Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wen-Yuan LiifiledCriticalWen-Yuan Lii
Priority to TW83111053ApriorityCriticalpatent/TW244366B/en
Application grantedgrantedCritical
Publication of TW244366BpublicationCriticalpatent/TW244366B/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
A process of removing construction templates, in which an indirect element is connected to two construction templates to jointly form a template plane for complete wall and the two templates are equipped with reinforcing beams for withstanding concrete pressure, the process comprises the following steps: (a) installing a drive mechanism in reinforcing beams between two templates; (b) operating the driving mechanism to move the two templates close to each other, to complete the removal of construction templates.
TW83111053A1994-11-281994-11-28Process of removing construction templates and its apparatus
TW244366B
(en)