TW201947985A - Method and device for binding data stream, computer storage medium - Google Patents

Method and device for binding data stream, computer storage medium Download PDF

Info

Publication number
TW201947985A
TW201947985A TW108115954A TW108115954A TW201947985A TW 201947985 A TW201947985 A TW 201947985A TW 108115954 A TW108115954 A TW 108115954A TW 108115954 A TW108115954 A TW 108115954A TW 201947985 A TW201947985 A TW 201947985A
Authority
TW
Taiwan
Prior art keywords
network element
message
access network
data flow
core network
Prior art date
Application number
TW108115954A
Other languages
Chinese (zh)
Inventor
劉建華
Original Assignee
大陸商Oppo廣東移動通信有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大陸商Oppo廣東移動通信有限公司 filed Critical 大陸商Oppo廣東移動通信有限公司
Publication of TW201947985A publication Critical patent/TW201947985A/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • H04W28/24Negotiating SLA [Service Level Agreement]; Negotiating QoS [Quality of Service]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection

Abstract

Embodiments of the present invention disclose a method and apparatus for binding a data stream, and a computer storage medium thereof. The method comprises an action of receiving, by a first access network element, a data flow establishment request message in a PDU session or modification request message sent by a first core network element and an action of binding by the first access network element the data stream and/or the session to be established or to be modified and/or at least one tunnel to a corresponding radio bearer in corresponding RAT according to the data flow establishment request message or the modification request message, the at least one tunnel being used to transmit data between the core network and the access network.

Description

一種綁定資料流程的方法及裝置、電腦存儲媒介Method and device for binding data flow, computer storage medium

本申請涉及無線通訊技術領域,尤其涉及一種綁定資料流程的方法及裝置、電腦存儲媒介。The present application relates to the field of wireless communication technologies, and in particular, to a method and device for binding data flow, and a computer storage medium.

參照圖1,圖1是一種現有的組網模式,其中,使用者面的路徑透過實線表示,控制面的路徑透過虛線表示,在該組網模式中,終端(UE,User Equipment)可以在同一個協定資料單元(PDU,Protocol Data Unit)會話(Session)上同時建立新空中介面(NR,New Radio)存取和長期演進(LTE,Long Term Evolution)存取,PDU Session的一部分資料流程走NR基地台(RAN node-1)與UE之間的空中介面承載,另一部分資料流程走LTE基地台(RAN node-2)與UE之間的空中介面承載。Referring to FIG. 1, FIG. 1 is an existing networking mode in which a path on a user plane is represented by a solid line and a path on a control plane is represented by a dashed line. In this networking mode, a terminal (UE, User Equipment) may be New Air Interface (NR) access and Long Term Evolution (LTE) access are established simultaneously on the same Protocol Data Unit (PDU) Session (Session). Part of the data flow of the PDU Session goes The air interface bearer between the NR base station (RAN node-1) and the UE, the other part of the data flow is carried by the air interface bearer between the LTE base station (RAN node-2) and the UE.

其中,NR基地台或LTE基地台作為控制面的錨點,與核心網側的接收核心存取和移動性管(AMF,Core Access and Mobility Management Function)和會話管理功能(SMF,Session Management Function)進行訊號交互,完成PDU會話的建立/修改/刪除等操作。Among them, the NR base station or LTE base station serves as the anchor point of the control plane, and the receiving core access and mobility management function (AMF, Core Access and Mobility Management Function) and session management function (SMF, Session Management Function) of the core network side. Perform signal interactions and complete operations such as establishing / modifying / deleting PDU sessions.

目前,RAN側的錨點僅根據自身的空中介面通道品質、服務品質(QoS,Quality of Service)滿足程度等來判斷哪些資料流程走NR對應的空中介面承載,哪些資料流程走LTE對應的空中介面承載,可控性較差。At present, the anchor point on the RAN side only judges which data flow is carried by the NR corresponding air interface and which data flow is carried by the LTE corresponding air interface based on its own air interface channel quality and quality of service (QoS) satisfaction. Carrying, poor controllability.

本申請實施例提供了一種綁定資料流程的方法及裝置、電腦存儲媒介。The embodiments of the present application provide a method and device for binding data flow, and a computer storage medium.

本申請實施例提供的綁定資料流程的方法,包括:The method for binding data flow provided in the embodiments of the present application includes:

第一存取網網元接收第一核心網網元發送的PDU會話中的資料流程的建立請求訊息或修改請求訊息;The first access network element receives a data flow establishment request message or a modification request message in a PDU session sent by the first core network element;

所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中,所述至少一個隧道用於傳輸核心網與存取網之間的資料。The first access network element binds each to-be-established or to-be-modified data flow and / or session and / or at least one tunnel to a radio bearer of a corresponding RAT according to the establishment request message or modification request message. The at least one tunnel is used for transmitting data between the core network and the access network.

在一實施方式中,所述建立請求訊息或修改請求訊息包括第一指示訊息,所述第一指示訊息包括以下至少之一:In one embodiment, the establishment request message or modification request message includes a first instruction message, and the first instruction message includes at least one of the following:

待建立或待修改的資料流程對應的資料流程指示訊息和RAT指示訊息的對應關係;The correspondence between the data flow instruction message and the RAT instruction message corresponding to the data flow to be created or modified;

至少一個隧道對應的隧道訊息和RAT指示訊息的對應關係。Correspondence between tunnel information and RAT indication message corresponding to at least one tunnel.

在一實施方式中,所述第一指示訊息還包括待建立或待修改的資料流程是否分流的指示訊息和/或上下行傳輸是否對應同一個RAT的指示訊息;In an embodiment, the first indication message further includes an indication message of whether the data flow to be established or modified is offloaded and / or an indication message of whether the uplink and downlink transmissions correspond to the same RAT;

其中,所述是否分流的指示訊息用於指示所述資料流程是否在多個RAT下傳輸。The indication message of whether to offload is used to indicate whether the data flow is transmitted under multiple RATs.

在一實施方式中,一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。In one embodiment, one data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages.

在一實施方式中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。In one embodiment, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

在一實施方式中,所述建立請求訊息或修改請求訊息包括第二指示訊息,所述第二指示訊息包括待建立或待修改的資料流程對應的資料流程指示訊息;In an embodiment, the establishment request message or modification request message includes a second instruction message, and the second instruction message includes a data process instruction message corresponding to a data process to be created or modified;

所述第一存取網網元側存儲有第一配置訊息,所述第一配置訊息包括不同的資料流程指示訊息範圍對應的RAT指示訊息。A first configuration message is stored on the network element side of the first access network, and the first configuration message includes RAT indication messages corresponding to different data flow indication message ranges.

在一實施方式中,所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中,包括:In an embodiment, the first access network element binds each data flow and / or session to be established or modified to a radio bearer of a corresponding RAT according to the establishment request message or the modification request message. , Including:

所述第一存取網網元根據所述第二指示訊息和所述第一配置訊息,確定各個待建立或待修改的資料流程對應的RAT,並將所述各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中。The first access network element determines, according to the second instruction message and the first configuration message, a RAT corresponding to each data flow to be created or to be modified, and assigns each data to be created or to be modified Processes and / or sessions are bound to radio bearers under the corresponding RAT.

在一實施方式中,所述第一配置訊息為所述第一存取網網元側靜態配置的,或者所述第一配置訊息由核心網側或網管側發送給所述第一存取網網元的。In one embodiment, the first configuration message is statically configured on the network element side of the first access network, or the first configuration message is sent to the first access network by the core network side or the network management side. Network element.

在一實施方式中,所述第二指示訊息由所述第一核心網網元基於綁定策略生成,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。In an embodiment, the second indication message is generated by the first core network element based on a binding policy, and the binding policy includes at least one of the following: each attribute information of a data flow, a PDU session, and a RAT. Correspondence, an indication message of whether the multi-connection function is supported, and an indication message of whether to trigger the multi-connection function, wherein the attribute information includes at least one of the following: a packet characteristic message, and an application id.

在一實施方式中,所述綁定策略存儲在簽約訊息中,在終端執行註冊或PDU會話建立時,所述第一核心網網元接收所述簽約訊息,從所述簽約訊息中獲取所述綁定策略。In one embodiment, the binding policy is stored in a subscription message. When the terminal performs registration or a PDU session is established, the first core network element receives the subscription message and obtains the subscription message from the subscription message. Binding strategy.

在一實施方式中,在簽約訊息中配置DNN和/或S-NSSAI對應的RAT,以使所述第一核心網網元根據所述簽約訊息確定基於所述DNN和/或S-NSSAI建立或修改的PDU會話對應的RAT,所述第一核心網網元向所述第一存取網網元發送的建立請求訊息或修改請求訊息中攜帶第三指示訊息,所述第三指示訊息用於指示所述PDU會話對應的RAT。In an implementation manner, a RAT corresponding to DNN and / or S-NSSAI is configured in the subscription message, so that the first core network element determines, based on the subscription message, to establish or The RAT corresponding to the modified PDU session, the establishment request message or modification request message sent by the first core network element to the first access network element carries a third instruction message, and the third instruction message is used for Indicates the RAT corresponding to the PDU session.

在一實施方式中,所述待建立或待修改的資料流程和/或至少一個隧道與對應的RAT下的無線承載的綁定操作,透過以下方式觸發:第二核心網網元向所述第一核心網網元發送第一請求訊息。In an embodiment, the data flow to be established or modified and / or the binding operation of at least one tunnel to a radio bearer under the corresponding RAT is triggered in the following manner: the second core network element sends the A core network element sends a first request message.

在一實施方式中,所述第一請求訊息由協力廠商伺服器發送給所述第二核心網網元,由所述第二核心網網元轉發給所述第一核心網網元。In one embodiment, the first request message is sent by the third-party server to the second core network element, and the second core network element is forwarded to the first core network element.

在一實施方式中,所述方法還包括:In an embodiment, the method further includes:

終端發送第二請求訊息給所述第一核心網網元或第二核心網網元;和/或,協力廠商伺服器發送第二請求訊息給所述第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。The terminal sends a second request message to the first core network element or the second core network element; and / or, a third-party server sends a second request message to the first core network element or the second core network. For the network element, the second request message includes a binding policy, and the binding policy includes at least one of the following: information on each attribute of the data flow, the correspondence between the PDU session and the RAT, an indication message of whether the multi-connection function is supported, An indication message of whether to trigger multi-connection, wherein the attribute information includes at least one of the following: a packet characteristic message and an Application ID.

在一實施方式中,所述綁定策略由網路側發送給所述終端。In one embodiment, the binding policy is sent by the network side to the terminal.

在一實施方式中,所述方法還包括:In an embodiment, the method further includes:

所述第一存取網網元將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中後,向所述第一核心網網元發送確認訊息。The first access network element binds each to-be-established or to-be-modified data flow and / or session and / or at least one tunnel to a radio bearer of a corresponding RAT, and then sends the data flow to the first core network. Yuan sends a confirmation message.

在一實施方式中,所述方法還包括:In an embodiment, the method further includes:

所述第一存取網網元接收所述第一核心網網元發送的第四指示訊息,基於所述第四指示訊息確定是否開啟多連接功能;或者,Receiving, by the first access network element, a fourth instruction message sent by the first core network element, and determining whether to enable the multi-connection function based on the fourth instruction message; or

所述第一存取網網元接收所述第一核心網網元發送的至少兩個隧道訊息的情況下,所述第一存取網網元確定開啟多連接功能。When the first access network element receives at least two tunnel messages sent by the first core network element, the first access network element determines to enable the multi-connection function.

在一實施方式中,所述第四指示訊息還用於指示多連接中的各存取網網網元的類型。In one embodiment, the fourth instruction message is further used to indicate the type of each access network network element in the multi-connection.

在一實施方式中,當有N個隧道訊息和所述第四指示訊息發送給所述第一存取網網元時,為每一個存取網網元分別建立一個隧道進行資料傳輸,N≥2。In one embodiment, when there are N tunnel messages and the fourth indication message sent to the first access network element, a tunnel is set up for each access network element for data transmission, N≥ 2.

在一實施方式中,所述多連接功能至少包括雙連接功能。In one embodiment, the multi-connection function includes at least a dual-connection function.

在一實施方式中,所述雙連接功能為第一雙連接功能或第二雙連接功能;In one embodiment, the dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

本申請實施例提供的綁定資料流程的方法,包括:The method for binding data flow provided in the embodiments of the present application includes:

終端發送第二請求訊息給第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。The terminal sends a second request message to the first core network element or the second core network element. The second request message includes a binding policy, and the binding policy includes at least one of the following: each attribute information of the data flow. , The correspondence between the PDU session and the RAT, an indication message of whether the multi-connection function is supported, or an indication message of whether the multi-connection function is triggered, wherein the attribute information includes at least one of the following: a packet characteristic message, and an application id.

在一實施方式中,所述多連接功能至少包括雙連接功能。In one embodiment, the multi-connection function includes at least a dual-connection function.

在一實施方式中,所述多連接功能至少包括雙連接功能。In one embodiment, the multi-connection function includes at least a dual-connection function.

在一實施方式中,所述雙連接功能為第一雙連接功能或第二雙連接功能;In one embodiment, the dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

在一實施方式中,所述第二請求訊息包括會話建立請求訊息或會話修改請求訊息。In one embodiment, the second request message includes a session establishment request message or a session modification request message.

在一實施方式中,所述終端發送的所述第二請求訊息包括一種綁定關係,所述一種綁定關係用於指示將建立和/或修改的資料流程和/或會話綁定到一個存取網網元。In an implementation manner, the second request message sent by the terminal includes a binding relationship, and the binding relationship is used to indicate that the established and / or modified data flow and / or session is bound to a storage Get network NEs.

在一實施方式中,所述終端發送的所述第二請求訊息包括一種對應關係,所述一種對應關係用於指示一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。In an embodiment, the second request message sent by the terminal includes a correspondence relationship, and the correspondence relationship is used to indicate that a data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages.

在一實施方式中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息In one embodiment, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

本申請實施例提供的綁定資料流程的方法,包括:The method for binding data flow provided in the embodiments of the present application includes:

終端發送第二請求訊息給第一核心網網元或第二核心網網元,其中,當所述終端發送多次第二請求訊息時,不同的第二請求訊息所建立和/或修改的資料流程和/或會話需綁定到不同的存取網網元上進行傳輸。The terminal sends a second request message to the first core network element or the second core network element, and when the terminal sends the second request message multiple times, data created and / or modified by different second request messages Processes and / or sessions need to be bound to different access network elements for transmission.

本申請實施例提供的綁定資料流程的裝置,包括:The apparatus for binding data flow provided in the embodiment of the present application includes:

接收單元,用於接收第一核心網網元發送的PDU會話中的資料流程的建立請求訊息或修改請求訊息;A receiving unit, configured to receive a setup request message or a modification request message for a data flow in a PDU session sent by a first core network element;

綁定單元,用於根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中,所述至少一個隧道用於傳輸核心網與存取網之間的資料。A binding unit is configured to bind each data flow and / or session to be established or modified and / or at least one tunnel to a radio bearer of a corresponding RAT according to the establishment request message or the modification request message. The at least one tunnel is used to transmit data between the core network and the access network.

在一實施方式中,所述建立請求訊息或修改請求訊息包括第一指示訊息,所述第一指示訊息包括以下至少之一:In one embodiment, the establishment request message or modification request message includes a first instruction message, and the first instruction message includes at least one of the following:

待建立或待修改的資料流程對應的資料流程指示訊息和RAT指示訊息的對應關係;The correspondence between the data flow instruction message and the RAT instruction message corresponding to the data flow to be created or modified;

至少一個隧道對應的隧道訊息和RAT指示訊息的對應關係。Correspondence between tunnel information and RAT indication message corresponding to at least one tunnel.

在一實施方式中,所述第一指示訊息還包括待建立或待修改的資料流程是否分流的指示訊息和/或上下行傳輸是否對應同一個RAT的指示訊息;In an embodiment, the first indication message further includes an indication message of whether the data flow to be established or modified is offloaded and / or an indication message of whether the uplink and downlink transmissions correspond to the same RAT;

其中,所述是否分流的指示訊息用於指示所述資料流程是否在多個RAT下傳輸。The indication message of whether to offload is used to indicate whether the data flow is transmitted under multiple RATs.

在一實施方式中,一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。In one embodiment, one data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages.

在一實施方式中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。In one embodiment, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

在一實施方式中,所述建立請求訊息或修改請求訊息包括第二指示訊息,所述第二指示訊息包括待建立或待修改的資料流程對應的資料流程指示訊息;In an embodiment, the establishment request message or modification request message includes a second instruction message, and the second instruction message includes a data process instruction message corresponding to a data process to be created or modified;

所述裝置還包括:存儲單元,用於存儲第一配置訊息,所述第一配置訊息包括不同的資料流程指示訊息範圍對應的RAT指示訊息。The device further includes a storage unit for storing a first configuration message, where the first configuration message includes a RAT indication message corresponding to a different data flow indication message range.

在一實施方式中,所述綁定單元,用於根據所述第二指示訊息和所述第一配置訊息,確定各個待建立或待修改的資料流程對應的RAT,並將所述各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中。In an embodiment, the binding unit is configured to determine, according to the second instruction message and the first configuration message, a RAT corresponding to each data flow to be established or to be modified, and Or the data flow and / or session to be modified are bound to the radio bearer under the corresponding RAT.

在一實施方式中,所述第一配置訊息為所述第一存取網網元側靜態配置的,或者所述第一配置訊息由核心網側或網管側發送給所述第一存取網網元的。In one embodiment, the first configuration message is statically configured on the network element side of the first access network, or the first configuration message is sent to the first access network by the core network side or the network management side. Network element.

在一實施方式中,所述第二指示訊息由所述第一核心網網元基於綁定策略生成,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。In an embodiment, the second indication message is generated by the first core network element based on a binding policy, and the binding policy includes at least one of the following: each attribute information of a data flow, a PDU session, and a RAT. Correspondence, an indication message of whether the multi-connection function is supported, and an indication message of whether to trigger the multi-connection function, wherein the attribute information includes at least one of the following: a packet characteristic message, and an application id.

在一實施方式中,所述綁定策略存儲在簽約訊息中,在終端執行註冊或PDU會話建立時,所述第一核心網網元接收所述簽約訊息,從所述簽約訊息中獲取所述綁定策略。In one embodiment, the binding policy is stored in a subscription message. When the terminal performs registration or a PDU session is established, the first core network element receives the subscription message and obtains the subscription message from the subscription message. Binding strategy.

在一實施方式中,在簽約訊息中配置DNN和/或S-NSSAI對應的RAT,以使所述第一核心網網元根據所述簽約訊息確定基於所述DNN和/或S-NSSAI建立或修改的PDU會話對應的RAT,所述第一核心網網元向所述第一存取網網元發送的建立請求訊息或修改請求訊息中攜帶第三指示訊息,所述第三指示訊息用於指示所述PDU會話對應的RAT。In an implementation manner, a RAT corresponding to DNN and / or S-NSSAI is configured in the subscription message, so that the first core network element determines, based on the subscription message, to establish or The RAT corresponding to the modified PDU session, the establishment request message or modification request message sent by the first core network element to the first access network element carries a third instruction message, and the third instruction message is used for Indicates the RAT corresponding to the PDU session.

在一實施方式中,所述待建立或待修改的資料流程和/或至少一個隧道與對應的RAT下的無線承載的綁定操作,透過以下方式觸發:第二核心網網元向所述第一核心網網元發送第一請求訊息。In an embodiment, the data flow to be established or modified and / or the binding operation of at least one tunnel to a radio bearer under the corresponding RAT is triggered in the following manner: the second core network element sends the A core network element sends a first request message.

在一實施方式中,所述第一請求訊息由協力廠商伺服器發送給所述第二核心網網元,由所述第二核心網網元轉發給所述第一核心網網元。In one embodiment, the first request message is sent by the third-party server to the second core network element, and the second core network element is forwarded to the first core network element.

在一實施方式中,終端發送第二請求訊息給所述第一核心網網元或第二核心網網元;和/或,協力廠商伺服器發送第二請求訊息給所述第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。In an embodiment, the terminal sends a second request message to the first core network element or the second core network element; and / or, a third-party server sends a second request message to the first core network element. Element or a second core network element, the second request message includes a binding policy, and the binding policy includes at least one of the following: the attribute information of the data flow, the correspondence between the PDU session and the RAT, An indication message of a connection function and an indication message of whether to trigger multi-connection. The attribute message includes at least one of the following: a packet characteristic message and an Application ID.

在一實施方式中,所述綁定策略由網路側發送給所述終端。In one embodiment, the binding policy is sent by the network side to the terminal.

在一實施方式中,所述裝置還包括:In an embodiment, the device further includes:

發送單元,用於向所述第一核心網網元發送確認訊息。A sending unit, configured to send a confirmation message to the first core network element.

在一實施方式中,所述接收單元,還用於接收所述第一核心網網元發送的第四指示訊息,基於所述第四指示訊息確定是否開啟多連接功能;或者,接收所述第一核心網網元發送的至少兩個隧道訊息的情況下,確定開啟多連接功能。In an embodiment, the receiving unit is further configured to receive a fourth instruction message sent by the first core network element, and determine whether to enable the multi-connection function based on the fourth instruction message; or, receive the first In the case of at least two tunnel messages sent by a core network element, it is determined to enable the multi-connection function.

在一實施方式中,所述第四指示訊息還用於指示多連接中的各存取網網網元的類型。In one embodiment, the fourth instruction message is further used to indicate the type of each access network network element in the multi-connection.

在一實施方式中,當有N個隧道訊息和所述第四指示訊息發送給所述第一存取網網元時,為每一個存取網網元分別建立一個隧道進行資料傳輸,N≥2。In one embodiment, when there are N tunnel messages and the fourth indication message sent to the first access network element, a tunnel is set up for each access network element for data transmission, N≥ 2.

在一實施方式中,所述多連接功能至少包括雙連接功能。In one embodiment, the multi-connection function includes at least a dual-connection function.

在一實施方式中,所述雙連接功能為第一雙連接功能或第二雙連接功能;In one embodiment, the dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

本申請實施例提供的綁定資料流程的裝置,包括:The apparatus for binding data flow provided in the embodiment of the present application includes:

發送單元,用於發送第二請求訊息給第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。The sending unit is configured to send a second request message to the first core network element or the second core network element. The second request message includes a binding policy, and the binding policy includes at least one of the following: a data flow. Each attribute message, the corresponding relationship between the PDU session and the RAT, the indication message of whether the multi-connection function is supported, the indication message of whether the multi-connection is triggered, etc., wherein the attribute message includes at least one of the following: a packet characteristic message, and an application id.

在一實施方式中,所述多連接功能至少包括雙連接功能。In one embodiment, the multi-connection function includes at least a dual-connection function.

在一實施方式中,所述雙連接功能為第一雙連接功能或第二雙連接功能;In one embodiment, the dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

在一實施方式中,所述第二請求訊息包括會話建立請求訊息或會話修改請求訊息。In one embodiment, the second request message includes a session establishment request message or a session modification request message.

在一實施方式中,所述終端發送的所述第二請求訊息包括一種綁定關係,所述一種綁定關係用於指示將建立和/或修改的資料流程和/或會話綁定到一個存取網網元。In an implementation manner, the second request message sent by the terminal includes a binding relationship, and the binding relationship is used to indicate that the established and / or modified data flow and / or session is bound to a storage Get network NEs.

在一實施方式中,所述終端發送的所述第二請求訊息包括一種對應關係,所述一種對應關係用於指示一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。In an embodiment, the second request message sent by the terminal includes a correspondence relationship, and the correspondence relationship is used to indicate that a data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages.

在一實施方式中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。In one embodiment, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

本申請實施例提供的綁定資料流程的裝置,包括:The apparatus for binding data flow provided in the embodiment of the present application includes:

發送單元,用於發送第二請求訊息給第一核心網網元或第二核心網網元,其中,當所述發送多次第二請求訊息時,不同的第二請求訊息所建立和/或修改的資料流程和/或會話需綁定到不同的存取網網元上進行傳輸。A sending unit, configured to send a second request message to a first core network element or a second core network element, wherein when the second request message is sent multiple times, different second request messages are established and / or The modified data flow and / or session need to be bound to different access network elements for transmission.

本申請實施例提供的電腦存儲媒介,其上存儲有電腦可執行指令,該電腦可執行指令被處理器執行時實現上述的綁定資料流程的方法。The computer storage medium provided in the embodiment of the present application stores computer-executable instructions. The computer-executable instructions are implemented by the processor to implement the foregoing method for binding data.

本申請實施例的技術方案中,第一存取網網元接收第一核心網網元發送的PDU會話中的資料流程的建立請求訊息或修改請求訊息;所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中。採用本申請實施例的技術方案,控制資料流程對於RAT的選擇,RAN側的錨點可以根據其他網元發送的指示訊息來確定PDU會話中的各資料流程(也即QoS flow)如何映射到空中介面的承載(DRB)上。In the technical solution of the embodiment of the present application, the first access network element receives the data flow establishment request message or the modification request message in the PDU session sent by the first core network element; the first access network element is based on The establishment request message or the modification request message binds each data flow and / or session to be established or modified to a radio bearer of a corresponding RAT. With the technical solution of the embodiment of the present application, the selection of the RAT by the data flow is controlled, and the anchor on the RAN side can determine how each data flow (ie, QoS flow) in the PDU session is mapped to the air according to the instruction message sent by other network elements. Interface Bearer (DRB).

為了能夠更加詳盡地瞭解本申請實施例的特點與技術內容,下麵結合附圖對本申請實施例的實現進行詳細闡述,所附附圖僅供參考說明之用,並非用來限定本申請實施例。In order to understand the features and technical contents of the embodiments of the present application in more detail, the implementation of the embodiments of the present application will be described in detail with reference to the accompanying drawings. The attached drawings are for reference only and are not intended to limit the embodiments of the present application.

圖2為本申請實施例的綁定資料流程的方法的流程示意圖一,如圖2所示,所述綁定資料流程的方法包括以下步驟:FIG. 2 is a first schematic flowchart of a method for binding data flow according to an embodiment of the present application. As shown in FIG. 2, the method for binding data flow includes the following steps:

步驟201:第一存取網網元接收第一核心網網元發送的PDU會話中的資料流程的建立請求訊息或修改請求訊息。Step 201: The first access network element receives a data flow establishment request message or a modification request message in a PDU session sent by the first core network element.

本申請實施例中,第一存取網網元為RAN側的錨點,例如圖1中的NR基地台或者LTE基地台。第一核心網網元為SMF。以下涉及到的第二核心網網元為PCF。In the embodiment of the present application, the first access network element is an anchor point on the RAN side, such as the NR base station or the LTE base station in FIG. 1. The first core network element is SMF. The second core network element referred to below is a PCF.

RAN側根據核心網側發送的PDU會話中的資料流程的建立/修改請求訊息,來選擇在特定的RAT下建立無線承載。The RAN side chooses to establish a radio bearer under a specific RAT according to the establishment / modification request message of the data flow in the PDU session sent by the core network side.

步驟202:所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中,所述至少一個隧道用於傳輸核心網與存取網之間的資料。Step 202: The first access network element binds each data flow and / or session to be established or modified and / or at least one tunnel to the corresponding RAT according to the establishment request message or the modification request message. In the wireless bearer, the at least one tunnel is used to transmit data between the core network and the access network.

本申請實施例中,所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中,可以分為如下幾種情況:In the embodiment of the present application, the first access network element binds each to-be-created or to-be-modified data flow and / or session to a radio bearer of a corresponding RAT according to the establishment request message or modification request message. , Can be divided into the following situations:

情況一:參照圖3,所述建立請求訊息或修改請求訊息包括第一指示訊息,所述第一指示訊息包括以下至少之一:Case 1: Referring to FIG. 3, the establishment request message or modification request message includes a first instruction message, and the first instruction message includes at least one of the following:

待建立或待修改的資料流程對應的資料流程指示訊息和RAT指示訊息的對應關係;The correspondence between the data flow instruction message and the RAT instruction message corresponding to the data flow to be created or modified;

至少一個隧道對應的隧道訊息和RAT指示訊息的對應關係。Correspondence between tunnel information and RAT indication message corresponding to at least one tunnel.

進一步,所述第一指示訊息還包括待建立或待修改的資料流程是否分流的指示訊息和/或上下行傳輸是否對應同一個RAT的指示訊息。其中,所述是否分流的指示訊息用於指示所述資料流程是否在多個RAT下傳輸。Further, the first indication message further includes an indication message of whether the data flow to be established or modified is offloaded and / or an indication message of whether the uplink and downlink transmissions correspond to the same RAT. The indication message of whether to offload is used to indicate whether the data flow is transmitted under multiple RATs.

例如:資料流程分流的指示訊息的表示:在核心網跑的資料流程在RAN側一部分對應NR基地台,一部分對應LTE基地台。For example, the indication of the data flow shunting indication message: the data flow running in the core network corresponds to a part of the NR base station on the RAN side and a part of the LTE base station.

這裡,一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。Here, one data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages. When one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

具體地,SMF向RAN側發送第一指示訊息,所述第一指示訊息包括待建立/修改的資料流程的清單以及對應的RAT。RAN側根據SMF發送的第一指示訊息來綁定資料流程或整個PDU會話到不同的RAT下的無線承載中。Specifically, the SMF sends a first instruction message to the RAN side, where the first instruction message includes a list of data flows to be created / modified and a corresponding RAT. The RAN side binds the data flow or the entire PDU session to radio bearers under different RATs according to the first instruction message sent by the SMF.

RAT可以是如下存取類型:NR存取、LTE存取、WLAN存取、3GPP存取、非3GPP存取、衛星存取等等。RAT can be the following access types: NR access, LTE access, WLAN access, 3GPP access, non-3GPP access, satellite access, and so on.

以下透過表1來對第一指示訊息進行舉例,其中,QFI取值表示資料流程指示訊息,RAT選擇表示RAT指示訊息。The following uses Table 1 to exemplify the first instruction message. The QFI value indicates the data flow instruction message, and the RAT selection indicates the RAT instruction message.

QFI取值 RAT選擇 是否做split承載 是否上下行均為同一個RAT

表 1
QFI value RAT chooses whether to split the bearer, whether the uplink and downlink are the same RAT

Table 1

此外,第一指示訊息還包括待建立或待修改的資料流程是否分流的指示訊息和/或上下行傳輸是否對應同一個RAT的指示訊息,如表1所示,是否做split承載表示是否分流的指示訊息,是否上下行均為同一個RAT表示上下行傳輸是否對應同一個RAT的指示訊息。In addition, the first indication message also includes an indication message whether the data flow to be established or modified is offloaded and / or an indication message whether the uplink and downlink transmissions correspond to the same RAT. As shown in Table 1, whether a split bearer is performed indicates whether the offload The indication message, whether the uplink and downlink are the same RAT, indicates whether the uplink and downlink transmission corresponds to the same RAT.

應理解,是否做Split承載是指:下行資料流程全都發給RAN側的錨點,然後由RAN側的錨點分別轉發給指定的RAT。例如,RAN側的錨點為NR基地台,資料流程需要承載在LTE空中介面的承載上,在做Split承載時,核心網的資料流程都發送給NR基地台,然後NR基地台把需要在LTE上傳輸的資料流程轉發給LTE基地台;反之,如果不做split承載,核心網會把資料流程直接發送給LTE基地台,不需要經過NR基地台的轉發。It should be understood that whether the split bearer is performed means that all downlink data processes are sent to the anchor point on the RAN side, and then the anchor point on the RAN side is forwarded to the designated RAT respectively. For example, the anchor point on the RAN side is the NR base station. The data flow needs to be carried on the bearer of the LTE air interface. When the split bearer is performed, the data flow of the core network is sent to the NR base station. The data flow transmitted on the network is forwarded to the LTE base station. On the contrary, if the split bearer is not performed, the core network will directly send the data flow to the LTE base station without forwarding by the NR base station.

此外,RAT選擇可以是一個優先順序列表,如表1中的QFI=1對應的RAT選擇所示,第一優選存取LTE、第二選擇存取NR,表示優先存取LTE,LTE存取失敗或者出現其他狀況時,才存取到NR。In addition, the RAT selection can be a priority list. As shown in the RAT selection corresponding to QFI = 1 in Table 1, the first preferred access to LTE and the second access to NR indicate priority access to LTE, and LTE access failure. Or access to NR only when other conditions occur.

情況二:參照圖4,所述建立請求訊息或修改請求訊息包括第二指示訊息,所述第二指示訊息包括待建立或待修改的資料流程對應的資料流程指示訊息;所述第一存取網網元側存儲有第一配置訊息,所述第一配置訊息包括不同的資料流程指示訊息範圍對應的RAT指示訊息。Case 2: Referring to FIG. 4, the establishment request message or modification request message includes a second instruction message, and the second instruction message includes a data flow instruction message corresponding to a data flow to be created or modified; the first access The network element side of the network stores a first configuration message, where the first configuration message includes RAT indication messages corresponding to different data flow indication message ranges.

這種情況,所述第一存取網網元根據所述第二指示訊息和所述第一配置訊息,確定各個待建立或待修改的資料流程對應的RAT,並將所述各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中。In this case, the first access network element determines, according to the second instruction message and the first configuration message, a RAT corresponding to each data flow to be created or modified, and The data flow and / or session to be modified are bound to the radio bearer under the corresponding RAT.

在一實施方式中,所述第一配置訊息為所述第一存取網網元側靜態配置的,或者所述第一配置訊息由核心網側或網管側發送給所述第一存取網網元的。In one embodiment, the first configuration message is statically configured on the network element side of the first access network, or the first configuration message is sent to the first access network by the core network side or the network management side. Network element.

在一實施方式中,所述第二指示訊息由所述第一核心網網元基於綁定策略生成,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。進一步,所述綁定策略存儲在簽約訊息中,在終端執行註冊或PDU會話建立時,所述第一核心網網元接收所述簽約訊息,從所述簽約訊息中獲取所述綁定策略。這裡,是否支援觸發雙連接功能的指示訊息是指:終端是否具備雙連接的能力。In an embodiment, the second indication message is generated by the first core network element based on a binding policy, and the binding policy includes at least one of the following: each attribute information of a data flow, a PDU session, and a RAT. Correspondence, an indication message of whether the multi-connection function is supported, and an indication message of whether to trigger the multi-connection function, wherein the attribute information includes at least one of the following: a packet characteristic message, and an application id. Further, the binding policy is stored in a subscription message, and when the terminal performs registration or a PDU session establishment, the first core network element receives the subscription message and obtains the binding policy from the subscription message. Here, the indication message of whether the dual-connection triggering function is supported refers to: whether the terminal has dual-connection capability.

具體地,RAN側接收到SMF發送的資料流程建立/修改請求後,根據QFI的取值以及QFI取值範圍對應的RAT來將不同的資料流程的無線承載建立在不同的RAT下。這裡,QFI取值範圍與RAT的對應關係靜態配置在RAN側或之前由核心網/網管發送給RAN,即類似表1的映射關係預先配置在RAN側,不需要每次PDU會話的資料流程建立/修改時進行改動。Specifically, after receiving the data flow establishment / modification request sent by the SMF, the RAN side establishes radio bearers of different data flows under different RATs according to the QFI value and the RAT corresponding to the QFI value range. Here, the corresponding relationship between the QFI value range and the RAT is statically configured on the RAN side or previously sent by the core network / network management to the RAN, that is, the mapping relationship similar to Table 1 is pre-configured on the RAN side, and there is no need to establish the data flow of each PDU session. / Make changes when modifying.

進一步,QFI的取值由SMF生成,可以根據表2所示的綁定策略來生成。具體地,SMF/PCF網元根據如表2所示的綁定策略,當滿足觸發條件時觸發將不同的資料流程的無線承載建立在不同的RAT下。

表 2
Further, the value of QFI is generated by SMF, and can be generated according to the binding strategy shown in Table 2. Specifically, the SMF / PCF network element triggers the establishment of radio bearers of different data flows under different RATs when the triggering conditions are met according to the binding policy shown in Table 2.

Table 2

其中,資料包特徵訊息包括以下一項或多項:URL、SNI(Server Name Indicator)、IP源位址、IP源埠號、IP目的地址、IP目的埠號、MAC源位址、IP源埠號、MAC目的地址、MAC目的埠號、協定類型、和VLAN標籤等。在表2中的左側的全部訊息(本申請實施例稱為資料流程的屬性訊息)最終都會對應到一個資料流程上,每個資料流程有自己的QFI(QoS Flow Id)。The packet characteristic information includes one or more of the following: URL, SNI (Server Name Indicator), IP source address, IP source port number, IP destination address, IP destination port number, MAC source address, IP source port number , MAC destination address, MAC destination port number, protocol type, and VLAN tag. All the messages on the left in Table 2 (referred to as the attribute information of the data flow in the embodiment of this application) will eventually correspond to a data flow, and each data flow has its own QFI (QoS Flow Id).

情況三:在簽約訊息中配置DNN和/或S-NSSAI對應的RAT,以使所述第一核心網網元根據所述簽約訊息確定基於所述DNN和/或S-NSSAI建立或修改的PDU會話對應的RAT,所述第一核心網網元向所述第一存取網網元發送的建立請求訊息或修改請求訊息中攜帶第三指示訊息,所述第三指示訊息用於指示所述PDU會話對應的RAT。Case 3: The DRAT and / or S-NSSAI corresponding RAT is configured in the contract message, so that the first core network element determines the PDU established or modified based on the DNN and / or S-NSSAI according to the contract message. The RAT corresponding to the session, the establishment request message or modification request message sent by the first core network element to the first access network element carries a third instruction message, and the third instruction message is used to indicate the The RAT corresponding to the PDU session.

具體地,在簽約訊息中配置DNN和/或S-NSSAI對應的RAT類型,後續SMF上根據該DNN和/或S-NSSAI建立/修改的PDU會話只能選擇指定的RAT類型,包括NR、LTE、NR和LTE等,SMF在建立/修改PDU會話請求時,只攜帶該PDU會話對應的RAT類型。Specifically, the RAT type corresponding to the DNN and / or S-NSSAI is configured in the contract message, and the PDU session established / modified on the subsequent SMF according to the DNN and / or S-NSSAI can only select the specified RAT type, including NR, LTE , NR, LTE, and so on, when the SMF establishes / modifies a PDU session request, it only carries the RAT type corresponding to the PDU session.

在一實施方式中,所述待建立或待修改的資料流程和/或至少一個隧道與對應的RAT下的無線承載的綁定操作,透過以下方式觸發:第二核心網網元向所述第一核心網網元發送第一請求訊息。進一步,所述第一請求訊息由協力廠商伺服器發送給所述第二核心網網元,由所述第二核心網網元轉發給所述第一核心網網元。In an embodiment, the data flow to be established or modified and / or the binding operation of at least one tunnel to a radio bearer under the corresponding RAT is triggered in the following manner: the second core network element sends the A core network element sends a first request message. Further, the first request message is sent by a third-party server to the second core network element, and the second core network element is forwarded to the first core network element.

此外,第一核心網網元或第二核心網網元,可以透過以下方式獲取綁定策略:終端發送第二請求訊息給所述第一核心網網元或第二核心網網元;和/或,協力廠商伺服器發送第二請求訊息給所述第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。這裡,是否支援觸發雙連接功能的指示訊息是指:終端是否具備雙連接的能力。In addition, the first core network element or the second core network element may obtain a binding policy in the following manner: the terminal sends a second request message to the first core network element or the second core network element; and / Or, the third-party server sends a second request message to the first core network element or the second core network element, the second request message includes a binding policy, and the binding policy includes at least one of the following : The attribute information of the data flow, the correspondence between the PDU session and the RAT, the indication message of whether the multi-connection function is supported, the indication message of whether the multi-connection is triggered, etc., wherein the attribute message includes at least one of the following: a packet characteristic message, Application id. Here, the indication message of whether the dual-connection triggering function is supported refers to: whether the terminal has the dual-connection capability.

這裡,綁定策略可存儲在簽約訊息中,在UE執行註冊或PDU會話建立時發送給核心網網元(如SMF)。所述綁定策略由網路側發送給所述終端。Here, the binding policy may be stored in a subscription message and sent to the core network element (such as SMF) when the UE performs registration or PDU session establishment. The binding policy is sent by the network side to the terminal.

具體地,UE透過NAS訊息向PCF/SMF發送請求資料流程綁定訊息和/或協力廠商OTT伺服器向PCF/SMF發送請求資料流程綁定訊息,該請求資料流程綁定訊息中包括表2所示的綁定策略。Specifically, the UE sends a request data flow binding message to the PCF / SMF through the NAS message and / or the third-party OTT server sends a request data flow binding message to the PCF / SMF. The request data flow binding message includes the information in Table 2. The binding strategy shown below.

本申請實施例中,所述第一存取網網元將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中後,向所述第一核心網網元發送確認訊息。In the embodiment of the present application, the first access network element binds each to-be-established or to-be-modified data flow and / or session and / or at least one tunnel to a radio bearer of a corresponding RAT, and sends the The first core network element sends a confirmation message.

本申請實施例中,除了上述將各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中以外,還可以將至少一個隧道綁定到對應的RAT下的無線承載中,進一步,所述第一存取網網元接收所述第一核心網網元發送的第四指示訊息,基於所述第四指示訊息確定是否開啟多連接功能(顯示的方式確定是否開啟雙連接功能);或者,所述第一存取網網元接收所述第一核心網網元發送的至少兩個隧道訊息的情況下,所述第一存取網網元確定開啟多連接功能(隱式的方式確定是否開啟雙連接功能)。In the embodiment of the present application, in addition to binding each of the data processes and / or sessions to be established or modified to the radio bearer of the corresponding RAT, at least one tunnel may be bound to the radio of the corresponding RAT. In the bearer, further, the first access network element receives a fourth instruction message sent by the first core network element, and determines whether to enable the multi-connection function based on the fourth instruction message (the display manner determines whether to enable the multi-connection function. Dual connection function); or when the first access network element receives at least two tunnel messages sent by the first core network element, the first access network element determines to enable the multi-connection function (The implicit method determines whether the dual connection function is turned on).

在一實施方式中,所述第四指示訊息還用於指示多連接中的各存取網網網元的類型。In one embodiment, the fourth instruction message is further used to indicate the type of each access network network element in the multi-connection.

以雙連接為例,所述第四指示訊息指示第一存取網網元的類型為NR基地台,第二存取網網元的類型為LTE基地台,或者,所述第四指示訊息指示第二存取網網元的類型為NR基地台,第一存取網網元的類型為LTE基地台,或者,所述第四指示訊息指示第一存取網網元和第二存取網網元的類型都是NR基地台,或者,所述第四指示訊息指示第一存取網網元和第二存取網網元的類型都是LTE基地台。Taking dual connectivity as an example, the fourth instruction message indicates that the type of the first access network element is an NR base station, and the type of the second access network element is an LTE base station, or the fourth instruction message indicates The type of the second access network element is an NR base station, and the type of the first access network element is an LTE base station, or the fourth instruction message indicates the first access network element and the second access network. The types of the network elements are all NR base stations, or the fourth indication message indicates that the types of the first access network element and the second access network element are both LTE base stations.

在一實施方式中,當有N個隧道訊息和所述第四指示訊息發送給所述第一存取網網元時,為每一個存取網網元分別建立一個隧道進行資料傳輸,N≥2。In one embodiment, when there are N tunnel messages and the fourth indication message sent to the first access network element, a tunnel is set up for each access network element for data transmission, N≥ 2.

這裡,存取網網元側需要建立與核心網的介面,如果有多個隧道訊息,那麼,多連接中的每個存取網網元都需要建立一個隧道進行資料傳輸。Here, the access network element side needs to establish an interface with the core network. If there are multiple tunnel messages, each access network element in the multi-connection needs to establish a tunnel for data transmission.

上述方案中涉及到的所述多連接功能至少包括雙連接功能。The multi-connection function involved in the above solution includes at least a dual-connection function.

這裡,所述雙連接功能為第一雙連接功能或第二雙連接功能;其中,Here, the dual connection function is a first dual connection function or a second dual connection function; wherein,

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

舉個例子,在PDU會話建立和/或修改流程中,核心網網元(SMF)可向存取網網元提供一個或多個核心網側的隧道訊息(CN Tunnel Info),即N3 Tunnel訊息,N3 Tunnel訊息指向N3 Tunnel位址,進一步,每一個CN Tunnel Info對應的一個RAT,即該CN Tunnel Info指示的隧道所傳輸的資料透過特定的RAT無線存取進行傳輸。進一步,核心網向存取網指示是否觸發雙連接(DC,Dual Connectivity)的功能,包括如下兩種DC形式:For example, during the PDU session establishment and / or modification process, the core network element (SMF) can provide one or more core network side tunnel information (CN Tunnel Info) to the access network element, that is, N3 Tunnel message The N3 Tunnel message points to the N3 Tunnel address. Further, each CN Tunnel Info corresponds to a RAT, that is, the data transmitted by the tunnel indicated by the CN Tunnel Info is transmitted through a specific RAT wireless access. Further, the core network indicates to the access network whether to trigger dual connectivity (DC, Dual Connectivity) function, including the following two forms of DC:

DC-1:參照圖5(a),一個或多個UPF分別連接RAN Node-1和RAN Node-2。DC-1: Referring to FIG. 5 (a), one or more UPFs are respectively connected to RAN Node-1 and RAN Node-2.

DC-2:參照圖5(b),一個或多個UPF都只連接RAN Node-1,透過RAN Node-2的資料是由RAN Node-1經過Xn介面提供的。DC-2: Referring to Figure 5 (b), one or more UPFs are only connected to RAN Node-1. The data through RAN Node-2 is provided by RAN Node-1 through the Xn interface.

圖6為本申請實施例的綁定資料流程的方法的流程示意圖二,如圖6所示,所述綁定資料流程的方法包括以下步驟:FIG. 6 is a second flowchart of a method for binding data flow according to an embodiment of the present application. As shown in FIG. 6, the method for binding data flow includes the following steps:

步驟601:UE向SMF/UPF發送PDU會話建立/修改請求訊息,可選地,PDU會話建立/修改請求訊息中增加有資料包特徵描述訊息/Application id以及相應的RAT選擇(類似表2所示的綁定策略)。Step 601: The UE sends a PDU session establishment / modification request message to the SMF / UPF. Optionally, the PDU session establishment / modification request message adds a packet characteristic description message / Application id and a corresponding RAT selection (similar to that shown in Table 2). Binding strategy).

步驟602:2a.SMF和PCF交互過程中,PCF可配置表2所示的綁定策略;和/或,2b. SMF與UDM交互,透過簽約訊息來獲取DNN/NSSAI對應的RAT選擇策略。Step 602: 2a. During the interaction between the SMF and the PCF, the PCF may configure the binding strategy shown in Table 2; and / or, 2b. The SMF interacts with the UDM to obtain the RAT selection strategy corresponding to the DNN / NSSAI through the contract message.

步驟603:SMF觸發PDU會話建立/修改請求。Step 603: The SMF triggers a PDU session establishment / modification request.

3a. 如果步驟401中的PDU會話建立/修改請求訊息中攜帶了RAT選擇要求(也即綁定策略),則立即出發此請求。3a. If the PDU session establishment / modification request message in step 401 carries a RAT selection requirement (that is, a binding policy), the request is immediately initiated.

3b. 如果後續某一種應用資料流產生,則SMF根據步驟602中配置的綁定策略或RAT選擇策略來觸發此請求。3b. If a subsequent application data stream is generated, the SMF triggers the request according to the binding policy or RAT selection policy configured in step 602.

這裡,SMF在發送給RAN側的請求訊息中增加表1所示的指示訊息;或根據靜態配置規則確定QFI的取值然後發送給RAN側。Here, the SMF adds the indication message shown in Table 1 to the request message sent to the RAN side; or determines the value of QFI according to the static configuration rule and then sends it to the RAN side.

步驟604:RAN按照RAT指示參數或QFI取值來進行無線承載的建立。Step 604: The RAN establishes a radio bearer according to a RAT indication parameter or a QFI value.

步驟605:RAN向SMF/UPF發送回復訊息。Step 605: The RAN sends a reply message to the SMF / UPF.

圖7為本申請實施例的綁定資料流程的方法的流程示意圖三,如圖7所示,所述綁定資料流程的方法包括以下步驟:FIG. 7 is a third flowchart of a method for binding data flow according to an embodiment of the present application. As shown in FIG. 7, the method for binding data flow includes the following steps:

步驟701:終端發送第二請求訊息給第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。Step 701: The terminal sends a second request message to the first core network element or the second core network element. The second request message includes a binding policy, and the binding policy includes at least one of the following: Each attribute message, the correspondence between the PDU session and the RAT, an indication message of whether the multi-connection function is supported, or an indication message of whether the multi-connection is triggered, wherein the attribute message includes at least one of the following: a packet characteristic message, and an application id.

在一實施方式中,所述多連接功能至少包括雙連接功能。In one embodiment, the multi-connection function includes at least a dual-connection function.

所述雙連接功能為第一雙連接功能或第二雙連接功能;The dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

這裡,所述第二請求訊息包括會話建立請求訊息或會話修改請求訊息。Here, the second request message includes a session establishment request message or a session modification request message.

在一實施方式中,所述終端發送的所述第二請求訊息包括一種綁定關係,所述一種綁定關係用於指示將建立和/或修改的資料流程和/或會話綁定到一個存取網網元。例如:終端第一次會話建立的資料流程全部透過RAT-1進行傳輸,終端發起第二次第二請求訊息時,將本次新建立的資料流程全部透過RAT-2進行傳輸。In an implementation manner, the second request message sent by the terminal includes a binding relationship, and the binding relationship is used to indicate that the established and / or modified data flow and / or session is bound to a storage Get network NEs. For example, the data flow for the first session establishment of the terminal is transmitted through RAT-1, and when the terminal initiates the second second request message, the newly established data flow is transmitted through RAT-2.

在一實施方式中,所述終端發送的所述第二請求訊息包括一種對應關係,所述一種對應關係用於指示一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。進一步,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。In an embodiment, the second request message sent by the terminal includes a correspondence relationship, and the correspondence relationship is used to indicate that a data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages. Further, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

而後,存取網側和核心網側的流程可參照圖5所示的綁定資料流程的方法的描述以及圖2所示的綁定資料流程的方法的描述進行理解,不再贅述。Then, the processes on the access network side and the core network side can be understood by referring to the description of the method of binding data flow shown in FIG. 5 and the description of the method of binding data flow shown in FIG.

以上方式是終端透過第二請求訊息顯示的指示需要建立和/或修改的資料流程和/或會話應該綁定到哪個存取網網元。不局限於此,終端還可以透過隱式的方式來確定需要建立和/或修改的資料流程和/或會話應該綁定到哪個存取網網元,具體地,終端發送第二請求訊息給第一核心網網元或第二核心網網元,其中,當所述終端發送多次第二請求訊息時,不同的第二請求訊息所建立和/或修改的資料流程和/或會話需綁定到不同的存取網網元上進行傳輸。例如,終端第一次發送第二請求訊息,此次建立和/或修改的資料流程和/或會話綁定到RAT-1進行傳輸;終端第二次發送第二請求訊息,此次建立和/或修改的資料流程和/或會話綁定到RAT-2進行傳輸。The above method is the data flow and / or session to which the terminal indicates through the second request message to indicate which access network element should be bound to. Not limited to this, the terminal may also determine in an implicit way to which access network element the data flow and / or session to be established and / or modified should be bound. Specifically, the terminal sends a second request message to the first A core network element or a second core network element, wherein when the terminal sends the second request message multiple times, the data flow and / or session created and / or modified by different second request messages need to be bound Transfer to different access network elements. For example, the terminal sends the second request message for the first time, and the data flow and / or session established and / or modified this time are bound to RAT-1 for transmission; the terminal sends the second request message for the second time, and the establishment and / or Or the modified data flow and / or session is bound to RAT-2 for transmission.

圖8為本申請實施例的綁定資料流程的裝置的結構組成示意圖一,如圖8所示,所述裝置包括:FIG. 8 is a first schematic structural diagram of a device for binding data flow according to an embodiment of the present application. As shown in FIG. 8, the device includes:

接收單元801,用於接收第一核心網網元發送的PDU會話中的資料流程的建立請求訊息或修改請求訊息;A receiving unit 801, configured to receive a setup request message or a modification request message for a data flow in a PDU session sent by a first core network element;

綁定單元802,用於根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中,所述至少一個隧道用於傳輸核心網與存取網之間的資料。A binding unit 802, configured to bind each data flow and / or session to be established or modified and / or at least one tunnel to a radio bearer of a corresponding RAT according to the establishment request message or the modification request message, The at least one tunnel is used for transmitting data between the core network and the access network.

在一實施方式中,所述建立請求訊息或修改請求訊息包括第一指示訊息,所述第一指示訊息包括以下至少之一:In one embodiment, the establishment request message or modification request message includes a first instruction message, and the first instruction message includes at least one of the following:

待建立或待修改的資料流程對應的資料流程指示訊息和RAT指示訊息的對應關係;The correspondence between the data flow instruction message and the RAT instruction message corresponding to the data flow to be created or modified;

至少一個隧道對應的隧道訊息和RAT指示訊息的對應關係。Correspondence between tunnel information and RAT indication message corresponding to at least one tunnel.

在一實施方式中,所述第一指示訊息還包括待建立或待修改的資料流程是否分流的指示訊息和/或上下行傳輸是否對應同一個RAT的指示訊息;In an embodiment, the first indication message further includes an indication message of whether the data flow to be established or modified is offloaded and / or an indication message of whether the uplink and downlink transmissions correspond to the same RAT;

其中,所述是否分流的指示訊息用於指示所述資料流程是否在多個RAT下傳輸。The indication message of whether to offload is used to indicate whether the data flow is transmitted under multiple RATs.

在一實施方式中,一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。In one embodiment, one data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages.

在一實施方式中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。In one embodiment, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

在一實施方式中,所述建立請求訊息或修改請求訊息包括第二指示訊息,所述第二指示訊息包括待建立或待修改的資料流程對應的資料流程指示訊息;In an embodiment, the establishment request message or modification request message includes a second instruction message, and the second instruction message includes a data process instruction message corresponding to a data process to be created or modified;

所述裝置還包括:存儲單元803,用於存儲第一配置訊息,所述第一配置訊息包括不同的資料流程指示訊息範圍對應的RAT指示訊息。The device further includes: a storage unit 803, configured to store a first configuration message, where the first configuration message includes RAT indication messages corresponding to different data flow indication message ranges.

在一實施方式中,所述綁定單元802,用於根據所述第二指示訊息和所述第一配置訊息,確定各個待建立或待修改的資料流程對應的RAT,並將所述各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中。In an embodiment, the binding unit 802 is configured to determine, according to the second instruction message and the first configuration message, a RAT corresponding to each data flow to be established or to be modified, and The data flow and / or session to be established or to be modified are bound to the radio bearer under the corresponding RAT.

在一實施方式中,所述第一配置訊息為所述第一存取網網元側靜態配置的,或者所述第一配置訊息由核心網側或網管側發送給所述第一存取網網元的。In one embodiment, the first configuration message is statically configured on the network element side of the first access network, or the first configuration message is sent to the first access network by the core network side or the network management side. Network element.

在一實施方式中,所述第二指示訊息由所述第一核心網網元基於綁定策略生成,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。In an embodiment, the second indication message is generated by the first core network element based on a binding policy, and the binding policy includes at least one of the following: each attribute information of a data flow, a PDU session, and a RAT. Correspondence, an indication message of whether the multi-connection function is supported, and an indication message of whether to trigger the multi-connection function, wherein the attribute information includes at least one of the following: a packet characteristic message, and an application id.

在一實施方式中,所述綁定策略存儲在簽約訊息中,在終端執行註冊或PDU會話建立時,所述第一核心網網元接收所述簽約訊息,從所述簽約訊息中獲取所述綁定策略。In one embodiment, the binding policy is stored in a subscription message. When the terminal performs registration or a PDU session is established, the first core network element receives the subscription message and obtains the subscription message from the subscription message. Binding strategy.

在一實施方式中,在簽約訊息中配置DNN和/或S-NSSAI對應的RAT,以使所述第一核心網網元根據所述簽約訊息確定基於所述DNN和/或S-NSSAI建立或修改的PDU會話對應的RAT,所述第一核心網網元向所述第一存取網網元發送的建立請求訊息或修改請求訊息中攜帶第三指示訊息,所述第三指示訊息用於指示所述PDU會話對應的RAT。In an implementation manner, a RAT corresponding to DNN and / or S-NSSAI is configured in the subscription message, so that the first core network element determines, based on the subscription message, to establish or The RAT corresponding to the modified PDU session, the establishment request message or modification request message sent by the first core network element to the first access network element carries a third instruction message, and the third instruction message is used for Indicates the RAT corresponding to the PDU session.

在一實施方式中,所述待建立或待修改的資料流程和/或至少一個隧道與對應的RAT下的無線承載的綁定操作,透過以下方式觸發:第二核心網網元向所述第一核心網網元發送第一請求訊息。In an embodiment, the data flow to be established or modified and / or the binding operation of at least one tunnel to a radio bearer under the corresponding RAT is triggered in the following manner: the second core network element sends the A core network element sends a first request message.

在一實施方式中,所述第一請求訊息由協力廠商伺服器發送給所述第二核心網網元,由所述第二核心網網元轉發給所述第一核心網網元。In one embodiment, the first request message is sent by the third-party server to the second core network element, and the second core network element is forwarded to the first core network element.

在一實施方式中,終端發送第二請求訊息給所述第一核心網網元或第二核心網網元;和/或,協力廠商伺服器發送第二請求訊息給所述第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。In an embodiment, the terminal sends a second request message to the first core network element or the second core network element; and / or, a third-party server sends a second request message to the first core network element. Element or a second core network element, the second request message includes a binding policy, and the binding policy includes at least one of the following: the attribute information of the data flow, the correspondence between the PDU session and the RAT, An indication message of a connection function and an indication message of whether to trigger multi-connection. The attribute message includes at least one of the following: a packet characteristic message and an Application ID.

在一實施方式中,所述綁定策略由網路側發送給所述終端。In one embodiment, the binding policy is sent by the network side to the terminal.

在一實施方式中,所述裝置還包括:In an embodiment, the device further includes:

發送單元804,用於向所述第一核心網網元發送確認訊息。The sending unit 804 is configured to send a confirmation message to the first core network element.

在一實施方式中,所述接收單元801,還用於接收所述第一核心網網元發送的第四指示訊息,基於所述第四指示訊息確定是否開啟多連接功能;或者,接收所述第一核心網網元發送的至少兩個隧道訊息的情況下,確定開啟多連接功能。In an embodiment, the receiving unit 801 is further configured to receive a fourth instruction message sent by the first core network element, and determine whether to enable the multi-connection function based on the fourth instruction message; or, receive the In the case of at least two tunnel messages sent by the first core network element, it is determined to enable the multi-connection function.

在一實施方式中所述第四指示訊息還用於指示多連接中的各存取網網網元的類型。In an implementation manner, the fourth instruction message is further used to indicate the type of each access network network element in the multi-connection.

在一實施方式中,當有N個隧道訊息和所述第四指示訊息發送給所述第一存取網網元時,為每一個存取網網元分別建立一個隧道進行資料傳輸,N≥2。In one embodiment, when there are N tunnel messages and the fourth indication message sent to the first access network element, a tunnel is set up for each access network element for data transmission, N≥ 2.

在一實施方式中,所述多連接功能至少包括雙連接功能。進一步,所述雙連接功能為第一雙連接功能或第二雙連接功能;In one embodiment, the multi-connection function includes at least a dual-connection function. Further, the dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

本領域技術人員應當理解,圖8所示的綁定資料流程的裝置中的各單元的實現功能可參照前述綁定資料流程的方法的相關描述而理解。圖8所示的綁定資料流程的裝置中的各單元的功能可透過運行於處理器上的程式而實現,也可透過具體的邏輯電路而實現。Those skilled in the art should understand that the implementation function of each unit in the apparatus for binding data flow shown in FIG. 8 can be understood by referring to the related description of the foregoing method for binding data flow. The functions of the units in the device for binding data flow shown in FIG. 8 can be realized through programs running on the processor, and can also be realized through specific logic circuits.

圖9為本申請實施例的綁定資料流程的裝置的結構組成示意圖二,如圖9所示,所述裝置包括:發送單元901。FIG. 9 is a second schematic diagram of the structure and composition of the device for binding data flow according to the embodiment of the present application. As shown in FIG. 9, the device includes: a sending unit 901.

在一實施方式中,所述發送單元901,用於發送第二請求訊息給第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。In an embodiment, the sending unit 901 is configured to send a second request message to a first core network element or a second core network element, and the second request message includes a binding policy, and the binding The policy includes at least one of the following: the attribute information of the data flow, the correspondence between the PDU session and the RAT, the indication message of whether to support the multi-connection function, and the indication message of whether to trigger the multi-connection, wherein the attribute message includes at least one of the following : Packet characteristic message, Application id.

在一實施方式中,所述多連接功能至少包括雙連接功能。進一步,所述雙連接功能為第一雙連接功能或第二雙連接功能;In one embodiment, the multi-connection function includes at least a dual-connection function. Further, the dual connection function is a first dual connection function or a second dual connection function;

所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸;The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element;

所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling.

進一步,所述第二請求訊息包括會話建立請求訊息或會話修改請求訊息。Further, the second request message includes a session establishment request message or a session modification request message.

進一步,所述終端發送的所述第二請求訊息包括一種綁定關係,所述一種綁定關係用於指示將建立和/或修改的資料流程和/或會話綁定到一個存取網網元。Further, the second request message sent by the terminal includes a binding relationship, and the binding relationship is used to indicate that the established and / or modified data flow and / or session is bound to an access network element .

上述方案中,所述終端發送的所述第二請求訊息包括一種對應關係,所述一種對應關係用於指示一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。進一步,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。In the above solution, the second request message sent by the terminal includes a correspondence relationship, and the correspondence relationship is used to indicate that a data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages. Further, when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message.

在另一實施方式中,所述發送單元901,用於發送第二請求訊息給第一核心網網元或第二核心網網元,其中,當所述發送多次第二請求訊息時,不同的第二請求訊息所建立和/或修改的資料流程和/或會話需綁定到不同的存取網網元上進行傳輸。In another implementation manner, the sending unit 901 is configured to send a second request message to a first core network element or a second core network element, wherein when the second request message is sent multiple times, it is different The data flow and / or session established and / or modified by the second request message of the user needs to be bound to different access network elements for transmission.

本領域技術人員應當理解,圖9所示的綁定資料流程的裝置中的各單元的實現功能可參照前述綁定資料流程的方法的相關描述而理解。圖9所示的綁定資料流程的裝置中的各單元的功能可透過運行於處理器上的程式而實現,也可透過具體的邏輯電路而實現。Those skilled in the art should understand that the implementation function of each unit in the apparatus for binding data flow shown in FIG. 9 can be understood by referring to the related description of the foregoing method for binding data flow. The functions of the units in the device for binding data flow shown in FIG. 9 can be realized through programs running on the processor, and can also be realized through specific logic circuits.

本申請實施例上述綁定資料流程的裝置如果以軟體功能模組的形式實現並作為獨立的產品銷售或使用時,也可以存儲在一個電腦可讀取存儲媒介中。基於這樣的理解,本申請實施例的技術方案本質上或者說對現有技術做出貢獻的部分可以以軟體產品的形式體現出來,該電腦軟體產品存儲在一個存儲媒介中,包括若干指令用以使得一台電腦設備(可以是個人電腦、伺服器、或者網路設備等)執行本申請各個實施例所述方法的全部或部分。而前述的存儲媒介包括:隨身碟、移動硬碟、唯讀記憶體(ROM,Read Only Memory)、磁碟或者光碟等各種可以存儲程式碼的媒介。這樣,本申請實施例不限制於任何特定的硬體和軟體結合。If the device for binding data flow in the embodiment of the present application is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium. Based on such an understanding, the technical solutions of the embodiments of the present application that are essentially or contribute to the existing technology can be embodied in the form of software products. The computer software product is stored in a storage medium and includes several instructions to make A computer device (which may be a personal computer, a server, or a network device) executes all or part of the methods described in the embodiments of the present application. The aforementioned storage media include: various types of media that can store program codes, such as a flash drive, a removable hard disk, a read only memory (ROM, Read Only Memory), a magnetic disk, or an optical disk. In this way, the embodiments of the present application are not limited to any specific combination of hardware and software.

相應地,本申請實施例還提供一種電腦存儲媒介,其中存儲有電腦可執行指令,該電腦可執行指令被處理器執行時實現本申請實施例的上述綁定資料流程的方法。Correspondingly, an embodiment of the present application further provides a computer storage medium in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, the method for implementing the foregoing data binding process in the embodiment of the present application is provided.

圖10為本申請實施例的電腦設備的結構組成示意圖,該電腦設備可以是終端,也可以是網路設備。如圖10所示,電腦設備100可以包括一個或多個(圖中僅示出一個)處理器1002(處理器1002可以包括但不限於微處理器(MCU,Micro Controller Unit)或可程式設計邏輯器件(FPGA,Field Programmable Gate Array)等的處理裝置)、用於存儲資料的記憶體1004、以及用於通訊功能的傳輸裝置1006。本領域普通技術人員可以理解,圖10所示的結構僅為示意,其並不對上述電子裝置的結構造成限定。例如,電腦設備100還可包括比圖10中所示更多或者更少的元件,或者具有與圖10所示不同的配置。FIG. 10 is a schematic structural composition diagram of a computer device according to an embodiment of the present application. The computer device may be a terminal or a network device. As shown in FIG. 10, the computer device 100 may include one or more (only one shown in the figure) a processor 1002 (the processor 1002 may include but is not limited to a microprocessor (MCU, Micro Controller Unit) or programmable logic Processing devices such as devices (FPGA, Field Programmable Gate Array), memory 1004 for storing data, and transmission device 1006 for communication functions. A person of ordinary skill in the art can understand that the structure shown in FIG. 10 is only for illustration, and does not limit the structure of the electronic device. For example, the computer device 100 may further include more or fewer elements than those shown in FIG. 10, or have a different configuration from that shown in FIG. 10.

記憶體1004可用於存儲應用軟體的軟體程式以及模組,如本申請實施例中的方法對應的程式指令/模組,處理器1002透過運行存儲在記憶體1004內的軟體程式以及模組,從而執行各種功能應用以及資料處理,即實現上述的方法。記憶體1004可包括高速隨機記憶體,還可包括非揮發性記憶體,如一個或者多個磁性存儲裝置、快閃記憶體、或者其他非揮發性固態記憶體。在一些實例中,記憶體1004可進一步包括相對於處理器1002遠端設置的記憶體,這些遠端存放器可以透過網路連接至電腦設備100。上述網路的實例包括但不限於互聯網、企業內部網、局域網、移動通訊網及其組合。The memory 1004 can be used to store software programs and modules of application software, such as program instructions / modules corresponding to the methods in the embodiments of the present application. The processor 1002 runs the software programs and modules stored in the memory 1004, thereby Perform various functional applications and data processing, that is, to achieve the above method. The memory 1004 may include high-speed random access memory, and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 1004 may further include memory remotely disposed relative to the processor 1002, and these remote storages may be connected to the computer device 100 through a network. Examples of the above network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

傳輸裝置1006用於經由一個網路接收或者發送資料。上述的網路具體實例可包括電腦設備100的通訊供應商提供的無線網路。在一個實例中,傳輸裝置1006包括一個網路介面卡(NIC,Network Interface Controller),其可透過基地台與其他網路設備相連從而可與互聯網進行通訊。在一個實例中,傳輸裝置1006可以為射頻(RF,Radio Frequency)模組,其用於透過無線方式與互聯網進行通訊。The transmission device 1006 is used for receiving or transmitting data via a network. The above specific examples of the network may include a wireless network provided by a communication provider of the computer device 100. In an example, the transmission device 1006 includes a network interface card (NIC), which can be connected to other network devices through the base station to communicate with the Internet. In one example, the transmission device 1006 may be a radio frequency (RF) module, which is used to communicate with the Internet in a wireless manner.

本申請實施例所記載的技術方案之間,在不衝突的情況下,可以任意組合。The technical solutions described in the embodiments of the present application can be arbitrarily combined without conflict.

在本申請所提供的幾個實施例中,應該理解到,所揭露的方法和智慧設備,可以透過其它的方式實現。以上所描述的設備實施例僅僅是示意性的,例如,所述單元的劃分,僅僅為一種邏輯功能劃分,實際實現時可以有另外的劃分方式,如:多個單元或元件可以結合,或可以集成到另一個系統,或一些特徵可以忽略,或不執行。另外,所顯示或討論的各組成部分相互之間的耦合、或直接耦合、或通訊連接可以是透過一些介面,設備或單元的間接耦合或通訊連接,可以是電性的、機械的或其它形式的。In the several embodiments provided in this application, it should be understood that the disclosed method and smart device may be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. In actual implementation, there may be another division manner. For example, multiple units or elements may be combined or may be combined. Integration into another system, or some features can be ignored or not implemented. In addition, the coupling or direct coupling or communication connection between the components shown or discussed can be through some interfaces, indirect coupling or communication connection of the device or unit, and can be electrical, mechanical or other forms of.

上述作為分離部件說明的單元可以是、或也可以不是實體上分開的,作為單元顯示的部件可以是、或也可以不是實體單元,即可以位於一個地方,也可以分佈到多個網路單元上;可以根據實際的需要選擇其中的部分或全部單元來實現本實施例方案的目的。The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, which may be located in one place or distributed to multiple network units. ; Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of this embodiment.

另外,在本申請各實施例中的各功能單元可以全部集成在一個第二處理單元中,也可以是各單元分別單獨作為一個單元,也可以兩個或兩個以上單元集成在一個單元中;上述集成的單元既可以採用硬體的形式實現,也可以採用硬體加軟體功能單元的形式實現。In addition, each functional unit in each embodiment of the present application may be integrated into a second processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into a unit; The above integrated unit may be implemented in the form of hardware, or in the form of hardware plus software functional units.

以上所述,僅為本申請的具體實施方式,但本申請的保護範圍並不局限於此,任何熟悉本技術領域的技術人員在本申請揭露的技術範圍內,可輕易想到變化或替換,都應涵蓋在本申請的保護範圍之內。The above is only a specific implementation of this application, but the scope of protection of this application is not limited to this. Any person skilled in the art can easily think of changes or replacements within the technical scope disclosed in this application. It should be covered by the protection scope of this application.

201、202、601、602、603、604、605、701‧‧‧步驟201, 202, 601, 602, 603, 604, 605, 701‧‧‧ steps

801‧‧‧接收單元 801‧‧‧Receiving unit

802‧‧‧綁定單元 802‧‧‧Binding Unit

803‧‧‧存儲單元 803‧‧‧Storage Unit

804、901‧‧‧發送單元 804, 901‧‧‧ sending unit

100‧‧‧電腦設備 100‧‧‧Computer equipment

1002‧‧‧處理器 1002‧‧‧Processor

1004‧‧‧記憶體 1004‧‧‧Memory

1006‧‧‧傳輸裝置 1006‧‧‧Transmission device

此處所說明的附圖用來提供對本申請的進一步理解,構成本申請的一部分,本申請的示意性實施例及其說明用於解釋本申請,並不構成對本申請的不當限定。在附圖中:The drawings described here are used to provide a further understanding of the present application and constitute a part of the present application. The schematic embodiments of the present application and the description thereof are used to explain the present application, and do not constitute an improper limitation on the present application. In the drawings:

圖1是一種現有的組網模式;FIG. 1 is an existing networking mode;

圖2為本申請實施例的綁定資料流程的方法的流程示意圖一;FIG. 2 is a first schematic flowchart of a method for binding a data flow according to an embodiment of the present application; FIG.

圖3為本申請實施例的綁定資料流程的情況一對應的示意圖;FIG. 3 is a schematic diagram of a case-one correspondence of a data binding process according to an embodiment of the present application; FIG.

圖4為本申請實施例的綁定資料流程的情況二對應的示意圖;FIG. 4 is a schematic diagram corresponding to case 2 of a data binding process according to an embodiment of the present application; FIG.

圖5(a)為本申請實施例的DC架構的示意圖一;5 (a) is a first schematic diagram of a DC architecture according to an embodiment of the present application;

圖5(b)為本申請實施例的DC架構的示意圖二;5 (b) is a second schematic diagram of a DC architecture according to an embodiment of the present application;

圖6為本申請實施例的綁定資料流程的方法的流程示意圖二;6 is a second schematic flowchart of a method for binding data flow according to an embodiment of the present application;

圖7為本申請實施例的綁定資料流程的方法的流程示意圖三;FIG. 7 is a third flowchart of a method for binding data flow according to an embodiment of the present application;

圖8為本申請實施例的綁定資料流程的裝置的結構組成示意圖一;FIG. 8 is a first schematic diagram of the structure and composition of an apparatus for binding data according to an embodiment of the present application; FIG.

圖9為本申請實施例的綁定資料流程的裝置的結構組成示意圖二FIG. 9 is a schematic diagram of the structure and composition of a device for binding data according to an embodiment of the present application.

圖10為本申請實施例的電腦設備的結構組成示意圖。FIG. 10 is a schematic structural diagram of a computer device according to an embodiment of the present application.

Claims (25)

一種綁定資料流程的方法,所述方法包括: 第一存取網網元接收第一核心網網元發送的PDU會話中的資料流程的建立請求訊息或修改請求訊息; 所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中,所述至少一個隧道用於傳輸核心網與存取網之間的資料。A method for binding data flow, the method includes: The first access network element receives a data flow establishment request message or a modification request message in a PDU session sent by the first core network element; The first access network element binds each to-be-established or to-be-modified data flow and / or session and / or at least one tunnel to a radio bearer of a corresponding RAT according to the establishment request message or modification request message. The at least one tunnel is used for transmitting data between the core network and the access network. 根據申請專利範圍第1項所述的方法,其中,所述建立請求訊息或修改請求訊息包括第一指示訊息,所述第一指示訊息包括以下至少之一: 待建立或待修改的資料流程對應的資料流程指示訊息和RAT指示訊息的對應關係; 至少一個隧道對應的隧道訊息和RAT指示訊息的對應關係。The method according to item 1 of the scope of patent application, wherein the establishment request message or modification request message includes a first instruction message, and the first instruction message includes at least one of the following: The correspondence between the data flow instruction message and the RAT instruction message corresponding to the data flow to be created or modified; Correspondence between tunnel information and RAT indication message corresponding to at least one tunnel. 根據申請專利範圍第2項所述的方法,其中,所述第一指示訊息還包括待建立或待修改的資料流程是否分流的指示訊息和/或上下行傳輸是否對應同一個RAT的指示訊息; 其中,所述是否分流的指示訊息用於指示所述資料流程是否在多個RAT下傳輸。The method according to item 2 of the scope of patent application, wherein the first indication message further includes an indication message of whether the data flow to be established or modified is offloaded and / or an indication message of whether uplink and downlink transmissions correspond to the same RAT; The indication message of whether to offload is used to indicate whether the data flow is transmitted under multiple RATs. 根據申請專利範圍第2項或第3項所述的方法,其中,一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。The method according to item 2 or item 3 of the patent application scope, wherein one data flow and / or tunnel corresponds to one RAT indication message or multiple RAT indication messages. 根據申請專利範圍第4項所述的方法,其中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。The method according to item 4 of the scope of patent application, wherein when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message. 根據申請專利範圍第1項所述的方法,其中,所述建立請求訊息或修改請求訊息包括第二指示訊息,所述第二指示訊息包括待建立或待修改的資料流程對應的資料流程指示訊息; 所述第一存取網網元側存儲有第一配置訊息,所述第一配置訊息包括不同的資料流程指示訊息範圍對應的RAT指示訊息。The method according to item 1 of the scope of patent application, wherein the establishment request message or modification request message includes a second instruction message, and the second instruction message includes a data flow instruction message corresponding to a data flow to be created or modified ; A first configuration message is stored on the network element side of the first access network, and the first configuration message includes RAT indication messages corresponding to different data flow indication message ranges. 根據申請專利範圍第6項所述的方法,其中,所述第一存取網網元根據所述建立請求訊息或修改請求訊息,將各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中,包括: 所述第一存取網網元根據所述第二指示訊息和所述第一配置訊息,確定各個待建立或待修改的資料流程對應的RAT,並將所述各個待建立或待修改的資料流程和/或會話綁定到對應的RAT下的無線承載中。The method according to item 6 of the scope of patent application, wherein the first access network element binds each to-be-created or to-be-modified data flow and / or session according to the establishment request message or modification request message. The radio bearers under the corresponding RAT include: The first access network element determines, according to the second instruction message and the first configuration message, a RAT corresponding to each data flow to be created or to be modified, and assigns each data to be created or to be modified Processes and / or sessions are bound to radio bearers under the corresponding RAT. 根據申請專利範圍第6項或第7項所述的方法,其中,所述第一配置訊息為所述第一存取網網元側靜態配置的,或者所述第一配置訊息由核心網側或網管側發送給所述第一存取網網元的。The method according to item 6 or item 7 of the patent application scope, wherein the first configuration message is statically configured on the network element side of the first access network, or the first configuration message is configured by the core network side Or sent by the network management side to the network element of the first access network. 根據申請專利範圍第6項至第7項任一項所述的方法,其中,所述第二指示訊息由所述第一核心網網元基於綁定策略生成,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。The method according to any one of items 6 to 7 of the scope of patent application, wherein the second indication message is generated by the first core network element based on a binding policy, and the binding policy includes at least the following One: the attribute information of the data flow, the correspondence between the PDU session and the RAT, the indication message of whether the multi-connection function is supported, and the indication message of whether the multi-connection is triggered, wherein the attribute message includes at least one of the following: packet characteristics Message, Application id. 根據申請專利範圍第9項所述的方法,其中,所述綁定策略存儲在簽約訊息中,在終端執行註冊或PDU會話建立時,所述第一核心網網元接收所述簽約訊息,從所述簽約訊息中獲取所述綁定策略。The method according to item 9 of the scope of patent application, wherein the binding policy is stored in a contract message, and when the terminal performs registration or PDU session establishment, the first core network element receives the contract message from Obtaining the binding policy from the signing message. 根據申請專利範圍第1-3項或第5-7項或第10項中任一項所述的方法,其中,在簽約訊息中配置DNN和/或S-NSSAI對應的RAT,以使所述第一核心網網元根據所述簽約訊息確定基於所述DNN和/或S-NSSAI建立或修改的PDU會話對應的RAT,所述第一核心網網元向所述第一存取網網元發送的建立請求訊息或修改請求訊息中攜帶第三指示訊息,所述第三指示訊息用於指示所述PDU會話對應的RAT。The method according to any one of items 1-3, 5-7, or 10 in the scope of the patent application, wherein a DRAT and / or a RAT corresponding to S-NSSAI is configured in the contract message, so that the The first core network element determines a RAT corresponding to a PDU session established or modified based on the DNN and / or S-NSSAI according to the subscription message, and the first core network element sends the first access network element to the first access network element. The sent setup request message or modification request message carries a third indication message, and the third indication message is used to indicate a RAT corresponding to the PDU session. 根據申請專利範圍第1-3項或第5-7項或第10項中任一項所述的方法,其中,所述待建立或待修改的資料流程和/或至少一個隧道與對應的RAT下的無線承載的綁定操作,透過以下方式觸發:第二核心網網元向所述第一核心網網元發送第一請求訊息。The method according to any one of claims 1-3, 5-7, or 10 in the scope of patent application, wherein the data flow to be established or modified and / or at least one tunnel and corresponding RAT The binding operation of the lower radio bearer is triggered in the following manner: the second core network element sends a first request message to the first core network element. 根據申請專利範圍第12項所述的方法,其中,所述第一請求訊息由協力廠商伺服器發送給所述第二核心網網元,由所述第二核心網網元轉發給所述第一核心網網元。The method according to item 12 of the scope of patent application, wherein the first request message is sent by a third-party server to the second core network element, and the second core network element is forwarded to the second core network element A core network element. 根據申請專利範圍第1-3項或第5-7項或第10項中任一項所述的方法,其中,所述方法還包括: 終端發送第二請求訊息給所述第一核心網網元或第二核心網網元;和/或,協力廠商伺服器發送第二請求訊息給所述第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。The method according to any one of claims 1 to 3 or 5 to 7 or 10, wherein the method further comprises: The terminal sends a second request message to the first core network element or the second core network element; and / or, a third-party server sends a second request message to the first core network element or the second core network. For the network element, the second request message includes a binding policy, and the binding policy includes at least one of the following: information on each attribute of the data flow, the correspondence between the PDU session and the RAT, an indication message of whether the multi-connection function is supported, An indication message of whether to trigger multi-connection, wherein the attribute information includes at least one of the following: a packet characteristic message and an Application ID. 根據申請專利範圍第1-3項或第5-7項或第10項任一項所述的方法,其中,所述方法還包括: 所述第一存取網網元將各個待建立或待修改的資料流程和/或會話和/或至少一個隧道綁定到對應的RAT下的無線承載中後,向所述第一核心網網元發送確認訊息。The method according to any one of claims 1-3, 5-7, or 10 in the scope of patent application, wherein the method further includes: The first access network element binds each to-be-established or to-be-modified data flow and / or session and / or at least one tunnel to a radio bearer of a corresponding RAT, and then sends the data flow to the first core network. Yuan sends a confirmation message. 一種綁定資料流程的方法,所述方法包括: 終端發送第二請求訊息給第一核心網網元或第二核心網網元,所述第二請求訊息中包括綁定策略,所述綁定策略包括以下至少之一:資料流程的各個屬性訊息、PDU會話與RAT的對應關係、是否支援多連接功能的指示訊息、是否觸發多連接的指示訊息,其中,所述屬性訊息包括以下至少之一:資料包特徵訊息、Application id。A method for binding data flow, the method includes: The terminal sends a second request message to the first core network element or the second core network element. The second request message includes a binding policy, and the binding policy includes at least one of the following: each attribute information of the data flow. , The correspondence between the PDU session and the RAT, an indication message of whether the multi-connection function is supported, or an indication message of whether the multi-connection function is triggered, wherein the attribute information includes at least one of the following: a packet characteristic message, and an application id. 根據申請專利範圍第16項所述的方法,其中,所述多連接功能至少包括雙連接功能。The method according to item 16 of the patent application scope, wherein the multi-connection function includes at least a dual-connection function. 根據申請專利範圍第17項所述的方法,其中,所述雙連接功能為第一雙連接功能或第二雙連接功能; 所述第一雙連接功能是指:至少一個第三核心網網元分別與所述第一存取網網元和第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸; 所述第二雙連接功能是指:至少一個第三核心網網元均與所述第一存取網網元連接,所述第一存取網網元與所述第二存取網網元連接;所述第一存取網網元側的資料透過所述第一存取網網元與所述至少一個第三核心網網元之間的隧道傳輸,所述第二存取網網元側的資料透過所述第二存取網網元轉發給所述第一存取網網元,並經過所述第一存取網網元與所述述至少一個第三核心網網元之間的隧道傳輸。The method according to item 17 of the scope of patent application, wherein the dual connection function is a first dual connection function or a second dual connection function; The first dual connection function means that at least one third core network element is connected to the first access network element and the second access network element respectively; Data is transmitted through a tunnel between the first access network element and the at least one third core network element, and data on the second access network element side passes through the second access network element Tunnel transmission with the at least one third core network element; The second dual connection function means that at least one third core network element is connected to the first access network element, and the first access network element is connected to the second access network element. Connection; the data of the first access network element is transmitted through the tunnel between the first access network element and the at least one third core network element, and the second access network element Side data is forwarded to the first access network element through the second access network element, and passes between the first access network element and the at least one third core network element Tunneling. 根據申請專利範圍第16項至第18項任一項所述的方法,其中,所述第二請求訊息包括會話建立請求訊息或會話修改請求訊息。The method according to any one of items 16 to 18 of the scope of patent application, wherein the second request message includes a session establishment request message or a session modification request message. 根據申請專利範圍第16項至第18項任一項所述的方法,其中,所述終端發送的所述第二請求訊息包括一種綁定關係,所述一種綁定關係用於指示將建立和/或修改的資料流程和/或會話綁定到一個存取網網元。The method according to any one of items 16 to 18 of the scope of patent application, wherein the second request message sent by the terminal includes a binding relationship, which is used to indicate that The modified data flow and / or session is bound to an access network element. 根據申請專利範圍第16項至第18項任一項所述的方法,其中,所述終端發送的所述第二請求訊息包括一種對應關係,所述一種對應關係用於指示一個資料流程和/或隧道對應一個RAT指示訊息或者多個RAT指示訊息。The method according to any one of items 16 to 18 of the scope of patent application, wherein the second request message sent by the terminal includes a correspondence relationship, which is used to indicate a data flow and / Or the tunnel corresponds to one RAT indication message or multiple RAT indication messages. 根據申請專利範圍第21項所述的方法,其中,一個資料流程和/或隧道對應多個RAT指示訊息時,所述多個RAT指示訊息中的每個RAT指示訊息對應一個優先順序訊息。The method according to item 21 of the scope of patent application, wherein when one data flow and / or tunnel corresponds to multiple RAT instruction messages, each of the multiple RAT instruction messages corresponds to a priority message. 一種綁定資料流程的方法,所述方法包括: 終端發送第二請求訊息給第一核心網網元或第二核心網網元,其中,當所述終端發送多次第二請求訊息時,不同的第二請求訊息所建立和/或修改的資料流程和/或會話需綁定到不同的存取網網元上進行傳輸。A method for binding data flow, the method includes: The terminal sends a second request message to the first core network element or the second core network element, and when the terminal sends the second request message multiple times, data created and / or modified by different second request messages Processes and / or sessions need to be bound to different access network elements for transmission. 一種網路設備,包括記憶體以及處理器,所述記憶體上存儲有電腦可執行指令,該電腦可執行指令被所述處理器執行時使得所述網路設備執行申請專利範圍第1項至第15項任一項所述的方法步驟。A network device includes a memory and a processor. The memory stores computer-executable instructions. When the computer-executable instructions are executed by the processor, the network device executes the first patent application range from 1 to The method step of any one of item 15. 一種終端設備,包括記憶體以及處理器,所述記憶體上存儲有電腦可執行指令,該電腦可執行指令被處理器執行時使得所述終端設備執行申請專利範圍第16項至第22項任一項所述的方法步驟,或者申請專利範圍第23項所述的方法步驟。A terminal device includes a memory and a processor. The memory stores computer-executable instructions. When the computer-executable instructions are executed by a processor, the terminal device executes any of the patent application scopes 16 to 22 The method steps described in one item, or the method steps described in item 23 of the scope of patent application.
TW108115954A 2018-05-10 2019-05-08 Method and device for binding data stream, computer storage medium TW201947985A (en)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
WOPCT/CN2018/086352 2018-05-10
PCT/CN2018/086352 WO2019213905A1 (en) 2018-05-10 2018-05-10 Method and apparatus for binding data stream, and computer storage medium
PCT/CN2018/097796 WO2019214089A1 (en) 2018-05-10 2018-07-31 Method and device for binding data stream, and computer storage medium
WOPCT/CN2018/097796 2018-07-31
WOPCT/CN2018/100536 2018-08-14
PCT/CN2018/100536 WO2019214105A1 (en) 2018-05-10 2018-08-14 Method and apparatus for binding data streams, and computer storage medium

Publications (1)

Publication Number Publication Date
TW201947985A true TW201947985A (en) 2019-12-16

Family

ID=68467279

Family Applications (1)

Application Number Title Priority Date Filing Date
TW108115954A TW201947985A (en) 2018-05-10 2019-05-08 Method and device for binding data stream, computer storage medium

Country Status (3)

Country Link
CN (1) CN111247837B (en)
TW (1) TW201947985A (en)
WO (3) WO2019213905A1 (en)

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272315B (en) * 2007-03-23 2011-04-06 华为技术有限公司 Packet data package transmission method, system and network appliance
CN101365159B (en) * 2007-08-08 2011-11-16 华为技术有限公司 Bearing identification processing method and apparatus
CN101771986A (en) * 2009-01-06 2010-07-07 中兴通讯股份有限公司 Strategic charging control method, device and system based on multiple access technology
CN101742471B (en) * 2009-02-12 2015-12-16 中兴通讯股份有限公司 A kind of method that data flow and Access Network connect and bind
CN102685714B (en) * 2011-03-18 2017-12-15 中兴通讯股份有限公司 A kind of method and system for supporting double-mode and double-standby terminal while communication
US9681481B2 (en) * 2014-12-19 2017-06-13 At&T Intellectual Property I, L.P. Mobility management of wireless networks based on multipath transfer control protocol
US9900911B2 (en) * 2015-05-15 2018-02-20 Mediatek Inc. QoS provisioning for LTE-WLAN aggregation
CN106304414B (en) * 2015-06-10 2019-10-29 中国移动通信集团公司 A kind of resource release method based on QoS, device and equipment
CN107295575B (en) * 2016-04-01 2020-02-28 中兴通讯股份有限公司 Method and device for controlling service quality
US10390331B2 (en) * 2016-04-20 2019-08-20 Convida Wireless, Llc System information provisioning and light weight connection signaling
CN110248382B (en) * 2017-01-05 2020-09-08 华为技术有限公司 Information transmission method and device

Also Published As

Publication number Publication date
WO2019214089A1 (en) 2019-11-14
CN111247837B (en) 2022-02-25
WO2019214105A1 (en) 2019-11-14
CN111247837A (en) 2020-06-05
WO2019213905A1 (en) 2019-11-14

Similar Documents

Publication Publication Date Title
EP3965440A1 (en) Sidelink communication method and apparatus, and storage medium
CN109314695B (en) Method for determining user plane protocol stack, control plane network element and system
CN104854576B (en) The system and method for accessing network
KR20190133031A (en) Communication method and device
CN110063084A (en) The method and device thereof of selection session and service modulus of continuity formula in a wireless communication system
US20150271710A1 (en) Method, apparatus, and system for processing radio network user access
KR102469973B1 (en) Communication method and device
WO2019185062A1 (en) Communication method and device
JP2021518079A (en) Packet transmission methods, devices, and systems
US20050063409A1 (en) Method and apparatus for managing multicast delivery to mobile devices involving a plurality of different networks
CN112715055A (en) Radio access network and method for accelerated network access
AU2018370721A1 (en) Session processing method, device, and system
CN106470465B (en) WIFI voice service initiating method, LTE communication equipment, terminal and communication system
US9961045B2 (en) Service path changing method and apparatus
US20140219198A1 (en) Method for switching communication connection mode, communication system, base station, transmitter and receiver
WO2022017285A1 (en) Packet forwarding method, apparatus and system
WO2022067818A1 (en) Data transmission method and apparatus
US20230254922A1 (en) Multipath transmission method and communication apparatus
WO2018023544A1 (en) Communication method, user equipment, base station, control plane network element, and communication system
WO2019238050A1 (en) Communication method and apparatus
US20220248479A1 (en) Data Transmission Method and Apparatus
AU2021278130B2 (en) Communication method and apparatus, and system
WO2020211538A1 (en) Data transmission method and apparatus
EP3836655B1 (en) User equipment (ue) and communication control method
TW201947985A (en) Method and device for binding data stream, computer storage medium