TW390919B - Fine spinning frame with roving bobbin transfer apparatus - Google Patents

Fine spinning frame with roving bobbin transfer apparatus Download PDF

Info

Publication number
TW390919B
TW390919B TW084105560A TW84105560A TW390919B TW 390919 B TW390919 B TW 390919B TW 084105560 A TW084105560 A TW 084105560A TW 84105560 A TW84105560 A TW 84105560A TW 390919 B TW390919 B TW 390919B
Authority
TW
Taiwan
Prior art keywords
reel
switch
spool
frame
along
Prior art date
Application number
TW084105560A
Other languages
Chinese (zh)
Inventor
Ryuichi Higashinaka
Kunio Shinkai
Kanehiro Ito
Original Assignee
Howa Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP6143994A external-priority patent/JPH07331540A/en
Priority claimed from JP7068743A external-priority patent/JPH08246265A/en
Application filed by Howa Machinery Ltd filed Critical Howa Machinery Ltd
Application granted granted Critical
Publication of TW390919B publication Critical patent/TW390919B/en

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/02Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing completed take-up packages and replacing by bobbins, cores, or receptacles at take-up stations; Transferring material between adjacent full and empty take-up elements
    • D01H9/04Doffing arrangements integral with spinning or twisting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)

Abstract

A fine spinning frame including a bobbin transfer device having an overhead rail looped along a creel of the fine spinning frame and a bobbin carriage moved along the overhead rail. A switch (s) 50 for operating a rotating motor M for the bobbin carriage 20 is arranged at an end of a machine frame of the fine spinning frame. A cable 52 as an operating member of the switch 50 is arranged along an entire length of the creel 6, so that the cable 52 is connected to an operating lever of the switch 50. An operator can manipulate the cable at any location along the creel to turn the switch ON for moving the bobbin carriage 20.

Description

% 經濟部中夬橾率局員工消費合作社印製 第84105560號專利申請案 中文説明書修正頁(86年3月) 五、發明説明( 有利的是一封閉環形却 '、 衣形那伸出精紡機機架之一端外,其下 万之某-處則設有捲線軸裝載/卸載站。 ’% Chinese Ministry of Economic Affairs Bureau Consumer Cooperatives printed the revised Chinese manual of the patent application No. 84105560 (March 86) V. Description of the invention Outside one end of the spinning machine frame, there is a spool loading / unloading station somewhere.

附圖簡單説明 V 圖1係設有本發明精纺機之纺織廠平面示意圖。 圖2係本發明紡織機之側视示意圖。 圖3係精纺機設有-懸空轨道之_端局部平面圖。 圖4係懸空軌道與捲線轴载具之局部侧視圖。 圖5係懸伸軌道之截面圖。 圖6(a)至(c)係圖1之a部份放女閽 捲線轴交[.—以放大圖,㈣如何進行成組 圖7揭示以-控制電路選擇操作捲線轴載 圖。 、疋開關放大 圖8簡示一用於操作—開關之硬样。 (讀先閱讀背面之注意事項再填寫本頁}Brief Description of the Drawings Figure V is a schematic plan view of a textile mill equipped with the worsted spinning machine of the present invention. Fig. 2 is a schematic side view of a textile machine according to the present invention. Fig. 3 is a partial plan view of the end of a spinning track provided with a -floating track. Figure 4 is a partial side view of the suspended track and the reel carrier. Figure 5 is a sectional view of an overhanging track. Figures 6 (a) to (c) are part of a in Figure 1 where the son-in-law's reel crosses [.—to enlarge the figure, how to group them. , 疋 Switch Enlarge Figure 8 shows a hard sample for operation—switch. (Read the notes on the back before filling in this page}

卜-·捲線軸交換裝置; 2···精紡機; 3···滿載捲線軸; 4…空捲線軸; 5…捲線軸推車; 6 ···捲線軸架; 7…捲線抽轨道; 11·..懸空轨道, 12…間隔之柱件; 13···轨道支架; 20···捲線軸載具;. 3〇…承載單元; 31 ···承載桿; 32…捲線軸懸桿; 3 3 · · ·聯結件; 3 4…銷; 35···支承轉輪; 36…導引轉輪; 4〇.·.驅動單元(推進器’); 41、46、92…支架 44…傳送盤; 47…支承件; 本紙悵尺度適用.中國國家標準(CNS ) A4规格(210X297公釐) -8 - A7 B7 五、發明説明( 發明背景 1 _發明領域 請 I 先I 閱 讀 背I 面 I 之 s | 意 | 事 2 I 再 ! 填I 寫裝 本十 頁 ::明係關於—種具有移動捲線 :備有-封閉電路以取得移動I緣::精妨機, 痛行移動,其中滿載捧線軸係在 二機捲線輪架之 動交換成裝置上之=線:㈣架處之空〜 2 ·相關技術説明 日本審查之實用新型案(公告如] 出 纺機,其中-鏈條輸送器沿—封„環而種精 =機之捲線轴架外,鏈條輸送器備有多购:::於 訂 =則2滿載之捲線捲㈣架之捲線㈣”, 泉軸即換以輸送器之滿載捲㈣,而當鍵條輸送 器上t所有滿載捲線轴皆用過時,鏈條輸送器即開始沿封 閉圈%低速移動’而在鄰近於精纺機機架末端之—捲線抽 裝載/卸載站之操作人員即從鏈條輸送器卸下用過之捲線 軸,然後從一捲線軸推車將滿載捲線軸掛在鏈條輸送器上 〇 經濟部中央標準局員工消費合作社印製 曰本未審查之專利案(公開)5 9 - 1 3 0 3 2 6號提出一種精紡 機’其備有一沿精紡機頂部循繞之鏈條輸送器,在鏈條輸 送器伸出精紡機機架一端外之一位置設有一裝置,可自動 裝載滿載捲線軸於鏈條輸送器上。 曰本未審查之專利案(公開)4-222238號提出一種精紡 機’其備有一設名精紡機上方且繞於精紡機外周缘之懸空 -4 本紙張尺度適用中國國家橾準(CMS ) A4規格(210X297公釐 第84105560號專利申請案 中文説明書修正頁(86年3月)Bu- · reel exchange device; 2 ·· worsted spinning machine; 3 ·· full-load reel; 4 ... empty reel; 5 ... reel cart; 6 ··· reel frame; 7 ... reel drawing track; 11 ... Hanging rails, 12 ... Spaced pillars; 13 ... Rail supports; 20 ... Reel carriers; 30 Bearing units; 31 ... Bearing bars; 32 ... Reel suspension rods ; 3 3 · · · coupling piece; 3 4 ... pin; 35 ... support roller; 36 ... guide roller; 4... Drive unit (thruster '); 41, 46, 92 ... bracket 44 … Conveying trays; 47… supporting parts; the paper size is applicable. Chinese National Standard (CNS) A4 specification (210X297 mm) -8-A7 B7 V. Description of the invention (Background of the invention 1 _ Fields of invention, please I read the first I Face s | Meaning | Thing 2 I again! Fill in the ten pages of I paperback :: Ming about about-a kind of mobile coil: equipped-closed circuit to get mobile I edge :: fine machine, painful move, Among them, the fully loaded bobbin is on the second machine's reeling frame. The line = the empty space at the reel ~ 2Related technical description Type case (Announcement such as) out of the spinning machine, among which-the chain conveyor along-seal „ring and seed essence = machine's reel frame, the chain conveyor is equipped with multiple purchases ::: book order = 2 full-load coil reels The reel of the carriage is replaced by the spring's full-load reel. When all the full-reel spools on the key conveyor are used, the chain conveyor starts to move along the closed circle at a low speed. At the end of the worsted machine frame, the operator of the reel unloading / unloading station unloads the used reel from the chain conveyor, and then hangs the fully loaded reel on the chain conveyor from a reel cart. Economy Ministry of Central Standards Bureau's Consumer Cooperative Co., Ltd. printed an unexamined patent case (publication) No. 5 9-1 3 0 3 2 6 proposed a worsted machine 'which is equipped with a chain conveyor that runs along the top of the worsted machine, in the chain A device is provided at a position outside the one end of the worsted machine frame, which can automatically load a full-loading reel on the chain conveyor. This unexamined patent (publication) No. 4-222238 proposes a worsted machine There is a famous spinning machine above and around Vacant outer peripheral edge of the spinning frame -4 This paper applies China National scale prospective Qiao (CMS) A4 size (210X297 mm Patent Application No. 84,105,560 Chinese manual correction pages (86 March)

AA

rU 五、發明説明() 5a 經濟部中央標隼局員工消費合作社印製 48…接點單元; 51、61…操作桿; 53…彈簧; 62…繩索; 72、82…速度指示開關 82’…速度設定電路; 90···硬桿; ρ…捲線軸裝载/卸載站 較佳實例説明 本發明之—實例以下即由附圖加以說明‘ 一成組交換方法中之捲線軸交換.操作,惟 線軸交換方法仍可揭示本發明之理念。 圖1中,編號1係指設於各紡織機2中之移動捲線軸傳送 裝置,許多紡織機2(圖中僅示其二)以預定間距設置,精 万機2各包含—長形機架”,機架之—端設有一齒輪驅動 ^ (即俗稱〈齒輪端部7 i a),其中設有一驅動馬達(圖中未 )及一齒輪組(圖中未不),用於轉動精纺機2之组件(圖 未丁)白知 < 配置中,各糈紡機2係沿機架7 1之長度 而5又’並有多具各包含-通風部(圖中未示)及-心軸(圖 50···開關;52···绳索; 60···傳送開關; 71···長形機架; 8G···開關箱; 84···控制電路; Μ ···電動馬達; 此實例係指在 使用任意之捧rU V. Description of the invention (5a) Printed by the Consumer Cooperatives of the Central Bureau of Standards of the Ministry of Economic Affairs 48 ... contact units; 51, 61 ... operating levers; 53 ... springs; 62 ... ropes; 72, 82 ... speed indication switches 82 '... Speed setting circuit; 90 ... hard rod; ρ ... spool reel loading / unloading station is a better example of the present invention-an example will be described below with reference to the drawings' reel exchange in a group exchange method operation, However, the spool exchange method still reveals the idea of the present invention. In Figure 1, the number 1 refers to the mobile spool transfer device installed in each textile machine 2. Many textile machines 2 (only the second one is shown in the figure) are arranged at a predetermined distance. Each of the fine machines 2 includes an elongated frame. A gear drive is provided at the end of the frame ^ (commonly known as "gear end 7 ia"), which includes a drive motor (not shown in the figure) and a gear set (not shown in the figure) for rotating the spinning machine 2 components (figure Ding) of Bai Zhi < configuration, each of the spinning machine 2 is along the length of the frame 7 1 and 5 'and there are multiple including-ventilation section (not shown) and-mandrel (Figure 50 ··· Switch; 52 ·· Rope; 60 ··· Transfer Switch; 71 ··· Long Frame; 8G ··· Switch Box; 84 ··· Control Circuit; M ··· Electric Motor ; This example refers to the use of arbitrary

(請先閎讀背面之注意富·項再填寫本頁} 訂— ' 五、發明説明( A7 B7 經 濟 部 f 標 準 % 工 消 f 人 社 印 製 轨運Μ吏捲線軸載具沿懸空軌道移動,載具用於懸伸移 動ι捲線轴。在繞於移動架_端之懸线道—處,空捲緣 =捲線轴载具卸下,此外,在繞於移動架—端之懸空轨 迢處,滿載捧線轴裝载於捲線軸載具上。 >有、"方法可進行此捲線軸交換操作,第一種爲"成组 人換法一其中精纺機择線軸處之移動捲線轴係沿機架長 度而分&成多組,而播線軸交換以組對组方式進行,即捧 線轴架之—組用盡捲線轴換成滿載接線軸〆第二種爲,•任意交換法",JL中命祕姑土: h 、長度任意處進行;It 、㈣之迷係沿機架 一支用盡之捲線⑽。=_纺機巡行,而每次發現 在2組交換法之料巾,料懸料載捲 送器或捲線轴载具某—區之長度爲成組長度之二倍t 精纺機捲線轴架上之捧線㈣沿精㈣各側之 因 結果ί進行成组交換操作時會發生一種狀況,亦面 向待又換道線轴之鏈條輸送器或捲線轴載具之—位置處 並:懸伸於鍵條輸送器或捲線轴載具之滿載捲線轴。而: 子m捲線抽換成滿載捲線時 機架長度之任意處進行,因此會發生一種狀況,並中鏈: ==線軸載具在對應於發現空捲線轴之捲線= 並典—滿載捲線轴,即出現需要做空捲線轴之交換,」 避免此狀況,操作人員需反覆切換傳送裝置之啓停,= 或捲線轴载具在捲線轴交換操作期間係甴操作 人貝沿封閉圈環敏間歇式移動。— 作 本錄尺度剌作 — 1— I - I - -- - I .. :.Λ±衣-- (請先閲讀背面之注意事項再填寫大Τ頁) i球 .I m · • II I - «(Please read the note on the back of the rich item before filling out this page} Order — 'V. Description of the invention (A7 B7 Ministry of Economic Affairs f Standards% Industry Consumers f Human-printed orbital printing and transportation of the reel carrier along the suspended track , The carrier is used to suspend and move the reel spool. At the suspension track around the moving frame _ end, the empty curl edge = the spool carrier is unloaded. In addition, the suspension track around the moving frame _ end is removed. The spool is fully loaded on the spool carrier. ≫ Yes, " Methods can be used to perform this spool reel exchange operation. The first is the "group replacement method", where the spinning machine selects the spool. The moving spools are divided into multiple groups along the length of the rack, and the reel exchanges are performed in a group-to-group manner, that is, holding the spools—the exhausted spools of the group are replaced with full-load spools. The second is, • Arbitrary exchange method ", JL hits the secret secret soil: h, the length is carried out anywhere; It, the mystery of the line is along a rack of an exhausted winding line ⑽. = _ Textile machinery tour, and each time found in 2 The material exchange of the group exchange method, the material suspension loader or the reel carrier, the length of a certain area is twice the group length. The result of holding the thread on the bobbin frame along the sides of the sprout is a situation that occurs when performing a group exchange operation. It also faces the chain conveyor or reel carrier of the spool to be changed again. : Overhanging the reel overhanging the key conveyor or the reel carrier. And: When the sub m reel is replaced with the full reel, it will be performed anywhere in the length of the rack, so a situation will occur, and the chain: == spool The carrier corresponds to the reel corresponding to the discovery of the empty reel = 典典 —full reel, there will be a need to exchange the empty reel, "to avoid this situation, the operator needs to repeatedly switch the start and stop of the conveyor, = or the reel carrier During the reel exchange operation, the operator was moved intermittently along the closed ring and ring-sensitive ring. — For this record, the scale operation — 1 — I-I---I ..:. Λ ± 衣-(please first Read the notes on the back and fill in the large T page) i ball.I m · • II I-«

經濟部中央標準局員工消費合作社印製 白知系統中,爾认 纺機周倒封閉圈環移Γί鍵條輪送器或捲線韩載具沿精 ,因此,t 多動I电子開關係設於精紡機之一端上 捲線轴架I#,作開關’則操作人員需從發現空捲線軸之 言十分辛勞"心動至設有開關之移動架端,對操作人員而 此外,習心、 動速度恒&,〈精贫機中’鏈條輸送器或捲線轴載具之移 線轴載具之4致,進订擦線轴交換操作之鏈條輸送器或捲 或捲線轴載移動會造成長時等候,直到鍵條輪送器 (即空捲“自此夕卜,.若已進行捲韩交換操作 ,,,^自捲泉軸采一處移除且於該處安插滿載捲線 ’鏈條輸送器或捲線軸載具移動,則 =:播線轴交換—長等候時間,= 诛作人貝又·工作負荷會過高》 發明概述 某目:在提供一種精纺機,其可供位於精纺機 未特疋位置之操作人員留駐於該位置。 ^發=另-目的在提供_種具有捲線㈣送^ 、.万機’可減少精紡機所佔之空間。 本發明之又-目的在提供—種具有捲,料傳送裝置 紡機,可減少播線轴傳送操作時之等候時間。 ^ 本發明之再一目的在提供一種具有捲線軸傳送裝置之浐 紡機,可依操作人員之技術而改變移動捲線軸之循二 依本發明所示J其備有一種精紡機-,包含; 本紙浪尺度適用中國國家標準(CNS ) A4規格(210X297公瘦 1.裝 -1?------Μ------- (請先閲讀背面之注意事項再填寫本") A7 B7 五、發明説明(4 一機架,係沿精紡機之長度延伸; 數’間隔之纺紗组件,係沿機架之長度配置; 紗::線,架,係沿機架之長度延伸,以支承供應至各纺 <移動捲線轴,而紡各絲線; 傳送裳置,用於在沿捲 λ. ,, ^ 支捲線軸; 求釉ΚΙ終細通運中傳送多 線軸’設於支承裝置上,其用盡時可手動交換於 捲線軸架上之捲線轴; —開關,用於傳送裝置之選擇生操作; 一捲線轴裝載/卸載站,係在沿封閉通道之—位置處, 在此進行空捲絲與滿_線㈣之交換,而_關可選 擇切斷或接通’以取得傳送捲線轴之選擇移動或停止;及 一操作件,係大致沿該捲線軸架之全長而設,操作件接 通於開關’而使操作件在沿捲線㈣長度之—要求位置處 I操作可令開關依需要而接通或切斷。 依本發明W ’操作人貝可操作該操作件,以接通開關 而在沿精纺機之任意位置處啓始捲線轴載具之移動,且人 留在一處,藉此取得增高之捲線軸交換效率。 、有利的是-用於取得傳送裝置選擇性操作《第二開關設 於近捲線軸裝載/卸載站之—處,使捲線轴裝載/卸載站之 操作人貫方便操作開關,而選擇操作捲線軸傳送裝置。 有利的是設有一改變傳送裝置移動速度設定之單元,使 操作人男可改變I線軸傳送裝置之移動速度,藉此減少等 候時間且改善捲參軸交換操作之效率〜 Μ民張尺度適财辟( (請先閱靖背面之注意事項再填寫:尽頁) 經濟部中央標準局員工消費合作社印製 -----I-------- …"衣------- -訂--------."------ • I— I i 1— · -7. % 經濟部中夬橾率局員工消費合作社印製 第84105560號專利申請案 中文説明書修正頁(86年3月) 五、發明説明( 有利的是一封閉環形却 '、 衣形那伸出精紡機機架之一端外,其下 万之某-處則設有捲線軸裝載/卸載站。 ’In the printing of the Baizhi system by the Employees Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs, the textile machinery is recognized by the closed circle and moved around the key ring carousel or the winding thread of the Korean carrier. Therefore, the t-movement I electronic opening relationship is set at On one end of the spinning machine, the bobbin frame I # is used as a switch. The operator needs to go from the very hard work of finding the empty bobbin to the end of the moving frame with the switch. Heng &, "4 of the reel carrier of the chain conveyor or reel carrier in the lean machine, the movement of the chain conveyor or reel or reel carrier of the replenishing and wiping spool exchange operation will cause a long time Wait until the key strip carousel (that is, the empty roll "Since then, if you have performed a roll exchange operation, please remove one from the coil spring shaft and insert a full load coiled chain conveyor there" Or the spool carrier moves, then =: reel exchange-long waiting time, = 诛 作人 贝 ·· work load will be too high "Summary of the invention: Provide a worsted machine, which can be located in worsted spinning Operators who are not in a special location stay at the location. Supply_kinds with winding reeling and feeding ^, Wanwan 'can reduce the space occupied by worsted spinning machines. Another object of the present invention is to provide a spinning machine with a coil and material conveying device, which can reduce the waiting time during the transfer operation of the bobbin. ^ Another object of the present invention is to provide a reeling machine with a bobbin conveying device, which can be changed according to the technique of the operator. According to the present invention, it is equipped with a worsted spinning machine, including: ; This paper wave scale is applicable to China National Standard (CNS) A4 specifications (210X297 male thin 1. pack -1? ------ M ------- (Please read the precautions on the back before filling in this " ) A7 B7 V. Description of the invention (4 A frame, which extends along the length of the worsted spinning machine; The number of spaced spinning components is arranged along the length of the frame; Yarn :: line, frame, along the length of the frame Extended to support the supply to each spinning < moving reel, and spinning each yarn; conveying clothes set, for supporting the reel along the roll λ. ,, ^; for multi-spool conveying in the final fine shipping On the supporting device, when it is used up, it can be manually exchanged with the spool on the spool frame;-switch , Used for the selection operation of the conveying device; a spool loading / unloading station is located at a position along the closed channel, where the empty coil and the full line are exchanged. Turn on 'to get the selection to move or stop the transfer spool; and an operating member is set approximately along the entire length of the spool holder, the operating member is turned on to the switch', so that the operating member is within the length of the winding reel—requirement The I operation at the position can cause the switch to be turned on or off as needed. According to the present invention, the operator can operate the operating member to turn on the switch and start the spool carrier at any position along the spinning machine. Moving, and people staying in one place, in order to obtain increased reel exchange efficiency. Advantageous-for obtaining the selective operation of the conveying device "the second switch is located near the reel loading / unloading station- The operator of the reel loading / unloading station is convenient to operate the switch, and chooses to operate the reel transfer device. It is advantageous to provide a unit for changing the setting of the moving speed of the conveying device, so that the operator can change the moving speed of the I-spool conveying device, thereby reducing the waiting time and improving the efficiency of the exchange operation of the coiled shaft. ((Please read the precautions on the back of Jing before filling in: the last page) Printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs ----- I --------… " 衣 ------ --Order --------. &Quot; ------ • I— I i 1— · -7.% Printed Patent Application No. 84105560 by Employee Consumer Cooperatives of Zhongli Rate Bureau, Ministry of Economic Affairs Revised page of the Chinese manual (March 86) V. Description of the invention (It is beneficial to have a closed loop but ', clothes-shaped that protrudes out of one end of the worsted machine frame, and there is a reel at somewhere below it. Loading / unloading station. '

附圖簡單説明 V 圖1係設有本發明精纺機之纺織廠平面示意圖。 圖2係本發明紡織機之側视示意圖。 圖3係精纺機設有-懸空轨道之_端局部平面圖。 圖4係懸空軌道與捲線轴载具之局部侧視圖。 圖5係懸伸軌道之截面圖。 圖6(a)至(c)係圖1之a部份放女閽 捲線轴交[.—以放大圖,㈣如何進行成組 圖7揭示以-控制電路選擇操作捲線轴載 圖。 、疋開關放大 圖8簡示一用於操作—開關之硬样。 (讀先閱讀背面之注意事項再填寫本頁}Brief Description of the Drawings Figure V is a schematic plan view of a textile mill equipped with the worsted spinning machine of the present invention. Fig. 2 is a schematic side view of a textile machine according to the present invention. Fig. 3 is a partial plan view of the end of a spinning track provided with a -floating track. Figure 4 is a partial side view of the suspended track and the reel carrier. Figure 5 is a sectional view of an overhanging track. Figures 6 (a) to (c) are part of a in Figure 1 where the son-in-law's reel crosses [.—to enlarge the figure, how to group them. , 疋 Switch Enlarge Figure 8 shows a hard sample for operation—switch. (Read the notes on the back before filling in this page}

卜-·捲線軸交換裝置; 2···精紡機; 3···滿載捲線軸; 4…空捲線軸; 5…捲線軸推車; 6 ···捲線軸架; 7…捲線抽轨道; 11·..懸空轨道, 12…間隔之柱件; 13···轨道支架; 20···捲線軸載具;. 3〇…承載單元; 31 ···承載桿; 32…捲線軸懸桿; 3 3 · · ·聯結件; 3 4…銷; 35···支承轉輪; 36…導引轉輪; 4〇.·.驅動單元(推進器’); 41、46、92…支架 44…傳送盤; 47…支承件; 本紙悵尺度適用.中國國家標準(CNS ) A4规格(210X297公釐) -8 - 第84105560號專利申請案 中文説明書修正頁(86年3月)Bu- · reel exchange device; 2 ·· worsted spinning machine; 3 ·· full-load reel; 4 ... empty reel; 5 ... reel cart; 6 ··· reel frame; 7 ... reel drawing track; 11 ... Hanging rails, 12 ... Spaced pillars; 13 ... Rail supports; 20 ... Reel carriers; 30 Bearing units; 31 ... Bearing bars; 32 ... Reel suspension rods ; 3 3 · · · coupling piece; 3 4 ... pin; 35 ... support roller; 36 ... guide roller; 4... Drive unit (thruster '); 41, 46, 92 ... bracket 44 … Conveying trays; 47… supports; the paper size is applicable. Chinese National Standard (CNS) A4 specification (210X297 mm) -8-No. 84105560 Patent Application Chinese Manual Correction Sheet (March 86)

AA

rU 五、發明説明() 5a 經濟部中央標隼局員工消費合作社印製 48…接點單元; 51、61…操作桿; 53…彈簧; 62…繩索; 72、82…速度指示開關 82’…速度設定電路; 90···硬桿; ρ…捲線軸裝载/卸載站 較佳實例説明 本發明之—實例以下即由附圖加以說明‘ 一成組交換方法中之捲線軸交換.操作,惟 線軸交換方法仍可揭示本發明之理念。 圖1中,編號1係指設於各紡織機2中之移動捲線軸傳送 裝置,許多紡織機2(圖中僅示其二)以預定間距設置,精 万機2各包含—長形機架”,機架之—端設有一齒輪驅動 ^ (即俗稱〈齒輪端部7 i a),其中設有一驅動馬達(圖中未 )及一齒輪組(圖中未不),用於轉動精纺機2之组件(圖 未丁)白知 < 配置中,各糈紡機2係沿機架7 1之長度 而5又’並有多具各包含-通風部(圖中未示)及-心軸(圖 50···開關;52···绳索; 60···傳送開關; 71···長形機架; 8G···開關箱; 84···控制電路; Μ ···電動馬達; 此實例係指在 使用任意之捧rU V. Description of the invention (5a) Printed by the Consumer Cooperatives of the Central Bureau of Standards of the Ministry of Economic Affairs 48 ... contact units; 51, 61 ... operating levers; 53 ... springs; 62 ... ropes; 72, 82 ... speed indication switches 82 '... Speed setting circuit; 90 ... hard rod; ρ ... spool reel loading / unloading station is a better example of the present invention-an example will be described below with reference to the drawings' reel exchange in a group exchange method operation, However, the spool exchange method still reveals the idea of the present invention. In Figure 1, the number 1 refers to the mobile spool transfer device installed in each textile machine 2. Many textile machines 2 (only the second one is shown in the figure) are arranged at a predetermined distance. Each of the fine machines 2 includes an elongated frame. A gear drive is provided at the end of the frame ^ (commonly known as "gear end 7 ia"), which includes a drive motor (not shown in the figure) and a gear set (not shown in the figure) for rotating the spinning machine 2 components (figure Ding) of Bai Zhi < configuration, each of the spinning machine 2 is along the length of the frame 7 1 and 5 'and there are multiple including-ventilation section (not shown) and-mandrel (Figure 50 ··· Switch; 52 ·· Rope; 60 ··· Transfer Switch; 71 ··· Long Frame; 8G ··· Switch Box; 84 ··· Control Circuit; M ··· Electric Motor ; This example refers to the use of arbitrary

(請先閎讀背面之注意富·項再填寫本頁} 訂— '(Please read the note on the back of the rich item before filling out this page} Order — '

中未示)之間隔紡紗組件2 _丨(如圖2)-2備有一捲線軸架6(如圖丨), ,同時可知各精紡機 未示),令捲線轴供給至各纺織組:=線軸懸捍(圖中 備有設於精紡機2機架71上 捲線軸架ό 沿機架”之長度而延伸。捲線= — 件12(如圖2,3),用於連接軌道7與機架71,= 7柱 依圖1所示有二條軌道7說於精纺機2之各例上.二;知, 線轴架6之捲線轴懸样總數對應於精 .ι外’捲 ,其例如可爲7 2 0 ;另可知的〆 义'•万,··少组件總數 之各侧上呈單排““古的疋”、组件(心輪)在精纺機 各"上…k置’且有二條捲線軸 機2之各側上,因此,各捲線轴架軌道 叹於精贫 間距爲精纺機纺紗組件間距之二倍。I 泉軸懸桿所設 圖” 移動之捲線轴推車5鄭近於精纺機2之—端, 即機架7 1之一齒輪嫂却71。 . A . ^ •齒輪ma,在相對於齒輪端部7 猜每機_2設有-外端部7丨b (如圖2 )。在習知應用中, 軸7在讀之移動程序中,利用—移動架(圖中未示)於1 操作循環中可存放多支滿載之捲線軸,或相當於待生產' 捲線軸數之空捲線轴,例如有12。支,圖Η滿載之I: 軸係由編號3所示之較大直徑圓圈表示,而空捲線 編號4所示之較小直徑圓圈表示。捲線轴架6上之捲 供給至精紡機2之紡紗组件2_〗且尚未完全用盡,其係由 -直徑介於滿載择線軸3與空捲線轴4之直徑間之圓圈所表 不捲線軸推車5以手動前後移行於精紡機與移動架之間 ,即捲線軸推車自—移動架移至一精紡機,以供應滿^ 請 先 閲 讀. 背 1¾ 之 注 項 再 填 訂 經濟部中央標準局員工消費合作社印製 本紙張尺) A4規格(2丨0讀公瘦) -9- A7 B7 五、發明説明( 之捲線軸,此外,捲線軸推車5自一精纺機移至— ,以送回用盡之捲線軸。圖中 u 動木 w中雖僅卜捲線㈣車5,但 可使用一部以上之捲線軸推車5, 機數及移動架及/或其羞能而定。P推車5數里係依精纺 二=〃,懸吊於捲線轴架6之播線轴聚組成8個組 寺,圖1中各组係由沿雙排捲線軸軌道7之放 =方形表示之,捲線轴交換需求即發生料组中,亦即 裝 :換出二捲線=之需求時’成组中之所有捲線軸皆 易…成组中之空捲绫軸4在沿本發明 1良軸傳送裝置輸送時可以手動換成滿载之格線轴3。應 '、主 =是相鄰精纺機2之間留有-小空間…供操作:員 訂 空捲=間執行捲線轴交換操作及例行之結合操 易σ之’该S間並不需女$丨丨:t + 卢。 而大到捲線軸推車5可移過之程The interval spinning assembly 2 _ 丨 (see Figure 2) -2 is equipped with a spool frame 6 (see Figure 丨), and it can be seen that each spinning machine is not shown), so that the spool is supplied to each textile group: = Bobbin suspension (the bobbin frame on the frame 2 of the worsted machine 71 is provided in the picture to extend along the length of the frame ". The winding line = — 12 (as shown in Figures 2 and 3) for connecting the track 7 and Frame 71, = 7 columns according to Figure 1, there are two tracks 7 said on each example of worsted machine 2. Second, we know that the total number of bobbin suspension samples of the bobbin frame 6 corresponds to the fine. It can be, for example, 7 2 0; also known as “• 万”, there is a single row of “" ancient 疋 "on each side of the total number of components, and the components (heart wheel) are on each of the worsting machines ... k set 'and there are two spools on each side of the reel machine 2, therefore, the reel stand rails sighed that the fine-lean pitch is twice the pitch of the spinning components of the worsted spinning machine. The reel cart 5 is near the end of the worsted spinning machine 2, that is, one of the gears 7 1 and the gear 71.. A. ^ • Gear ma is provided at each machine _2 with respect to the gear end 7 -Outer end 7 丨 b (see Figure 2). In conventional applications In reading the moving program of the shaft 7, the use of a moving rack (not shown in the figure) can store multiple fully loaded reels in one operation cycle, or empty reels equivalent to the number of reels to be produced, for example, 12. Supported, figure I with full load: The shaft system is indicated by the larger diameter circle shown by number 3, and the smaller diameter circle by empty coil line number 4 is indicated. The roll on the bobbin frame 6 is supplied to the spinning machine 2 Yarn assembly 2_〗 has not been completely exhausted yet, it is represented by a circle with a diameter between the diameter of the full-load selection spool 3 and the empty spool 4 and the spool cart 5 is manually moved forward and backward between the spinning machine and the moving frame. Time, that is, the reel cart is moved from the mobile rack to a worsted machine to supply the full ^ Please read it first. Please fill in the note above 1¾ and fill in the paper rule printed by the Staff Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs) A4 size ( 2 丨 0 read the public thin) -9- A7 B7 V. Description of the invention (of the reel, in addition, the reel cart 5 is moved from a worsted spinning machine to — to return the exhausted reel. U moves in the picture Although only the reel cart 5 can be used in the wood w, more than one reel cart 5 can be used. The number of machines and the moving frame and / or its shame can be determined. The 5 miles of the P cart is based on worsted spinning 2 = 〃, which is suspended from the bobbin of the reel frame 6 to form 8 groups of temples. The system is represented by the put = square along the double-row reel track 7. The reel exchange demand will happen in the material group, that is, install: when the demand for the second reel line = is replaced, all the reels in the group are easy ... The empty coil reel 4 in the group can be manually changed to the fully loaded grid spool 3 when conveyed along the good-shaft conveying device 1 of the present invention. Should be, the main = is left between adjacent worsted machines 2-small Space ... for operation: ordering empty volumes = performing reel exchange operations and routine combination operations between σ ',' the S room does not need female $ 丨 丨: t + Lu. And the reel cart 5 can be moved over

=,以下將説明捲線軸交換裝置i之細部結構… 乂換$置1包含—沿各精紡機2捲線軸架6而設之封g 回路式懸空轨道^、一沿懸空軌 ' ’ 經濟部中央標準局員工消費合作社印製 轴3及/或空捲線軸4之捲線相載具2。,二= = :,?:道^封閉回路循環移動之驅動裝置(進給; u. ,匕生軌迢U構成相對方向之回路部11&、 帮圖2中,軌道支架13自捲線軸架柱们2呈延 ㈣㈣13,心心,在精㈣ 輪回路部lla係自 -播線㈣載/㈣站L,在此進行滿載之:::下… 丁雨载之搭線轴3自一老=, The detailed structure of the bobbin exchange device i will be explained below. 乂 Replacement of $ 1 includes-a g-loop hanging track along the winding frame 6 of each worsted machine. Standard Bureau staff consumer cooperative prints spool 3 and / or spool 4 of empty spool 4. , Two ==:,? : Road ^ closed loop loop-moving driving device (feed; u., Dangling rail 迢 U constitutes the opposite direction of the loop section 11 &, in Figure 2, the track support 13 is extended from the spool bobbin 2 to ㈣㈣13, Attentively, in the wheel circuit department lla is a self-broadcasting line load / load station L, and here is full load: ::: down ... Ding Yuzai's spool 3 is a old one

B7 五、發明説明(8) 線軸推車5裝載至-捲線軸載具2〇,以及空捲線軸4自— 捲線轴載具2 〇卸載至一捧線轴推車5。 (請先聞讀背面之注意事項再填寫本頁) 如圖3,4所示,—捲線軸载具2〇包含若干承載單元3〇, 各由-承載桿3 1、若干(如3支)接於承载桿3 i底表面之播 線軸懸样3 2及由聯結件3 3與銷3 4構成之聯結單元所组成 ,易言之,相鄰I承載桿31與聯結件η係利用銷“而互 相旋轉地連接,以達成撓性之捲線轴載具2〇結構,供載具 20在懸空軌道11末端沿孤形段Ua、llb移動,捲線抽載 具20沿懸空軌适11爻全長而延)申,亦即當捲線軸載具2 〇 位於懸空轨道1 1上時,位於前端之承載样以3丨a標示,而 位於後端之承載和·則以3 1 b標示,如圖3所示,在前端承 載桿3 1 a後端承載桿3 lb之間並無聯結件3 3,即承載桿 3 1 a、3 1 b之間留有一空間。在捲線軸載具2 〇中,單一移 動架中之捲線軸懸捍3 2數量相當於紡紗單元總數之三倍( 例如捲線軸載具2 0中之捲線軸懸捍3 2數爲3 6 〇支),而捲 線軸懸样3 2之間距即相鄰捲線軸懸桿3 2間之距離,相同 於精紡紗機2捲線軸架6中之捲線軸懸桿間距。 經濟部中央標準局員工消費合作社印製 如圖4,5所示’承載捍31在末端備有支承與導引單元, 各單元由一對在側向間隔之支承轉輪3 5構成,各轉輪鼻有 一水平延伸之旋轉轴線,另有一對在縱向間隔之導引轉輪 36 ’各轉輪具有一垂直延伸之旋轉軸線。如圖5所示,懸 空軌道11具有一C形之橫截面且開口在底部,即懸空軌道 1 1具有一頂'壁1 1 - 1、側壁丨丨_ 2及底壁1卜3,底壁1 1 - 3 上設有水平之支表平面U c,可供各•支承轉輪35在其上滚 -11 - 本紙張尺度適角中國國家標準(CNS &gt;八4規格(21〇X297公釐) 經濟部中央標準局員工消費合作社印製 A7 B7 五、發明説明(9 ) 行 '底壁1 1 - 3沿軌道1.1長度而間隔,使一對間隔之垂直 導引表面lid形成,而表面之間設置導引轉輪36,支承轉 輪3 5與導引轉輪3 6可供捲線軸載具2 〇沿懸空軌道丨〖導行 如圖1所不,在懸g轨道u鄰近於精紡機2之外端7ib處 設有一對驅動單元40 ’係令捲線軸載具20沿懸空軌道 移動,如圖5所示,各驅動單元4〇包含一固接於懸空軌道 11之支架41、一對旋轉連接於支架41且具有一垂直延伸 旋轉軸線之傳送盤4 4及一對連無於各盤4 4之變速電動馬 達Μ,傳送盤41之設置上可令其周側表面互相面對,且接 觸到承載桿3 1之表面3 1 - 1 ’致使圓盤4 4利用電動馬達μ (轉動可令捲線軸載具20依圖1,3之箭頭f所示而沿懸空 軌道11移動。如圖1所示,一對手動操作之電動開關5〇設 於機架71之齒輪端部71a上,即其中—開關5〇設於機架 7 1之一侧上,而另一開關5 0設於機架7丨之另一側上,開 關5 0可啓動或停止進給單元4 〇之電動馬達M,藉此控制 捲線軸載具2 0之移動。如圖7所示,各開關5 〇包含一接於 電動馬達Μ之接點單元48及一依圖中實線第—位置51與 第二位置5 4間之軸線5 1 a.而轉動之操作桿5 j,样5〖在第 一位置脱離接點單元4 8而切斷開關5 〇,第二位5 4爲虚線 且桿5 1在此接觸到接點單元4 8而接通開關5 〇,藉此啓動 電動馬達Μ之驅動軸旋轉。開關5 0另備有—彈菁5 3,可 將桿5 1轉推回第一位置5 5 (即開關5 〇之切斷狀雜)。 如圖1,2所示L 一操作纜線或索5 2沿捲線軸架6而自接 (請先閱讀背面之注意事項再填寫本頁) ---:------------裝------.丨訂 ^------- ---- 本紙浪尺度適用中國國家標準(CNS ) Α4規格(210X297公釐) 12 經濟部中央標準局員工消費合作社印製 A7 B7 五、發明説明(10 ) 於機架7 1齒輪端部7 1 a中對應開關5 0操作桿5 1之第—端 ,伸至在接近機架7 1外端7 1 b固接於捲線轴架6柱件1 2之 支架46之第二端,繩索52之中段係由支承件47支承,支 承件以孔板接於捲線軸架6,藉此以防繩索5 2鬆弛。當操 作人員依圖7箭頭g方向拉動纜繩52時,桿51自切斷位置 55移至接通位置54而頂推彈簧53之彈力,使接點單元48 接通’封閉電路即通過電動馬達Μ,使捲線轴載具2〇可沿_ 懸空軌道1 1之封閉回路循行。當操作人員釋放繩索5 2時 ,桿5 1即自接通位置5 4利用彈姜5 3之力而回到切斷位置 5 5 ’使接點單元4 8切斷,因此通過電動馬達μ之封閉電 路即中斷’以防止捲線軸載具2 〇沿懸空軌道1 1之封閉回 路循行。在懸空軌道丨1對應於捲線轴裝載/卸載站ρ處設 有一類似於開關5 0者之傳送開關6 0,即開關6 0備有一操 作桿6 1 ’係利用一彈簧6 0 _丨之力而依圖2實線所示迫推至 一切斷位置65,在開關之切斷位置中,電動馬達Μ斷電以 防止捲線轴載具2 〇移動,桿6 1可依圖2之虛線6 4抵抗彈 簧6 0 - 1之力而移至接通位置,使開關接通而電動馬達μ通 電’使捲線轴載具2 〇可移動。一繩索6 2自桿6 1懸伸於懸 空軌道1 1之外側,操作人員可向下拉動繩索6 2,在需做 捲線拍交換操作時接通開關6 〇,易言之,站ρ之操作人員 欲停止或移動捲線轴載具2〇時可發出命令。 如圖1,2所示,一開關箱8 〇設於機架η之齒輪端部71a 中’開關箱8 0包含一速度指示開關8 2及一速度設定電路 8 2 ’(如圖7 ),用^;於指示捲線軸載具2 〇之速度變化,實例 t @S^#iTcNS ) A4^ ( ) ---:--- ------1 —1 n I— r·.·;^^-- ----- 丁 J__I ---.-衣 0¾ 'V5&amp;, (讀先閲讀背面之注意事項再填寫本頁) Α7 Β7 五、發明説明(11 中速度指7F開關82可指示二種傳送單元4〇馬達Μ之轉速 即開關72具有一第—位置,供一第一訊號自速度設定電 路82發出且取得馬達“之高轉速,一第二位置供一第二 訊唬自速度設足電路82,發出且取得馬達Μ之低轉速。速 度叹疋%路82’接於一控制電路84,其接於進給器4〇之電 達Μ ’使電動馬達Μ之轉速依據速度指示開關之位 置而在问、低速之間變動,例如,當捲線軸需做長距離移 動二於站Ρ執行捲線軸裝載/卸載操作時,則選擇高速位置 而在捲,’泉軸裝載/卸載站Ρ做快速之卸載操作而傳送 捧,,泉轴時即選擇之。反之,當在_移動交換處進行間歇式 捲泉轴傳送時,或捲線軸傳送操作期間在捲線軸裝載/ 卸載站Ρ做滿载捲線轴之安插時,則選擇低速位置。 二另了構成—控制電路84 ’使驅動馬達Μ之速度依開關82 位:而在低 '巾、高速之間切換,此例中,當捲線軸需長 =動:進行站Ρ之捲線轴裝載/卸載操作時,則選擇高 在:在捲線㈣送操作期間自 /卸載站p移出時,則選擇中速位置,或當 = 進行間歇式捲線㈣料;#捲絲_ =處 :在:::裝載,卸載站。安插時,則選擇低= '、 發明之操作將説明於后。如圖!所— 万機2 &amp; I線#架6處備便移動之捲,妹 各精 需求各別發生於成组BL1、BL2等之間,易:捲線轴交換 軸叉換需求不會同時發生在成组之間,〈捲線 織操作時,滿I之捲線轴3以一面向捲線機2開” 神木6&lt;捲線軸拆 (请先閱讀背面尤注意事項存填寫本頁) 經 濟 部 中 央 標 準 工 消 費 合 η 社 印 製 ..·裝-----.—訂^---u——Γ- 線! ----- 中國國' A7 ΒΊ 經濟部中央標準局負工消費合作社印製 五、發明説明(Π 區'^又自—捲線軸載具2 0懸伸,即懸空軌道1 1面向機架7】 縱側之直 '.泉&amp;。此外,如下所述,在捲線軸载具2 0上之歲 載捲’泉轴3換成2捲線軸4之前,相當於一移動架在一次德 乍循裒中所生捲線軸數之裝載空捲線軸4空推車$與裝韋 1 2 0支滿载捲線軸3之另—推車5即備便於捲線軸裝載/南 載站Ρ。自精紡織操作開始一段適當時間後,一捲線軸交 換而求即對—成组發出,例如组B L 1,此例中手動之捲靖 軸交換操作依以下方式由操作人員進行,以交換捲_ 6成組B l 1中 &gt; 命祕祕1 4〆.* 二播,'•泉轴4成爲.面對成组β L 1空捲線轴4戈 捲j轴载具2 〇中之滿载捲線轴3群f Β (如圖〇,即在格轉 奐操作l則,捲線軸載具2 〇移停至—處,使捲線軸弟 ”20上1滿載捲線軸3群FB之前端面向成组BLi之後端。 用捲線轴在捲線軸架6上成兩排,而播線料載具上 2載爲單排。此外,捲線軸之間距在捲線轴架6 =【轴载具2。之間係相同,因此,群FB之長度爲组 .…度〈二倍,成组捲線軸交換之初期中,成组⑴前 物各捲線軸架軌道7中之命 二捲·在轴4a如圖6-(a)箭頭fl、 :,換成面向空捧線轴4a處之捲線轴載具以内第— c之捲線轴3a;.隨後操作人員拉動繩索52,使 ,裝5 〇之桿5 i自切斷位 .^ DM夕主接通位置54(如圖7 吏—^令發至進给單元4Q而令驅動馬動㈣轉動,以取 :『·(”所示h方向之捲線軸載具⑼循行 — 支滿載捲線轴3b定位而面向圖所動田下一 軸架勅it 7 ()所不成組B L· 1各捲線 中m線軸㈣,勒人㈣放绳索52 本錄尺度適用~~—B7 V. Description of the invention (8) The bobbin cart 5 is loaded to the bobbin carrier 20, and the empty bobbin 4 is unloaded from the bobbin cart 2 to a stack of bobbin carts 5. (Please read the precautions on the back before filling out this page) As shown in Figures 3 and 4, the reel carrier 20 includes a number of load-bearing units 30, each with a load-bearing rod 3 1, several (such as 3) The bobbin suspension sample 3 2 connected to the bottom surface of the bearing rod 3 i and the coupling unit composed of the coupling member 3 3 and the pin 34 are composed of the adjacent I bearing rod 31 and the coupling member η. They are connected to each other to achieve a flexible reel carrier 20 structure, for the carrier 20 to move along the solitary sections Ua, llb at the end of the suspended track 11, and the coiled drawing carrier 20 is suitable for a full length of 11 爻 along the suspended track. Yan) Shen, that is, when the reel carrier 20 is located on the suspended track 1 1, the bearing sample at the front end is marked with 3 丨 a, and the bearing at the rear end is marked with 3 1 b, as shown in Figure 3. As shown, there is no coupling member 3 3 between the front-end load-bearing rod 3 1 a and the rear-end load-bearing rod 3 lb, that is, a space is left between the load-bearing rods 3 1 a, 3 1 b. In the spool carrier 2 0, The number of reel suspensions 3 2 in a single moving frame is equivalent to three times the total number of spinning units (for example, the number of reel suspensions 3 2 in the reel carrier 20 is 3 600), The distance between the reel suspension samples 3 and 2 is the distance between the adjacent reel suspension rods 3 and 2. It is the same as the reel suspension rod spacing in the spinning frame 2 reel frame 6. The Central Consumers Bureau of the Ministry of Economy The system is shown in Figures 4 and 5 'The load bearing 31 is provided with a support and guide unit at the end, each unit is composed of a pair of laterally spaced support wheels 35, and each wheel nose has a horizontally extending axis of rotation There is also a pair of guide runners 36 ′ spaced longitudinally. Each runner has a rotation axis extending vertically. As shown in FIG. 5, the suspended track 11 has a C-shaped cross section and the opening is at the bottom, that is, the suspended track 1. 1 has a top wall 1 1-1, side walls 丨 丨 2 and bottom wall 1 3, and the bottom wall 1 1-3 is provided with a horizontal supporting plane U c for each supporting roller 35 in its Scroll up-11-This paper is in accordance with the Chinese National Standards (CNS &gt; 8 4 specifications (21 × 297 mm)) Printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs A7 B7 V. Description of the invention (9) Row 'bottom wall 1 1-3 are spaced along the length of the track 1.1, so that a pair of spaced vertical guide surfaces lid are formed with the surfaces arranged The guide wheel 36, the support wheel 3 5 and the guide wheel 3 6 are available for the reel carrier 2 〇 along the suspended track 丨 the guide is as shown in Figure 1, the suspension track g is adjacent to the spinning machine 2 A pair of drive units 40 'are provided at the end 7ib to move the reel carrier 20 along the suspended track. As shown in FIG. 5, each drive unit 40 includes a bracket 41 fixed to the suspended track 11 and a pair of rotationally connected to The bracket 41 is provided with a transfer plate 44 and a pair of variable-speed electric motors M connected to each plate 44. The transfer plate 41 can be arranged so that its peripheral surfaces face each other and contact the bearing. The surface 3 1-1 ′ of the rod 31 causes the disc 4 4 to use the electric motor μ (the rotation causes the spool carrier 20 to move along the suspended track 11 as shown by the arrow f in FIGS. 1 and 3. As shown in FIG. 1, a pair of manually operated electric switches 50 are provided on the gear end portion 71 a of the frame 71, that is, a switch 50 is provided on one side of the frame 71 and the other switch 50 is Set on the other side of the frame 7 丨, the switch 50 can start or stop the electric motor M of the feeding unit 40, thereby controlling the movement of the spool carrier 20. As shown in FIG. 7, each switch 50 includes a contact unit 48 connected to the electric motor M and an operation of turning the axis 5 1 a. Between the first position 51 and the second position 54 of the solid line in the figure. Rod 5 j, sample 5 [Disconnect the contact unit 4 8 in the first position and cut off the switch 5 〇, the second position 5 4 is a dashed line and the rod 51 contacts the contact unit 4 8 and turns on the switch 50, thereby starting the rotation of the drive shaft of the electric motor M. The switch 5 0 is also provided with-elastic spring 5 3, which can turn the lever 51 back to the first position 5 5 (that is, the cut-off shape of the switch 5 0). As shown in Figures 1 and 2, L-operate the cable or cable 5 2 along the reel stand 6 and self-connect (please read the precautions on the back before filling this page) ---: --------- --- Installation ------. 丨 Order ^ ------- ---- This paper scale is applicable to China National Standard (CNS) Α4 specification (210X297 mm) 12 Staff Consumption of Central Bureau of Standards, Ministry of Economic Affairs Cooperative printed A7 B7 V. Description of the invention (10) The corresponding end of the switch 5 0 operating lever 5 1 in the gear end 7 1 a of the frame 7 1 extends to close to the outer end of the frame 7 1 7 1 b It is fixed to the second end of the bracket 46 of the column member 12 of the reel frame 6. The middle section of the rope 52 is supported by the support member 47. The support member is connected to the reel frame 6 with an orifice plate to prevent the rope 5 from loosening. . When the operator pulls the cable 52 in the direction of the arrow g in FIG. 7, the lever 51 moves from the cut-off position 55 to the on-position 54 and pushes the elastic force of the spring 53, so that the contact unit 48 is turned on. , So that the reel carrier 20 can follow the closed loop of the _ suspension track 1 1. When the operator releases the rope 5 2, the lever 5 1 is returned from the on position 5 4 to the cut-off position 5 5 ′ with the force of the spring 5 3 to cut off the contact unit 4 8. Therefore, the electric motor μ The closed circuit is interrupted 'to prevent the reel carrier 20 from following the closed loop of the suspended track 11. A transmission switch 60 similar to the switch 50 is provided on the suspended track 丨 1 corresponding to the reel loading / unloading station ρ, that is, the switch 60 is provided with an operating lever 6 1 ′, which uses the force of a spring 6 0 _ 丨As shown by the solid line in FIG. 2, it is forced to a cut-off position 65. In the cut-off position of the switch, the electric motor M is de-energized to prevent the spool carrier 2 from moving, and the rod 6 1 can be dotted line 6 4 according to FIG. 2. It is moved to the ON position against the force of the spring 60-1, and the switch is turned on and the electric motor μ is energized, so that the spool carrier 2 can be moved. A rope 6 2 is suspended from the pole 6 1 outside the suspension track 1 1. The operator can pull the rope 6 2 downwards and turn on the switch 6 when a reel exchange operation is required. In other words, the operation of the station ρ A person can issue a command when he wants to stop or move the reel carrier at 20 o'clock. As shown in Figs. 1 and 2, a switch box 80 is provided in the gear end 71a of the frame η. The 'switch box 80 includes a speed indicating switch 82 and a speed setting circuit 8 2' (as shown in Fig. 7). Use ^; to indicate the speed change of the spool carrier 2 〇 Example t @ S ^ # iTcNS) A4 ^ () ---: --- ------ 1 — 1 n I — r ·. · ; ^^------ 丁 J__I ---.- yi 0¾ 'V5 &amp;, (read the precautions on the back before filling this page) Α7 Β7 V. Description of the invention (11 in the speed refers to 7F switch 82 It can indicate two kinds of transmission unit 40, the speed of the motor M, that is, the switch 72 has a first position for a first signal to be sent from the speed setting circuit 82 and obtain the high speed of the motor, and a second position for a second signal. The self-speed setting circuit 82 sends out and obtains the low rotation speed of the motor M. The speed 82% is connected to a control circuit 84, which is connected to the feeder 40 and the electric speed M ′ makes the rotation speed of the electric motor M The position of the speed indicator switch changes between low and high speed. For example, when the reel needs to be moved a long distance to the station P to perform the reel loading / unloading operation, select the high speed position and "'Spring shaft loading / unloading station P is used for fast unloading and transfer, and spring shaft is selected. Conversely, when intermittent spring shaft transfer is performed at the _mobile exchange place, or during the reel transfer operation, When the reel loading / unloading station P is used for the installation of the fully loaded reel, the low-speed position is selected. Two other components-the control circuit 84 'makes the speed of the drive motor M according to the switch 82 position: between low and high speed Switch, in this example, when the reel needs to be long = moving: when the reel loading / unloading operation of station P is performed, select high: when moving from / unloading station p during the reeling operation, select the medium speed position , Or when = intermittent winding reeling; #roll wire_ = place: at ::: loading, unloading station. When inserted, select low = ', the operation of the invention will be explained later. Figure! So-million Machine 2 &amp; I line # rack 6 ready-to-remove scrolls, each girl ’s precise needs occur between the groups BL1, BL2, etc., easy: the reel exchange shaft fork and shaft exchange requirements do not occur at the same time in the group In the meanwhile, during the weaving operation, the full reel 3 is opened with one side facing the reel 2 ” 6 & Reel spool disassembly (please read the special precautions on the back and fill in this page first) Printed by the Central Standard Industrial and Consumer Corporation of the Ministry of Economic Affairs .. · Installation -----.—— Order ^ --- u——Γ- ----- China's A7 ΒΊ Printed by the Central Standards Bureau of the Ministry of Economic Affairs and Consumer Cooperatives. V. Description of the invention (II area) ^ Self-reel carrier 2 0 overhang, that is, the suspended track 1 1 facing Frame 7] Straight on the longitudinal side '. 泉 &amp;. In addition, as described below, before the old roll' spring shaft 3 'on the reel carrier 20 is replaced with 2 reel 4, it is equivalent to a moving rack in the The number of reels produced in a German-Israeli cycle is loaded with empty reels 4 empty carts $ and loaded with 1 2 0 full-loaded reels 3-cart 5 is ready for reel loading / South load station P . After a certain period of time since the start of the worsted spinning operation, a reel is exchanged and it is issued in pairs—for example, group BL 1. In this example, the manual reel exchange operation is performed by the operator in the following manner to exchange the reel_ 6 group B l 1 in middle &gt; life secret 1 4〆. * Second broadcast, '• spring axis 4 becomes. Face group β L 1 empty reel 4 go reel j axis carrier 2 0 full load Reel 3 groups f Β (as shown in Figure 〇, that is, in the case of the grid rotation operation 1, the reel carrier 2 moves to the-position, so that the full end of the reel brother "20 1 full reel 3 group FB front end facing into The rear end of the group BLi. Reels are used to form two rows on the reel stand 6 while the sowing material carrier 2 is carried in a single row. In addition, the distance between the reel shafts is in the reel stand 6 = [shaft carrier 2. The relationship is the same. Therefore, the length of the group FB is the group .... degree <double. In the initial stage of the group spool reel exchange, the two rolls in each spool reel stand rail 7 of the group predecessor are shown in Figure 4 on the axis 4a. 6- (a) Arrow fl,: Replace with the spool-cylinder 3a facing the spool holder at the empty spool 4a; then the operator pulls the rope 52 so that the rod 5 i Self-cut Position. ^ DM evening main connection position 54 (as shown in Figure 7)-^ order is sent to the feed unit 4Q to make the driving horse move, in order to take: "· (" h direction of the reel carrier carrier cycle Line — Fully loaded spool 3b is positioned and faces the next frame of the moving field 敕 it 7 () Ungrouped BL · 1 The m spools in each coil are placed on the spools, and the ropes are placed 52. This record applies ~~ —

A 7 ------_____ B7 五、發明説明(13 ) -----:— ,以停緣線㈣㈣之循行㈣,然後成组βμ各捲線 軸架軌道7中之空捲線抽4b依圖6(c)箭頭f3、_示換成 捲埭轴載具20中(二支滿载捲線軸3b,圖“a)至⑷説明 之此程序重覆,直到成组BL1中之所有空捲線轴皆換成捲 線軸載具2 0中之滿載捲線軸爲止。 當-捲線軸交換需求對一後續之組⑴產生時,捲線軸 架6處(捲線轴對應於组BL2者已空,操作人員拉動繩索 52^令接線轴載具2〇移動,直到—滿載捲線軸3群?8移 至懸更軌道U面向组BL2之位宣,然後捲線轴交換操作依 圖6 ( a )至(c )所示之類似方式進行。 田捲’泉軸載具2 〇中之所有捲線軸漸成空捲線軸4時,捲 '-泉軸裝載/卸載站p之操作人員拉動傳送開關6 〇之繩索6 2 經濟部中央標準局員工消費合作社印製 、、多動捲’’泉轴載具2 0,使2捲線軸4來到捲線軸裝載/ 卸載站P,此例中,操作人員可方便地操作速度指示開關 使驅動馬達河之轉速切換成高速模式,令空捲線轴4 ,速移至站P而縮短等候時間。如圖i所示,站p之操作人 員自一捲線軸載具2〇之捲線軸懸桿取出一空捲線軸4,並 存放於空捲線轴儲存用之推車5内’然後操作人員自滿载 捲線軸儲存用之另—推車5内取出_滿載之捲線軸,並將 ' 捲、’泉軸載具2 〇之捲線轴懸捍。操作人員重覆此j頁空 捲、’泉軸卸載與滿載捲線軸裝載操作,並反覆切換開關6 〇, 使捲,在軸載具2 〇間歇地沿懸空軌道丨1移動,直到完成將 滿載捲線軸儲存推車5中之所有移動捲線軸(丨2〇支)裝在 捲在軸载具2 〇 &lt;,然後操作人員自站P移動已將滿載捲線 本紙張尺度· -—-- A7 B7 經濟部中央標準局員工消費合作社印製 五、發明説明(μ ㈣載具2G上之推車5及放Λ來自㈣轴载且 20U拾線軸之推車5,並將載有滿載捲線轴之新 及新的空車㈣至站Ρ’然後重覆上述操作,使空捲線轴 自捲線轴載具取出交換,且滿載之捲軸放在捲線轴载呈 2〇(捧線轴懸桿上,藉由持續此操作,滿載之接線轴 (3 6 0支)皆存放在面向捧線軸架6上捲㈣懸捍處之所有 捲線軸載具捲線軸懸捍上。 依本發明所示,對於在搂線轴裝載/卸載站Ρ之操作人員 有一件重要之事爲欲令I㈣裁具2Q沿懸空軌道u循行 時應拉動繩索5 2以接通開關5 〇,易士 ^ ^ 勿s &lt;,操作者可留在 捲線軸裝載/卸載站P,而不必移位 王機木71义齒輪端7ia ,一如習知技術方式。此外,揲蚱 P梅線轴裝載/卸載站P之空間 在頂部會受懸空軌道1 1限制,此 J此因嬙空軌道1 1伸出精紡 機2槔架7 1之齒輪端部7丨a外 丨隹’依本發明所示,傳送 控制開關6 0可使開關样向外伸, 卜伸且-繩索62自桿之-端 读'伸且在懸空轨道i i外之一虚。 、 疋因此,在捲線軸裝載/卸 載站P之操作人員可於—處操作 诛作繩索62,以裝載或卸載捲 線軸,而不必進入懸空軌道u 飞万爻有限空間内,因而可 改善捲線軸交換操作之生產力。 另依本發明所示,捲線細奘 种裝载/卸載站P係位於精紡機2 機架71之一端(即齒輪端部 ..a )’此一配置可減少相鄰精 紡機2間之間距,而—捲緩蚰 ,,4 ’果1裝載/卸載站可設於相鄰精紡 機2間之—通道内,簡言之, _ 本發明之結構優點在於精紡 機2之間距可減t。另依本發明沁 赞月所於,用於傳送移動捲線 - —一 本紙張尺度家縣(CNS ) ------I--- ------ 訂 J_____I__旅 (請先閱t背面之注意事項再填寫本頁) -17- A7 B7 經濟部中央標準局員工消費合作社印製 五、發明説明(15) 軸(捧線軸載具20之優點爲其内之捲線軸懸样間距相等與 精紡機据線·軸架中之捲線軸懸桿間距。 上述實例中,所用之桿式傳送開關5〇在操作人員拉動缚 索52時接通,而操作人員釋放繩索”時切斷,在此样式 ]關5 0之4代上’可用旋轉式開關而在操作人員拉動绳= 52時交替接通或切斷,此外,以做爲—傳送開關而言,可 用—自精紡機捲線軸架懸伸出之垂吊式開關。 在二修改例中,除了撓性繩索52外,圖8所示之硬椁9.0 可由接於精紡機2機架之支架9.2;(故滑動支承,桿9 〇之—端 係面對-開關50之作動件5〇],而開關5〇在作動件 按下時即接通,而在作動件釋放時即切斷。 此外,上述實例係指一種成组式捲線轴交換,惟,本發 明(理念可應用於任意之捲線軸交換操作,即在任意之振 線軸交換中,捲線軸交換係沿捲線軸架之長度任意地進行 ,即每次-操作人員發現捲線軸架處之—棬線轴用盡時, 操作人員即將用盡之捲線軸換成自—捲線㈣㈣上之捲 線軸懸桿取出之滿載捲線軸,此種任意之捲線軸交換中, 操作人員可在任意發現用盡之捲線軸處 而不必移位至齒輪端部-之開關5。處,播線可 迅速移動’而操作人員可迅速自捲線轴載具⑺取出 捧線轴。 上述實例中,滿載捲㈣之裝載與空捲線轴之卸載可交 替進行,而捲載具2G爲㈣式㈣。騎代此種交扶 〈义換挺作中、捲線軸載具20先沿噁空軌道&quot;之整個: 本紙張尺度顏t _ 規格(27^_297公釐 ---;----· !| 1 I -- --I I—I -II 1.· —^衣 I ·- I (讀先聞I背面之注意事項再填寫本頁} ...-訂----:--Γ I :綠 ----- .HI - i tm . -18 五、發明説明(16 閉回路循行,以抽出捲線轴載具20上泛、、 然後捲線軸載具2 〇再沿辩命.、所有空捲線軸4, ,使滿載捲線軸3放在捲線 ^11〈整個封閉回路循行 。此例中,杏命捲^ 八2 〇足所有捲線軸懸捍 卸載站p時,可利用速距離傳运至捲線軸裝載/ 得空捲線歸捲_裝载/卸載站= =式’以取 裝載/卸載站p之操作人員自=;^且速移動。在捲線轴 、 v貝目捲線軸载具2 〇取下空 之工作因空捲線軸較輕 6 ’ — 吨勿於几成,而不論捲線軸載且2〇 I向速,因此可減少工作完 - 、 丄 凡成爻時間當較重疋滿載捲線 ^放在捲絲裝载/卸載站ρ時,則利用速度指示開關 82選擇低速模式,使推車5中之120支滿載捲線轴裝在捲 ’泉軸載具2 〇上。此外,$同於上述實例的是,亦可使用一 種程序,丨中在捲線轴载具20連續移動期間,空格線轴4 I卸載與滿載捲線軸3之裝載可交替進行,此例中之高速 杈式可選用於有經驗之操作人員,而低速模式可選用於不 热練之操作人員,因此,速度可配合於操作人員之技術, 以減少等候時間。 (請先閎免背面之注意事項再填寫本頁) •裝------'I訂 經濟部中央標準局員工消費合作社印製 尽紙浪尺度適用t國國家標準(CNS〉Α4規格(21〇χ297公茇 19A 7 ------_____ B7 V. Description of the invention (13) -----: —, take the trail of the stop line 缘, and then group the empty coil windings in the bobbin track 7 of βμ 4b According to the arrows f3 and _ shown in Figure 6 (c), it is replaced in the reel carrier 20 (two full-load reels 3b, as shown in Figure "a) to ⑷. This procedure is repeated until all of the group BL1 The empty reels are replaced with the fully loaded reels in the reel carrier 20. When the -reel exchange demand is generated for a subsequent group, the reel stand 6 (the reel corresponding to group BL2 is empty, The operator pulls the rope 52 ^ to make the spool carrier 20 move until it is fully loaded with 3 groups of spools? 8 Move to the suspension track U to declare the position of group BL2, and then the spool exchange operation is performed according to Fig. 6 (a) to ( c) Perform in a similar manner as shown. When all the reels in the Tianquan 'Spring shaft carrier 2 〇 gradually become empty spools 4, the operator of the roll'-Spring shaft loading / unloading station p pulls the transfer switch 6 〇 之Rope 6 2 Printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs, the multi-action scroll `` spring shaft carrier 2 0, so that 2 spools 4 come to the spool loading / unloading station P, this During the operation, the operator can conveniently operate the speed indication switch to switch the speed of the driving motor to the high-speed mode, so that the empty reel 4 can be quickly moved to station P to shorten the waiting time. As shown in Figure i, the operator at station p automatically A reel carrier 20 of the reel suspension rod takes out an empty reel 4 and stores it in the cart 5 for storage of empty reels. Then the operator takes it out of the cart for storage of the full reel—take it out of the cart 5_ Fully-loaded reel and suspend the reel of the 'reel' and 'spring-axle carrier 2'. The operator repeats this j-page empty reel, 'unloading and reloading of the reel and spring-loading reel, and switch 6 repeatedly. Let the rolls be intermittently moved along the suspended track 1 at the axle carrier 2 until all the moving reels (20 20) in the fully loaded reel storage cart 5 are mounted on the roll at the axle carrier 2 &lt; Then the operator moved from the station P to the paper scale of the full-load coil. A7 B7 Printed by the Consumer Cooperatives of the Central Standards Bureau of the Ministry of Economic Affairs. 5. Description of the invention (μμ Cart 5 on the 2G carrier and 5 Put Λ cart 5 loaded with ㈣ axle and 20U spool, Take the new and new empty car loaded with the fully loaded reel to the station P 'and repeat the above operation, so that the empty reel is taken out and exchanged from the reel carrier, and the fully loaded reel is placed on the reel and loaded with 20 (holding line On the shaft suspension rod, by continuing this operation, the fully-loaded connecting shafts (360 pieces) are stored on all the reel carrier reel suspension shafts facing the winding reel overhangs of the bobbin shaft frame 6. According to the present invention As shown, it is important for the operator at the reel loading / unloading station P to pull the rope 5 2 to turn on the switch 5 while the I 2 cutting tool 2Q is traveling along the suspended track u. ^ Don't s &lt; the operator can stay at the reel loading / unloading station P, without having to displace Wangiamu 71 prosthetic gear end 7ia, as in the conventional technique. In addition, the space of the grasshopper P plum bobbin loading / unloading station P will be limited at the top by the suspended track 1 1. This is because the empty track 1 1 protrudes from the gear end 7 of the worsted machine 2 frame 7 1. According to the present invention, the transmission control switch 60 can extend the switch pattern outward, and the extension cord 62 is read from the end of the rod and extended to the outside of the suspended track II.疋 Therefore, the operator at the reel loading / unloading station P can operate the reel 62 in the place to load or unload the reel without having to enter the limited space of the flying track u Feiwanyu, thus improving the reel Productivity of exchange operations. According to another aspect of the present invention, the winding line fine loading / unloading station P is located at one end of the frame 71 of the worsted machine 2 (ie, the end of the gear..a). This configuration can reduce the distance between adjacent worsted machines 2 However, the “winding and rewinding,” 4 'fruit 1 loading / unloading station can be set in the channel between two adjacent spinning machines. In short, the structure advantage of the present invention is that the distance between spinning machines 2 can be reduced by t. In addition, according to the present invention, Qin Zanyue is used to transfer mobile winding lines-a paper size home county (CNS) ------ I --- ------ Order J_____I__ 旅 (please read first Note on the back of this page, please fill in this page again) -17- A7 B7 Printed by the Consumers' Cooperative of the Central Bureau of Standards of the Ministry of Economic Affairs 5. Description of the invention (15) Shaft It is the same as the reel suspension distance in the spinning frame and the bobbin of the worsted machine. In the above example, the lever-type transfer switch 50 is turned on when the operator pulls the cord 52, and it is cut off when the operator releases the rope " In this style] Off 5 0 4th generation, 'Rotary switch can be used and alternately turned on or off when the operator pulls the rope = 52. In addition, as a-transfer switch, available-self-spinning machine spool In the second modification, in addition to the flexible rope 52, the hard 9.0 shown in Fig. 8 can be connected to the frame 9.2 of the worsted machine 2 frame (so the sliding support, rod 9 〇 之 —the end is facing-the actuating member 50 of the switch 50], and the switch 50 is turned on when the actuating member is pressed, and It is cut off when it is released. In addition, the above example refers to a group type spool reel exchange. However, the present invention (the idea can be applied to any reel exchange operation, that is, in any reel exchange, the reel exchange system is The length of the reel frame is arbitrarily performed, that is, every time the operator finds that the reel frame is out of use-when the reel is exhausted, the operator will replace the exhausted reel with a self-reel suspension rod on the reel. Full-load spools, in this kind of arbitrary spool exchange, the operator can find any exhausted spools without having to shift to the end of the gear-the switch 5. At this point, the broadcast line can be moved quickly and the operator The bobbin can be quickly taken out from the reel carrier. In the above example, the loading of the fully loaded reel and the unloading of the empty reel can be performed alternately, and the roll carrier 2G is a ㈣ style. During the changeover, the reel carrier 20 first follows the entire empty orbit &quot; the whole: the paper size Yan _ specifications (27 ^ _297 mm ---; ----!! | 1 I-- II—I -II 1. · — ^ 衣 I ·-I (Notes on the back of I Fill out this page} ...- Order ----:-Γ I: Green ----- .HI-i tm. -18 V. Description of the invention (16 Closed-loop looping to extract the spool carrier 20 pan, and then the reel carrier 2 〇 and then follow the command. All empty reels 4, so that the fully loaded reel 3 is placed on the reel ^ 11 <The entire closed loop follows. In this example, Xing Ming Scroll ^ 8. When all the reels are suspended and unloaded at station p, they can be transported to the reel using fast distances to load / unwind the reel_loading / unloading station == type to obtain the operator of loading / unloading station p. Since =; ^ and move quickly. Removal of empty work on the reel and v-beam reel carrier 2 〇 The empty reel is lighter 6 ′ — no more than a few tons, regardless of the reel load and the speed of 20 I, so the work can be reduced. -When the full load reel ^ is placed at the reel loading / unloading station ρ at the time of completion, the speed indication switch 82 is used to select the low speed mode, so that 120 fully loaded reels in the cart 5 are installed in the reel. 'Spring shaft carrier 20. In addition, $ is the same as the above example. A program can also be used. During the continuous movement of the spool carrier 20, the unloading of the space spool 4 I and the loading of the fully loaded spool 3 can be alternated. The high speed in this example The fork type can be used for experienced operators, and the low speed mode can be used for operators who are not hot. Therefore, the speed can be matched with the operator's technology to reduce waiting time. (Please fill out this page to avoid the precautions on the back before filling in this page) • Install ---- 'I order the paper printed by the Consumers' Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs to apply the national standard (CNS> Α4 specifications ( 21〇χ297 Male 19

Claims (1)

第841〇5560號專利申請案 中文申請專利範圍修正本(86年3月)No. 84105560 Patent Application Chinese Patent Application Amendment (March 86) 申請專利範園Patent Application 經濟部中央標準局負工消費合作社印製 1- 一種精紡機之粗紗輪送裝置,包含: 一機架,係沿精紡機之一長度廷伸; 數個間隔之纺炒組件,係沿機架之長度配置; 、-捲線轴架,係沿機架之長度延伸,以支承供應至各 贫紗組件之移動捲線軸,而紡各絲線; 傳送裝‘置,用於在沿捲線軸架之一無終端通道 多支捲線軸; 、 滿載捲線軸,設於支承裝置上,其用盡時可手動交換 於捧線軸架上之捲棒軸; 人 &quot; V —開關’用於取得傳送裝置之一選擇性操作; —捲線軸裝載/卸載站,係在沿封閉通道之—位晋 處’在此進行空捲線軸與滿載捲線軸間之交換,而哕 開關可選擇切冑或接通,⑽得傳送捲線軸之選擇移 動或停止; 、—操作件,係大致沿該捲線軸架之全長而設,操作件 接通於開關,而使操作件在沿捲線軸架長度之一要求 位置處之操作可令開關依需要而接通或切斷。 2·根據申請專利範圍第!項之精紡機之粗紗輸送裝置,其 中該開關包含一開關單元及一用於操作開關單元之擺 ^,且其中孩操作件係撓性繩索,可沿精紡織機之捲 線轴架長度拉伸,該繩索接至擺件,因此一操作人員 對趣索之操作可令開關沿捲線軸架長度之任意要求位 置處操作。 根據中請專利範圍第i項之猜纺機之粗紗輪送裝置,其 --------1··裝-----1訂 (請先閎讀背面之注意事項再填寫本頁). 第841〇5560號專利申請案 中文申請專利範圍修正本(86年3月)Printed by the Central Laboratories of the Ministry of Economic Affairs and Consumer Cooperatives 1- A roving carousel device for worsted spinning machines, including: a frame, which extends along one length of the worsted machine; The length configuration of the reel frame is extended along the length of the frame to support the moving reels supplied to the various poor yarn components, while spinning each yarn; the conveying device is used for one of the reel frames. Multiple spools with no end channel;, Full-load spools, set on the support device, when they run out, they can be manually exchanged with the reel shaft on the spool holder; People &quot; V-switch 'is used to obtain one of the transfer devices Optional operation; — the reel loading / unloading station is located along the closed aisle — where the exchange between the empty reel and the fully loaded reel is performed, and the 哕 switch can be switched on or off to obtain The selection of moving or stopping the conveying spool; ——- The operating element is set along the entire length of the spool frame, the operating element is connected to the switch, and the operating element is operated at a required position along the length of the spool frame. Can make Off and switched on or off as needed. 2 · According to the scope of patent application! The roving conveying device of the worsted spinning machine, wherein the switch includes a switch unit and a pendulum for operating the switch unit, and the operating member is a flexible rope, which can be stretched along the length of the bobbin of the worsted machine. The rope is connected to the pendant, so an operator's operation on the fun cable can cause the switch to operate at any desired position along the length of the spool frame. According to the roving rotation device of the guessing spinning machine in item i of the patent, its -------- 1 ·· installation ----- 1 order (please read the precautions on the back before filling in this Page). Chinese Patent Application Amendment No. 8410505560 (March 86) 申請專利範園Patent Application 經濟部中央標準局負工消費合作社印製 1- 一種精紡機之粗紗輪送裝置,包含: 一機架,係沿精紡機之一長度廷伸; 數個間隔之纺炒組件,係沿機架之長度配置; 、-捲線轴架,係沿機架之長度延伸,以支承供應至各 贫紗組件之移動捲線軸,而紡各絲線; 傳送裝‘置,用於在沿捲線軸架之一無終端通道 多支捲線軸; 、 滿載捲線軸,設於支承裝置上,其用盡時可手動交換 於捧線軸架上之捲棒軸; 人 &quot; V —開關’用於取得傳送裝置之一選擇性操作; —捲線軸裝載/卸載站,係在沿封閉通道之—位晋 處’在此進行空捲線軸與滿載捲線軸間之交換,而哕 開關可選擇切冑或接通,⑽得傳送捲線軸之選擇移 動或停止; 、—操作件,係大致沿該捲線軸架之全長而設,操作件 接通於開關,而使操作件在沿捲線軸架長度之一要求 位置處之操作可令開關依需要而接通或切斷。 2·根據申請專利範圍第!項之精紡機之粗紗輸送裝置,其 中該開關包含一開關單元及一用於操作開關單元之擺 ^,且其中孩操作件係撓性繩索,可沿精紡織機之捲 線轴架長度拉伸,該繩索接至擺件,因此一操作人員 對趣索之操作可令開關沿捲線軸架長度之任意要求位 置處操作。 根據中請專利範圍第i項之猜纺機之粗紗輪送裝置,其 --------1··裝-----1訂 (請先閎讀背面之注意事項再填寫本頁). A8 B8 C8 D8 六、申請專利範圍 中該開關包含一開關單元及一用於操作開關單元之亩 線往復件,且其中該操作件係一硬桿,其沿精纺機之 捲線轴架長度延伸JL可滑動地支承於精纺機之機架 上,該捍接至往復件’因此一操作人員對捍之操作可 令開關沿捲線轴長度之任意要求位置處操作。 4. 根據申請專利範圍第1項之精紡機之粗紗輸送裝置,其 另包含一第二開關,用於取得傳送裝置之選擇性操 作’該第二開關設於鄰近捲線軸裝载/卸載站之—位 置。 » 5. 根據申請專利範圍第1項之精紡機之粗紗輸送裝置,其 另包含一單元,用於變化設定傳送捲線軸之移動速 度。 經濟部中央標隼局員工消費合作it·印裝 6. 根據申i專利範圍弟1項之精纺機之粗紗輸送裝置,其 中該傳送裝置包含一沿捲線軸架而設之懸空軌道,以 提供封閉之通道’ 一撓性播線轴載具沿懸空軌道移動 以支承;^支捲線抽’並有進給裝置提供捲線軸載具移 動,該開關接於進給裝置以取得進給裝置所需之切斷 或接通操作。 7. 根據申請專利範圍第6項之精纺機之粗紗輸送裝置,其 中該撓性捧線軸載具包含多支承載桿、設於各承載样 上之捲線軸懸桿及令互相鄰近之承載捍循行之裝置。 8. 根據申請專利範圍第7項之精纺機之粗紗輸送裝置,其 中該循行裝置包含一聯結件及多支銷而將聯結件連接 相鄰之承載桿。 L本纸浪國準(CNS )八4祕(210X297么、釐_)2 ----;- ----- 申請專利範圍 9’根據申請專利範圍第 .中钤说 精巧機&lt;粗紗輸送裝置,f Μ進给裝置包含—對盘挺後红也 其 圓般/· ’軸載具接觸之圓盤,你 固盤在周側面接觸捲線軸载具, 使 動馬達違一 /、 —由開關操作之電 ’建了產丨施加於-圓盤之旋轉移動。 lat㈣請專利範圍第1項之精纺機之粗紗輸送裝置,龙 =懸空軌道包含-對沿捲線轴長度而設之直形部^ —對連接直形部之環形部以形成封閉通道,且其中— 封閉環部伸出纺織機機架之—端外,而其下方二: 線軸裝載/卸載站。 又捲 U-根據申請專利範圍第10項之精紡機之粗紗輸送裝置, 其另包含一第二開關,用於取得傳送裝置之選擇性操 作,該第二開關設於捲線軸裝載/卸載站上方之一位 置,且其中該第二開關由一開關件及一用於開關件選 擇性操作之繩索構成,該繩索係懸伸於該站上方。 (請先閔讀t面之注意事項再填寫本頁) 訂 經濟部中央標準局員工消費合作社印製 本纸浪尺度逋用中國國家標準(CNS〉A4規格(公策-)3 -Printed by the Central Laboratories of the Ministry of Economic Affairs and Consumer Cooperatives 1- A roving carousel device for worsted spinning machines, including: a frame, which extends along one length of the worsted spinning machine; several spaced spinning and frying components, which are distributed along the frame The length configuration of the reel frame is extended along the length of the frame to support the moving reels supplied to the various poor yarn components, while spinning each yarn; the conveying device is used for one of the reel frames. Multiple spools with no end channel;, Full-load spools, set on the support device, when they run out, they can be manually exchanged with the reel shaft on the spool holder; People &quot; V-switch 'is used to obtain one of the transfer devices Optional operation; — the reel loading / unloading station is located along the closed aisle — where the exchange between the empty reel and the fully loaded reel is performed, and the 哕 switch can be switched on or off to obtain The selection of moving or stopping the conveying spool; ——- The operating element is set along the entire length of the spool frame, the operating element is connected to the switch, and the operating element is operated at a required position along the length of the spool frame. Can make Off and switched on or off as needed. 2 · According to the scope of patent application! The roving conveying device of the worsted spinning machine, wherein the switch includes a switch unit and a pendulum for operating the switch unit, and the operating member is a flexible rope, which can be stretched along the length of the bobbin of the worsted machine. The rope is connected to the pendant, so an operator's operation on the fun cable can cause the switch to operate at any desired position along the length of the spool frame. According to the roving rotation device of the guessing spinning machine in item i of the patent, its -------- 1 ·· installation ----- 1 order (please read the precautions on the back before filling in this (Page). A8 B8 C8 D8 6. In the scope of patent application, the switch includes a switch unit and a reciprocating piece for operating the switch unit, and the operating piece is a hard rod that runs along the reel of a worsted spinning machine. Frame length extension JL is slidably supported on the frame of the worsted spinning machine, and the guard is connected to the reciprocating member. Therefore, an operator's operation on the guard can cause the switch to operate at any desired position along the length of the spool. 4. The roving conveying device of the worsted spinning machine according to item 1 of the scope of the patent application, which further includes a second switch for obtaining selective operation of the conveying device. The second switch is provided adjacent to the reel loading / unloading station. -position. »5. The roving conveying device of the worsted spinning machine according to item 1 of the patent application scope further includes a unit for changing the setting moving speed of the conveying reel. Employees ’cooperation with the Central Bureau of Standards of the Ministry of Economic Affairs, it printing and printing 6. According to the scope of the patent application, the roving conveying device of the worsted spinning machine, the conveying device includes a suspended track along a spool frame to provide Closed channel 'A flexible spool carrier is moved along the suspended track to support it; ^ support coil draw' and there is a feeding device to provide the spool carrier movement, the switch is connected to the feeder to obtain the feed device Switch off or on operation. 7. The roving conveying device of the worsted spinning machine according to item 6 of the scope of patent application, wherein the flexible bobbin carrier includes multiple supporting carrier rods, a bobbin suspension rod provided on each load specimen, and a load guard for adjacent to each other Follow the device. 8. The roving conveying device of the worsted spinning machine according to item 7 of the scope of patent application, wherein the traveling device includes a coupling member and a plurality of pins to connect the coupling member to an adjacent bearing rod. L This Paper Wave National Standard (CNS) Eighty Four Secret (210X297 Mod, __) 2 ----;------ Patent Application Scope 9 'According to the Patent Application Scope No. Conveying device, f Μ feed device contains-the disk is very round after the disk is flat. "The shaft carrier is in contact with the disk. You fix the disk on the peripheral side to contact the reel carrier, making the moving motor violated. The electric power operated by the switch is built and applied to the rotary movement of the disc. lat㈣Please ask for the roving conveying device of worsted spinning machine in the first item of the patent scope. Long = the suspended track contains-a straight section set along the length of the spool ^-a ring section connecting the straight section to form a closed channel, and — The closed loop extends out of the end of the frame of the textile machine, and the lower two: the spool loading / unloading station. Reel U-The roving conveying device of the worsted spinning machine according to item 10 of the scope of the patent application, which also includes a second switch for obtaining selective operation of the conveying device, the second switch is located above the reel loading / unloading station A position, and wherein the second switch is composed of a switch element and a rope for selective operation of the switch element, the rope is suspended above the station. (Please read the precautions on page t before filling out this page.) Order Printed by the Central Consumers Bureau of the Ministry of Economic Affairs, printed by the Consumer Cooperatives of China. This paper uses the Chinese National Standard (CNS> A4 Specification (Public Policy-) 3)-
TW084105560A 1994-06-01 1995-06-01 Fine spinning frame with roving bobbin transfer apparatus TW390919B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP6143994A JPH07331540A (en) 1994-06-01 1994-06-01 Spinning frame equipped with roving bobbin carrier
JP7068743A JPH08246265A (en) 1995-03-01 1995-03-01 Spinning frame equipped with roving bobbin conveyor

Publications (1)

Publication Number Publication Date
TW390919B true TW390919B (en) 2000-05-21

Family

ID=26409943

Family Applications (1)

Application Number Title Priority Date Filing Date
TW084105560A TW390919B (en) 1994-06-01 1995-06-01 Fine spinning frame with roving bobbin transfer apparatus

Country Status (3)

Country Link
KR (1) KR0132621B1 (en)
CN (1) CN1048767C (en)
TW (1) TW390919B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100370067C (en) * 2005-06-01 2008-02-20 江苏宏源纺机股份有限公司 Transmission device of automatic doffing track
KR100791967B1 (en) * 2006-09-18 2008-01-04 주식회사 이주 Apparatus for a uv curing textile
CN101148795B (en) * 2007-11-02 2011-03-23 上海二纺机股份有限公司 Integral doffing tube-walking device for spinning frame
CN102001516B (en) * 2010-10-14 2012-07-25 广东忠华棉纺织实业有限公司 Rough yarn conveying device
CN102704071A (en) * 2012-06-09 2012-10-03 山西经纬合力机械制造有限公司四厂 Coarse yarn circulating device in spinning frame
CN103074710B (en) * 2013-02-06 2015-10-21 山西经纬合力机械制造有限公司四厂 The switch apparatus of thickness connection in fine spining machine
CN105668131A (en) * 2016-03-31 2016-06-15 青岛天一集团红旗纺织机械有限公司 Chain type rotary suspension device of automatic doffer
CN106757581A (en) * 2016-12-28 2017-05-31 无锡诚本纺机有限公司 A kind of upper spindle blade drape flyer that release mechanism is hung with bobbin

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH681461A5 (en) * 1988-11-21 1993-03-31 Rieter Ag Maschf

Also Published As

Publication number Publication date
KR0132621B1 (en) 1998-04-16
CN1128307A (en) 1996-08-07
KR960001232A (en) 1996-01-25
CN1048767C (en) 2000-01-26

Similar Documents

Publication Publication Date Title
TW390919B (en) Fine spinning frame with roving bobbin transfer apparatus
US3841578A (en) Method and apparatus for continuously reeling webs of material into individual rolls
CN108423482B (en) Full-automatic high-speed coil separator
CN100404401C (en) Traverse apparatus
US2778578A (en) Winding machine
CN105600588A (en) Automatic winding machine
US4134559A (en) Equipment for processing material in sheet or ribbon form
CN214166947U (en) Coiling equipment is used in dacron cloth production
US3432118A (en) Creel
TW399026B (en) Spinning winding machine
CN210789582U (en) Wire feeder for cantilever type automatic welding device
CN218434300U (en) Winding shaft of splitting machine
CN216671391U (en) Automatic winding machine for hollow coil
CN209999781U (en) roller replacing device for corrugated board production line
CN113844953A (en) Yarn winding machine capable of quantifying yarn and using method thereof
JP2017002416A (en) Yarn winding-up system and yarn winding-up method
US2817206A (en) Apparatus for making coils and other twisted and mated elements
CN216270086U (en) Full-automatic wire binding device
CN2166897Y (en) Machine for coiling plate coil wire
CN214326690U (en) Paper roll support
CN216511734U (en) Automatic material collecting device of cloth
CN215755708U (en) On-line winding and unwinding device of wire drawing machine
JPS61102428A (en) Sliver changing in spinning frame
JP2787268B2 (en) Glass fiber winding processing apparatus and winding processing method
CN216501567U (en) Wire drawing traction equipment is used in copper wire production

Legal Events

Date Code Title Description
GD4A Issue of patent certificate for granted invention patent
MM4A Annulment or lapse of patent due to non-payment of fees