TW202326320A - Power management assistance device, program, and power management assistance method - Google Patents
Power management assistance device, program, and power management assistance method Download PDFInfo
- Publication number
- TW202326320A TW202326320A TW111123001A TW111123001A TW202326320A TW 202326320 A TW202326320 A TW 202326320A TW 111123001 A TW111123001 A TW 111123001A TW 111123001 A TW111123001 A TW 111123001A TW 202326320 A TW202326320 A TW 202326320A
- Authority
- TW
- Taiwan
- Prior art keywords
- power consumption
- plan
- aforementioned
- power
- future
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 53
- 238000004519 manufacturing process Methods 0.000 claims abstract description 305
- 230000008859 change Effects 0.000 claims abstract description 117
- 238000004891 communication Methods 0.000 claims abstract description 88
- 230000005540 biological transmission Effects 0.000 claims abstract description 52
- 230000008569 process Effects 0.000 claims description 49
- 230000005611 electricity Effects 0.000 claims description 14
- 238000012986 modification Methods 0.000 claims 1
- 230000004048 modification Effects 0.000 claims 1
- 238000010422 painting Methods 0.000 claims 1
- 238000007726 management method Methods 0.000 description 252
- 238000003860 storage Methods 0.000 description 38
- 230000009467 reduction Effects 0.000 description 30
- 238000010586 diagram Methods 0.000 description 21
- 238000011156 evaluation Methods 0.000 description 11
- 230000006870 function Effects 0.000 description 3
- 230000008520 organization Effects 0.000 description 2
- 238000011867 re-evaluation Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本揭示係關於電力管理支援裝置、程式產品及電力管理支援方法。This disclosure relates to a power management support device, a program product, and a power management support method.
自以往已知可籌劃工廠等電力需求設施中考慮到節電的生產計畫的生產管理裝置。 例如,在專利文獻1係記載取得關於電力需求設施中的電力消耗的指示資訊,根據該指示資訊來進行關於生產計畫的變更的判斷的生產管理裝置。 [先前技術文獻] [專利文獻] Conventionally, there is known a production management device capable of planning a production plan in consideration of power saving in power-demanding facilities such as factories. For example, Patent Document 1 describes a production management device that acquires instruction information on power consumption in power demand facilities, and makes judgments about changes in production plans based on the instruction information. [Prior Art Literature] [Patent Document]
[專利文獻1]日本特開2015-228166號公報[Patent Document 1] Japanese Unexamined Patent Publication No. 2015-228166
[發明所欲解決的問題][Problem to be solved by the invention]
習知的生產管理裝置係自動變更生產計畫。 但是,若工廠全體的電力使用的管理者、與該工廠中的生產計畫的管理者不同,若計畫被自動變更,有發生變得無法實現生產計畫等等不利的情形。 The known production management device automatically changes the production plan. However, if the manager of the power usage of the entire factory is different from the manager of the production plan in the factory, if the plan is automatically changed, there may be disadvantages such as that the production plan cannot be realized.
因此,本發明之目的在實際參與電力供需的利用者可按照其權限而有效率地變更計畫。 [用以解決問題的手段] Therefore, the purpose of the present invention is that users who actually participate in the supply and demand of electricity can efficiently change plans according to their authority. [means used to solve a problem]
本揭示之一態樣之電力管理支援裝置之特徵為:包括:通訊部,用以與利用者所使用的終端裝置進行通訊;預測部,用以根據生產製品的生產系統的生產計畫,預測因前述生產系統而在將來被消耗的電力,藉此指定前述生產計畫中將來的消耗電力亦即將來消耗電力;消耗電力畫面生成部,用以生成表示前述將來消耗電力的消耗電力畫面畫像;利用者權限管理部,用以受理來自前述利用者的登入,按照前述利用者可進行關於前述生產系統中的電力的變更的權限,指定前述利用者在前述生產計畫中可變更的內容亦即生產計畫可變更內容;計畫編輯畫面生成部,用以生成前述利用者可變更前述生產計畫可變更內容的計畫編輯畫面畫像;及畫面送訊處理部,用以透過前述通訊部,將前述消耗電力畫面畫像及前述計畫編輯畫面畫像以可在一個畫面顯示的方式,傳送至前述終端裝置。The power management support device according to an aspect of the present disclosure is characterized by: including: a communication unit for communicating with a terminal device used by a user; The power consumption in the future due to the aforementioned production system is used to designate the future power consumption in the aforementioned production plan, that is, the future power consumption; the power consumption screen generating unit is used to generate a power consumption screen image representing the aforementioned future power consumption; The user authority management unit is used to accept the login from the user, and specify the content that the user can change in the production plan according to the user's authority to change the power in the production system. The content of the production plan can be changed; the plan editing screen generation part is used to generate the image of the plan editing screen in which the user can change the changeable content of the production plan; The aforementioned power consumption screen image and the aforementioned plan editing screen image are transmitted to the aforementioned terminal device in such a manner that they can be displayed on one screen.
本揭示之一態樣之程式產品係內置用以使電腦執行以下步驟的程式:根據生產製品的生產系統的生產計畫,預測因前述生產系統而在將來被消耗的電力,藉此指定前述生產計畫中將來的消耗電力亦即將來消耗電力的步驟;生成表示前述將來消耗電力的消耗電力畫面畫像的步驟;受理來自利用者的登入,按照前述利用者可進行關於前述生產系統中的電力的變更的權限,指定前述利用者在前述生產計畫中可變更的內容亦即生產計畫可變更內容的步驟;生成前述利用者可變更前述生產計畫可變更內容的計畫編輯畫面畫像的步驟;及將前述消耗電力畫面畫像及前述計畫編輯畫面畫像在一個畫面顯示的步驟。A program product according to an aspect of the present disclosure is a program for causing a computer to execute the following steps: Based on the production plan of the production system for producing products, predict the power consumed by the production system in the future, thereby specifying the production The step of planning the future power consumption is the step of the future power consumption; the step of generating the power consumption screen image showing the aforementioned future power consumption; accepting the login from the user, according to which the aforementioned user can perform the power consumption in the aforementioned production system Change authority, specifying the content that the user can change in the production plan, that is, the steps of changing the content of the production plan; the steps of generating the image of the plan editing screen where the user can change the content that can be changed in the production plan ; and a step of displaying the aforementioned power consumption screen image and the aforementioned plan editing screen image on one screen.
本揭示之一態樣之電力管理支援方法之特徵為:根據生產製品的生產系統的生產計畫,預測因前述生產系統而在將來被消耗的電力,藉此指定前述生產計畫中將來的消耗電力亦即將來消耗電力;生成表示前述將來消耗電力的消耗電力畫面畫像;受理來自利用者的登入,按照前述利用者可進行關於前述生產系統中的電力的變更的權限,指定前述利用者在前述生產計畫中可變更的內容亦即生產計畫可變更內容;生成前述利用者可變更前述生產計畫可變更內容的計畫編輯畫面畫像;及可將前述消耗電力畫面畫像及前述計畫編輯畫面畫像在一個畫面顯示。 [發明功效] A power management support method according to an aspect of the present disclosure is characterized in that, based on the production plan of the production system for producing products, the power consumption in the future by the production system is predicted, thereby specifying the future consumption in the production plan Electricity is the future consumption of electricity; generate a power consumption screen image showing the aforementioned future consumption of electricity; accept login from the user, and designate the aforementioned user in the aforementioned The content that can be changed in the production plan is also the changeable content of the production plan; the image of the plan editing screen that the aforementioned user can change the changeable content of the aforementioned production plan can be generated; and the image of the aforementioned power consumption screen and the aforementioned plan can be edited Screen portraits are displayed on one screen. [Efficacy of the invention]
藉由本揭示之一或複數態樣,實際參與電力供需的利用者可按照其權限而有效率地變更計畫。With one or more aspects of this disclosure, users who actually participate in power supply and demand can efficiently change plans according to their authority.
實施形態1.
圖1係概略示出實施形態1之電力管理支援系統100的構成的區塊圖。
電力管理支援系統100係包括:終端裝置110、生產系統120、電力計測器130、及電力管理支援裝置140。
終端裝置110、生產系統120、電力計測器130、及電力管理支援裝置140係設為可透過網路101來進行通訊者。
Implementation form 1.
FIG. 1 is a block diagram schematically showing the configuration of a power management support system 100 according to the first embodiment.
The power management support system 100 includes a
終端裝置110係電力管理支援系統100的利用者所使用的終端機。電力管理支援系統100的利用者係使用終端裝置110,由電力管理支援裝置140收取資訊,且對電力管理支援裝置140進行指示等。在電力管理支援系統100係設為配備有一或複數終端裝置110者。The
圖2係概略示出終端裝置110的構成的區塊圖。
終端裝置110係包括:通訊部111、顯示部112、輸入部113、記憶部114、及控制部115。
FIG. 2 is a block diagram schematically showing the configuration of the
通訊部111係在與連接於網路101的各種裝置之間進行通訊。
例如,通訊部111係與電力管理支援裝置140進行通訊。具體而言,通訊部111係接收來自電力管理支援裝置140的編輯畫面畫像資訊或變更編輯畫面畫像資訊,將該等供予至控制部115。
The
顯示部112係顯示各種畫面畫像。
輸入部113係由電力管理支援系統100的利用者受理指示的輸入。
記憶部114係記憶在終端裝置110中的處理所需資訊及程式。
The
控制部115係控制在終端裝置110中的處理。
例如,控制部115係若電力管理支援系統100的利用者透過輸入部113而輸入了在電力管理支援裝置140進行存取的指示時,使供輸入用以認證利用者的利用者認證資訊之用的利用者認證資訊輸入畫面畫像,亦即登入畫面畫像,顯示於顯示部112。接著,控制部115係若利用者在登入畫面畫像中,透過輸入部113輸入了利用者認證資訊時,將該利用者認證資訊透過通訊部111而送至電力管理支援裝置140。在此,利用者認證資訊係設為例如用以識別利用者的利用者識別資訊亦即利用者名、及密碼者。
The
此外,控制部115若由通訊部111收取編輯畫面畫像資訊,使以該編輯畫面畫像資訊所示之編輯畫面畫像顯示在顯示部112。
此外,控制部115若由通訊部111收取變更編輯畫面畫像資訊,使以該變更編輯畫面畫像資訊所示之變更編輯畫面畫像顯示在顯示部112。
接著,控制部115係若透過編輯畫面畫像或變更編輯畫面畫像,接受輸入部113變更計畫的內容的指示的輸入時,生成表示該經變更的內容亦即變更內容的變更部分資訊。控制部115係使通訊部111將該變更部分資訊傳送至電力管理支援裝置140。
In addition, if the
以上記載的終端裝置110係例如可藉由圖3所示之電腦10來實現。
電腦10係包括:CPU(Central Processing Unit,中央處理單元)等處理器11、記憶體12、HDD(Hard Disk Drive,硬碟驅動機)等輔助記憶裝置13、及用以連接於網路101的NIC(Network Interface Card,網路介面卡)等通訊介面(以下稱為通訊I/F)14。
The
例如,通訊部111係可藉由處理器11利用通訊I/F14來實現。記憶部114係可藉由處理器11利用記憶體12或輔助記憶裝置13來實現。控制部115係可藉由將被記憶在輔助記憶裝置13的程式載入於記憶體12而在處理器11執行來實現。For example, the
其中,雖未圖示,顯示部112係可藉由處理器11利用顯示裝置來實現,輸入部113係可藉由處理器11利用鍵盤或滑鼠等輸入裝置來實現。Wherein, although not shown in the figure, the
其中,以上的程式亦可由未圖示的記憶媒體、或透過通訊I/F14而由網路101被下載在輔助記憶裝置13,且自此被載入在記憶體12上而藉由處理器11來執行。此外,亦可由記憶媒體、或透過通訊I/F14而由網路101直接載入於記憶體12上,藉由處理器11來執行。換言之,如上所示之程式亦可形成為例如程式產品來提供。Wherein, the above programs can also be downloaded to the
返回至圖1,生產系統120係包含被設置在生產一或複數製品的工廠等的生產機器,消耗電力來生產該一或複數製品的系統。Returning to FIG. 1 , the
電力計測器130係計測在生產系統120所消耗的電力亦即消耗電力。在電力管理支援系統100係設為配備有一或複數電力計測器130者,俾以可計測生產系統120全體的消耗電力。The
電力管理支援裝置140係在電力管理支援系統100中進行電力的管理。
圖4係概略示出實施形態1中的電力管理支援裝置140的構成的區塊圖。
電力管理支援裝置140係包括:記憶部141、通訊部142、及處理部150。
The power management support device 140 manages power in the power management support system 100 .
FIG. 4 is a block diagram schematically showing the configuration of the power management support device 140 in the first embodiment.
The power management support device 140 includes: a
記憶部141係記憶在電力管理支援裝置140中的處理成為所需的資訊及程式。The
通訊部142係在與連接於網路101的各種裝置之間進行通訊。例如,通訊部142係與終端裝置110、生產系統120、及電力計測器130進行通訊。The
處理部150係執行在電力管理支援裝置140中的處理。
處理部150係包括:消耗電力取得部151、計畫管理部152、使用者輸入取得部153、預測部154、消耗電力畫面生成部155、利用者權限管理部156、計畫編輯畫面生成部157、及畫面送訊處理部158。
The processing unit 150 executes processing in the power management support device 140 .
The processing unit 150 includes: a power
消耗電力取得部151係透過通訊部142,由電力計測器130取得表示生產系統120的消耗電力的消耗電力資訊。所取得的消耗電力資訊係與取得消耗電力資訊的時刻建立對應而記憶在記憶部141。The power
計畫管理部152係透過通訊部142,由生產系統120取得表示在生產系統120生產製品的生產計畫的生產計畫資訊。該生產計畫資訊係被供予至預測部154及計畫編輯畫面生成部157。The
在此,生產計畫係設為表示至少按每個所生產的製品,使生產機器運轉的時刻者。此外,生產計畫係若以複數生產線生產製品,亦可表示按每條生產線使生產機器運轉的時刻。此外,生產計畫若依生產機器的動作內容,在該生產機器的消耗電力有影響時,亦可包含有該生產機器的動作內容。Here, the production plan is set to indicate the timing at which the production machine is operated for at least each manufactured product. In addition, if the production plan is to produce products on a plurality of production lines, it can also indicate the timing at which the production equipment is operated for each production line. In addition, if the production plan depends on the operation content of the production equipment, if the power consumption of the production equipment is affected, the operation content of the production equipment may also be included.
此外,計畫管理部152係將表示變更已結束的生產計畫的變更生產計畫資訊,透過通訊部142而送至生產系統120,藉此可變更生產系統120中的生產計畫。其中,變更的結束係設為利用者輸入至終端裝置110者。In addition, the
使用者輸入取得部153係作為透過通訊部142,由終端裝置110取得表示被輸入至終端裝置110的內容的資訊的取得部來發揮功能。
例如,使用者輸入取得部153係若透過後述之編輯畫面畫像或變更編輯畫面畫像,在終端裝置110中,按照利用者的權限而變更了生產計畫時,透過通訊部142,由終端裝置110取得表示該經變更的內容亦即變更內容的變更部分資訊。該變更部分資訊係被供予至預測部154及計畫管理部152。
The user
預測部154係根據以來自計畫管理部152的生產計畫資訊所示之生產計畫,預測因生產系統120而在將來被消耗的電力,藉此指定該生產計畫中將來的消耗電力亦即將來消耗電力。預測部154係將表示該將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155。The prediction unit 154 predicts the future power consumption by the
此外,預測部154若由使用者輸入取得部153收取變更部分資訊時,利用以該變更部分資訊所示之內容來變更以來自計畫管理部152的生產計畫資訊所示之生產計畫,藉此指定變更生產計畫。接著,預測部154係根據變更生產計畫,預測因生產系統120而在將來被消耗的電力,藉此指定變更生產計畫中的消耗電力亦即變更將來消耗電力。預測部154係將表示該變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。In addition, when the forecasting unit 154 receives the changed part information from the user
消耗電力畫面生成部155係生成表示以來自預測部154的將來消耗電力資訊所示之將來消耗電力的消耗電力畫面畫像。
例如,消耗電力畫面生成部155係生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以來自預測部154的將來消耗電力資訊所示之將來消耗電力的消耗電力畫面畫像。接著,消耗電力畫面生成部155係將表示該消耗電力畫面畫像的消耗電力畫面畫像資訊供予至畫面送訊處理部158。
The power
此外,消耗電力畫面生成部155係生成,其變更消耗電力畫面畫像表示以來自預測部154的變更將來消耗電力資訊所示之變更將來消耗電力。
例如,消耗電力畫面生成部155若由預測部154收取變更將來消耗電力資訊時,生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以該變更將來消耗電力資訊所示之變更將來消耗電力的變更消耗電力畫面畫像。接著,消耗電力畫面生成部155係將表示該變更消耗電力畫面畫像的變更消耗電力畫面畫像資訊供予至畫面送訊處理部158。
In addition, the power consumption
利用者權限管理部156係受理來自利用者的登入,按照該利用者可進行關於生產系統120中的電力的變更的權限,指定該利用者在生產計畫中可變更的內容。例如,若在生產系統120中生產第1製品與第2製品時,管理第1製品的生產的管理者並沒有變更第2製品的生產數等的權限,因此成為具備進行關於第1製品的生產的變更的權限的利用者。另一方面,管理第2製品的生產的管理者係成為具備進行關於第2製品的生產的變更的權限的利用者。在實施形態1中,可變更的內容由於為在生產計畫中可變更的內容,因此將在此所指定的內容,亦稱為生產計畫可變更內容。The user
例如,利用者權限管理部156係透過通訊部142,由終端裝置110取得利用者認證資訊。接著,利用者權限管理部156係使用被記憶在記憶部141的登錄認證資訊,進行該利用者認證資訊的認證。利用者權限管理部156係若認證失敗,對送來該利用者認證資訊的終端裝置110傳送登入錯誤,且停止之後的處理。另一方面,若認證成功,利用者權限管理部156係按照被記憶在記憶部141的利用者權限資訊,按照以已成功認證的利用者認證資訊所包含的利用者名所識別的利用者的權限,來指定該利用者可變更的內容。接著,利用者權限管理部156係將表示被指定出的內容的可變更內容資訊供予至計畫編輯畫面生成部157。For example, the user
計畫編輯畫面生成部157係生成可變更利用者在生產計畫中可變更的內容亦即生產計畫可變更內容的計畫編輯畫面畫像。
例如,計畫編輯畫面生成部157係生成在以來自計畫管理部152的生產計畫資訊所示之生產計畫之中,僅可編輯以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容的計畫編輯畫面畫像。接著,計畫編輯畫面生成部157係將表示該計畫編輯畫面畫像的計畫編輯畫面畫像資訊供予至畫面送訊處理部158。其中,若在生產計畫中沒有可變更以利用者認證資訊所包含的利用者名予以識別的利用者的內容時,計畫編輯畫面生成部157若生成表示沒有可編輯的內容的計畫編輯畫面畫像即可。
The plan editing
畫面送訊處理部158係透過通訊部142,將消耗電力畫面畫像或變更消耗電力畫面畫像及計畫編輯畫面畫像以可在一個畫面顯示的方式送至終端裝置110。
例如,畫面送訊處理部158係將以來自消耗電力畫面生成部155的消耗電力畫面畫像資訊所示之消耗電力畫面畫像或以變更消耗電力畫面畫像資訊所示之變更消耗電力畫面畫像、及以計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像,透過通訊部142而送至送來相對應的利用者認證資訊的終端裝置110。換言之,畫面送訊處理部158若收取變更處理電力畫面畫像資訊,即取代消耗電力畫面畫像而將變更消耗電力畫面畫像送至終端裝置110。
The screen
在此,畫面送訊處理部158若由消耗電力畫面生成部155收取到消耗電力畫面畫像資訊時,係生成包含以該消耗電力畫面畫像資訊所示之消耗電力畫面畫像、及以計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像的編輯畫面畫像。接著,畫面送訊處理部158係使通訊部142,將表示該編輯畫面畫像的編輯畫面畫像資訊傳送至送來相對應的利用者認證資訊的終端裝置110。Here, when the screen
此外,畫面送訊處理部158若由消耗電力畫面生成部155收取到變更消耗電力畫面畫像資訊時,係生成包含以該變更消耗電力畫面畫像資訊所示之變更消耗電力畫面畫像、及以計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像的變更編輯畫面畫像。接著,畫面送訊處理部158係使通訊部142,將表示該變更編輯畫面畫像的變更編輯畫面畫像資訊傳送至送來相對應的利用者認證資訊的終端裝置110。In addition, when the screen
以上記載的電力管理支援裝置140亦可例如藉由圖3所示之電腦10來實現。The power management support device 140 described above can also be realized by the
例如,通訊部142係可藉由處理器11利用通訊I/F14來實現。記憶部141係可藉由處理器11利用記憶體12或輔助記憶裝置13來實現。處理部150係可藉由將被記憶在輔助記憶裝置13的程式載入於記憶體12而在處理器11執行來實現。For example, the
圖5係示出在實施形態1中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。Fig. 5 is a flowchart showing a process of generating a screen image for displaying power consumption in the first embodiment.
首先,消耗電力取得部151係透過通訊部142,由電力計測器130依序取得消耗電力資訊,將所取得的消耗電力資訊與所取得的時刻建立對應而記憶在記憶部141(S10)。First, the power
接著,計畫管理部152係透過通訊部142,由生產系統120取得生產計畫資訊,將該生產計畫資訊供予至預測部154(S11)。Next, the
接著,預測部154係根據以來自計畫管理部152的生產計畫資訊所示之生產計畫,預測將來消耗電力,且將表示該將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155(S12)。Next, the prediction unit 154 predicts the future power consumption based on the production plan shown by the production plan information from the
接著,消耗電力畫面生成部155係生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以來自預測部154的將來消耗電力資訊所示之將來消耗電力的消耗電力畫面畫像,將表示該消耗電力畫面畫像的消耗電力畫面畫像資訊供予至畫面送訊處理部158(S13)。Next, the power
接著,使用者輸入取得部153係藉由是否已透過通訊部142而取得來自終端裝置110的變更部分資訊,來判斷生產計畫的內容是否已被變更(S14)。若生產計畫的內容已變更(S14中為Yes),處理係進至步驟S15。此時,使用者輸入取得部153係將透過通訊部142所取得的變更部分資訊供予至預測部154。Next, the user
在步驟S15中,預測部154係利用以來自使用者輸入取得部153的變更部分資訊所示之內容,變更以來自計畫管理部152的生產計畫資訊所示之生產計畫,且藉由變更後的生產計畫亦即變更生產計畫,預測因生產系統120而在將來被消耗的電力亦即變更將來消耗電力。接著,預測部154係將表示所被預測出的變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。In step S15, the prediction unit 154 changes the production plan indicated by the production plan information from the
接著,消耗電力畫面生成部155係生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以來自預測部154的變更將來消耗電力資訊所示之變更將來消耗電力的變更消耗電力畫面畫像,將表示該變更消耗電力畫面畫像的變更消耗電力畫面畫像資訊供予至畫面送訊處理部158(S16)。接著,處理係返回至步驟S14。Next, the power
如以上所示,藉由圖5所示之流程圖,使用者輸入取得部153由任何終端裝置110取得變更部分資訊,藉此變更在將來所預測的消耗電力。因此,可在所有終端裝置110中,確認根據在任何終端裝置110被變更了的計畫所變更的消耗電力。As described above, the user
圖6係示出在實施形態1中,電力管理支援裝置140接受來自終端裝置110的存取,顯示消耗電力,且傳送用以變更計畫的內容的畫面的處理的流程圖。FIG. 6 is a flowchart showing the process of receiving an access from the
首先,利用者權限管理部156係透過通訊部142,判斷是否已由終端裝置110取得利用者認證資訊(S20)。若已取得利用者認證資訊(S20中為Yes),處理係進至步驟S21。First, the user
在步驟S21中,利用者權限管理部156係使用被記憶在記憶部141的登錄認證資訊,進行所中被取得的利用者認證資訊的認證,且判斷是否認證成功。若認證失敗(S21中為No),利用者權限管理部156係對送來該利用者認證資訊的終端裝置110傳送登入錯誤,且將處理返回至步驟S20。另一方面,若認證成功(S21中為Yes),處理係進至步驟S22。In step S21, the user
在步驟S22中,利用者權限管理部156係按照被記憶在記憶部141的利用者權限資訊,按照以認證成功的利用者認證資訊所包含的利用者名所識別的利用者的權限,指定該利用者可變更的內容,將表示所被指定的內容的可變更內容資訊供予至計畫編輯畫面生成部157。In step S22, the user
接著,計畫編輯畫面生成部157係生成在以來自計畫管理部152的生產計畫資訊所示之生產計畫之中,僅可編輯以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容的計畫編輯畫面畫像,將表示該計畫編輯畫面畫像的計畫編輯畫面畫像資訊供予至畫面送訊處理部158(S23)。Next, the plan editing
接著,畫面送訊處理部158係判斷是否已由消耗電力畫面生成部155取得變更消耗電力畫面畫像資訊(S24)。若未取得變更消耗電力畫面畫像資訊(S24中為No),處理係進至步驟S25,若已取得變更消耗電力畫面畫像資訊(S24中為Yes),處理係進至步驟S27。Next, the screen
在步驟S25中,畫面送訊處理部158係生成表示包含以來自消耗電力畫面生成部155的消耗電力畫面畫像資訊所示之消耗電力畫面畫像、及以在步驟S23中所生成的計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像的編輯畫面畫像的編輯畫面畫像資訊。In step S25, the screen
接著,畫面送訊處理部158係使通訊部142,將該編輯畫面畫像資訊傳送至送來相對應的利用者認證資訊的終端裝置110(S26)。接著,處理係進至步驟S29。Next, the screen
另一方面,在步驟S27中,畫面送訊處理部158係生成表示包含以來自消耗電力畫面生成部155的變更消耗電力畫面畫像資訊所示之變更消耗電力畫面畫像、及以在步驟S23中所生成的計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像的變更編輯畫面畫像的變更編輯畫面畫像資訊。On the other hand, in step S27, the screen
接著,畫面送訊處理部158係使通訊部142,將該變更編輯畫面畫像資訊傳送至送來相對應的利用者認證資訊的終端裝置110(S28)。接著,處理係進至步驟S29。Next, the screen
在步驟S29中,畫面送訊處理部158係判斷是否已由消耗電力畫面生成部155取得變更消耗電力畫面畫像資訊。若已取得變更消耗電力畫面畫像資訊(S29中為Yes),處理係進至步驟S27。In step S29 , the screen
如以上所示,藉由實施形態1,可根據利用者使用終端裝置110所變更的生產計畫,來預測將來的消耗電力。As described above, according to Embodiment 1, future power consumption can be predicted based on the production plan changed by the user using the
此外,各利用者根據變更中的生產計畫,更新消耗電力的預測值,消耗電力畫面生成部155根據該更新內容,再生成畫面畫像,因此經更新的消耗電力畫面畫像被配訊至全部利用者的終端裝置110。因此,各利用者對於對工廠等的生產系統120全體的節電要求,可立即判斷是否全體已達成目標。因此,可抑制導致過度的消耗電力削減的生產計畫的變更。In addition, each user updates the predicted value of power consumption based on the changing production plan, and the power
此外,僅對藉由利用者權限管理部156被判斷出有權限的利用者,提供用以進行生產計畫的變更的畫面,因此可防止藉由無權限的利用者所為之生產計畫的編輯。In addition, since the screen for changing the production plan is provided only to the user whose authority is judged by the user
此外,藉由比較根據由生產系統120所取得的生產計畫的預測部154的輸出亦即變更前的預測消耗電力的時間序列、及根據變更中的生產計畫的預測部的輸出亦即變更中的預測消耗電力預測的時間序列,可生成包含各生產部門的消耗電力削減預定量的畫面。藉由生成如上所示之畫面,可共有對各生產部門的消耗電力減低的貢獻。In addition, by comparing the output of the forecasting unit 154 based on the production plan acquired by the
實施形態2.
如圖1所示,實施形態2之電力管理支援系統200係包括:終端裝置110、生產系統220、電力計測器130、及電力管理支援裝置240。
Implementation form 2.
As shown in FIG. 1 , the power management support system 200 of Embodiment 2 includes: a
實施形態2之電力管理支援系統200的終端裝置110及電力計測器130係與實施形態1之電力管理支援系統100的終端裝置110及電力計測器130相同。The
實施形態2中的生產系統220係與實施形態1中的生產系統120大致相同,惟按照來自電力管理支援裝置240的要求,管理表示以生產系統220生產製品時的生產個數、原單位或人事費等因變更生產計畫而值發生變化之用以識別預先設定的對象的對象識別資訊、及該對象的值的參照資訊。在此的對象為電力以外。The production system 220 in the second embodiment is substantially the same as the
電力管理支援裝置240係在電力管理支援系統200中進行電力的管理。
圖7係概略示出實施形態2中的電力管理支援裝置240的構成的區塊圖。
電力管理支援裝置240係包括:記憶部141、通訊部142、及處理部250。
實施形態2中的電力管理支援裝置240的記憶部141及通訊部142係與實施形態1中的電力管理支援裝置140的記憶部141及通訊部142相同。
The power
處理部250係執行在電力管理支援裝置240中的處理。
處理部250係包括:消耗電力取得部151、計畫管理部252、使用者輸入取得部153、預測部254、消耗電力畫面生成部255、利用者權限管理部256、計畫編輯畫面生成部157、及畫面送訊處理部158。
The
實施形態2中的處理部250的消耗電力取得部151、使用者輸入取得部153、計畫編輯畫面生成部157、及畫面送訊處理部158係與實施形態1中的處理部150的消耗電力取得部151、使用者輸入取得部153、計畫編輯畫面生成部157、及畫面送訊處理部158相同。The power
計畫管理部252係除了進行與實施形態1的計畫管理部152相同的處理之外,進行以下處理。
計畫管理部252係透過通訊部142,由生產系統220取得生產計畫資訊時,亦取得參照資訊。所取得的參照資訊係被供予至預測部254。
The
預測部254係除了進行與實施形態1的預測部154相同的處理之外,進行以下處理。
預測部254係與實施形態1的預測部154同樣地,將將來消耗電力資訊供予至消耗電力畫面生成部155,並且來自計畫管理部252的參照資訊亦供予至消耗電力畫面生成部255。
The predicting
此外,預測部254若由使用者輸入取得部153收取變更部分資訊時,在以來自計畫管理部252的參照資訊所示之值之中,預測依以該變更部分資訊所示之變更內容而變化的值。接著,預測部254係生成表示被預測出的值、及對應該值的對象的對象識別資訊的變更參照資訊。變更參照資訊係被供予至消耗電力畫面生成部255。In addition, when the change part information is received by the user
利用者權限管理部256係除了進行與實施形態1中的利用者權限管理部156相同的處理之外,進行以下處理。
利用者權限管理部256係與實施形態1中的利用者權限管理部156同樣地進行認證,認證成功時,將可變更內容資訊連同計畫編輯畫面生成部157一起亦供予至消耗電力畫面生成部255。
The user
實施形態2中的消耗電力畫面生成部255係在消耗電力畫面畫像或變更消耗電力畫面畫像中表示藉由利用者變更生產計畫可變更內容而值發生變化的對象、與該值。
例如,消耗電力畫面生成部255係生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以來自預測部254的將來消耗電力資訊所示之將來消耗電力,並且表示在以來自計畫管理部252的參照資訊所示之值及對象識別資訊之中,以來自利用者權限管理部256的可變更內容資訊所示之可變更的內容所對應的值及對象的消耗電力畫面畫像。接著,消耗電力畫面生成部255係將表示該消耗電力畫面畫像的消耗電力畫面畫像資訊供予至畫面送訊處理部158。
The power consumption
此外,消耗電力畫面生成部255係若由預測部254收取變更將來消耗電力資訊及變更參照資訊時,生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以該變更將來消耗電力資訊所示之變更將來消耗電力,並且表示在以來自預測部254的變更參照資訊所示之值及對象識別資訊之中,以來自利用者權限管理部256的可變更內容資訊所示之可變更的內容所對應的值及對象的變更消耗電力畫面畫像。接著,消耗電力畫面生成部255係將表示該變更消耗電力畫面畫像的變更消耗電力畫面畫像資訊供予至畫面送訊處理部158。In addition, when the power consumption
圖8係示出在實施形態2中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 其中,在圖8中,進行與圖5所示之步驟相同的處理的步驟係標註與圖5相同的符號。 Fig. 8 is a flowchart showing a process of generating a screen image for displaying power consumption in the second embodiment. However, in FIG. 8 , steps that perform the same processing as those shown in FIG. 5 are denoted by the same symbols as those in FIG. 5 .
圖8的步驟S10中的處理係與圖5的步驟S10中的處理相同。但是,在圖8中,步驟S10之後,處理係進至步驟S30。The processing in step S10 in FIG. 8 is the same as the processing in step S10 in FIG. 5 . However, in FIG. 8, after step S10, the process proceeds to step S30.
在步驟S30中,計畫管理部252係透過通訊部142,由生產系統220取得生產計畫資訊及參照資訊,將該生產計畫資訊及參照資訊供予至預測部254。接著,處理係進至步驟S12。In step S30 , the
圖8的步驟S12的處理係與圖5的步驟S12的處理相同。但是,在圖8中,步驟S12之後,處理係進至步驟S31。The process of step S12 in FIG. 8 is the same as the process of step S12 in FIG. 5 . However, in FIG. 8, after step S12, the process proceeds to step S31.
在步驟S31中,消耗電力畫面生成部255係生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以來自預測部254的將來消耗電力資訊所示之將來消耗電力,並且表示在以來自計畫管理部252的參照資訊所示之值及對象識別資訊之中,以來自利用者權限管理部256的可變更內容資訊所示之可變更的內容所對應的值及對象的消耗電力畫面畫像。接著,消耗電力畫面生成部255係將表示該消耗電力畫面畫像的消耗電力畫面畫像資訊供予至畫面送訊處理部158。接著,處理係進至步驟S14。In step S31, the power
圖8的步驟S14及S15的處理係與圖5的步驟S14及S15的處理相同。但是,在圖8中,步驟S15之後,處理係進至步驟S32。The processing in steps S14 and S15 in FIG. 8 is the same as the processing in steps S14 and S15 in FIG. 5 . However, in FIG. 8, after step S15, the process proceeds to step S32.
在步驟S32中,預測部254若由使用者輸入取得部153收取變更部分資訊時,在以來自計畫管理部252的參照資訊所示之值之中,預測依以該變更部分資訊所示之變更的內容而發生變化的值。接著,預測部254係生成表示經預測出的值、與對應該值的對象的對象識別資訊的變更參照資訊。變更參照資訊係被供予至消耗電力畫面生成部255。In step S32, if the
接著,消耗電力畫面生成部255若由預測部254收取變更將來消耗電力資訊及變更參照資訊時,生成以時間序列表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以該變更將來消耗電力資訊所示之變更將來消耗電力,並且表示在以來自預測部254的變更參照資訊所示之值及對象識別資訊之中,以來自利用者權限管理部256的可變更內容資訊所示之可變更的內容所對應的值及對象的變更消耗電力畫面畫像。接著,消耗電力畫面生成部255係將表示該變更消耗電力畫面畫像的變更消耗電力畫面畫像資訊供予至畫面送訊處理部158。接著,處理係返回至步驟S14。Next, when the power consumption
其中,在實施形態2中,消耗電力畫面畫像及變更消耗電力畫面畫像係按每位登入的利用者來作成,因此畫面送訊處理部158係按每位利用者生成編輯畫面畫像及變更編輯畫面畫像,且按每位利用者送至相對應的終端裝置110。However, in Embodiment 2, the power consumption screen image and the change power consumption screen image are created for each logged-in user, so the screen
藉由實施形態2,利用者並非僅消耗電力,亦可參照生產台數或人事費等參照資訊來判斷計畫變更的實施可否。其中,在實施形態2中,由於在編輯畫面畫像或變更編輯畫面畫像顯示參照資訊,因此僅觀看一個畫面畫像,即可取得所需資訊,且可縮短判斷所需時間。 此外,生產台數或人事費等參照資訊係限定為可參照的利用者予以顯示,因此利用者係可僅使用與事故相關連的資訊來變更計畫。 According to Embodiment 2, the user can judge whether or not the plan change can be implemented by referring to reference information such as the number of production units or labor costs, not only the power consumption. Among them, in Embodiment 2, since the reference information is displayed on the editing screen image or changing the editing screen image, the necessary information can be obtained by viewing only one screen image, and the time required for judgment can be shortened. In addition, reference information such as the number of production units and labor costs is displayed only for users who can refer to it, so users can change plans using only information related to accidents.
實施形態3.
如圖1所示,實施形態3之電力管理支援系統300係包括:終端裝置110、生產系統120、電力計測器130、及電力管理支援裝置340。
Implementation form 3.
As shown in FIG. 1 , the power management support system 300 of Embodiment 3 includes: a
實施形態3之電力管理支援系統300的終端裝置110、生產系統120及電力計測器130係與實施形態1之電力管理支援系統100的終端裝置110、生產系統120及電力計測器130相同。The
電力管理支援裝置340係在電力管理支援系統300中進行電力的管理。
圖9係概略示出實施形態3中的電力管理支援裝置340的構成的區塊圖。
電力管理支援裝置340係包括:記憶部141、通訊部142、及處理部350。
實施形態3中的電力管理支援裝置340的記憶部141及通訊部142係與實施形態1中的電力管理支援裝置140的記憶部141及通訊部142相同。
The power
處理部350係執行在電力管理支援裝置340中的處理。
處理部350係包括:消耗電力取得部151、計畫管理部152、使用者輸入取得部353、預測部354、消耗電力畫面生成部355、利用者權限管理部356、計畫編輯畫面生成部157、畫面送訊處理部158、及削減實績管理部359。
The
實施形態3中的處理部350的消耗電力取得部151、計畫管理部152、計畫編輯畫面生成部157及畫面送訊處理部158係與實施形態1中的處理部150的消耗電力取得部151、計畫管理部152、計畫編輯畫面生成部157及畫面送訊處理部158相同。The power
利用者權限管理部356係除了進行與實施形態1的利用者權限管理部156相同的處理之外,進行以下處理。
利用者權限管理部356係若認證成功,將已認證成功的利用者認證資訊所包含的利用者名、及送來該利用者認證資訊的終端裝置110的識別資訊亦即終端裝置識別資訊(例如終端裝置110的通訊位址)供予至使用者輸入取得部353。
The user
使用者輸入取得部353係與實施形態1同樣地,透過通訊部142,由終端裝置110取得變更部分資訊,且將該變更部分資訊供予至預測部354及計畫管理部152。在此,在實施形態3中,使用者輸入取得部353在將變更部分資訊供予至預測部354時,送來該變更部分資訊的終端裝置110的利用者的利用者名亦供予至預測部354。The user
預測部354係除了進行與實施形態1的預測部154相同的處理之外,進行以下處理。
預測部354係在生成將來消耗電力資訊及變更將來消耗電力資訊時,將將來消耗電力資訊及變更將來消耗電力資訊亦供予至削減實績管理部359。其中,預測部354在將變更將來消耗電力資訊供予至削減實績管理部359時,送來預測該變更將來消耗電力時所使用的變更部分資訊的終端裝置110的利用者的利用者名亦一起供予至削減實績管理部359。
The predicting
削減實績管理部359之功能係作為利用者管理使在過去因變更生產計畫而使因生產系統120而被消耗的電力發生變化的變化實績之變化實績管理部。The function of the reduction
例如,削減實績管理部359係按每位利用者,管理消耗電力的削減實績。
具體而言,削減實績管理部359係每逢由預測部354送來變更將來消耗電力資訊及利用者名時,將以該變更將來消耗電力資訊所示之變更將來消耗電力,由前次的將來消耗電力或變更將來消耗電力進行減算,藉此可算出以該利用者名所示之利用者的消耗電力的削減值。接著,削減實績管理部359係按每位利用者,合計預先設定的期間,例如周、月或年等期間、削減值,藉此可算出以利用者名所示之每位利用者的削減實績。接著,削減實績管理部359係將表示所算出的削減實績的削減實績資訊供予至消耗電力畫面生成部355。
For example, the reduction
消耗電力畫面生成部355係進行與實施形態1的消耗電力畫面生成部155大致相同的處理,惟在生成變更消耗電力畫面畫像資訊時,在變更消耗電力畫面畫像追加作為變化實績的削減實績。The power consumption
圖10係示出在實施形態3中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 其中,在圖10中,進行與圖5所示之步驟相同的處理的步驟係標註與圖5相同的符號。 Fig. 10 is a flowchart showing a process of generating a screen image for displaying power consumption in the third embodiment. However, in FIG. 10 , steps that perform the same processing as those shown in FIG. 5 are denoted by the same symbols as those in FIG. 5 .
關於圖10的步驟S10~S15的處理,係與圖5的步驟S10~S15的處理相同。
但是,在圖10的步驟S14中,若生產計畫的內容已被變更(S14中為Yes),處理係進至步驟S15,惟此時,使用者輸入取得部353係將透過通訊部142所取得的變更部分資訊供予至預測部354,並且送來該變更部分資訊的終端裝置110的利用者的利用者名亦供予至預測部354。
此外,在圖10中,步驟S15之後,處理係進至步驟S40。
The processing of steps S10 to S15 in FIG. 10 is the same as the processing in steps S10 to S15 in FIG. 5 .
However, in step S14 of FIG. 10 , if the content of the production plan has been changed (Yes in S14), the processing system proceeds to step S15, but at this time, the user
在步驟S40中,削減實績管理部359係按每位利用者,算出消耗電力的削減實績,且將表示所被算出的削減實績的削減實績資訊供予至消耗電力畫面生成部355。In step S40 , the actual reduction
接著,消耗電力畫面生成部355係生成以時間序列表示表示以被記憶在記憶部141的消耗電力資訊所示之消耗電力、及以來自預測部354的變更將來消耗電力資訊所示之變更將來消耗電力,並且表示以來自削減實績管理部359的削減實績資訊所示之削減實績的變更消耗電力畫面畫像,將表示該變更消耗電力畫面畫像的變更消耗電力畫面畫像資訊供予至畫面送訊處理部158(S41)。接著,處理係返回至步驟S14。Next, the power
如以上所示,藉由實施形態3,電力管理支援裝置340的利用者可直覺地理解哪位利用者、或包含利用者的該部門或組織有助於削減多少程度消耗電力。
結果,在貢獻度低的部門或組織中具有權限的利用者更積極地協力於消耗電力的削減。
As described above, according to Embodiment 3, the user of the power
實施形態4.
如圖1所示,實施形態4之電力管理支援系統400係包括:終端裝置110、生產系統120、電力計測器130、及電力管理支援裝置440。
實施形態4之電力管理支援系統400的終端裝置110、生產系統120及電力計測器130係與實施形態1之電力管理支援系統100的終端裝置110、生產系統120及電力計測器130相同。
Implementation form 4.
As shown in FIG. 1 , the power management support system 400 according to Embodiment 4 includes: a
電力管理支援裝置440係在電力管理支援系統400中進行電力的管理。
圖11係概略示出實施形態4中的電力管理支援裝置440的構成的區塊圖。
電力管理支援裝置440係包括:記憶部141、通訊部142、及處理部450。
實施形態4中的電力管理支援裝置440的記憶部141及通訊部142係與實施形態1中的電力管理支援裝置140的記憶部141及通訊部142相同。
The power
處理部450係執行在電力管理支援裝置440中的處理。
處理部450係包括:消耗電力取得部151、計畫管理部152、使用者輸入取得部153、預測部454、消耗電力畫面生成部155、利用者權限管理部156、計畫編輯畫面生成部157、畫面送訊處理部158、及關連設備管理部460。
The
實施形態4中的處理部450的消耗電力取得部151、計畫管理部152、使用者輸入取得部153、消耗電力畫面生成部155、利用者權限管理部156、計畫編輯畫面生成部157及畫面送訊處理部158係與實施形態1中的處理部150的消耗電力取得部151、計畫管理部152、使用者輸入取得部153、消耗電力畫面生成部155、利用者權限管理部156、計畫編輯畫面生成部157及畫面送訊處理部158相同。
但是,實施形態4中的計畫管理部152係將來自生產系統120的生產計畫資訊亦供予至關連設備管理部460。此外,實施形態4中的使用者輸入取得部153係將來自終端裝置110的變更部分資訊亦供予至關連設備管理部460。
The power
關連設備管理部460係在與在生產計畫中生產製品的生產機器相關連的設備亦即關連設備中,根據生產計畫,預測在將來所被消耗的電力亦即將來關連消耗電力。The related-
例如,關連設備管理部460係指定與以來自生產系統120的生產計畫資訊所示之生產計畫所包含的生產機器相關連的設備亦即關連設備。例如,表示生產機器、與和該生產機器相關連的關連設備的對應關係的關連設備管理資訊被記憶在記憶部141,關連設備管理部460若藉由參照該關連設備管理資訊,指定與生產計畫所包含的生產機器相關連的關連設備即可。其中,以關連設備而言,有照明及空調機等。For example, the related
接著,關連設備管理部460係在該生產計畫中,預測因該所指定的關連設備而在將來被消耗的電力亦即將來關連消耗電力。用以預測每個關連設備的消耗電力等將來關連消耗電力所需的資訊係設為被記憶在記憶部141者。關連設備管理部460係生成表示經預測的將來關連消耗電力的將來關連消耗電力資訊,且將該將來關連消耗電力資訊供予至預測部454。Next, the related
此外,關連設備管理部460係根據變更生產計畫,預測因關連設備而在將來被消耗的電力亦即變更將來關連消耗電力。In addition, the related
例如,關連設備管理部460係若將以來自生產系統120的生產計畫資訊所示之生產計畫,變更為以來自終端裝置110的變更部分資訊所示之內容時,判斷是否可變更關連設備的狀態。接著,關連設備管理部460係在可變更的關連設備中,指定藉由變更而消耗電力變得最小的變更內容,若反映出該所指定的變更內容時,根據以來自生產系統120的生產計畫資訊所示之生產計畫,預測在關連設備在將來被消耗的電力亦即變更將來關連消耗電力。關連設備管理部460係生成表示所被預測的變更將來關連消耗電力的變更將來關連消耗電力資訊,且將該變更將來關連消耗電力資訊供予至預測部454。For example, when the production plan shown by the production plan information from the
此外,關連設備管理部460係生成表示變更已結束的變更內容的變更內容資訊,將該變更內容資訊供予至計畫管理部152。取得如上所示之變更內容資訊的計畫管理部152係將該變更內容資訊,透過通訊部142而送至生產系統120,藉此可變更生產系統120中的關連設備的狀態。其中,變更的結束係設為利用者輸入至終端裝置110者。Furthermore, the related
預測部454係根據以來自計畫管理部152的生產計畫資訊所示之生產計畫,預測因生產系統120而在將來被消耗的電力,藉此指定該生產計畫中將來的消耗電力亦即將來消耗電力。在此,預測部454係根據生產計畫,對因生產系統120而在將來被消耗的電力加上將來關連消耗電力,藉此指定將來消耗電力。接著,預測部454係將表示該將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155。The
此外,預測部454若由使用者輸入取得部153收取變更部分資訊,將以來自計畫管理部152的生產計畫資訊所示之生產計畫的一部分變更為以該變更部分資訊所示之內容,藉此指定變更生產計畫。接著,預測部454係根據變更生產計畫,在因生產系統120而在將來被消耗的電力加上變更將來關連消耗電力,藉此指定變更將來消耗電力。預測部454係將表示該變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。In addition, when the
圖12係示出在實施形態4中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 其中,在圖12中,進行與圖5所示之步驟相同的處理的步驟係標註與圖5相同的符號。 Fig. 12 is a flowchart showing a process of generating a screen image for displaying power consumption in the fourth embodiment. However, in FIG. 12 , steps that perform the same processing as those shown in FIG. 5 are denoted by the same symbols as those in FIG. 5 .
圖12的步驟S10及S11中的處理係與圖5的步驟S10及S11中的處理相同。
但是,在圖12的步驟S11中,係由生產系統120將生產計畫資訊供予至預測部454及關連設備管理部460。此外,圖12的步驟S11之後,處理係進至步驟S50。
The processing in steps S10 and S11 in FIG. 12 is the same as the processing in steps S10 and S11 in FIG. 5 .
However, in step S11 of FIG. 12 , the
在步驟S50中,關連設備管理部460係指定與以來自生產系統120的生產計畫資訊所示之生產計畫所包含的生產機器相關連的設備亦即關連設備,在該生產計畫中,預測因該所指定出的關連設備而在將來被消耗的電力亦即將來關連消耗電力。接著,關連設備管理部460係生成表示所被預測出的將來關連消耗電力的將來關連消耗電力資訊,且將該將來關連消耗電力資訊供予至預測部454。In step S50, the related-
接著,預測部454係根據以來自計畫管理部152的生產計畫資訊所示之生產計畫,來指定將來消耗電力(S51)。在此,預測部454係對根據生產計畫所預測的電力,加算以來自關連設備管理部460的將來關連消耗電力資訊所示之將來關連消耗電力,藉此指定將來消耗電力,將表示該將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155。接著,處理係進至步驟S13。Next, the
圖12的步驟S13及S14中的處理係與圖5的步驟S13及S14中的處理相同。
但是,在圖12中,若在步驟S14中判斷出生產計畫的內容已變更(S14中為Yes),使用者輸入取得部153係將透過通訊部142所取得的變更部分資訊供予至預測部454及關連設備管理部460,處理係進至步驟S52。
The processing in steps S13 and S14 in FIG. 12 is the same as the processing in steps S13 and S14 in FIG. 5 .
However, in FIG. 12, if it is determined in step S14 that the content of the production plan has been changed (Yes in S14), the user
在步驟S52中,關連設備管理部460若將以來自生產系統120的生產計畫資訊所示之生產計畫,變更為以來自終端裝置110的變更部分資訊所示的內容時,在可變更的關連設備的狀態下,指定藉由變更而消耗電力成為最小的變更內容,若反映出該經指定的變更內容,根據以來自生產系統120的生產計畫資訊所示之生產計畫,預測因關連設備而在將來所被消耗的電力亦即變更將來關連消耗電力。接著,關連設備管理部460係生成表示所被預測出的變更將來關連消耗電力的變更將來關連消耗電力資訊,且將該變更將來關連消耗電力資訊供予至預測部454。In step S52, when the related
接著,預測部454係將以來自計畫管理部152的生產計畫資訊所示之生產計畫,變更為以來自終端裝置110的變更部分資訊所示之內容,藉此指定變更生產計畫,且根據該變更生產計畫,來指定變更將來消耗電力(S53)。在此,預測部454係根據變更生產計畫,在因生產系統120而在將來被消耗的電力,加算以來自關連設備管理部460的變更將來關連消耗電力資訊所示之變更將來關連消耗電力,藉此指定變更將來消耗電力,且將表示該變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。之後,處理係進至步驟S16。Next, the
圖12的步驟S16中的處理係與圖5的步驟S16中的處理相同。接著,處理係返回至步驟S14。The processing in step S16 in FIG. 12 is the same as the processing in step S16 in FIG. 5 . Then, the process returns to step S14.
如以上所示,藉由實施形態4,不僅生產設備,關連設備的消耗電力的變化亦反映在預測結果,因此預測精度變高。As described above, according to Embodiment 4, changes in the power consumption of not only production facilities but also related facilities are reflected in the prediction results, so the prediction accuracy becomes high.
實施形態5.
圖13係概略示出實施形態5之電力管理支援系統500的構成的區塊圖。
電力管理支援系統500係包括:終端裝置110、生產系統120、電力計測器130、電力管理支援裝置540、及供電系統570。
Implementation form 5.
Fig. 13 is a block diagram schematically showing the configuration of a power
實施形態5之電力管理支援系統500的終端裝置110、生產系統120及電力計測器130係與實施形態1之電力管理支援系統100的終端裝置110、生產系統120及電力計測器130相同。
但是,如後所述,在實施形態5中,在以由電力管理支援裝置540送訊至終端裝置110的計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像及以變更計畫編輯畫面畫像資訊所示之變更計畫編輯畫面畫像中,亦可按照利用者的權限來變更供電計畫。因此,由終端裝置110送至電力管理支援裝置540的變更部分資訊係有表示變更供電計畫的一部分的內容的情形。
The
供電系統570係包括蓄電池等供電設備,對生產系統120供給電力的系統。供電系統570係保持有供電計畫,按照該供電計畫來控制供電設備,藉此進行蓄電或對生產系統120的供電。The
電力管理支援裝置540係在電力管理支援系統500中進行電力的管理。
如圖4所示,電力管理支援裝置540係包括:記憶部141、通訊部142、及處理部550。
實施形態5中的電力管理支援裝置540的記憶部141及通訊部142係與實施形態1中的電力管理支援裝置140的記憶部141及通訊部142相同。
The power
處理部550係執行電力管理支援裝置540中的處理。
處理部550係包括:消耗電力取得部151、計畫管理部552、使用者輸入取得部153、預測部554、消耗電力畫面生成部155、利用者權限管理部156、計畫編輯畫面生成部557、及畫面送訊處理部158。
The processing unit 550 executes the processing in the power
實施形態5中的處理部550的消耗電力取得部151、使用者輸入取得部153、消耗電力畫面生成部155、利用者權限管理部156及畫面送訊處理部158係與實施形態1中的處理部150的消耗電力取得部151、使用者輸入取得部153、消耗電力畫面生成部155、利用者權限管理部156及畫面送訊處理部158相同。The power
其中,在實施形態5中,按照利用者權限管理部156所指定之以認證成功的利用者認證資訊所包含的利用者名予以識別的利用者的權限,該利用者可變更的內容係有包含供電計畫的內容的情形。在此,將在供電計畫中可變更的內容亦稱為供電計畫可變更內容。Among them, in Embodiment 5, according to the authority of the user identified by the user name included in the user authentication information of the successfully authenticated user specified by the user
計畫管理部552係除了進行與實施形態1相同的處理之外,進行以下處理。
計畫管理部552係透過通訊部142,由供電系統570取得表示供電計畫的供電計畫資訊。該供電計畫資訊係被供予至預測部554及計畫編輯畫面生成部557。
The plan management unit 552 performs the following processing in addition to the same processing as in the first embodiment.
The plan management unit 552 obtains the power supply plan information representing the power supply plan from the
在此,供電計畫係設為至少表示對生產系統120進行供電的量及時刻以及對供電設備進行蓄電的量及時刻者。Here, the power supply plan is set to indicate at least the amount and timing of power supply to the
此外,計畫管理部552係將表示變更已結束的供電計畫的變更供電計畫資訊,透過通訊部142送至供電系統570,藉此可變更供電系統570中的供電計畫。其中,變更的結束係設為利用者輸入至終端裝置110者。In addition, the plan management unit 552 sends the power supply plan change information indicating that the change of the power supply plan has been completed to the
預測部554係根據以來自計畫管理部552的供電計畫資訊所示之供電計畫,將由供電系統570在將來供給至生產系統120的電力,根據以來自計畫管理部552的生產計畫資訊所示之生產計畫,由因生產系統120而在將來被消耗的電力減去,藉此指定將來消耗電力。接著,預測部554係將表示該將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155。The prediction unit 554 uses the power supply plan shown by the power supply plan information from the plan management unit 552 to predict the power to be supplied from the
此外,預測部554若由使用者輸入取得部153收取包含變更供電計畫的內容的變更部分資訊時,根據以該變更內容變更供電計畫後的變更供電計畫,將由供電系統570在將來供給至生產系統120的電力,根據生產計畫,由因生產系統120而在將來被消耗的電力減去,藉此指定因變更供電計畫所致之消耗電力亦即變更將來消耗電力。In addition, if the prediction unit 554 receives the changed part information including the content of changing the power supply plan from the user
例如,預測部554若由使用者輸入取得部153收取變更部分資訊,將生產計畫或供電計畫,變更為以該變更部分資訊所示之內容。接著,預測部554係藉由變更後的生產計畫亦即變更生產計畫及變更後的供電計畫亦即變更供電計畫的至少任一方,由因生產系統120而在將來被消耗的電力,減去藉由供電系統570而在將來被供電的電力,藉此指定變更將來消耗電力。接著,預測部554係將表示該變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。For example, if the forecast unit 554 receives the changed part information from the user
計畫編輯畫面生成部557係生成在以生產計畫資訊所示之生產計畫之中,僅可編輯以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容、或僅可編輯以供電計畫資訊所示之供電計畫之中,以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容的計畫編輯畫面畫像。表示所生成的計畫編輯畫面畫像的計畫編輯畫面畫像資訊係被供予至畫面送訊處理部158。其中,若在生產計畫中沒有可變更以利用者認證資訊所包含的利用者名予以識別的利用者的內容,計畫編輯畫面生成部557若生成表示在生產計畫中沒有可編輯的內容的計畫編輯畫面畫像即可。此外,若在供電計畫中沒有以利用者認證資訊所包含的利用者名予以識別的利用者可變更的內容時,計畫編輯畫面生成部557若生成表示在供電計畫中沒有可編輯的內容的計畫編輯畫面畫像即可。The plan editing screen generation unit 557 generates only the changeable content shown in the changeable content information from the user
圖14係示出在實施形態5中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 其中,圖14中,進行與圖5所示之步驟相同的處理的步驟係標註與圖5相同的符號。 Fig. 14 is a flowchart showing a process of generating a screen image for displaying power consumption in the fifth embodiment. However, in FIG. 14 , steps that perform the same processing as those shown in FIG. 5 are denoted by the same symbols as those in FIG. 5 .
圖14的步驟S10及S11的處理係與圖5的步驟S10及S11的處理相同。但是,圖14的步驟S11之後,處理係進至步驟S60。The processing in steps S10 and S11 in FIG. 14 is the same as the processing in steps S10 and S11 in FIG. 5 . However, after step S11 in FIG. 14, the process proceeds to step S60.
在步驟S60中,計畫管理部552係透過通訊部142,由供電系統570取得供電計畫資訊,而將該供電計畫資訊供予至預測部554。In step S60 , the plan management unit 552 obtains the power supply plan information from the
接著,預測部554係根據以來自計畫管理部552的生產計畫資訊所示之生產計畫及以供電計畫資訊所示之供電計畫,指定將來消耗電力,且將表示該將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155(S61)。接著,處理係進至步驟S13。Next, the prediction unit 554 designates future power consumption based on the production plan shown by the production plan information from the plan management unit 552 and the power supply plan shown by the power supply plan information, and displays the future power consumption The future power consumption information is supplied to the power consumption screen generation part 155 (S61). Next, the process proceeds to step S13.
圖14的步驟S13的處理係與圖5的步驟S13的處理相同。但是,圖14的步驟S13之後,處理係進至步驟S62。The processing of step S13 in FIG. 14 is the same as the processing of step S13 in FIG. 5 . However, after step S13 in FIG. 14, the process proceeds to step S62.
在步驟S62中,使用者輸入取得部153係依透過通訊部142,依是否已取得來自終端裝置110的變更部分資訊,來判斷生產計畫及供電計畫的至少任一方的內容是否已被變更。若生產計畫及供電計畫的至少任一方的內容已被變更(S62中為Yes),處理係進至步驟S63。此時,將使用者輸入取得部153透過通訊部142所取得的變更部分資訊供予至預測部554。In step S62, the user
在步驟S63中,預測部554係利用以來自使用者輸入取得部153的變更部分資訊所示之內容,變更生產計畫或供電計畫,且根據變更後的生產計畫亦即變更生產計畫或變更後的供電計畫亦即變更供電計畫,指定變更將來消耗電力。接著,預測部554係將表示所被指定的變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。接著,處理係進至步驟S16。In step S63, the prediction unit 554 changes the production plan or the power supply plan by using the content shown in the changed partial information from the user
圖14中的步驟S16的處理係與圖5中的步驟S16的處理相同。The processing of step S16 in FIG. 14 is the same as the processing of step S16 in FIG. 5 .
圖15係示出在實施形態5中,電力管理支援裝置540接受來自終端裝置110的存取,顯示消耗電力,且傳送用以變更計畫的內容的畫面的處理的流程圖。Fig. 15 is a flow chart showing the process of receiving an access from the
圖15的步驟S20~S22的處理係與圖6的步驟S20~S22的處理相同。但是,在圖15,步驟S22之後,處理係進至步驟S70。 其中,在圖15的步驟S22中所指定的可變更的內容係有包含供電計畫的一部分的情形。 The processing of steps S20 to S22 in FIG. 15 is the same as the processing in steps S20 to S22 in FIG. 6 . However, in FIG. 15, after step S22, the process proceeds to step S70. However, the changeable content specified in step S22 of FIG. 15 may include a part of the power supply plan.
在步驟S70中,計畫編輯畫面生成部557係生成在以來自計畫管理部552的生產計畫資訊所示之生產計畫之中,可僅編輯以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容、或可僅編輯以供電計畫資訊所示之供電計畫之中,以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容的計畫編輯畫面畫像,且將表示該計畫編輯畫面畫像的計畫編輯畫面畫像資訊供予至畫面送訊處理部158。接著,處理係進至步驟S24。In step S70, the plan editing screen generation unit 557 generates the production plan shown by the production plan information from the plan management unit 552, and only the changeable information from the user
圖15的步驟S24~S29的處理係與圖6的步驟S24~S29的處理相同。 但是,在圖15的步驟S25及S27中,係使用在步驟S70中所生成的計畫編輯畫面畫像。 The processing of steps S24 to S29 in FIG. 15 is the same as the processing in steps S24 to S29 in FIG. 6 . However, in steps S25 and S27 of FIG. 15 , the plan editing screen image generated in step S70 is used.
藉由實施形態5,在消耗電力的預測反映來自供電系統570的供電計畫,因此可防止生產計畫被過度重新評估。According to Embodiment 5, the power supply plan from the
實施形態6.
圖16係概略示出實施形態6之電力管理支援系統600的構成的區塊圖。
電力管理支援系統600係包括:終端裝置110、生產系統120、電力計測器130、電力管理支援裝置640、供電系統670、及評估裝置680。
Implementation form 6.
Fig. 16 is a block diagram schematically showing the configuration of a power
實施形態6之電力管理支援系統600的終端裝置110、生產系統120及電力計測器130係與實施形態1之電力管理支援系統100的終端裝置110、生產系統120及電力計測器130相同。
但是,如後所述,在實施形態6中,與實施形態5同樣地,在以由電力管理支援裝置640傳送至終端裝置110的計畫編輯畫面畫像資訊所示之計畫編輯畫面畫像及以變更計畫編輯畫面畫像資訊所示之變更計畫編輯畫面畫像中,亦可按照利用者的權限,來變更供電計畫。因此,由終端裝置110送至電力管理支援裝置640的變更部分資訊係有表示變更供電計畫的內容的情形。
The
供電系統670係與實施形態5中的供電系統570同樣地,包括蓄電池等供電設備,對生產系統120供給電力的系統。此外,實施形態6中的供電系統670係使用作為供電設備來發揮功能的蓄電池,利用者所利用的車等利用機器的利用計畫亦作為供電計畫的一部分加以保持。若未利用利用機器,而且亦未進行充電時,該利用機器所使用的蓄電池係設為可使用在生產系統120的供電者。在實施形態6中,供電系統670亦藉由按照該供電計畫來控制供電設備,進行對生產系統120的供電或蓄電。The
換言之,在實施形態6中,在供電計畫係亦包含有由利用者所利用的利用機器對生產系統供給電力的計畫。因此,利用者係可藉由控制該利用機器的利用,來變更供電計畫。In other words, in Embodiment 6, the power supply plan also includes a plan for supplying electric power to the production system by the utilization equipment used by the user. Therefore, the user can change the power supply plan by controlling the utilization of the utilization device.
電力管理支援裝置640係在電力管理支援系統600中進行電力的管理。
圖17係概略示出實施形態6中的電力管理支援裝置640的構成的區塊圖。
電力管理支援裝置640係包括:記憶部141、通訊部142、及處理部650。
實施形態6中的電力管理支援裝置640的記憶部141及通訊部142係與實施形態1中的電力管理支援裝置140的記憶部141及通訊部142相同。
The power
處理部650係執行在電力管理支援裝置640中的處理。
處理部650係包括:消耗電力取得部151、計畫管理部652、使用者輸入取得部153、預測部654、消耗電力畫面生成部155、利用者權限管理部156、計畫編輯畫面生成部657、畫面送訊處理部158、及供給實績管理部661。
The
實施形態6中的處理部650的消耗電力取得部151、使用者輸入取得部153、消耗電力畫面生成部155、利用者權限管理部156及畫面送訊處理部158係與實施形態1中的處理部150的消耗電力取得部151、使用者輸入取得部153、消耗電力畫面生成部155、利用者權限管理部156及畫面送訊處理部158相同。The power
其中,在實施形態6中,按照利用者權限管理部156所指定之以認證成功的利用者認證資訊所包含的利用者名予以識別的利用者的權限,該利用者可變更的內容係有包含供電計畫的內容的情形。尤其,在實施形態6中,係有包含變更利用機器的利用計畫的內容的情形。
此外,使用者輸入取得部153係將來自終端裝置110的變更部分資訊供予至預測部654、計畫管理部652及供給實績管理部661。
Among them, in Embodiment 6, according to the authority of the user identified by the user name included in the user authentication information of the successfully authenticated user specified by the user
計畫管理部652係除了進行與實施形態1相同的處理之外,進行以下處理。
計畫管理部652係透過通訊部142,由供電系統670取得表示供電計畫的供電計畫資訊。該供電計畫資訊係被供予至預測部654及計畫編輯畫面生成部657。
The
在此,供電計畫係設為至少表示對生產系統120進行供電的量及時刻以及對供電設備進行蓄電的量及時刻者。此外,在供電計畫係包含表示利用機器的利用時間及利用機器所使用的蓄電池的充電時間的利用計畫。Here, the power supply plan is set to indicate at least the amount and timing of power supply to the
此外,計畫管理部652係將表示變更已結束的供電計畫的變更供電計畫資訊,透過通訊部142送至供電系統670,藉此可變更供電系統670中的供電計畫。其中,變更的結束係設為利用者輸入至終端裝置110者。In addition, the
預測部654係藉由以來自計畫管理部652的生產計畫資訊所示之生產計畫,預測因生產系統120而在將來被消耗的電力,藉由以來自計畫管理部652的供電計畫資訊所示之供電計畫,將由供電系統670被供給的電力,由被預測到的電力減去,藉此指定將來消耗電力。預測部654係將表示所被指定出的將來消耗電力的將來消耗電力資訊供予至消耗電力畫面生成部155。在此被供給的電力亦包含由利用機器所使用的蓄電池被供給的電力。The
此外,預測部654若由使用者輸入取得部153收取變更部分資訊,將生產計畫或供電計畫,變更為以該變更部分資訊所示之內容。接著,預測部654係藉由變更後的生產計畫亦即變更生產計畫及變更後的供電計畫亦即變更生產計畫的至少任一方,由因生產系統120而在將來被消耗的電力,減去藉由供電系統670而在將來被供電的電力,藉此指定變更將來消耗電力。預測部654係將表示所被指定的變更將來消耗電力的變更將來消耗電力資訊供予至消耗電力畫面生成部155。在實施形態6中,利用機器的利用者藉由縮短該利用時間或取消利用,可在生產系統120使用該利用機器所使用的蓄電池的電力。In addition, if the
計畫編輯畫面生成部657係生成在以生產計畫資訊所示之生產計畫之中,僅可編輯以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容、或在以供電計畫資訊所示之供電計畫之中,僅可編輯以來自利用者權限管理部156的可變更內容資訊所示之可變更的內容的計畫編輯畫面畫像。計畫編輯畫面生成部657係將表示所生成的計畫編輯畫面畫像的計畫編輯畫面畫像資訊,供予至畫面送訊處理部158。其中,若在生產計畫中沒有以利用者認證資訊所包含的利用者名予以識別的利用者可變更的內容,計畫編輯畫面生成部657若生成表示在生產計畫中沒有可編輯的內容的計畫編輯畫面畫像即可。此外,若在供電計畫中沒有以利用者認證資訊所包含的利用者名予以識別的利用者可變更的內容,計畫編輯畫面生成部557若生成表示在供電計畫中沒有可編輯的內容的計畫編輯畫面畫像即可。The plan editing
在此,在實施形態6中,計畫編輯畫面生成部657亦可在計畫編輯畫面畫像中,編輯利用機器的利用時間。但是,關於利用機器,有其他利用者亦利用的情形,因此必須使得無法變更為對其他利用者的利用時間。Here, in Embodiment 6, the plan edit
供給實績管理部661係藉由利用者控制利用機器的利用,評估增加對生產系統120供給電力,因此管理利用者控制利用機器的利用的實績。The supply
例如,供給實績管理部661若由使用者輸入取得部153收取變更部分資訊,若該變更部分資訊為利用機器的利用時間的短縮或利用機器的取消時,將該實績,按每位已進行如上所示之變更的利用者進行合計。
在此所合計的值亦可為經短縮的時間及經取消的時間的預先設定的期間中的總計,亦可為因利用時間被短縮或取消所被供電的電力量的預先設定的期間中的總計。
此外,合計亦可按每位個人進行,亦可按每個利用者所屬組織進行。
接著,供給實績管理部661係透過通訊部142,將表示經合計的值的實績值資訊送至評估裝置680。
For example, when the supply
返回至圖16,評估裝置680係接收來自電力管理支援裝置640的實績值資訊,按照該實績值資訊,來進行利用者的評估的裝置。
圖18係概略示出評估裝置680的構成的區塊圖。
評估裝置680係包括:通訊部681、記憶部682、及控制部683。
Returning to FIG. 16 , the
通訊部681係在與連接於網路101的各種裝置之間進行通訊。
例如,通訊部681係與電力管理支援裝置640進行通訊。具體而言,通訊部681係接收來自電力管理支援裝置640的實績值資訊,將該實績值資訊供予至控制部683。
The
記憶部682係記憶評估裝置680中的處理所需資訊及程式。The
控制部683係控制在評估裝置680中的處理。
例如,控制部683係由通訊部681收取實績值資訊,按照該實績值資訊來評估利用者。例如,控制部683係依實績值資訊來決定對利用者的報酬額。在此,利用者的實績值愈大,報酬額愈大。
The
以上記載的評估裝置680亦可例如藉由圖3所示之電腦10來實現。The
例如,通訊部681係可藉由處理器11利用通訊I/F14來實現。記憶部682係可藉由處理器11利用記憶體12或輔助記憶裝置13來實現。控制部683係可將被記憶在輔助記憶裝置13的程式載入於記憶體12而在處理器11執行來實現。For example, the
其中,以上程式亦可由未圖示的記憶媒體、或透過通訊I/F14而由網路101被下載至輔助記憶裝置13,自此被載入在記憶體12上,藉由處理器11來執行。此外,亦可由記憶媒體,或者透過通訊I/F14而由網路101直接載入在記憶體12上,藉由處理器11來執行。換言之,如上所示之程式亦可例如形成為程式產品來提供。Wherein, the above program can also be downloaded to the
如以上所示,藉由實施形態6,在消耗電力的預測反映來自供電系統的供電量,因此可防止過度進行生產計畫的重新評估。 此外,不直接處理工廠內的生產設備或供電專用設備等的工廠內工作人員可協力於節電或削減尖峰用電等,來管理該實績,因此如上所示之工作人員可更積極地有助於節電。 As described above, according to Embodiment 6, the amount of power supplied from the power supply system is reflected in the prediction of power consumption, so excessive re-evaluation of the production plan can be prevented. In addition, factory workers who do not directly handle production equipment or power supply equipment in the factory can cooperate in power saving or peak power consumption reduction to manage the actual performance, so the above-mentioned workers can contribute more actively. save electricity.
在以上記載的實施形態1~6中,畫面送訊處理部158係生成編輯畫面畫像或變更減収畫面畫像而送至終端裝置110,惟實施形態1~6並非為限定於如上所示之例者。例如,畫面送訊處理部158亦可將消耗電力畫面畫像或變更消耗電力畫面畫像、及計畫編輯畫面畫像送至終端裝置110,且在終端裝置110將該等畫像編輯為一個畫面畫像來顯示。In Embodiments 1 to 6 described above, the screen
10:電腦
11:處理器
12:記憶體
13:輔助記憶裝置
14:通訊介面
100,200,300,400,500,600:電力管理支援系統
110:終端裝置
111:通訊部
112:顯示部
113:輸入部
114:記憶部
115:控制部
120,220:生產系統
130:電力計測器
140,240,340,440,540,640:電力管理支援裝置
141:記憶部
142:通訊部
150,250,350,450,550,650:處理部
151:消耗電力取得部
152,252,552,652:計畫管理部
153,353,653:使用者輸入取得部
154,254,454,554,654:預測部
155,255,355:消耗電力畫面生成部
156,256,356:利用者權限管理部
157,557,657:計畫編輯畫面生成部
158:畫面送訊處理部
359:削減實績管理部
460:關連設備管理部
661:供給實績管理部
570,670:供電系統
680:評估裝置
681:通訊部
682:記憶部
683:控制部
10: computer
11: Processor
12: Memory
13: Auxiliary memory device
14: Communication interface
100,200,300,400,500,600: Power Management Support System
110: terminal device
111: Department of Communications
112: display part
113: input part
114: memory department
115: control department
120,220: Production system
130: Electric
圖1係概略示出實施形態1~4之電力管理支援系統的構成的區塊圖。 圖2係概略示出終端裝置的構成的區塊圖。 圖3係示出電腦之一例的區塊圖。 圖4係概略示出實施形態1及5中的電力管理支援裝置的構成的區塊圖。 圖5係示出在實施形態1中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 圖6係示出在實施形態1中,電力管理支援裝置接受來自終端裝置的存取,顯示消耗電力,且傳送用以變更計畫的內容的畫面的處理的流程圖。 圖7係概略示出實施形態2中的電力管理支援裝置的構成的區塊圖。 圖8係示出在實施形態2中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 圖9係概略示出實施形態3中的電力管理支援裝置的構成的區塊圖。 圖10係示出在實施形態3中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 圖11係概略示出實施形態4中的電力管理支援裝置的構成的區塊圖。 圖12係示出在實施形態4中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 圖13係概略示出實施形態5之電力管理支援系統的構成的區塊圖。 圖14係示出在實施形態5中,生成用以顯示消耗電力的畫面畫像的處理的流程圖。 圖15係示出在實施形態5中,電力管理支援裝置接受來自終端裝置的存取,顯示消耗電力,且傳送用以變更計畫的內容的畫面的處理的流程圖。 圖16係概略示出實施形態6之電力管理支援系統的構成的區塊圖。 圖17係概略示出實施形態6中的電力管理支援裝置的構成的區塊圖。 圖18係概略示出評估裝置的構成的區塊圖。 Fig. 1 is a block diagram schematically showing the configuration of an electric power management support system according to Embodiments 1 to 4. FIG. 2 is a block diagram schematically showing the configuration of a terminal device. Fig. 3 is a block diagram showing an example of a computer. Fig. 4 is a block diagram schematically showing the configuration of the power management support device in Embodiments 1 and 5. Fig. 5 is a flowchart showing a process of generating a screen image for displaying power consumption in the first embodiment. Fig. 6 is a flowchart showing processing of the power management support device receiving access from the terminal device, displaying the power consumption, and transmitting a screen for changing the content of the plan in Embodiment 1. Fig. 7 is a block diagram schematically showing the configuration of the power management support device in the second embodiment. Fig. 8 is a flowchart showing a process of generating a screen image for displaying power consumption in the second embodiment. Fig. 9 is a block diagram schematically showing the configuration of the power management support device in the third embodiment. Fig. 10 is a flowchart showing a process of generating a screen image for displaying power consumption in the third embodiment. Fig. 11 is a block diagram schematically showing the configuration of the power management support device in the fourth embodiment. Fig. 12 is a flowchart showing a process of generating a screen image for displaying power consumption in the fourth embodiment. Fig. 13 is a block diagram schematically showing the configuration of the power management support system according to the fifth embodiment. Fig. 14 is a flowchart showing a process of generating a screen image for displaying power consumption in the fifth embodiment. Fig. 15 is a flowchart showing processing of the power management support device receiving access from a terminal device, displaying power consumption, and transmitting a screen for changing the contents of a plan in Embodiment 5. Fig. 16 is a block diagram schematically showing the configuration of the power management support system according to the sixth embodiment. Fig. 17 is a block diagram schematically showing the configuration of the power management support device in the sixth embodiment. FIG. 18 is a block diagram schematically showing the configuration of the evaluation device.
140,540:電力管理支援裝置 140,540: Power management support devices
141:記憶部 141: memory department
142:通訊部 142: Department of Communications
150,550:處理部 150,550: Processing Department
151:消耗電力取得部 151: Power Consumption Acquisition Department
152,552:計畫管理部 152,552: Program Management
153:使用者輸入取得部 153: User input acquisition unit
154,554:預測部 154,554: Forecasting Department
155:消耗電力畫面生成部 155: Power consumption screen generation unit
156:利用者權限管理部 156: User Rights Management Department
157,557:計畫編輯畫面生成部 157,557: Plan editing screen generation department
158:畫面送訊處理部 158: Screen transmission processing department
Claims (12)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
WOPCT/JP2021/047176 | 2021-12-21 | ||
PCT/JP2021/047176 WO2023119393A1 (en) | 2021-12-21 | 2021-12-21 | Power management assistance device, program, and power management assistance method |
Publications (1)
Publication Number | Publication Date |
---|---|
TW202326320A true TW202326320A (en) | 2023-07-01 |
Family
ID=86901590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW111123001A TW202326320A (en) | 2021-12-21 | 2022-06-21 | Power management assistance device, program, and power management assistance method |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP7408028B2 (en) |
CN (1) | CN118401951A (en) |
TW (1) | TW202326320A (en) |
WO (1) | WO2023119393A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116757451A (en) * | 2023-08-17 | 2023-09-15 | 青岛海瑞达网络科技有限公司 | Production energy data processing system based on intelligent analysis technology |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09179604A (en) * | 1995-09-13 | 1997-07-11 | Toshiba Corp | System and method for controlling operation of plant |
JP2006195916A (en) * | 2005-01-17 | 2006-07-27 | Hitachi Ltd | Unit requirement production method, unit requirement production device and process evaluation method |
CN102955464B (en) * | 2011-08-26 | 2015-11-11 | 欧姆龙株式会社 | Electric quantity display device and system and method |
JP6114532B2 (en) * | 2012-10-26 | 2017-04-12 | 株式会社日立製作所 | Energy management system |
JP6038085B2 (en) * | 2014-08-28 | 2016-12-07 | 横河電機株式会社 | Industrial demand response control system and industrial demand response control method |
JP6096735B2 (en) * | 2014-10-09 | 2017-03-15 | 横河電機株式会社 | Industrial demand response realization system |
JP6363556B2 (en) * | 2015-05-28 | 2018-07-25 | 株式会社日立製作所 | Energy management system |
JP6975073B2 (en) * | 2018-02-27 | 2021-12-01 | 三菱重工業株式会社 | Forecasting systems, forecasting methods, and programs |
-
2021
- 2021-12-21 WO PCT/JP2021/047176 patent/WO2023119393A1/en active Application Filing
- 2021-12-21 CN CN202180105017.1A patent/CN118401951A/en active Pending
- 2021-12-21 JP JP2023551087A patent/JP7408028B2/en active Active
-
2022
- 2022-06-21 TW TW111123001A patent/TW202326320A/en unknown
Also Published As
Publication number | Publication date |
---|---|
JP7408028B2 (en) | 2024-01-04 |
JPWO2023119393A1 (en) | 2023-06-29 |
WO2023119393A1 (en) | 2023-06-29 |
CN118401951A (en) | 2024-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6564916B2 (en) | Intelligent warehouse storage management method, apparatus, system, and unmanned intelligent warehouse storage equipment | |
CN102124623B (en) | Methods and systems for managing facility power and cooling | |
Li et al. | Integrated power management of data centers and electric vehicles for energy and regulation market participation | |
KR102037829B1 (en) | Method, apparatus and computer-readable recording medium for providing interior construciton inmformation based on scenario | |
JP2012190457A (en) | Energy display device and energy display method | |
KR101847946B1 (en) | Human resources management system and method specific project | |
JP5656921B2 (en) | Power accommodation apparatus, power accommodation system, power accommodation method and program | |
TW202326320A (en) | Power management assistance device, program, and power management assistance method | |
CN114024948B (en) | Intelligent Building Integrated Management System | |
WO2016084313A1 (en) | Power demand adjustment system, demand adjustment device, group generation device, and group generation method | |
CN102713962B (en) | Diagnosis of energy saving system | |
CN114036746A (en) | Energy data acquisition system and method based on cloud platform and computer equipment | |
JP2002023831A (en) | System for controlling machine and method for the same and recording medium | |
JP2002297832A (en) | Information processor, charge presenting program, and charge presenting method | |
JP2004274915A (en) | Power supply planning system | |
WO2018207226A1 (en) | Aggregator-side system, prosumer-side system, aggregation system, and aggregation method | |
CN115187144B (en) | Virtual power plant power flow method, device, equipment, medium and program product | |
JP4926330B2 (en) | Information processing apparatus for consulting and data processing method | |
JPWO2023119393A5 (en) | ||
US20220221206A1 (en) | Refrigerant management system and refrigerant management method | |
JP2003153441A (en) | System and method for demand power supply | |
JP6516100B2 (en) | POWER MANAGEMENT SYSTEM, POWER MANAGEMENT DEVICE, POWER MANAGEMENT METHOD, AND CONTROL PROGRAM | |
WO2017191672A1 (en) | Production planning assist device, production planning assist system, and production planning assist method | |
JP2023080725A (en) | Display processing device, management device, display processing method, management method, display processing program, and management program | |
US11262390B2 (en) | Power consumption calculation apparatus, power consumption calculation method and program |