actual number of export containers. As shown in the second figure, it is a schematic diagram of the functional module of the automatic shipment scheduling system of the present invention. The logistics server 1 includes: a ship schedule information maintenance module, an estimated shipment plan generation module i 2, and an actual shipment plan generation module 14 . The official server 3 includes: a item location maintenance module 3, an estimated export container = recording module 32, and an actual export container recording module 34. Its I dimension = 讯 维护 maintenance module 1 〇 used to provide shipping schedules according to the transfer company 2; Mo 粑: the required schedule of the two companies. It is estimated that the export container record right group 3 2 according to the record traffic control department σ 呌 如 μ 如 * * 丨 人 根据 根据 according to the production schedule of the production site and = = Ϊ the parent number of the daily export goods; Group 12 generates a corresponding projected shipping plan based on the estimated number of daily export containers and the schedule.物 ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ The cutting machine department is inspected according to the expected shipping plan to the transfer company 2, while the transfer public + Α 2 will feedback the continuous shipping information to the logistics servo Device 1. The f-export container record module 34 records the number of exits per cabinet number of each item number that is re-arranged according to the production schedule and the actual schedule. The actual product planning module i 4 generates an actual shipping plan based on the actual shipping schedule and the actual export container f. The item number location maintenance module 30 is used to maintain information such as the shipping location and the number of shipments of each item number in the parent order.
第-· 1312973 、發明說明(7) 如第三圖所示’係為本發明出貨自動排配方法 流程圖。首先,船期資訊維護模組丨〇依據轉運公 業 的下個月的預計船期資訊相應的對企業内部所 供 進行維護(步驟S3G1);其次,交管部門人員根表 船期表及生產現場的生產進度排配每日出口貨櫃數曰°的 ί .箱ί 錄模組32記錄預計出口貨櫃資料(步驟S302 丄釤,十出貨計劃生成模組12按照以上記錄的每^ 立董及船期表生成預計的出貨計劃(步驟S303 );物、 ^二依據預計出貨計劃向轉運公司2訂艙(步驟; 旦么司2反饋實際船期資訊,其包括每條船可供的艙位 二^驟S305 ) ·,船期資訊維護模組10依據實際的船期資 ° ,維護企業内部所需之船期表(步驟S30 6 );交管部 門人^根據實際的船期表及生產現場的生產進度排配每日 出口貨櫃數量’實際出口貨櫃記錄模組34記錄每日出口貨 植數量(步驟S3 0 7 );實際出貨計劃生成模組14依據實際 船期表及實際每日出口貨櫃數量生成相應的實際出貨計畫1 (步驟S308 ) 。 、 * 以上所述僅為本發明之較佳實施例而已,且已達廣泛 之使用功效,凡其他未脫離本發明所揭示之精神下所完成 之均等變化或修飾,均應包含在下述之申請專利範圍内- 1312973, invention description (7) As shown in the third figure, it is a flow chart of the method for automatically discharging shipments of the present invention. First, the ship information maintenance module will maintain the internal supply according to the expected shipping schedule information of the next month of the transshipment business (step S3G1); secondly, the ship management department root table and production site The production schedule is arranged with the number of daily export containers 曰°. The box 355 is recorded in the estimated export container data (step S302 丄钐, ten shipping plan generation module 12 according to the above records of each of the directors and ships The schedule generates an estimated shipment plan (step S303); the object, ^2 is booked to the transfer company 2 according to the expected shipment plan (step; the company 2 feedbacks the actual schedule information, which includes the available space for each ship 2. Step S305) · The schedule information maintenance module 10 maintains the schedule required by the company according to the actual schedule (step S30 6); the traffic control department ^ according to the actual schedule and production site The production schedule is allocated with the number of daily export containers. The actual export container record module 34 records the daily export quantity (step S307); the actual shipping plan generation module 14 is based on the actual schedule and the actual daily export. Number of containers The actual shipping plan 1 (step S308) should be taken. The above is only the preferred embodiment of the present invention, and has been used in a wide range of functions, and other than the spirit of the present invention has been achieved. Equal changes or modifications shall be included in the scope of the patent application below
1312973 圖式簡單說明 【圖式簡單說明】 第一圖係為本發明出貨自動排配系統之應用環境圖。 第二圖係為本發明出貨自動排配系統之功能模組示意圖。 第三圖係為本發明出貨自動排配方法之作業流程圖。 【主要元件符號說明】 物流伺服器 1 船期資訊維護模組 10 預計出貨計劃生成模組 12 實際出貨計劃生成模組 14 轉運公司 2 交管伺服器 3 料號地點維護模組 30 預計出口貨櫃記錄模組 32 實際出口貨櫃記錄模組 34 網路 4 交管資料庫- 5 料號地點對照資料 50 預計出口貨櫃資料 52 實際出口貨櫃資料 54 物流資料庫 6 船期表 601312973 Simple description of the drawing [Simple description of the drawing] The first figure is the application environment diagram of the automatic dispatching system of the invention. The second figure is a schematic diagram of the functional modules of the automatic shipment scheduling system of the present invention. The third figure is a flow chart of the operation of the automatic shipment sorting method of the present invention. [Main component symbol description] Logistics server 1 Shipment information maintenance module 10 Estimated shipment plan generation module 12 Actual shipment plan generation module 14 Transfer company 2 Traffic management server 3 Item number Location maintenance module 30 Estimated export container Recording module 32 Actual export container record module 34 Network 4 Traffic management database - 5 Material number location comparison data 50 Estimated export container information 52 Actual export container information 54 Logistics database 6 Schedule 60
第13頁Page 13
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW93128996A TWI312973B (en) | 2004-09-24 | 2004-09-24 | A system and method for allocating output |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW93128996A TWI312973B (en) | 2004-09-24 | 2004-09-24 | A system and method for allocating output |
Publications (2)
Publication Number | Publication Date |
---|---|
TW200611163A TW200611163A (en) | 2006-04-01 |
TWI312973B true TWI312973B (en) | 2009-08-01 |
Family
ID=45072692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW93128996A TWI312973B (en) | 2004-09-24 | 2004-09-24 | A system and method for allocating output |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI312973B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI620144B (en) * | 2016-11-30 | 2018-04-01 | 財團法人資訊工業策進會 | Cargo delivery scheduling method, device and non-transitory computer readable medium of the same |
-
2004
- 2004-09-24 TW TW93128996A patent/TWI312973B/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
TW200611163A (en) | 2006-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Brandt et al. | The air cargo load planning problem-a consolidated problem definition and literature review on related problems | |
Crainic et al. | Intermodal transportation | |
CN101103360A (en) | Systems and methods for supply chain management | |
CN1421810A (en) | Automatic processing system and method for logistic storage data inside the enterprise | |
Toptal et al. | A joint production and transportation planning problem with heterogeneous vehicles | |
Ackerman et al. | Warehousing: a key link in the supply chain | |
TW552541B (en) | Dynamic inventory management system and method | |
TWI312973B (en) | A system and method for allocating output | |
US20230316214A1 (en) | Methods and systems for prioritization of selected overseas imports and improving visibility and prediction of import status | |
WO2023131989A1 (en) | Cargo tracking system, cargo tracking method, and program | |
Kappauf et al. | Warehouse logistics and inventory management | |
Edirisinghe et al. | Factors that Influence Container Inventory Management Strategies | |
Chen | A heuristic model for justifying the acceptance of rush orders in multi-plants manufacturing supply chain with outsourcing | |
Laik et al. | Container assignment and yard crane deployment in a container terminal: A case study | |
Mejía et al. | Truck and Cross-Docking Scheduling in the Flower Export Sector in Colombia | |
Ghosh et al. | Inventory Optimization through an Integrated Model: A Case Study. | |
Ramnath et al. | Inventory optimization using kanban system: A case study | |
US8131573B1 (en) | Method to facilitate the transport of shipments via hub based facilities | |
Jacyna-Gołda et al. | Logistics service for companies by warehouse facilities with different configurations in the logistics network | |
US20240095658A1 (en) | Integrated logistics ecosystem | |
Wyciślak | Dock appointment and real-time visibility: aspirations and opportunities | |
Гнилянська et al. | ORGANIZATION OF INTERNATIONAL FREIGHT TRANSPORTATION IN EXTREME CONDITIONS OF TODAY: PROBLEMS AND TRENDS | |
Thang | Proposing an Automation Concept for a Logistics Company | |
Peterson et al. | Transportation And Milstrip Transport Service And Rooting Decisions | |
CN118822418A (en) | Informationized warehouse management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Annulment or lapse of patent due to non-payment of fees |