Bulkheads Adapted To Foundation Construction
(AREA)
Abstract
A working process for continuous wall of gravel layer, which is characterized in comprising: step 1: installing preparatory holes; step 2: side-digging on appropriate side and removing the dug soil; step 3: after completion of side-digging to the appropriate width lowering the steel cage; step 4: grouting on the wall body; step 5: repeating from the step 2 until completion of construction of the whole continuous wall.
TW84107684A1995-07-251995-07-25Working process for continuous wall of gravel layer