TW201243131A - Shower head - Google Patents

Shower head Download PDF

Info

Publication number
TW201243131A
TW201243131A TW100115156A TW100115156A TW201243131A TW 201243131 A TW201243131 A TW 201243131A TW 100115156 A TW100115156 A TW 100115156A TW 100115156 A TW100115156 A TW 100115156A TW 201243131 A TW201243131 A TW 201243131A
Authority
TW
Taiwan
Prior art keywords
cover
hole
handle
water
lifting seat
Prior art date
Application number
TW100115156A
Other languages
Chinese (zh)
Other versions
TWI470137B (en
Inventor
kun-zhi Chen
Original Assignee
Sunrise Shower Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sunrise Shower Products Co Ltd filed Critical Sunrise Shower Products Co Ltd
Priority to TW100115156A priority Critical patent/TWI470137B/en
Publication of TW201243131A publication Critical patent/TW201243131A/en
Application granted granted Critical
Publication of TWI470137B publication Critical patent/TWI470137B/en

Links

Landscapes

  • Nozzles (AREA)
  • Bathtubs, Showers, And Their Attachments (AREA)

Abstract

A shower head comprises a housing, a lifting base, a plurality of sprinkler heads, a plastic liner, a metal seal cap, and an operation handle set, wherein a joint part is mounted at the top of housing, an opening formed at the bottom, and a handle installation hole is set at one side of the outer periphery. The lifting base has a flat sheet, a pipe extended upwardly from the center of the sheet. The top of the pipe is sealed and connected to a suspending seat with a longitude hole and a plurality of hanging grooves uniformly circularly installed at the peripheral side of the sheet. A groove is installed at the upper section of the sprinkler head periphery, and a water outlet port is formed from the expanded bottom section. A plurality of water outlet channels installed at the water outlet port. The plastic liner is injection molded with a through hole formed in the center. A plurality of through holes circularly are formed at the outside of the through hole and an appropriate flange is downwardly formed from the peripheral of each through hole. A plurality of through holes formed on the cover of metal seal cap and an accommodation room is recessed at the top plane with a guiding rod upwardly extended from the center of the accommodation room. The operation handle set has a control part with one end eccentrically extended with a connection rod and the other end sleevedly locked by a screw to be mutually engaged with a pulling handle.

Description

201243131 六、發明說明: 【發明所屬之技術領域】 本發明係有關於一種「淋浴灑水頭」,尤指一種出水順暢且均 勻之淋 >谷丨麗水頭者。 【先前技術】 按’目前一般習知之淋浴灑水頭,多如第六圖所示,該淋浴 麗水頭(70)係包含有:一罩殼(71)、一昇降座(72)、數灑>水頭 (73)、一金屬封蓋(74)及一操作把手組(75),其中,罩殼(71)上 方設有一接合件(711)(即萬向接頭),以該接合件(711)將能用來 啣接水源,下方形成有一開口(712),該開口(712)係供昇降座(72) 連同灑水頭(73)放入後,再以金屬封蓋(74)之蓋合進行封閉,而 在外周一側上則設有一連通其内部空間之把手安裝孔(713),昇降 座(72)具有一平板(721),平板(721)中央往上伸出有一管體 (722),管體(722)頂端封閉接設有一懸吊座(723),懸吊座(723) 中央開設有一長條孔(724),而在平板(721)周側則平均環設有數c 形狀之掛槽(725),灑水頭(73)係以外周上段之凹溝(731)卡入掛 槽(725),而得以平均環設在昇降座(72)之平板(721)上,其下段 乃擴大形成有出水部(732),出水部(732)上並順著其表面起伏而 設有數橄欖狀之出水槽道(733) ’金屬封蓋(74)為銅製品,其蓋面 乃以鑽孔、餹孔等機械加工之方式而形成有多數之穿孔(741),頂 201243131 面中央並往上伸出有一導桿(742),操作把手組(75)具有一控制件 (751),該控制件(751)—端乃偏心伸出有一連桿(752),另一端則 供一鎖螺(753)套掣後,再與扳動把手(754)城組定。 其組合時,係將灑水頭(73)逐一安裝在昇降座(72)之平板 (721)上,再連同昇降座(72)一起從開口(712)放入罩殼(71)内, 备金屬封蓋(74)蓋合於開口(712),並令導桿(742)往管體(722)内 部做伸入,而穿孔(741)則提供灑水頭(73)穿置伸出時,即能達到 昇降座(72)與丨脉頭(73)之套置限位,又操作把手組(75)係利用 鎖螺(753)之螺合’而得以裝設在把手安裝孔(713)上,該在安裝 後,操作把手組(75)之連桿(752)係會順勢插入於昇降座(72)之長 條孔(724)中,俾利用扳動把手(754)之操作,帶動連桿(752)偏心 旋轉,使昇降座(72)能受到連動而帶動各灑柄(73)_起產生同 步之上、下歸’讓從出讀道⑽)流出之水缝_出水部 (732)與穿孔(741)遮蔽位置之改變’來達到改變永花形狀與大小 之目的,以視每個人的使用需求不同,而加以調控者。 然,如上所述之習知結構於實際應财仍存在有下述之問題 點·()其穿孔(741)機械加工與加工後電鍍之精度與準確度都難 以被掌控,若施作不佳,並以該金屬封蓋⑽之穿孔(741)直接與 麗水頭⑽相?置齡時,即纽賴辆⑽鱗孔(741)無法 保持在同-中心位置上之問題(如第七圖及第八圖所示),該問題 4 201243131 將會嚴重影響水花分佈之均勻與水流流出之順暢度,如此一來, 將讓所預期之出水效果被大打折扣者;(二)其金屬封蓋⑽整體 均為銅製品’故所需之成本係較高,該麵業之競爭上將無法產 生優勢者。 故本發明人即有鑑於此,乃思及創作的意念,遂以多年的經 驗加以設計,經多謂討並稱樣品試驗,及多次修正改良,乃 推出本發明。 【發明内容】 欲解決之技術問題點: 習知淋浴麗水頭穿孔之精度與準確度難以被掌控,且金屬封 蓋所需之成本高,此乃欲解決之技術問題點者。 解決問題之技術特點: 本發明之淋洛水頭,其包含有:—罩殼、一昇降座、數灑 水頭、-塑料襯塊、-金屬封蓋及一操作把手組,其中,罩殼上 方叹有#合件’以該接合件將能用來喻接水源,下方形成有一 開口’ 係供昇降座連_水麵_襯塊放人後,再以金 屬封蓋之蓋合進行關’而在外周—侧上則設有—連通其内部空 間之把手絲孔,昇降座具有-平板,平板中央往上伸出有一管 體’管體頂端封閉接設有一懸吊座,懸吊座中央開設有-長條孔, 而在平__平均環設嫌e職之_,縣藝以外周上 201243131 丰又之凹/冓卡入掛槽,而得以平均環設在昇降座之平板上其下段 乃擴大形成有出水部,出水部上並順著其表面起伏而設有數橄欖 狀之出水槽道,塑料襯塊乃射出成型,其中央形成有一通過孔, 通過孔外方環設有數穿孔,且該每一穿孔周侧係再往下形成有一 適段之凸緣,金屬封蓋為銅製品,其蓋面乃以鑽孔、餹孔等機械 加工之方式而形成有多數之穿孔,頂面設有一凹陷狀之容置空 間,且該容置空間中央係往上伸出有一導桿,操作把手組具有一 控制件,該控制件一端乃偏心伸出有一連桿,另一端則供一鎖螺 套掣後’再與扳動把手相雜定;藉此,係能構成該淋浴麗水頭 者。 對照先前技術之功效: (一) 本發明之淋浴灑水頭,其塑膠射出之成品品質穩定,不 义j各種外界因素影響即破壞其精度與準確度,故縱使金屬封 蓋之穿孔在機械加工或電鍍後產生有較大之誤差,亦能利用塑料 襯塊之套合來提供修正,讓灑水軸塑料她之穿孔能—直保持 在同一中心位置上,俾令水流之流出能更順暢、均勻,以發揮其 預期效果者。 (二) 本發明之淋浴灑水頭,其金屬封蓋所設之容置空間將能 有效減少銅等金屬之用量’當塑料襯塊放上時,又麟該容置空 間填滿’以提供正t使用’ _該結構之設計’將能有效節省成 6 201243131 本,該在同業之競爭上將更具優勢者。 【實施方式】 為使貴審查委員對本發明之目的、特徵及功效能夠有更進 一步之瞭解與認識,以下茲請配合【圖式簡單說明】詳述如后: 通常根據本發明,請先由第一圖至第三圖所示觀之,其包含 有:一罩殼(10)、一昇降座(20)、數灑水頭(3〇)、一塑料襯塊(4〇)、 一金屬封蓋(50)及一操作把手組(60),其中,罩殼(1〇)上方設有 -接合件(11)(即萬向接頭),以該接合件⑴)將能用來喻接水 源,下方形成有-開口(12) ’該開σ⑽係供昇降座⑽連同灑 水頭⑽與簡峨⑽)放人後’再以金柄蓋⑼)之蓋合進行 封閉’而在外周-侧上則設有一連通其㈣空間之把手安裝孔 (13),昇降座(20)具有-平板⑻,平板⑵)中央往上伸出有一 g體(22),管體(22)頂端封閉接設有一懸吊座(23),懸吊座(μ) 中央開設有-長條孔(24) ’而在平板⑵)周綱平均環設有數c 形狀之掛槽(25) ’丨麗柄⑽)似外周上段之凹溝(31)卡入掛槽 (25) ’而得以平均環設在昇降座⑽之平板⑵)上其下段乃擴 大形成有出水部⑽,出水部⑽上並順著其表面起伏而設有數 撖棍狀之$水槽道(33),_姆⑽乃射$制,其中央形成 有-通過孔(41) ’通過孔(41)外方環設有數穿孔(42),且該每一 穿孔(42)周側係再往下形成有—適段之凸緣⑽,金屬封蓋⑽ 201243131 為銅製品,其蓋面乃以鑽孔、餹孔等機械加工之方式而形成有多 數之穿孔(51),頂面設有一凹陷狀之容置空間(52),且該容置空 間(52)中央係往上伸出有一導桿(53),操作把手組(6〇)具有一控 制件(61),該控制件(61)—端乃偏心伸出有一連桿(62),另一端 則供一鎖螺(63)套掣後,再與扳動把手(64)相崁組定。 其結構之組合,復請由第一圖、第四圖及第五圖所示觀之, 塑料襯塊(40)係以通過孔(41)提供導桿(53)穿過閃避,並以凸緣 (43)塞入於穿孔(51)中定位,而令該塑料襯塊(4〇)能契合填滿於 金屬封蓋(50)之容置空間(52)中,灑水頭(30)則逐一安裝在昇降 座(20)之平板(21)上,再連同昇降座(2〇)一起從開口(12)放入罩 殼(1〇)内,當金屬封蓋(50)蓋合於開口(12),並令導桿(53)往管 體(22)内部做伸人,而穿孔(42)(51)則提供灑水頭⑽)穿置伸出 時’即此達到昇降座(2〇)與灌水頭⑽)之套置限位,又操作把手 組⑽)係利用鎖螺⑽)之螺合,而得以裝設在把手安裝孔⑴) 上’該在安裝後’獅把手組⑽)之連桿⑽)齡順勢插入於昇 降座(20)之長條孔(24)中,俾利用扳動把手⑽之操作,帶動連 #(62)偏錢轉’使昇降座⑽)能受到連㈣帶動錢水頭⑽) 生同:y之上、下位移,讓從出水槽道(33)流出之水流能利 用出水部(32)與塑料襯塊⑽)穿孔(42)遮蔽位置之改變來達到 改變水化雜與大小之目的,以視每個人的使用需求不同,而加 8 201243131 以調控者。 藉由上述淋浴壤水頭具有下列之優點:(一)其塑膠射出之成 品品質穩定,不易受到各種外界因素影響即破壞其精度與準確 度,故縱使金屬封蓋(50)之穿孔(51)在機械加工或電鑛後產生有 較大之誤差,亦能利用塑料襯塊(4〇)之套合來提供修正,讓灑水 頭(30)與塑料襯塊(4〇)之穿孔(42)能一直保持在同一中心位置上 (睛同時由第四圖及第五圖所示觀之),俾令水流之流出能更順 暢、均勻,以發揮其預期效果者;(二)其金屣封蓋(50)所設之容 置空間(52)將能有效減少銅等金屬之用量,當塑料襯塊⑽)放上 時,又能將該容置空間⑽填滿,以提供正常,_該結構 之設計’將能有效節省成本,該顧#之競爭上將更具優勢者。 唯以上所述者’僅為本發明之-較佳實施例而已,當不能以 之限定本發明實施之範圍;即大凡依本發明申請專職圍所作之 均等變化絲飾,皆應仍屬本創作專利涵蓋之範圍内。 201243131 【圖式簡單說明】 第一圖:係本發明之立體組合圖。 第二圖:係本發明之立體分解圖。 第三圖:係本發·料襯制-角度之立細。 第四圖:係本發明出水狀態之剖面暨局部放大圖。 第五圖:係本發邮-角度之組合剖·局部放大圖。 第六圖:係習知之立體分解圖。 第七圖:制域水職穿料在同—巾雜置之邮暨局部放 中心位置之另1度剖面 第八圖:係習知灑水頭與穿孔不在同一 暨局部放大圖。 【主要元件符號說明】 本發明部份: 罩殼-----(10) 開口-----(12) 昇降座----(20) 管體-----(22) 長條孔---一(24) 灑水頭----(30) 出水部----(32) 接合件----(11) 把手安裝孔一一(13) 平板-----(21) 懸吊座----(23) 掛槽-----(25) 凹溝-----(31) 出水槽道---(33) 201243131 塑料襯塊一一 -(40) 通過孔一一 ——(41) 穿孔---- -(42) 凸緣--- --(43) 金屬封盖-- -(50) f孔--- --(51) 容置空間一一 -(52) 轉--- —— (53) 操作把手組——(60) 控制件—— --(61) 連桿---- -(62) 鎖嫘--- --(63) 扳動把手-- -(64) 習知部份: 淋浴灑水頭一 -(70) 罩殼--- ——(71) 接合件--- -(711) 開口--- ——(712) 把手安裝孔一 -(713) 昇降座-- ——(72) 平板---- — (721) 管體--- --(722) 懸$座--- -(723) 長條孑L-- --(724) 掛槽---- -(725) 灑水頭-- ——(73) 凹溝------ -(731) 出水部—— --(732) 出水槽道-- -(733) 金屬封蓋一 ——(74) 穿孔---- — (741) 轉--- --(742) 操作把手組一 -(75) 控制件一_ --(751) 連桿---- -(752) 鎖螺--- --(753) 板動把手---(754)201243131 VI. Description of the Invention: [Technical Field to Be Invented by the Invention] The present invention relates to a "shower sprinkler head", and more particularly to a smooth and uniform water discharge > Gu Lili head. [Prior Art] According to the current conventional shower sprinkler head, as shown in the sixth figure, the shower Lishui head (70) includes: a cover (71), a lifting seat (72), and several sprinkles. a water head (73), a metal cover (74) and an operating handle set (75), wherein a cover member (711) (ie, a universal joint) is disposed above the cover (71), and the joint member (711) It can be used to connect the water source, and an opening (712) is formed under the opening (712) for the lifting seat (72) to be placed together with the sprinkler head (73), and then covered with a metal cover (74). The cover is closed, and a handle mounting hole (713) is provided on the outer peripheral side to communicate with the inner space. The lift base (72) has a flat plate (721), and a flat body (722) protrudes upward from the center of the flat plate (721). a hanging seat (723) is closed at the top end of the pipe body (722), a long hole (724) is opened in the center of the hanging seat (723), and a number c shape is formed on the outer side of the flat plate (721). The hanging groove (725), the sprinkler head (73) is inserted into the hanging groove (725) by the groove (731) in the upper part of the outer circumference, and is evenly arranged on the flat plate (721) of the lifting seat (72), and the lower part thereof The water outlet portion (732) is enlarged, and the water outlet portion (732) is undulated along the surface thereof to provide a plurality of olive-shaped outlet channels (733). The metal cover (74) is a copper product, and the cover surface is drilled. A hole (741) is formed by machining such as a hole or a bore, and a guide rod (742) is protruded from the center of the top surface of the top 201243131, and the control handle set (75) has a control member (751). The control member (751) is eccentrically extended with a connecting rod (752), and the other end is provided with a locking screw (753), and then assembled with the pulling handle (754). In combination, the sprinkler heads (73) are mounted one by one on the flat plate (721) of the lifting base (72), and then placed together with the lifting base (72) into the casing (71) from the opening (712) for metal preparation. The cover (74) covers the opening (712) and extends the guide rod (742) into the interior of the tubular body (722), and the perforation (741) provides the sprinkler head (73) when it is inserted and extended, that is, The positioning limit of the lifting seat (72) and the cymbal head (73) can be achieved, and the operating handle set (75) is mounted on the handle mounting hole (713) by the screwing of the locking screw (753). After the installation, the connecting rod (752) of the operating handle set (75) is inserted into the long hole (724) of the lifting seat (72), and the operation of the pulling handle (754) is used to drive the connection. The rod (752) is eccentrically rotated, so that the lifting seat (72) can be interlocked to drive the sprinklers (73) to generate a water gap_water outlet portion that is synchronized from the upper reading channel (10). And the perforation (741) mask position change 'to achieve the purpose of changing the shape and size of the permanent flower, to adjust to each person's use needs, and to adjust. However, the conventional structure as described above still has the following problems in the actual financial situation. () The accuracy and accuracy of the perforation (741) machining and post-processing plating are difficult to control, if poorly applied And with the perforation (741) of the metal cover (10) directly with the Lishui head (10)? When the age is set, that is, the problem that the New Zealand (10) scale hole (741) cannot be kept at the same-center position (as shown in the seventh and eighth figures), the problem 4 201243131 will seriously affect the uniformity of the water distribution. The smoothness of the outflow of water will, as a result, the expected effluent effect will be greatly reduced; (2) the metal cover (10) is entirely copper products, so the cost required is higher, the competition of the face industry Admiral can't produce the advantage. Therefore, the present inventors have invented the present invention in view of the fact that the idea of creation and creation has been designed with many years of experience, and has been referred to as a sample test and a plurality of corrections. SUMMARY OF THE INVENTION Technical problems to be solved: It is difficult to be controlled by the precision and accuracy of the perforation of the shower head, and the cost of the metal cover is high, which is a technical problem to be solved. Technical features for solving the problem: The leaching water head of the present invention comprises: a cover shell, a lifting seat, a plurality of sprinkler heads, a plastic pad, a metal cover and an operating handle set, wherein the cover is sighed There is a #合件', the joint will be used to connect the water source, and an opening is formed underneath for the lifting seat _ water surface _ pad is released, and then closed with a metal cover. The outer circumference-side is provided with a handle wire hole connecting the inner space thereof, the lifting seat has a flat plate, and a tube body is protruded upward from the center of the flat plate. The top end of the pipe body is closed and connected with a suspension seat, and the suspension seat is opened at the center. -The long hole, and the average __ average ring is set to _ _, the county art outside the week 201243131 Feng yin concave / 冓 card into the hanging slot, and the average ring is placed on the flat plate Expanding and forming a water outlet portion, and having an olive-shaped outlet channel along the surface of the water outlet portion, the plastic pad is injection-molded, and a through hole is formed in the center thereof, and a plurality of perforations are provided through the outer ring of the hole, and the hole is formed Each perforated circumferential side is further formed with a suitable convex portion The metal cover is a copper product, and the cover surface is formed by drilling, boring and the like to form a plurality of perforations, and the top surface is provided with a recessed accommodating space, and the central space of the accommodating space is upward Extending a guide rod, the operating handle set has a control member, and one end of the control member is eccentrically extended with a connecting rod, and the other end is provided with a locking nut sleeve, and then is mixed with the pulling handle; Can constitute the shower Lishui head. Compared with the efficacy of the prior art: (1) The shower sprinkler of the present invention has stable quality of the finished product of the plastic injection, and the influence of various external factors destroys the precision and accuracy, so that even the perforation of the metal cover is mechanically processed or There is a large error after electroplating, and the plastic pad can be used to provide correction, so that the sprinkler shaft plastic can be held in the same center position, so that the flow of water can be smoother and evener. To play its intended effects. (2) According to the shower sprinkler of the present invention, the accommodating space provided by the metal cover can effectively reduce the amount of metal such as copper. When the plastic lining is placed, the accommodating space is filled up to provide positive Using ' _ the design of the structure' will effectively save 6 201243131, which will be more advantageous in the competition of the industry. [Embodiment] In order to enable the reviewing committee to have a better understanding and understanding of the purpose, features and effects of the present invention, please refer to the following [detailed description of the drawings] as follows: Generally, according to the present invention, please first As shown in the figure to the third figure, it comprises: a casing (10), a lifting seat (20), a number of sprinkler heads (3 inches), a plastic pad (4 inches), and a metal cover. (50) and an operating handle set (60), wherein a cover member (11) is disposed above the cover (1), and the joint member (1) can be used to connect the water source. Formed below - opening (12) 'The opening σ (10) is used for the lifting seat (10) together with the sprinkler head (10) and the simple (10)), and then closed by the cover of the gold handle cover (9), and on the outer circumference side There is a handle mounting hole (13) connected to the (four) space, the lifting base (20) has a flat plate (8), a flat body (2) protrudes upwardly from a g body (22), and the top end of the pipe body (22) is closed and connected Suspension seat (23), suspension seat (μ) center opening - long hole (24) 'and in the flat plate (2)) the average ring of the circumference is provided with several c-shaped hanging grooves (25) 'Beautiful (10)) The groove (31) in the upper part of the outer circumference is caught in the hanging groove (25)' and is evenly ringed on the flat plate (2) of the lifting seat (10). The lower portion is enlarged to form the water outlet portion (10), and the water outlet portion (10) is followed by The surface of the undulating surface is provided with a number of crowbar-shaped $slots (33), and the _m (10) is made of a film, and the center is formed with a through hole (41). The outer ring of the hole (41) is provided with a plurality of perforations (42). And the peripheral side of each of the perforations (42) is further formed with a flange (10) of the appropriate section, and the metal cover (10) 201243131 is a copper product, and the cover surface is machined by drilling or boring. A plurality of perforations (51) are formed, and a top surface is provided with a recessed receiving space (52), and a guiding rod (53) extends upward from the center of the receiving space (52), and the handle set is operated (6〇). There is a control member (61), the control member (61) is eccentrically extended with a connecting rod (62), and the other end is provided with a locking screw (63), and then the handle (64) Set up accordingly. The combination of the structures is illustrated by the first, fourth and fifth figures. The plastic pad (40) is provided with a guide rod (53) through the hole (41) to evade and protrude. The edge (43) is inserted into the perforation (51) so that the plastic pad (4〇) can fit in the accommodating space (52) of the metal cover (50), and the sprinkler head (30) Installed one by one on the flat plate (21) of the lifting base (20), and then placed together with the lifting base (2〇) into the casing (1〇) from the opening (12), when the metal cover (50) is closed to the opening (12), and the guide rod (53) is extended to the inside of the pipe body (22), and the perforation (42) (51) is provided with the sprinkler head (10). When the penetrating piece is extended, the lifting seat is reached. ) and the irrigation head (10)), and the handle set (10) is screwed by the lock screw (10), and is mounted on the handle mounting hole (1)). After the installation, the lion handle set (10) The connecting rod (10) is inserted into the long hole (24) of the lifting seat (20), and the operation of the pulling handle (10) is used to drive the #(62) partial money to turn the lifting seat (10) to be connected. (4) Drive the money head (10)) Shengtong: y above and below the displacement, let the water outlet channel (33) The water flow can use the water outlet (32) and the plastic pad (10) to change the position of the perforation (42) to change the hydration and size, depending on the needs of each person, plus 8 201243131 to regulate By. The above-mentioned shower head has the following advantages: (1) the quality of the finished product of the plastic injection is stable, and it is not easily affected by various external factors, that is, the precision and accuracy are destroyed, so that the perforation (51) of the metal cover (50) is There is a large error after machining or electro-mine, and the plastic pad (4〇) can be used to provide correction, so that the sprinkler head (30) and the plastic pad (4〇) can be perforated (42). Keeping it at the same center position (the eyes are also viewed from the fourth and fifth figures), so that the flow of water can be smoother and more uniform to achieve its intended effect; (2) its gold cover (50) The accommodating space (52) is designed to effectively reduce the amount of metal such as copper. When the plastic pad (10) is placed, the accommodating space (10) can be filled to provide normality. The design 'will be able to save costs, and the competition will be more advantageous. The above description is only for the preferred embodiment of the present invention, and the scope of the present invention cannot be limited thereto; that is, the equal variation of the silk thread applied for the full-time application according to the present invention should still belong to the present creation. Within the scope of the patent. 201243131 [Simplified description of the drawings] The first figure is a three-dimensional combination diagram of the present invention. Second Figure: A perspective exploded view of the present invention. The third picture: the hairline and the material lining - the angle of the fine. Figure 4 is a cross-sectional view and a partial enlarged view of the effluent state of the present invention. The fifth picture: the combination of the postal-angle combination and partial enlargement. Figure 6: An exploded view of the familiarity. The seventh picture: the other part of the position of the water-filled material in the same area, the postal and the partial placement of the center, and the other part of the center. The eighth picture: the traditional sprinkler head and the perforation are not in the same cum partial enlargement. [Description of main component symbols] Part of the invention: Cover-----(10) Opening-----(12) Lifting seat----(20) Tube-----(22) Long Holes---One (24) Sprinkler head----(30) Water outlet----(32) Engagement----(11) Handle mounting hole one-to-one (13) Flat----- (21) Suspension seat----(23) Hanging trough-----(25) Groove-----(31) Sewage channel---(33) 201243131 Plastic pad one--( 40) Through the hole one--(41) Perforation-----(42) Flange----(43) Metal cover---(50) f hole----(51) Set space one--(52) turn--- —— (53) Operation handle set - (60) Control part - --(61) Connecting rod---- - (62) Locking--- - (63) Pull the handle --- (64) Conventional part: Shower sprinkler head - (70) Cover --- -- (71) Engagement --- (711) Opening --- —(712) Handle Mounting Hole One-(713) Lifting Seat---(72) Flat Plate----- (721) Pipe Body----(722) Hanging $ Block----(723) Long strips L-- -- (724) Hanging troughs ----- (725) Sprinkler heads --- (73) Grooves ------ - (731) Water outlets --- (732 Out of the sink channel --- (733) metal cover one - (74) wear ---- — (741) Turn--- --(742) Operation Handle Set One-(75) Control Piece _ --(751) Connecting Rod---- -(752) Locking Screw--- - -(753) Plate Handle ---(754)

Claims (1)

201243131 七、申請專利範圍: 1、—種淋浴濃水頭,其包含有:一罩殼、一昇降座、數灑 水頭、-塑料襯塊、—金屬封蓋及—操作把手組,其中,罩殼上 方設有-接合件,以該接合件將能用來鱗水源,下方形成有一 開口,該開口係供昇降座連同灑水頭與塑料襯塊放入後,再以金 屬封蓋之蓋合進行封閉,而在外周—側上則設有—連通其内部空 間之把手安裝孔,昇降座具有—平板,平板中央往上伸出有一管 體’管體頂端觸接設有—懸吊座,懸吊座巾央開财-長條孔, 而在平板關解均環設核掛槽,躲_斯耻段之凹溝 卡入掛槽’秘以平均環設在昇降紅平板上,其下段乃擴大形 成有出水部,出水部上並順著其表面起伏而設有數出水槽道,操 作把手組具有-控制件,該控制件—端乃偏心伸出有—連桿,另 -端則供-鎖螺套掣後,再與扳動把手域組定,其特徵在於: 塑料襯塊乃射域型,其巾央形成有—通過孔,通過孔外方 環設有數?孔’且該每-穿關_再往下形成有—適段之凸 緣,金屬封蓋之蓋面形成有多數之穿孔,頂面設有—凹陷狀之容 置空間’且该谷置空間中央係往上伸出有_導桿; 藉此,㈣襯塊細通過孔提供導桿穿過_,並以凸緣塞 入於穿孔中定位,騎該簡襯塊能契合填滿於金屬封蓋之容置 空間中,水賴逐-安裝在昇降座之平板上,再連同昇降座一 12 201243131 起從開Π放人罩殼内,當金屬封蓋蓋合於開σ,並令導桿往管體 内部做伸人,而穿孔則提賴水頭穿置伸出時,即能達到昇降座 與灌水頭之套置限位,又·把手__綱之螺合,而得以 裝設在把手安裝孔上,該在安裝後,操作把手組之連桿係會順勢 插入於昇降座之長航巾,俾_扳動把手之㈣,帶動連桿偏 心旋轉’使昇降座能㈣連動而帶動各财頭—域生同步之 上、下位移,讓從出水槽道流出之水流能利用丨水部與塑料襯塊 穿孔遮蔽位置之暖,來達献變水花雜與大小之目的,以視 每個人的使用需求不同,而加以調控者。 2、 根據申請專利範圍第1項所述之淋浴灑水頭,其中,接 合件乃為一萬向接頭者。 3、 根據申請專利範圍第1項所述之淋浴灑水頭,其中,平 板周侧係平均環設有數C形狀之掛槽者。 4、 根據申請專利範圍第1項所述之淋浴灑水頭,其中,金 屬封蓋乃為銅製品者。 5、 根據申凊專利範圍第1項所述之淋浴灑水頭,其中,金 屬封蓋之蓋面乃以鑽孔等機械加工之方式而形成有多數之穿孔 者0 13201243131 VII. Patent application scope: 1. A kind of shower concentrated water head, which comprises: a cover, a lifting seat, a number of sprinkler heads, a plastic pad, a metal cover and an operating handle set, wherein the cover The upper part is provided with a jointing member, which can be used for the scale water source, and an opening is formed below, the opening is for the lifting seat to be placed together with the sprinkler head and the plastic pad, and then closed by the cover of the metal cover. On the outer circumference-side, there is a handle mounting hole connecting the inner space thereof, the lifting seat has a flat plate, and a central body of the flat plate protrudes upwardly. The top end of the pipe body is connected with a suspension seat, and the suspension is suspended. The seat towel is opened for the fortune-long strip hole, and the slab is closed to the outer ring, and the nuclear groove is hidden. The groove of the _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The water outlet part and the water outlet part are provided with a plurality of water tank passages along the surface of the water outlet, and the operation handle group has a control member, the control member has an eccentric extension and a connecting rod, and the other end is provided with a lock sleeve. After that, it is combined with the handle handle field, which is characterized by Plastic pad is the radio field type, which is formed with a central towel - through holes through the outer ring is provided with several holes? The hole 'and the per-through _ further down is formed with a flange of the appropriate section, the cover of the metal cover is formed with a plurality of perforations, and the top surface is provided with a recessed accommodation space and the valley space The central system protrudes upward with a _ guide rod; thereby, (4) the pad is provided through the hole to provide a guide rod through the _, and is inserted into the perforation with the flange, and the simple pad can be fitted to the metal seal In the space of the cover, the water is installed on the flat plate of the lifting seat, and then placed in the cover with the lifting seat 12 201243131. When the metal cover is closed, the guide bar is closed. The extension of the inside of the pipe body, while the perforation is carried out when the water head is placed and extended, the positioning limit of the lifting seat and the filling head can be reached, and the handle __ is screwed into the handle. On the mounting hole, after the installation, the linkage of the operating handle set will be inserted into the long sling of the lifting seat, and the 把手 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The financial position - the upper and lower displacement of the domain, so that the water flowing out of the outlet channel can utilize the water and plastic blocks Warm the shielding position of the hole to offer change of the size of the object and the spray heteroaryl, each person to use depending on the needs, and to be regulators. 2. The shower sprinkler head according to claim 1, wherein the joint member is a unidirectional joint. 3. The shower sprinkler head according to claim 1, wherein the average circumference of the flat plate is provided with a plurality of C-shaped hanging grooves. 4. The shower sprinkler head according to claim 1, wherein the metal cover is a copper product. 5. The shower sprinkler head according to claim 1, wherein the cover of the metal cover is formed by drilling or the like to form a plurality of perforators.
TW100115156A 2011-04-29 2011-04-29 Shower sprinkler head TWI470137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100115156A TWI470137B (en) 2011-04-29 2011-04-29 Shower sprinkler head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100115156A TWI470137B (en) 2011-04-29 2011-04-29 Shower sprinkler head

Publications (2)

Publication Number Publication Date
TW201243131A true TW201243131A (en) 2012-11-01
TWI470137B TWI470137B (en) 2015-01-21

Family

ID=48093756

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100115156A TWI470137B (en) 2011-04-29 2011-04-29 Shower sprinkler head

Country Status (1)

Country Link
TW (1) TWI470137B (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWM311481U (en) * 2006-08-04 2007-05-11 Kuen-Jr Chen Improved structure of the water-ejection nozzle for bath
TWM365952U (en) * 2009-03-27 2009-10-01 Meng-Meng Chen Improved pad structure for flushing device of toilet bowl

Also Published As

Publication number Publication date
TWI470137B (en) 2015-01-21

Similar Documents

Publication Publication Date Title
US10239065B2 (en) Flow control component and shower
US10060109B2 (en) Lavatory drain
CN105937255A (en) Jet regulator
CN103443367A (en) Sanitary throughflow element with a throughflow regulator unit and method for producing same
TW201243131A (en) Shower head
CN205534472U (en) Stop valve open in usual that hidden flushing cistern used
CN201722739U (en) Dialing type water saving mechanism
CN202392176U (en) Multifunctional valve core capable of double channel switch and cold-hot water conversion
CN106090244B (en) Shower control device and shower bath
CN106090309B (en) A kind of faucet valve core
CN104565448A (en) Divider ceramic spool and shower valve block
CN204553928U (en) A kind of point ceramic water spool and shower valve body adopting
JPH0985132A (en) Sprinkler plate and shower head
CN103090054A (en) Multifunctional valve core with two-channel switching and hot and cold water conversion functions
CN106168296A (en) A kind of single cooling spool
US20080099094A1 (en) Water Saving Device
WO2020048179A1 (en) Water divider
CN205937855U (en) Water tap
US9261887B2 (en) Pressure balance valve
CN211329882U (en) Novel shower head capable of regulating speed through rotation
CN103375610A (en) Faucet for controlling cold water and hot water and displacement
CN210344393U (en) Shower device
CN203891135U (en) Telescopic basin water faucet
CN218881063U (en) Shower head fixed connection device
CN218883070U (en) Integrated water tap