TW495577B - Combination type window frame for steel skeleton construction and its constructing method - Google Patents
Combination type window frame for steel skeleton construction and its constructing method Download PDFInfo
- Publication number
- TW495577B TW495577B TW90129344A TW90129344A TW495577B TW 495577 B TW495577 B TW 495577B TW 90129344 A TW90129344 A TW 90129344A TW 90129344 A TW90129344 A TW 90129344A TW 495577 B TW495577 B TW 495577B
- Authority
- TW
- Taiwan
- Prior art keywords
- frame
- steel
- frame material
- glass
- straight
- Prior art date
Links
Landscapes
- Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)
Abstract
Description
495577 五、發明說明(l) 產業上之利用領域 本發明係有關鋼骨建築組合式窗框及其施作方式,係 於鋼骨建築物上預留架設窗框所需的預留窗戶開口,於主 結構完成後,將標準化、模矩化的窗框料,以現場施作的 方式,依照一定的組裝方式,將前述窗框料現場組裝而 成。又因如述窗框具有現%組裝的特色,故可大幅降低施 工之搬運成本,並可同時避免傳統窗框於施工過程中需予 預先安裝,而於建築物後續施工時所可能造成的損壞。再 者,前述窗框除可達成防水、防颱外,更可依實際需要安 裝百葉或玻璃等,以符合環熱帶氣候區住居空間之f際^ 求。 里知技術及發明欲解決的問題點 傳統的窗框係於傳統鋼筋混凝土建築物建築的過程 將窗戶之外框預先埋設於預定的窗位中,而於鋼筋混I 建築物施工完成後始完成該窗戶之整體安裝。如此的施土 方式不但使預先埋設的窗戶外框容易於後續的施工過== 遭受損壞。且目前一般鋼骨建築採用的帷幕窗係於鋼 築物完成後,多以於外方覆以預鑄板之方式,因預鑄雙 體積較大,於搬運過程中容易遭受損壞且增加建材之搬j 成本。 迷 為避免窗戶外框於施工過程中遭受損壞,增加 之美觀性,、同時降低建材之搬運成本,於鋼骨建築物主= 構架设凡成後,將標準化、模矩化的窗框料,具有防水了495577 V. Description of the invention (l) Industrial application field The present invention relates to a steel frame building combined window frame and its application method. It is reserved for the reserved window openings required to erect a window frame on a steel frame building. After the main structure is completed, the standardized and moulded window frame material is assembled on-site according to a certain assembly method according to a certain assembly method. And because the window frame has the characteristics of current assembly, it can greatly reduce the transportation cost of construction, and at the same time avoid the traditional window frame that needs to be pre-installed during the construction process, which may cause damage during the subsequent construction of the building. . In addition, in addition to the above-mentioned window frames can be waterproof and anti-taiwan, louvers or glass can be installed according to actual needs to meet the requirements of living space in the tropical climate zone. Known technology and the problems to be solved by the invention The traditional window frame is tied to the traditional reinforced concrete building construction. The outer frame of the window is embedded in the predetermined window position in advance, and it is completed after the construction of the reinforced concrete building. The whole installation of the window. Such a method of soil application not only makes the pre-buried window frame easier to be used in subsequent constructions, but also suffers damage. And currently, the curtain windows used in general steel-framed buildings are constructed of steel structures, and they are usually covered with siding outside. Due to the large volume of the slab, it is easy to be damaged during transportation and the building materials are increased. Move j cost. In order to avoid damage to the window frame during the construction process, increase the aesthetics, and reduce the transportation cost of the building materials, after the steel frame building master = frame is completed, the standardized and modular window frame material is used. Waterproof
五、發明說明(2) 予以現場組裝 防颱功能且可重複拆骏 乃成為急待解決的課題次更新的固框料 而採用 有4監於上述問韻mi 丄心 現若於鋼骨建築2發明人經精心檢討、研究’發 築物主纟士播—二^ 預召一定大小的窗戶開口,於鋼骨建 Z ^ '° 70後,再將標準化、模矩化的窗框料現場組 裝而成,以至完成本發明。 a係3 i ί:ΐ關的鋼骨建築組合式窗框及其施作方式, ϊ及右仞:ί柴物架構内預留由上鋼骨、下鋼’、左侧鋼 骨所形成的鋼骨預留窗戶開…組配以左: 料右侧框料固定座、底框料、上框料、橡轉 中直框料固^右:框料、内中直框料、夕卜中直框料、内 中橫框料固:::夕[中ί框料固定座、防水橡膠墊片、内 产框料'π : ?、、外中橫框料固定座、上中橫框料、下中 :定百葉心璃)、固定百葉(或玻璃)之直押條、 r ΐΪ玻璃之橫押條、排水孔以及窗角防水板而 成,其中鋼骨之預留窗戶肖口係於上、 鋼骨架設時依實際需要的尺寸事先預留之, ^右側 成後,首先於鋼骨之預留窗戶開口之底部安置橡完 預留窗戶開口之底,,再將橡膠墊片安骨之 窗戶開口之上方並安裝上㈣,用上;骨預留 固定。前述橡谬墊片係使安裝窗框者能於拾= 91063.ptd 第6頁V. Description of the invention (2) The on-site assembly of the anti-type platform function and the ability to be repeatedly dismantled have become the urgently-resolved issue of the updated frame material and have been used. The inventor carefully reviewed and researched the “Building Owner Shi Shibo—Second ^ Pre-calling a certain size of window openings, and after the steel frame construction Z ^ '° 70, then the standardized and modular window frame material was assembled on site And even completed the present invention. a series 3 i ί: Tongguan ’s steel-framed building combined window frame and its application method, 仞 and right 仞: ί firewood structure is reserved by the upper steel frame, lower steel ', left steel frame The steel frame is reserved for the window to open ... combined with the left: the right frame material fixed base, the bottom frame material, the upper frame material, the rubber-turned straight frame material ^ right: the frame material, the inner middle frame material, Xibuzhong Straight frame material, inner and horizontal frame material solid ::: [Every frame material holder, waterproof rubber gasket, inner frame material 'π:? ,, outer and middle frame material holder, upper and middle frame material Bottom and middle: fixed louver heart glass), fixed veneer (or glass) straight bar, r ΐΪ glass horizontal bar, drainage hole and window corner waterproof board, of which the steel frame of the reserved window Xiaokou is The upper and lower steel frames are reserved in advance according to the actual size required. ^ After the right side is completed, first place the rubber finish bottom of the reserved window opening on the bottom of the steel window of the reserved window, and then rubber the gasket. Above the opening of the window and install a chin, use; bone is reserved for fixation. The aforementioned rubber gaskets enable those who install window frames to pick up = 91063.ptd Page 6
同時,微調 開口於預留 度能趨於一 側框料及内 框料之安裝 無誤後,續 鋼骨預留窗 並以螺栓固 左、右側框 侧框料完成 外中直框料 框料之上, 外側,再將 固定座之方 述内、外中 以螺栓固定 接於左、右 防水橡膠墊 上、下各一 固定座之上 每一個窗框 時所不能避 致,並維持 '外中直框 及微調作業 行安裝左、 戶開口之左 定於鋼骨預 料利用螺栓 安裝後,續 固定座須事 將防水橡膠 内、外各一 式對扣,並 直框料與内 。又内、外 側框料及内 片包覆於内 之中橫框料 ’並予以螺 之高度,消 免的些微誤 窗框之水平 料之安裝。 ,並確認每 右側框料, 、右側,其 留窗戶開口 固定於固定 行安裝内、 先以焊接的 塾片包覆於 之中直框料 於内、外中 、外中直框 中橫框料固 、外中直框 、外中橫框 以對扣方式 栓固定。 骨預留窗戶 個窗框之高 後的左、右 底框料及上 南度及水平 分別安置於 框固定座, 邊,再將 Λ右各一之 ’其中内、 上框料、底 框料固定座 外中直框料 的部分及前 部分分別予 事先分別焊 側上,並將 側後,將 外中橫框料 於底框料、組合完成的 裝位置分別放置橡膠墊片, (或玻璃)安裝完成後,分別 框料與上中橫框料之上方之 中橫框料之百葉(或玻璃)安 並安裝百葉(或玻璃)。於百葉 於百葉(或玻璃)之外側,即底 適當位置以螺栓安裝固定百葉 除每一個鋼 差,使每一 ,以利於其 在完成前述 一個窗框之 將橡膠墊片 上並架設窗 之左、右側 座上。於左 外中直框料 方式固定於 内、外中直 以包覆内、 直框料對扣 料固定座之 定座亦須於 料之左、右 料固定座外 安裝於内、At the same time, after fine-tuning the openings to ensure that the installation of one side frame and the inner frame is correct, continue the steel frame reserved window and bolt the left and right side frames to complete the outer, middle and straight frame materials. On the outside, the inside and outside of the fixed seat are bolted to the left and right waterproof rubber pads, and each window frame above and below the fixed seat cannot be avoided, and the 'outside, middle, and straight frame' And the fine-tuning operation installation left, the left side of the household opening is determined by the steel frame is expected to be installed with bolts, the continued fixing seat must be waterproof buckle inside and outside each type of buckle, and straight frame material and inside. In addition, the inner and outer side frame materials and the inner sheet are covered with the inner middle and horizontal frame materials' and the height of the screw is prevented to avoid slight errors in the installation of the horizontal material of the window frame. And confirm that each right side frame, and right side, has window openings fixed in the fixed row installation, first covered with welded cymbals in the middle straight frame material in the inner, outer middle, and outer middle straight frame horizontal frame material The solid, outer-middle straight frame and outer-middle horizontal frame are bolted in a buckle manner. The left and right bottom frame materials and the upper south degree and the horizontal height of the window frame of the bone reserve are respectively placed on the frame fixing seat, and then the Λ right one of the inner, upper frame and bottom frame materials is fixed. The outer and middle straight frame material and the front part are separately welded on the side in advance, and after the side, the outer and middle horizontal frame material is placed on the bottom frame material and the assembled position is placed with rubber gaskets (or glass). After the installation is completed, install and install the louvers (or glass) on the frame material and the louvers (or glass) on the middle and horizontal frame material above the upper and middle horizontal frame material. Mount the shutters on the outside of the shutters (or glass), that is, at the bottom of the shutters, and fix the shutters with bolts except for each steel difference, so that each one is good for the rubber gasket on the window frame and the left side of the window. On the right seat. It is fixed to the inner, outer, middle, and straight on the left, outer, and straight frame materials.The fixed seat that covers the inner and straight frame to the buckle holder must also be installed on the inner and outer sides of the left and right materials.
91063.ptd $ 7頁91063.ptd $ 7 pages
(或玻璃)之橋抑 的中直框料左條,於左側框料、右側框料及組合完成 (或玻璃)之直抑你兩側之適當位置以螺栓安裴固定百葉 不對稱的方式開i數或玻璃)之橫押條上以 此外,為加強心;::述排水孔’ “防止水流入内部。 性,並於苴下^本 有關的鋼骨建築組合式窗框之防水 窗角防水板,以::而:底框料之兩側以滿焊的方式固定 乂防止雨水由兩側溢流。 以下請參考附圖,詳細說明本發明。 第一圖為本發明之鋼骨建築組合式窗框正視圖, 一圖(a) ~(c)為第一圖中a__a方向之左侧框料放大圖 】、中直框料放大圖(b)與右側框料放大圖(c)剖面詳 圖。第三圖UMf)為第一圖中B_B方向之上側框料放大圖 、中k框料放大圖(e)與底框料放大圖(f)剖面詳圖。 其中鋼骨預留窗戶開口係於上鋼骨2、下鋼骨丨、左側鋼骨 右側鋼骨4架設時所預留,其尺寸須事先加以評估、計 #而予確定。於鈾述鋼骨預留窗戶開口之下鋼骨1之底部 安置橡膠墊片9 ’並將底框料7安裝於橡膠墊片9之上,以 螺栓A2 8鎖固於下鋼骨1之上方,再將前述橡膠墊片9安置 於前述上鋼骨2之下方並安裝上框料8,用上述組合方式以 螺才王B 2 9予以固疋。剞述橡膠墊片9係使窗框之安裝者能於 栓緊窗框螺栓A28及螺栓B29的同時,微調每一個窗框之高 度,消除每一個前述下鋼骨1、上鋼骨2於預留時所不能避(Or glass) bridge left middle straight frame material, on the left frame, right frame material and combination complete (or glass) the right position on both sides of you with bolts An Pei fixed louver asymmetric way to open i Number or glass) in addition to the horizontal strips, in order to strengthen the heart; :: the drainage hole '"prevents water from flowing into the interior. In addition, the waterproof window corner of the steel frame construction combined window frame of this ^ this is waterproof. The board is fixed with :: and both sides of the bottom frame are fully welded to prevent rainwater from overflowing from both sides. Please refer to the drawings below to explain the invention in detail. The first picture is the steel-frame construction combination of the invention Front view of the window frame, one picture (a) ~ (c) is the enlarged view of the left frame in the a__a direction in the first picture], the enlarged view of the middle straight frame (b) and the enlarged view of the right frame (c) Detailed picture. The third picture (UMf) is the enlarged picture of the upper side frame material in the B_B direction in the first picture, the enlarged picture of the middle k frame material (e) and the enlarged picture of the bottom frame material (f). The openings are reserved for the upper steel frame 2, the lower steel frame 丨, the left steel frame and the right steel frame 4 for erection, and their dimensions must be evaluated in advance. , 计 #。 It is determined. A rubber gasket 9 ′ is placed on the bottom of the steel bone 1 below the uranium steel steel reserved window opening, and the bottom frame material 7 is installed on the rubber gasket 9, and the bolt A2 8 is used for locking. Above the lower steel bone 1, the rubber gasket 9 is placed below the upper steel bone 2 and the upper frame material 8 is installed, and it is fixed with the screw king B 2 9 by the above combination. The rubber pad is described below. The sheet 9 enables the installer of the window frame to tighten the window frame bolts A28 and B29 while fine-tuning the height of each window frame, eliminating each of the aforementioned lower steel frame 1, upper steel frame 2 when reserved. avoid
91063.ptd 第8頁 495577 五、發明說明(5) 免的些微誤差,使每一個窗框之高度能趨於一致,並維持 窗框之水平,以利其後的左側框料1 0、右側框料1 1、内+ 直框料12及外中直框料13之安裝。在完成底框料7及上框 料8之安裝及微調作業,並確認每一個窗框之高度及水平 無誤後,續行安裝左側框料1 0、右侧框料1 1,將橡膠塾片 9分別安置於左側框料1 0、右側框料1 1及前述鋼骨固定 座5、6之左、右側鋼骨3、4之左、右侧邊之間,並以螺检 C30固定於左、右側鋼骨3、4之左、右側邊。於左側框料 1 0及右側框料11完成安裝後,續行安裝内中直框料1 2、外 中直框料1 3,其中内中直框料固定座1 5、外中直框料固定 座1 6須事先以焊接方式固定於上框料8、底框料7之上,將 防水橡膠墊片17包覆於内中直框料固定座15、外中直框料 固定座16外側,再將内中直框料12及外中直框料13以包覆 内中直框料固定座1 5、外中直框料固定座丨6之方式對扣, 並於内中直框料1 2、外中直框料丨3對扣的部分及内中直框 料1 2、外中直框料1 3與内中直框料固定座丨5、外中直框料 固定座16之部分分別以螺栓])3i及螺栓E32予以固定。又内 中橫框料固定座1 8、外中橫框料固定座丨9亦須於事先分別 焊接於左側框料1 〇、右側框料丨丨及内中直框料丨2、外中直 框料1 3之左、右兩側上,並將防水橡膠墊片丨7包覆於内中 k框料固疋座1 8、外中橫框料固定座1 g外側後,將上中橫 框料20、下中橫框料21以對扣的方式安裝於前述内中橫框 料固定座18、外中橫框料固定座19之上,並以螺栓F33予 以固定。91063.ptd Page 8 495577 V. Description of the invention (5) The slight error is avoided, so that the height of each window frame can be made uniform, and the level of the window frame can be maintained, so that the left side frame material 10, the right side Frame material 1 1. Installation of inner + straight frame material 12 and outer and middle frame material 13. After completing the installation and fine-tuning of the bottom frame material 7 and the top frame material 8 and confirming that the height and level of each window frame are correct, continue to install the left frame material 10 and the right frame material 1 1. 9 is placed between the left frame material 10, the right frame material 11 and the left and right steel frames 3 and 4 of the aforementioned steel frame holders 5 and 6, respectively, and is fixed to the left with screw inspection C30 , The left and right sides of the right steel frame 3,4. After the installation of the left frame material 10 and the right frame material 11 is completed, continue to install the inner middle straight frame material 1 2, the outer middle straight frame material 1 3, of which the inner middle straight frame material holder 15 and the outer middle straight frame material. The fixing base 16 must be fixed on the upper frame material 8 and the bottom frame material 7 by welding in advance, and the waterproof rubber gasket 17 is covered on the inner middle straight frame material fixing base 15 and the outer middle straight frame material fixing base 16 Then, the inner middle straight frame material 12 and the outer middle straight frame material 13 are covered with the inner middle straight frame material fixing seat 1 5 and the outer middle straight frame material fixing seat 丨 6 and the inner middle straight frame material is buckled. 1 2.Outer middle straight frame material 丨 3 pairs of buckle parts and inner middle straight frame material 1 2.Outer middle straight frame material 1 3and inner middle straight frame material holder 丨 5.Outer middle straight frame material holder 16 Parts are fixed with bolts]) 3i and bolts E32, respectively. The inner, middle and horizontal frame material holders 8 and the outer, middle and horizontal frame material holders 9 and 9 must also be welded to the left and right frame materials 10, the right and right frame materials, and the inner, and middle frame materials, respectively. 2. On the left and right sides of the frame material 1 3, cover the inner and middle k frame material fixed seat 1 8 with the waterproof rubber gasket 丨 7 and the outer middle frame material fixed seat 1 g. The frame material 20 and the lower middle frame material 21 are mounted on the inner middle frame material fixing base 18 and the outer middle frame material fixing base 19 in a buckle manner, and are fixed with bolts F33.
495577 五 、發明說明(6) 於底框料7、組合完成的中橫框料22之百葉(或玻璃 )安裝位置分別放置橡膠墊片9,並安裝百葉(或玻璃) 23 °於百葉(或玻璃)23安裝完成後,分別於百葉(或玻璃) 23之外側’即底框料7與上中橫框料20之上方之適當位置 以螺栓G34安裝固定百葉(或玻璃)之橫押條25,於左側 右側框料1 1及組合完成的中直框料1 4495577 V. Description of the invention (6) Place rubber spacers 9 on the louver (or glass) installation positions of the bottom frame material 7 and the completed middle and horizontal frame material 22, and install the louver (or glass) 23 ° on the louver (or After the installation of the glass) 23 is completed, the horizontal bars 25 of the louver (or glass) are fixed with bolts G34 at appropriate positions on the outer side of the louver (or glass) 23, that is, above the bottom frame 7 and the upper middle frame 20. , On the left and right side of the frame 1 1 and the combined straight frame 1 4
Aj 框料1 0 _ 之適當位置以螺栓G 3 4安裝固定百葉(或玻璃)之直押 ,24,並於固定百葉(或玻璃)之橫押條25上以不對稱的方 ί開設數個排水孔27,以防止水流入内部。此外,為加強 :本發明有關的鋼骨建築組合式 方兩側,亦即於底框料7々工^ ^ ,、卜 水板26,以防止雨水二之兩側以滿焊的方式固定窗角防 ~由兩側溢流。Aj frame material 1 0 _ is installed with bolts G 3 4 at the appropriate position for fixing the louvers (or glass), and 24, and several asymmetrical squares are opened on the batten (25) for fixing the louvers (or glass). Drain holes 27 to prevent water from flowing into the interior. In addition, in order to strengthen: the steel-frame building combined square sides of the present invention, that is, the bottom frame material 7 masonry ^ ^, the water board 26, to prevent rainwater two sides from fixing the window in a fully welded manner Corner protection ~ overflow from both sides.
第10頁 495577 圖式簡單說明 - 示之簡單說明 第一圖為本發明之鋼骨建築組合式窗框之正視圖。 第二圖(a)〜(c)為第一圖中A-A方向之左側框料放大 圖(a )、中直框料放大圖(b)與右側框料放大圖(c)剖 圖。 。平 第二圖(d)〜(f)為第一圖中β —b方向之上框料放大圖(d)、 中橫框料放大圖(e )與底框料放大圖(f )剖面詳圖。 圖號之說明 1 ·下鋼骨 2.上鋼骨 3 ·左側鋼骨 4 ·右侧鋼骨 5 ·左側框料固定座 6 ·右側框料固定座 7 ·底框料 8·上框料 9·橡膠墊片 I 0 ·左側框料 II ·右側框料 1 2 ·内中直框料 1 3 ·外中直框料 1 4 ·組合完成的中直框料Page 10 495577 Brief description of the drawings-Shown simple description The first picture is a front view of the steel frame building combined window frame of the present invention. The second pictures (a) to (c) are enlarged views of the left frame material in the A-A direction in the first image (a), the enlarged image of the middle straight frame material (b), and the enlarged image of the right frame material (c). . The second flat pictures (d) to (f) are the enlarged view of the frame above the β-b direction in the first picture (d), the enlarged view of the middle horizontal frame (e) and the enlarged view of the bottom frame (f). Illustration. Description of drawing number 1 · Lower steel frame 2. Upper steel frame 3 · Left steel frame 4 · Right steel frame 5 · Left frame material fixing seat 6 · Right frame material fixing seat 7 · Bottom frame material 8 · Upper frame material 9 · Rubber gasket I 0 · Left frame material II · Right frame material 1 2 · Inner middle frame material 1 3 · Outer middle frame material 1 4 · Middle completed frame material
第11頁 495577 圖式簡單說明 15.内中直框料固定座 1 6.外中直框料固定座 1 7.防水橡膠墊片 1 8.内中橫框料固定座 1 9.外中橫框料固定座 2 0.上中橫框料 2 1.下中橫框料 2 2.組合完成的中橫框料 23·百葉(或玻璃)Page 11 495577 Brief description of drawings 15. Inner and middle straight frame material holder 1 6. Outer and middle straight frame material holder 1 7. Waterproof rubber gasket 1 8. Inner and middle frame material holder 1 9. Outer and middle frame Frame material fixing seat 2 0. Upper, middle and horizontal frame material 2 1. Lower and middle frame material 2 2. Middle and horizontal frame material 23 · louver (or glass) completed
24·固定百葉(或玻璃)之直押條 2 5 ·固定百葉(或玻璃)之橫押條 2 6.窗角防水板 2 7.排水孔 28.螺栓A24 · Fixed strips for fixing louvers (or glass) 2 5 · Fixed strips for fixing louvers (or glass) 2 6.Window corner waterproof panel 2 7.Drain holes 28.Bolt A
2 9.螺栓B2 9.Bolt B
3 0.螺栓C 31.螺栓D 3 2.螺栓E 3 3.螺栓F 34.螺栓G3 0. Bolt C 31. Bolt D 3 2. Bolt E 3 3. Bolt F 34. Bolt G
91063.ptd 第12頁91063.ptd Page 12
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW90129344A TW495577B (en) | 2001-11-27 | 2001-11-27 | Combination type window frame for steel skeleton construction and its constructing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW90129344A TW495577B (en) | 2001-11-27 | 2001-11-27 | Combination type window frame for steel skeleton construction and its constructing method |
Publications (1)
Publication Number | Publication Date |
---|---|
TW495577B true TW495577B (en) | 2002-07-21 |
Family
ID=21679826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW90129344A TW495577B (en) | 2001-11-27 | 2001-11-27 | Combination type window frame for steel skeleton construction and its constructing method |
Country Status (1)
Country | Link |
---|---|
TW (1) | TW495577B (en) |
-
2001
- 2001-11-27 TW TW90129344A patent/TW495577B/en not_active IP Right Cessation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7854099B2 (en) | System for attaching prefabricated architectural panels | |
US20130025222A1 (en) | Pre-assembled internal shear panel | |
US10196808B1 (en) | Building comprising prefabricated composite panels with rigid structural frame | |
US20070130841A1 (en) | Construction module system and method | |
US3736709A (en) | Building system | |
CN103890290B (en) | Structural integrity and the structure system of integral sealing are provided | |
CN103917725B (en) | Structural integrity and the anti-torsion structure system of shock resistance are provided | |
US4691490A (en) | Cementitious modular panel and panel assembly for building walls and method of construction | |
US10240334B2 (en) | Z-arch building system | |
AU2007330481A1 (en) | Modular building for deployment in disaster regions | |
US20220049502A1 (en) | Systems and methods for retrofitting an existing building | |
TW495577B (en) | Combination type window frame for steel skeleton construction and its constructing method | |
RU2334050C2 (en) | Basement structure | |
US20090249741A1 (en) | Bracing panel | |
US20100236168A1 (en) | High Impact Storm Panel | |
JP2009280955A (en) | Construction method for truss type structure | |
JP4953482B2 (en) | Opening structure in the outer insulation wall of a reinforced concrete building | |
US1969125A (en) | Building system | |
TWI840290B (en) | Improved foundation and wall structure of prefabricated building | |
KR102567409B1 (en) | PDF water tank system without internal reinforcement using dry pad | |
TWI220439B (en) | An assemble and disassemble blind system and its assembling method | |
JP3143284U (en) | Truss structure | |
KR102249272B1 (en) | Wall pannal module and construction method using thereof | |
CN219528090U (en) | Closing-in structure of outer side end part of cantilever structure of canopy curtain wall | |
RU2684541C1 (en) | Panel mounting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GD4A | Issue of patent certificate for granted invention patent | ||
MM4A | Annulment or lapse of patent due to non-payment of fees |