Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Green Country Ind Co LtdfiledCriticalGreen Country Ind Co Ltd
Priority to TW081109515A03priorityCriticalpatent/TW265377B/en
Application grantedgrantedCritical
Publication of TW265377BpublicationCriticalpatent/TW265377B/en
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Abstract
A working process for trough on slope with special geological area such as mud rock, which comprises the steps of: digging a trench on the bottom end of the trench body; applying a layer of water-insulating material; applying a water-permeable pipe; applying a layer of insulating paper; nailing a layer of anti-seepage barrier tape on the outside of the trench; applying a layer or multiple layers of steel wire net; nailing the steel wire, insulating paper and barrier tape on the rock surface; applying concrete; and directly covering soil or installing anti-flushing measures on the barrier tape.
TW081109515A031994-09-151994-09-15Troughs on slope with special geological area such as mud rock and its working process
TW265377B
(en)