TW201315371A - Support construction method and device for tree - Google Patents

Support construction method and device for tree Download PDF

Info

Publication number
TW201315371A
TW201315371A TW100137425A TW100137425A TW201315371A TW 201315371 A TW201315371 A TW 201315371A TW 100137425 A TW100137425 A TW 100137425A TW 100137425 A TW100137425 A TW 100137425A TW 201315371 A TW201315371 A TW 201315371A
Authority
TW
Taiwan
Prior art keywords
end surface
tree
positioning unit
belt body
fixing frame
Prior art date
Application number
TW100137425A
Other languages
Chinese (zh)
Other versions
TWI450683B (en
Inventor
Shigehisa Kasamatsu
Taro Ota
Kae Narimoto
Original Assignee
Toho Leo Kabushiki Kaisha
Jato Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toho Leo Kabushiki Kaisha, Jato Co Ltd filed Critical Toho Leo Kabushiki Kaisha
Priority to TW100137425A priority Critical patent/TWI450683B/en
Publication of TW201315371A publication Critical patent/TW201315371A/en
Application granted granted Critical
Publication of TWI450683B publication Critical patent/TWI450683B/en

Links

Landscapes

  • Supports For Plants (AREA)

Abstract

A support construction method and a support construction device for a tree are disclosed. The support construction method includes the steps of: respectively driving a plurality of wood piles into a soil located around a soil ball of the tree, in which the soil ball is placed in a cavity of a land, and the wood pile includes a top surface and a side end surface; nailing a tip of a first fixation part that is pivotally coupled with a fixation frame to the top surface of the wood pile, in which the fixation frame includes a first positioning unit and a second position unit; enabling the first positioning unit and the second positioning unit to respectively couple to a first belt body of a first fastening element so that the first belt body is positioned to press the side end surface of the wood pile against the fixation frame; and applying the first fastening element to bind the wood piles and the fixation frames to surround around the soil ball of the tree and applying a first locking unit of the first fastening element to engage the first belt body thereof, so that the wood piles and the fixation frames are tightly pressed against the side end surface of the soil ball to stably support the tree.

Description

樹木支持施工方法及裝置Tree support construction method and device

本發明是有關在公園、庭園、廣場、公開空地、行人走道、展覽會場、停車場、購物中心、廣場等建築物周圍等進行植栽時,樹木支持的施工方法及裝置,尤其是有關利用木樁支持樹木的施工方法及裝置。The invention relates to a construction method and a device for supporting trees when planting plants, such as parks, gardens, squares, public open spaces, pedestrian walkways, exhibition halls, parking lots, shopping malls, squares, etc., especially regarding the use of wooden piles. Supporting construction methods and devices for trees.

在公園、庭園、廣場、公開空地、行人走道、展覽會場、停車場、購物中心、廣場等建築物周圍等進行樹木植栽時,利用木樁支持樹木的工法是最標準的方法。但傳統以木樁支持樹木的工法在支持強度方面、樹木的生長方面或景觀方面存在多種問題。在支持強度方面,插進地裡面的木樁因為深度不足,有導致樹木傾倒的現象。在樹木的生長方面,有些木樁在插入地面時破壞植栽樹木的土球,而影響樹木生長的現象。在景觀方面,密植樹木的時候防礙植栽,注重景觀的時候木樁比植栽的樹木更顯眼,而影響景觀。When trees are planted in parks, gardens, plazas, public open spaces, pedestrian walkways, exhibition halls, parking lots, shopping malls, plazas, etc., the use of wooden piles to support trees is the most standard method. However, traditional methods of supporting trees with stakes have various problems in terms of support strength, tree growth or landscape. In terms of support strength, the piles inserted into the ground have a phenomenon of causing the trees to fall because of insufficient depth. In terms of the growth of trees, some piles destroy the soil balls of planted trees when they are inserted into the ground, which affects the growth of trees. In terms of landscape, when planting trees, it hinders planting. When paying attention to the landscape, the piles are more conspicuous than the planted trees, and affect the landscape.

台灣公開專利第 201023733 號,揭示一種樹木的支撐施工方法以及支撐施工用具,係沿著樹木的根盆的側面釘入樁於地面;以樁保持體安裝樁,並使其偏心附件位於樁的軸中心部更偏心於外側的位置;從根盆的肩部側橫跨於偏心附件而傾斜向下設置張力傳達元件;設置橫壓抵抗元件於樁保持體的內側;以從張力傳達元件的根源部側傳達產生於環繞帶的張力至偏心附件的方式,使環繞帶環繞於根盆的上面,其特徵在:從橫壓抵抗元件的兩側部使一對架設桿分別架設於樁保持體的偏心附件。Taiwan Patent No. 201023733 discloses a support construction method for trees and supporting construction tools, which are nailed into the pile along the side of the root basin of the tree; the pile is installed with the pile retaining body, and the eccentric attachment is located at the axis of the pile The center portion is more eccentric to the outer position; the tension transmitting member is disposed obliquely downward from the shoulder side of the root basin across the eccentric attachment; the transverse pressure resisting member is disposed on the inner side of the pile retaining body; The side conveys the tension generated by the surrounding belt to the eccentric attachment, so that the surrounding belt surrounds the upper surface of the root basin, and is characterized in that a pair of erecting rods are respectively erected from the eccentricity of the pile holding body from both side portions of the transverse pressure resisting member annex.

日本公開專利第2008-109912號,揭示一種支持樹木的施工方法及支持施工用具,係將複數木樁打入樹根的土球週邊的地面;木樁的上端結合木樁保持體;木樁保持體藉由上結合部及吊下桿結合固定在地面上的抵抗部,木樁保持體藉由張力傳達部結合肩墊片;環繞皮帶結合複數肩墊片,使複數木樁固定於土球的周邊而固定土球。Japanese Laid-Open Patent Publication No. 2008-109912 discloses a construction method for supporting trees and supporting construction tools, which are to drive a plurality of wooden piles into the ground around the soil ball of the root; the upper end of the wooden pile is combined with the wooden pile retaining body; The body is combined with the resistance portion fixed on the ground by the upper joint portion and the hanging rod. The pile support body is combined with the shoulder gasket by the tension transmitting portion; the plurality of shoulder washers are wrapped around the belt to fix the plurality of wooden piles to the soil ball. Fix the soil ball around.

為了進一步改善已知支持樹木的施工方法及支持施工用具, 而提出本發明。The present invention has been made in order to further improve a construction method for supporting tree support and supporting construction tools.

本發明的主要目的,在提供一種樹木支持施工方法及裝置,提供在景觀方面不會顯眼,在樹木的生長方面不會破壞植栽土球,在支持強度方面擁有充分強度埋在地下的木樁,可以穩固的支持樹木的土球。The main object of the present invention is to provide a tree supporting construction method and apparatus, which can provide a tree stand which is not conspicuous in the landscape, does not damage the planting soil ball in the growth of the tree, and has sufficient strength to be buried in the ground in terms of supporting strength. , can firmly support the soil ball of the tree.

本發明的另一目的,在提供一種樹木支持施工方法及裝置,藉由第一固定部的尖端釘入木樁的上端面,並將複數釘子分別穿過第二固定部及第三固定部的孔,釘入木樁的側端面,使固定架穩固的結合木樁,並可以結合各種大小不均一的木樁。Another object of the present invention is to provide a tree supporting construction method and apparatus, wherein a tip end of a first fixing portion is nailed into an upper end surface of a stake, and a plurality of nails are respectively passed through the second fixing portion and the third fixing portion. The holes are nailed into the side end faces of the stakes so that the fixing brackets can be firmly combined with the wooden piles and can be combined with various piles of uneven size.

本發明的又一目的,在提供一種樹木支持施工方法及裝置,具有較少的支持施工用具,可節省支持施工用具的成本,且因為具有較少的支持施工用具使樹木的支撐施工方法更簡便,可節省樹木的支撐施工的時間。Still another object of the present invention is to provide a tree supporting construction method and apparatus, which has less supporting construction tools, can save the cost of supporting construction tools, and is simpler to support the construction method of trees because of less supporting construction tools. It can save time for supporting construction of trees.

本發明的樹木支持施工裝置,包括:The tree supporting construction device of the invention comprises:

複數支木樁,該木樁具有上端面及側端面;a plurality of wooden piles having an upper end surface and a side end surface;

複數個固定架,該固定架設有一第一定位單元及一第二定位單元;該固定架對應於該木樁的上端面的位置樞接一第一固定部;a plurality of fixing frames, the fixing frame is provided with a first positioning unit and a second positioning unit; the fixing frame is pivotally connected to a first fixing portion corresponding to the position of the upper end surface of the stake;

一第一束緊件,由一第一扣合單元結合一第一帶體所組成;a first tightening member is composed of a first fastening unit combined with a first belt body;

其特徵在於:該固定架對應於該木樁的上端面的位置樞接一第一固定部;該第一固定部具有一尖端;該尖端釘入該上端面;該固定架藉由該第一定位單元及該第二定位單元分別結合該第一帶體,使該第一帶體獲得定位並壓迫該側端面抵靠該固定架;該第一束緊件束縛該複數支木樁及該複數個固定架圍繞於一樹木的土球的周邊,藉由該第一扣合單元扣合該第一帶體使該複數支木樁及該複數個固定架緊密的抵靠該土球的側端面,以穩固的支持該樹木。The fixing frame is pivotally connected to a first fixing portion corresponding to the position of the upper end surface of the stake; the first fixing portion has a tip end; the tip is screwed into the upper end surface; the fixing frame is configured by the first The positioning unit and the second positioning unit respectively combine the first belt body to position the first belt body and press the side end surface against the fixing frame; the first tightening member binds the plurality of piles and the plural The fixing frame surrounds the periphery of the soil ball of a tree, and the first fastening unit fastens the first belt body so that the plurality of wood piles and the plurality of fixing frames closely abut against the side end surface of the soil ball To support the tree firmly.

其中該固定架對應於該側端面的位置,分別結合一第二固定部及一第三固定部;複數釘子分別穿過該第二固定部及該第三固定部的孔釘入該側端面,使該固定架更穩固的結合該木樁。The fixing frame is corresponding to the position of the side end surface, and is respectively coupled to a second fixing portion and a third fixing portion; the plurality of nails are respectively inserted into the side end surface through the holes of the second fixing portion and the third fixing portion. The bracket is more firmly bonded to the stake.

進一步包括一第二束緊件;該第二束緊件包括一第二扣合單元結合一第二帶體;該固定架設有一第三定位單元;該固定架藉由該第三定位單元結合該第二帶體,使該第二帶體獲得定位,並藉由該第二扣合單元固定該第二帶體,使該第二帶體分別緊密抵靠該土球的側端面及上端面,並壓迫該固定架緊密抵靠該土球的側端面,以更穩固的支持該樹木。Further comprising a second tightening member; the second tightening member comprises a second fastening unit coupled to a second strap; the mounting bracket is provided with a third positioning unit; the fixing bracket is coupled by the third positioning unit The second strip body is positioned to fix the second strip body, and the second strip body is fixed to the side end surface and the upper end surface of the soil ball, respectively, by the second fastening unit. And pressing the holder tightly against the side end surface of the soil ball to support the tree more stably.

其中該第一扣合單元及該第二扣合單元分別具有一剌輪及一彈性止擋件;藉由該彈性止擋件擋住該刺輪的齒,使該刺輪只能單向轉動;當使該彈性止擋件脫離擋住該齒的位置時,該第一帶體即由緊束狀態快速變成鬆開狀態;該第一帶體具有由可分解的材料製成的第一分解段或該第二帶體具有由可分解的材料製成的第二分解段中至少一者。The first fastening unit and the second fastening unit respectively have a wheel and an elastic stop; the elastic stop blocks the teeth of the roller, so that the roller can only rotate in one direction; When the elastic stop is disengaged from the position blocking the tooth, the first belt body is rapidly changed from a tightly packed state to a loosened state; the first belt body has a first decomposition section made of a decomposable material or The second belt body has at least one of a second decomposition section made of a decomposable material.

其中該第一定位單元、該第二定位單元及該第三定位單元分別為一穿孔;該固定架設有一第一抵靠部、一第二抵靠部及一第三抵靠部;該第一帶體及該第二帶體分別穿過該等穿孔,且分別抵靠該第一抵靠部、該第二抵靠部及該第三抵靠;該第一帶體及該第二帶體分別由可分解的材料製成中至少一者。The first positioning unit, the second positioning unit, and the third positioning unit are respectively a through hole; the fixing frame is provided with a first abutting portion, a second abutting portion and a third abutting portion; The strip body and the second strip body respectively pass through the perforations and respectively abut the first abutting portion, the second abutting portion and the third abutting; the first strip body and the second strip body At least one of being made of a decomposable material, respectively.

本發明的樹木支持施工方法,包括如下步驟:The tree supporting construction method of the present invention comprises the following steps:

(1) 將複數支木樁分別打入一樹木的土球週邊的土壤內;其中該土球係被放置在土地的一凹穴內,該木樁具有上端面及側端面;(1) driving a plurality of wooden stakes into the soil surrounding the soil ball of a tree; wherein the soil ball is placed in a recess of the land, the stake having an upper end surface and a side end surface;

(2)使與一固定架樞接的一第一固定部的尖端釘入該上端面;其中該固定架具有一第一定位單元及一第二定位單元;(2) the tip end of a first fixing portion pivotally connected to a fixing frame is inserted into the upper end surface; wherein the fixing frame has a first positioning unit and a second positioning unit;

(3)使該第一定位單元及該第二定位單元分別結合一第一束緊件的一第一帶體,使該第一帶體獲得定位並壓迫該側端面抵靠該固定架;該第一束緊件束縛該複數支木樁及複數個固定架圍繞於該土球的周邊,藉由該第一束緊件的一第一扣合單元扣合該第一帶體,使該複數支木樁及該複數個固定架緊密的抵靠該土球的側端面,以穩固的支持該樹木。(3) the first positioning unit and the second positioning unit are respectively coupled to a first belt body of the first tightening member, so that the first belt body is positioned and the side end surface is pressed against the fixing frame; The first tightening member binds the plurality of wooden piles and the plurality of fixing brackets around the periphery of the soil ball, and the first fastening unit of the first tightening member is fastened to the first belt body to make the plural The branch pile and the plurality of fixing frames closely abut against the side end surface of the soil ball to stably support the tree.

其中該步驟(2)中進一步包括:The step (2) further includes:

使複數釘子分別穿過與該固定架結合的一第二固定部及一第三固定部的孔釘入該側端面,使該固定架更穩固的結合該木樁。The plurality of nails are respectively inserted into the side end faces through the holes of a second fixing portion and a third fixing portion which are combined with the fixing frame, so that the fixing frame is more firmly combined with the wooden pile.

其中該固定架設有一第三定位單元;該步驟(3)之後進一步包括如下步驟:The fixing frame is provided with a third positioning unit; after the step (3), the method further comprises the following steps:

(4) 使該第三定位單元結合一第二束緊件的一第二帶體,使該第二帶體獲得定位,並藉由該第二束緊件的一第二扣合單元固定該第二帶體,使該第二帶體分別緊密抵靠該土球的側端面及上端面,並壓迫該固定架緊密抵靠該土球的側端面,以更穩固的支持該樹木。(4) combining the third positioning unit with a second strap of the second tightening member to position the second strap, and fixing the second strap by the second fastening unit of the second tightening member The second belt body is arranged to closely abut the side end surface and the upper end surface of the soil ball, respectively, and presses the fixing frame tightly against the side end surface of the soil ball to support the tree more stably.

本發明的其他目的、功效,請參閱圖式及實施例,詳細說明如下。For other purposes and functions of the present invention, please refer to the drawings and the embodiments, which are described in detail below.

如第1、2圖所示,本發明樹木支持施工裝置1,包括複數支木樁11、複數個固定架12、一第一束緊件13及一第二束緊件14所組成。As shown in the first and second figures, the tree supporting construction device 1 of the present invention comprises a plurality of wooden piles 11, a plurality of fixing frames 12, a first tightening member 13, and a second tightening member 14.

如第3、4、5圖所示,固定架12設有第一定位單元121、第一抵靠部122、第二定位單元123、第二抵靠部124、第三定位單元125、第三抵靠部126。固定架12對應於木樁11的上端面111的位置樞接一第一固定部15。固定架12對應於木樁11的側端面112的位置,分別結合片狀的第二固定部16及第三固定部17。第一固定部15具有相連接的一水平段151及一垂直段152;垂直段152的下端形成一尖端153。第二固定部16及第三固定部17分別設有孔18。第一定位單元121、第二定位單元123及第三定位單元125可分別為一穿孔。As shown in the third, fourth, and fifth figures, the fixing frame 12 is provided with a first positioning unit 121, a first abutting portion 122, a second positioning unit 123, a second abutting portion 124, a third positioning unit 125, and a third Abutting portion 126. The fixing frame 12 is pivotally connected to a first fixing portion 15 corresponding to the position of the upper end surface 111 of the stake 11. The fixing frame 12 corresponds to the position of the side end surface 112 of the stake 11, and respectively joins the second fixing portion 16 and the third fixing portion 17 in the form of a sheet. The first fixing portion 15 has a horizontal section 151 and a vertical section 152 connected thereto; the lower end of the vertical section 152 forms a tip 153. The second fixing portion 16 and the third fixing portion 17 are respectively provided with holes 18. The first positioning unit 121, the second positioning unit 123, and the third positioning unit 125 are respectively a through hole.

如第2圖所示,第一束緊件13及第二束緊件14具有相同的結構。第一束緊件13由第一扣合單元131結合第一帶體132所組成。第二束緊件14由第二扣合單元141結合第二帶體142所組成。第一扣合單元131及第二扣合單元141分別具有單方向自動扣合第一帶體132及第二帶體142的功能,並可快速鬆開第一帶體132及第二帶體142的功能。第一帶體132及第二帶體142中可分別具有由可分解的材料製成的第一分解段136及第二分解段143;第一帶體132及第二帶體142也可分別全部由可分解的材料製成。在樹木2的根成長到凹穴32周邊的期間(植栽後5年以內程度)不會分解,之後第一分解段136及第二分解段143逐漸分解使第一帶體132及第二帶體142失去強度,不再束縛土球21以避免限制樹木2的根的生長。使用此種可以分解的材料,可以達到將樹木2支持到想要支持的期間以內。第一帶體132及第二帶體142也可分別全部由不可分解的材料製成。As shown in Fig. 2, the first tightening member 13 and the second tightening member 14 have the same structure. The first tightening member 13 is composed of the first fastening unit 131 combined with the first strap 132. The second tightening member 14 is composed of a second fastening unit 141 in combination with the second strap 142. The first fastening unit 131 and the second fastening unit 141 respectively have the functions of automatically engaging the first belt 132 and the second belt 142 in one direction, and can quickly release the first belt 132 and the second belt 142. The function. The first strip body 132 and the second strip body 142 may respectively have a first decomposition section 136 and a second decomposition section 143 made of a decomposable material; the first strip body 132 and the second strip body 142 may also be respectively Made of decomposable material. When the root of the tree 2 grows to the periphery of the pocket 32 (within 5 years after planting), it does not decompose, and then the first decomposition section 136 and the second decomposition section 143 are gradually decomposed to make the first belt 132 and the second belt Body 142 loses strength and no longer binds soil ball 21 to avoid limiting the growth of the roots of tree 2. With this decomposable material, it is possible to support the tree 2 to the period that it is desired to support. The first strip 132 and the second strip 142 may also each be made entirely of an indecomposable material.

以第一扣合單元131說明第一扣合單元131及第二扣合單元141的結構。如第2、6圖所示,第一扣合單元131具有剌輪133及一彈性止擋件134。藉由彈性止擋件134擋住刺輪133的齒135,使刺輪133只能單向轉動;當拉動第一帶體132的尾端時,將使第一帶體132愈束愈緊。當使彈性止擋件134脫離擋住齒135的位置時,即可使第一帶體132由緊束狀態快速變成鬆開狀態;此為習知技術。The structure of the first fastening unit 131 and the second fastening unit 141 will be described with reference to the first fastening unit 131. As shown in FIGS. 2 and 6, the first fastening unit 131 has a wheel 133 and an elastic stopper 134. The elastic damper 134 blocks the teeth 135 of the lance wheel 133, so that the lance wheel 133 can only rotate in one direction; when the tail end of the first belt body 132 is pulled, the first belt body 132 will be tightened. When the elastic stopper 134 is disengaged from the position blocking the tooth 135, the first belt 132 can be quickly changed from the tight state to the released state; this is a conventional technique.

本發明樹木支持施工裝置1與樹木2的土球21的結合構造,如下述本發明樹木支持施工方法中所揭示者。The combined structure of the tree supporting construction device 1 of the present invention and the soil ball 21 of the tree 2 is as disclosed in the tree supporting construction method of the present invention described below.

如第9圖所示,本發明樹木支持施工方法,包括如下步驟:As shown in FIG. 9, the tree supporting construction method of the present invention comprises the following steps:

  1. 將複數支(例如四支或更多支依照土球21的大小而定)木樁11的一半長度以上的部分打入樹木2的土球21週邊的土壤31內;其中土球21係被放置在土地3的凹穴32內;A portion of more than half of the length of the stake 11 (for example, four or more branches depending on the size of the soil ball 21) is driven into the soil 31 around the soil ball 21 of the tree 2; wherein the soil ball 21 is placed Within the pocket 32 of the land 3;
  2. 使與固定架12樞接的第一固定部15的尖端153釘入木樁11的上端面111,並將複數釘子19分別穿過與固定架12結合的第二固定部16及第三固定部17的孔18,釘入木樁11的側端面112,使固定架12穩固的結合木樁11;The tip end 153 of the first fixing portion 15 pivotally connected to the fixing frame 12 is screwed into the upper end surface 111 of the stake 11 and the plurality of nails 19 are respectively passed through the second fixing portion 16 and the third fixing portion combined with the fixing frame 12. The hole 18 of the 17 is nailed into the side end surface 112 of the stake 11, so that the fixing frame 12 is firmly combined with the stake 11;
  3. 使第一束緊件13的第一帶體132的尾端依序穿過複數個固定架12的第一定位單元121,抵靠木樁11後穿過第二定位單元123,使第一帶體132分別抵靠土球21的周圍的側端面211、複數第一抵靠部122、複數木樁11及複數第二抵靠部124,如第1、6、7、8圖所示,然後藉由第一扣合單元131固定第一帶體132,使第一帶體132束緊複支數木樁11、複數個固定架12及土球21的側端面211,如第1圖所示。The first end of the first strap 132 of the first tightening member 13 is sequentially passed through the first positioning unit 121 of the plurality of fixing frames 12, and the second positioning unit 123 is passed after the stake 11 is passed to the first positioning unit 123. The body 132 abuts against the surrounding side end surface 211 of the soil ball 21, the plurality of first abutting portions 122, the plurality of stakes 11 and the plurality of second abutting portions 124, as shown in Figures 1, 6, 7, and 8, and then The first belt body 132 is fixed by the first fastening unit 131, and the first belt body 132 is tightened to the side end surface 211 of the plurality of piles 11, the plurality of fixing frames 12 and the soil ball 21, as shown in FIG. .
  4. 使第二束緊件14的第二帶體142的尾端依序穿過複數個固定架12的第三定位單元125,束緊複數個固定架12及土球21的側端面211及上端面212,如圖1、2、6圖所示,然後藉由第二扣合單元142固定第二帶體142,使第二帶體142分別抵靠土球21的側端面211、上端面212及複數個第三抵靠部126,使複數支木樁11與土球21結合一體,而具有支持土球21的功能。The trailing end of the second strap 142 of the second tightening member 14 is sequentially passed through the third positioning unit 125 of the plurality of fixing brackets 12, and the side end faces 211 and the upper end faces of the plurality of fixing brackets 12 and the soil ball 21 are tightened. 212, as shown in FIG. 1, 2, and 6, the second strap 142 is fixed by the second fastening unit 142, so that the second strap 142 abuts against the side end surface 211 and the upper end surface 212 of the soil ball 21, respectively. The plurality of third abutting portions 126 integrally integrate the plurality of stakes 11 with the soil ball 21, and have a function of supporting the soil ball 21.

本發明在土球21的側端面211的位置,將複數支木樁11(例如四支或更多支依照土球21的大小而定)打進土球21下面的土壤31裡面,以限制土球21移動。At the position of the side end surface 211 of the soil ball 21, the plurality of stakes 11 (for example, four or more branches according to the size of the soil ball 21) are driven into the soil 31 below the soil ball 21 to restrict the soil. The ball 21 moves.

因為只以木樁11限制樹木2的移動比較困難,所以對木樁11安裝必要的固定架12。Since it is difficult to restrict the movement of the trees 2 only by the stakes 11, the necessary fixing brackets 12 are attached to the stakes 11.

為了使限制樹木2的土球21移動的固定架12和木樁11一體化,本發明的固定架12藉由第一固定部15、第二固定部16及第三固定部17結合木樁11,使固定架12與木樁11更能穩固結合,較不會脫離而失去穩固支持土球21的功能。In order to integrate the fixing frame 12 and the stud 11 for restricting the movement of the soil ball 21 of the tree 2, the fixing frame 12 of the present invention is combined with the wooden pile 11 by the first fixing portion 15, the second fixing portion 16, and the third fixing portion 17. Therefore, the fixing frame 12 and the wooden pile 11 can be more stably combined, and the function of supporting the soil ball 21 can be stably supported without being detached.

為了使形狀不均一的木樁11都能緊密相連結,本發明在土球21側端面211設置可以緊縮的第一束緊件13,並藉由第一定位單元121及第二定位單元123使第一帶體132結合固定架12並獲得定位;在土球21的側端面211及上端面212設置可以緊縮的第二束緊件14,並藉由第三定位單元125使第一帶體142結合固定架12並獲得定位,而使木樁11和樹木2的土球21一體化。In order to make the studs 11 having a non-uniform shape can be closely coupled, the first tightening member 13 that can be tightened is disposed on the end surface 211 of the soil ball 21, and is fixed by the first positioning unit 121 and the second positioning unit 123. The first belt body 132 is combined with the fixing frame 12 and positioned; the second tensioning member 14 that can be tightened is disposed on the side end surface 211 and the upper end surface 212 of the soil ball 21, and the first belt body 142 is caused by the third positioning unit 125. The studs 11 and the soil balls 21 of the trees 2 are integrated by combining the fixing frames 12 and obtaining the positioning.

為了因應樹木2的移植或改植等需要,本發明採用的第一束緊件13及第二束緊件14,分別可快速鬆開第一帶體132及第二帶體142的功能,使複數木樁11快速與土球21分離,方便樹木2的移植或改植。In order to meet the needs of transplanting or replanting the trees 2, the first tightening member 13 and the second tightening member 14 used in the present invention can quickly loosen the functions of the first belt 132 and the second belt 142, respectively. The plurality of wooden piles 11 are quickly separated from the soil ball 21 to facilitate the transplantation or replanting of the trees 2.

本發明提供的樹木支持施工方法及裝置,由於複數支木樁11、複數個固定架12、一第一束緊件13及一第二束緊件14均被安裝在土地3的凹穴32內,因此在景觀方面不會顯眼;由於複數支木樁11打入樹木2的土球21週邊的土壤31內,因此在樹木的生長方面不會破壞植栽土球;由於複數支木樁11的一半長度以上的部分打入土球21週邊的土壤31內,且在固定架12設置第一固定部15、第二固定部16及第三固定部17,使固定架12與木樁11更能穩固結合,並在土球21側端面211設置可以緊縮的第一束緊件13,在土球21的側端面211及上端面212設置可以緊縮的第二束緊件14,使木樁11和樹木2的土球21一體化,因此在支持強度方面擁有充分強度,可以穩固的支持樹木的土球。The tree supporting construction method and device provided by the present invention, because a plurality of branch piles 11, a plurality of fixing frames 12, a first tightening member 13 and a second tightening member 14 are installed in the recess 32 of the land 3. Therefore, it is not conspicuous in terms of landscape; since a plurality of piles 11 are driven into the soil 31 around the soil ball 21 of the tree 2, the planting soil ball is not destroyed in the growth of the trees; A portion above half the length is inserted into the soil 31 around the soil ball 21, and the first fixing portion 15, the second fixing portion 16, and the third fixing portion 17 are provided on the fixing frame 12, so that the fixing frame 12 and the stake 11 can be more capable. The first tightening member 13 is tightly disposed on the side surface 211 of the soil ball 21, and the second tightening member 14 that can be tightened is disposed on the side end surface 211 and the upper end surface 212 of the soil ball 21 to make the stake 11 and The soil ball 21 of the tree 2 is integrated, so it has sufficient strength in supporting strength and can stably support the soil ball of the tree.

本發明藉由第一固定部15的尖端153釘入木樁11的上端面111,並將複數釘子19分別穿過第二固定部16及第三固定部17的定位單元18,釘入木樁11的側端面112,使固定架12穩固的結合木樁11,並可以結合各種大小不均一的木樁11。The present invention is driven into the upper end surface 111 of the stake 11 by the tip end 153 of the first fixing portion 15, and the plurality of nails 19 are respectively passed through the positioning unit 18 of the second fixing portion 16 and the third fixing portion 17, and are nailed into the stake. The side end surface 112 of the 11 allows the fixing frame 12 to firmly bond the stakes 11, and can be combined with various sizes of uneven piles 11.

本發明僅利用複數支木樁11、複數個固定架12、一第一束緊件13及一第二束緊件14,就能穩固的支持樹木2的土球21,較上述 台灣公開專利第201023733 號揭示的樹木的支撐施工方法以及支撐施工用具,及日本公開專利第2008-109912號揭示的支持樹木的施工方法及支持施工用具,分別具有較少的支持施工用具,可節省支持施工用具的成本,且因為具有較少的支持施工用具使樹木的支撐施工方法更簡便,可節省樹木的支撐施工的時間。The invention can stably support the soil ball 21 of the tree 2 by using only the plurality of wooden stakes 11, the plurality of fixing brackets 12, the first tightening member 13, and the second tightening member 14, which is more than the above-mentioned Taiwan Patent Publication No. The supporting construction method of the tree disclosed in No. 201023733 and the supporting construction tool, and the supporting method for supporting the tree and the supporting construction tool disclosed in Japanese Laid-Open Patent Publication No. 2008-109912, respectively, have less supporting construction tools, and can save support for construction tools. Cost, and because there are fewer supporting construction tools, the support construction method of the trees is simpler, and the time for supporting the construction of the trees can be saved.

以上所記載者,僅為利用本發明技術內容之實施例,任何熟悉本項技藝者運用本發明所為之修飾、變化,皆屬本創作所主張之專利範圍。The above descriptions are only examples of the use of the technical content of the present invention, and any modifications and variations made by those skilled in the art using the present invention are within the scope of the patent claimed.

1...樹木支持施工裝置1. . . Tree support construction unit

11...木樁11. . . Wooden pile

111、212...上端面111, 212. . . Upper end

112、211...側端面112, 211. . . Side end face

12...固定架12. . . Fixing frame

121...第一定位單元121. . . First positioning unit

122...第一抵靠部122. . . First abutment

123...第二定位單元123. . . Second positioning unit

124...第二抵靠部124. . . Second abutment

125...第三定位單元125. . . Third positioning unit

126...第三抵靠部126. . . Third abutment

13...第一束緊件13. . . First tightening

131...第一扣合單元131. . . First fastening unit

132...第一帶體132. . . First belt

133...剌輪133. . .剌 wheel

134...彈性止擋件134. . . Elastic stop

135...齒135. . . tooth

136...第一分解段136. . . First decomposition segment

14...第二束緊件14. . . Second tightening

141...第二扣合單元141. . . Second fastening unit

142...第二帶體142. . . Second belt

143...第二分解段143. . . Second decomposition

15...第一固定部15. . . First fixed part

151...水平段151. . . Horizontal section

152...垂直段152. . . Vertical segment

153...尖端153. . . Cutting edge

16...第二固定部16. . . Second fixed part

17...第三固定部17. . . Third fixed part

18...孔18. . . hole

19...釘子19. . . nail

2...樹木2. . . Trees

21...土球twenty one. . . Earth ball

3...土地3. . . land

31...土壤31. . . soil

32...凹穴32. . . Pocket

(1)、(2)、(3)、(4)...分別為樹木支持施工方法流程圖的步驟編號(1), (2), (3), (4). . . Step number of the flow chart of the tree support construction method

圖1為本發明樹木支持施工裝置的側視示意圖。Figure 1 is a side elevational view of the tree support construction apparatus of the present invention.

圖2為本發明樹木支持施工裝置的上視示意圖。2 is a top plan view of the tree supporting construction device of the present invention.

圖3為本發明固定架結合第一固定部、第二固定部及第三固定部的前視示意圖。3 is a front elevational view showing the fixing frame of the present invention in combination with the first fixing portion, the second fixing portion and the third fixing portion.

圖4為本發明固定架結合第一固定部、第二固定部及第三固定部的側視示意圖。4 is a side view showing the fixing frame of the present invention in combination with the first fixing portion, the second fixing portion and the third fixing portion.

圖5為本發明固定架結合木樁的上視示意圖。Figure 5 is a top plan view of the fixing frame combined with the wooden pile of the present invention.

圖6為本發明第一扣合單元的側視示意圖。Figure 6 is a side elevational view of the first fastening unit of the present invention.

圖7為本發明固定架結合木樁、第一帶體及第二帶體的前視示意圖。Figure 7 is a front elevational view of the fixing frame combining the wooden pile, the first belt body and the second belt body according to the present invention.

圖8為本發明固定架結合木樁及第一帶體的側視示意圖。Figure 8 is a side elevational view of the fixing frame combined with the wooden pile and the first belt body of the present invention.

圖9為本發明樹木支持施工方法的流程圖。Figure 9 is a flow chart of the tree supporting construction method of the present invention.

1...樹木支持施工裝置1. . . Tree support construction unit

11...木樁11. . . Wooden pile

12...固定架12. . . Fixing frame

13...第一束緊件13. . . First tightening

131...第一扣合單元131. . . First fastening unit

132...第一帶體132. . . First belt

14...第二束緊件14. . . Second tightening

141...第二扣合單元141. . . Second fastening unit

142...第二帶體142. . . Second belt

136...第一分解段136. . . First decomposition segment

2...樹木2. . . Trees

21...土球twenty one. . . Earth ball

211...側端面211. . . Side end face

212...上端面212. . . Upper end

3...土地3. . . land

31...土壤31. . . soil

32...凹穴32. . . Pocket

Claims (10)

一種樹木支持施工裝置,包括:
複數支木樁,該木樁具有上端面及側端面;
複數個固定架,該固定架設有一第一定位單元及一第二定位單元;
一第一束緊件,包括一第一扣合單元結合一第一帶體;
其特徵在於:該固定架對應於該木樁的上端面的位置樞接一第一固定部;該第一固定部具有一尖端;該尖端釘入該上端面;該固定架藉由該第一定位單元及該第二定位單元分別結合該第一帶體,使該第一帶體獲得定位並壓迫該側端面抵靠該固定架;該第一束緊件束縛該複數支木樁及該複數個固定架圍繞於一樹木的土球的周邊,藉由該第一扣合單元扣合該第一帶體使該複數支木樁及該複數個固定架緊密的抵靠該土球的側端面,以穩固的支持該樹木。
A tree supporting construction device comprising:
a plurality of wooden piles having an upper end surface and a side end surface;
a plurality of fixing frames, the fixing frame is provided with a first positioning unit and a second positioning unit;
a first tightening member comprising a first fastening unit coupled to a first strap;
The fixing frame is pivotally connected to a first fixing portion corresponding to the position of the upper end surface of the stake; the first fixing portion has a tip end; the tip is screwed into the upper end surface; the fixing frame is configured by the first The positioning unit and the second positioning unit respectively combine the first belt body to position the first belt body and press the side end surface against the fixing frame; the first tightening member binds the plurality of piles and the plural The fixing frame surrounds the periphery of the soil ball of a tree, and the first fastening unit fastens the first belt body so that the plurality of wood piles and the plurality of fixing frames closely abut against the side end surface of the soil ball To support the tree firmly.
如申請專利範圍第1項所述的樹木支持施工裝置,其中該固定架對應於該側端面的位置,分別結合一第二固定部及一第三固定部;複數釘子分別穿過該第二固定部及該第三固定部的孔釘入該側端面,使該固定架更穩固的結合該木樁。The tree supporting construction device according to the first aspect of the invention, wherein the fixing frame corresponds to the position of the side end surface, respectively combining a second fixing portion and a third fixing portion; the plurality of nails respectively pass through the second fixing The hole of the third fixing portion is nailed into the side end surface, so that the fixing frame is more firmly combined with the wooden pile. 如申請專利範圍第2項所述的樹木支持施工裝置,進一步包括一第二束緊件;該第二束緊件包括一第二扣合單元結合一第二帶體;該固定架設有一第三定位單元;該固定架藉由該第三定位單元結合該第二帶體,使該第二帶體獲得定位,並藉由該第二扣合單元固定該第二帶體,使該第二帶體分別緊密抵靠該土球的側端面及上端面,並壓迫該固定架緊密抵靠該土球的側端面,以更穩固的支持該樹木。The tree supporting construction device according to claim 2, further comprising a second tightening member; the second tightening member comprises a second fastening unit coupled with a second strap; the fixing bracket is provided with a third Positioning unit; the fixing frame is coupled to the second belt body by the third positioning unit to obtain the positioning of the second belt body, and the second belt body is fixed by the second fastening unit to make the second belt The body closely abuts the side end surface and the upper end surface of the soil ball, and presses the fixing frame tightly against the side end surface of the soil ball to support the tree more stably. 如申請專利範圍第3項所述的樹木支持施工及裝置,其中該第一扣合單元及該第二扣合單元分別具有一剌輪及一彈性止擋件;藉由該彈性止擋件擋住該刺輪的齒,使該刺輪只能單向轉動;當使該彈性止擋件脫離擋住該齒的位置時,該第一帶體即由緊束狀態快速變成鬆開狀態;該第一帶體具有由可分解的材料製成的第一分解段或該第二帶體具有由可分解的材料製成的第二分解段中至少一者。The tree supporting construction and device of the third aspect of the invention, wherein the first fastening unit and the second fastening unit respectively have a wheel and an elastic stop; and the elastic stopper blocks The teeth of the ratchet wheel enable the ratchet wheel to rotate only in one direction; when the elastic stop member is disengaged from the position blocking the tooth, the first belt body is quickly changed from the tightened state to the released state; the first The belt body has a first decomposition section made of a decomposable material or the second belt body has at least one of a second decomposition section made of a decomposable material. 如申請專利範圍第4項所述的樹木支持施工裝置,其中該第一定位單元、該第二定位單元及該第三定位單元分別為一穿孔;該固定架設有一第一抵靠部、一第二抵靠部及一第三抵靠部;該第一帶體及該第二帶體分別穿過該等穿孔,且分別抵靠該第一抵靠部、該第二抵靠部及該第三抵靠;該第一帶體及該第二帶體分別由可分解的材料製成中至少一者。The tree supporting construction device of the fourth aspect of the invention, wherein the first positioning unit, the second positioning unit and the third positioning unit are respectively a perforation; the fixing frame is provided with a first abutting portion, a first a second abutting portion and a third abutting portion; the first belt body and the second belt body respectively pass through the perforations, and respectively abut the first abutting portion, the second abutting portion and the first Three abutting; the first tape body and the second tape body are each made of at least one of a decomposable material. 一種樹木支持施工方法,包括如下步驟:
(1) 將複數支木樁分別打入一樹木的土球週邊的土壤內;其中該土球係被放置在土地的一凹穴內,該木樁具有上端面及側端面;
(2)使與一固定架樞接的一第一固定部的尖端釘入該上端面;其中該固定架具有一第一定位單元及一第二定位單元;
(3)使該第一定位單元及該第二定位單元分別結合一第一束緊件的一第一帶體,使該第一帶體獲得定位並壓迫該側端面抵靠該固定架;該第一束緊件束縛該複數支木樁及複數個固定架圍繞於該土球的周邊,藉由該第一束緊件的一第一扣合單元扣合該第一帶體,使該複數支木樁及該複數個固定架緊密的抵靠該土球的側端面,以穩固的支持該樹木。
A tree support construction method includes the following steps:
(1) driving a plurality of wooden stakes into the soil surrounding the soil ball of a tree; wherein the soil ball is placed in a recess of the land, the stake having an upper end surface and a side end surface;
(2) the tip end of a first fixing portion pivotally connected to a fixing frame is inserted into the upper end surface; wherein the fixing frame has a first positioning unit and a second positioning unit;
(3) the first positioning unit and the second positioning unit are respectively coupled to a first belt body of the first tightening member, so that the first belt body is positioned and the side end surface is pressed against the fixing frame; The first tightening member binds the plurality of wooden piles and the plurality of fixing brackets around the periphery of the soil ball, and the first fastening unit of the first tightening member is fastened to the first belt body to make the plural The branch pile and the plurality of fixing frames closely abut against the side end surface of the soil ball to stably support the tree.
如申請專利範圍第6項所述的樹木支持施工方法,其中該步驟(2)中進一步包括:
使複數釘子分別穿過與該固定架結合的一第二固定部及一第三固定部的孔釘入該側端面,使該固定架更穩固的結合該木樁。
The tree supporting construction method according to claim 6, wherein the step (2) further comprises:
The plurality of nails are respectively inserted into the side end faces through the holes of a second fixing portion and a third fixing portion which are combined with the fixing frame, so that the fixing frame is more firmly combined with the wooden pile.
如申請專利範圍第7項所述的樹木支持施工方法,其中該固定架設有一第三定位單元;該步驟(3)之後進一步包括如下步驟:
(4) 使該第三定位單元結合一第二束緊件的一第二帶體,使該第二帶體獲得定位,並藉由該第二束緊件的一第二扣合單元固定該第二帶體,使該第二帶體分別緊密抵靠該土球的側端面及上端面,並壓迫該固定架緊密抵靠該土球的側端面,以更穩固的支持該樹木。
The tree supporting construction method according to the seventh aspect of the invention, wherein the fixing frame is provided with a third positioning unit; the step (3) further comprises the following steps:
(4) combining the third positioning unit with a second strap of the second tightening member to position the second strap, and fixing the second strap by the second fastening unit of the second tightening member The second belt body is arranged to closely abut the side end surface and the upper end surface of the soil ball, respectively, and presses the fixing frame tightly against the side end surface of the soil ball to support the tree more stably.
如申請專利範圍第8項所述的樹木支持施工方法,其中該第一扣合單元及該第二扣合單元分別具有一剌輪及一彈性止擋件;藉由該彈性止擋件擋住該刺輪的齒,使該刺輪只能單向轉動;當使該彈性止擋件脫離擋住該齒的位置時,該第一帶體即由緊束狀態快速變成鬆開狀態。The tree supporting construction method of claim 8, wherein the first fastening unit and the second fastening unit respectively have a wheel and an elastic stop; the elastic stopper blocks the The teeth of the ratchet wheel are such that the ratchet wheel can only rotate in one direction; when the elastic stop member is disengaged from the position blocking the tooth, the first belt body is quickly changed from the tightened state to the released state. 如申請專利範圍第9項所述的樹木支持施工方法,其中該第一定位單元、該第二定位單元及該第三定位單元分別為一穿孔;該固定架設有一第一抵靠部、一第二抵靠部及一第三抵靠部;該第一帶體及該第二帶體分別穿過該等穿孔,且分別抵靠該第一抵靠部、該第二抵靠部及該第三抵靠。The tree supporting construction method according to claim 9, wherein the first positioning unit, the second positioning unit and the third positioning unit are respectively a perforation; the fixing frame is provided with a first abutting portion, a first a second abutting portion and a third abutting portion; the first belt body and the second belt body respectively pass through the perforations, and respectively abut the first abutting portion, the second abutting portion and the first Three to resist.
TW100137425A 2011-10-14 2011-10-14 Support construction method and device for tree TWI450683B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100137425A TWI450683B (en) 2011-10-14 2011-10-14 Support construction method and device for tree

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100137425A TWI450683B (en) 2011-10-14 2011-10-14 Support construction method and device for tree

Publications (2)

Publication Number Publication Date
TW201315371A true TW201315371A (en) 2013-04-16
TWI450683B TWI450683B (en) 2014-09-01

Family

ID=48802745

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100137425A TWI450683B (en) 2011-10-14 2011-10-14 Support construction method and device for tree

Country Status (1)

Country Link
TW (1) TWI450683B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104838970A (en) * 2015-06-01 2015-08-19 马卓娅 Spreader mechanism for tree branch support

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200926962A (en) * 2007-12-28 2009-07-01 Sheng-Huei Jou Assistant device of making foundation for tree
JP2009219432A (en) * 2008-03-17 2009-10-01 Adachi Trading:Kk Underground support for tree
CN201319782Y (en) * 2008-10-10 2009-10-07 李建国 Ground anchor type underground supporting device for trees
WO2010073395A1 (en) * 2008-12-26 2010-07-01 東邦レオ株式会社 Tree supporting method, and supporting tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104838970A (en) * 2015-06-01 2015-08-19 马卓娅 Spreader mechanism for tree branch support

Also Published As

Publication number Publication date
TWI450683B (en) 2014-09-01

Similar Documents

Publication Publication Date Title
JP3602948B2 (en) Revegetation method and revegetation device using adsorptive vine plants
AU2006345351B2 (en) A planting slope structure
US7640695B2 (en) Planter box
US8316579B1 (en) Landscape stabilization systems and methods
TWI450683B (en) Support construction method and device for tree
US20030000138A1 (en) V-strap tree stabilizing assembly
JP4480151B2 (en) Underground support for wooden transplanted trees and support method
JP2007306862A (en) Wall surface greening panel, and wall surface greening method of construction using the same
TWI458427B (en) Support construction method and device for tree that fit for trees soil ballscale
JP2010213622A (en) Planting mat for wall surface, and method for greening wall surface
JP4633540B2 (en) Planting planter on uneven surface of mortar and concrete
JPH11239422A (en) Fastener for root ball of planting tree
JP2004141174A (en) Vegetable unit and method for receiving vegetable in the vegetable unit
TWM492606U (en) Hidden type tree support system
JP3965093B2 (en) Slope landscape planting planter, base material storage device for slope landscape landscape greening, and planting device for slope landscape using the planter
JPH1014415A (en) Planting apparatus
JP3057675B2 (en) Tree support construction method
JP2004073075A (en) Supporting structure and method for planting tree
JP2013051903A (en) Construction method for greening wall surface
JP2573794Y2 (en) Tree planting support
JPS5930061Y2 (en) Equipment for installing soil bags on montal or concrete sprayed slopes
CN211510031U (en) Forestry sapling is planted and is used fixing device
JP2004089037A (en) Structure for post-planting care of tree and method for post-planting care of tree
JPH0313847B2 (en)
JPH0738384Y2 (en) Equipment for greening protection on concrete surface