TW201205505A - Change management analysis method, change management analysis apparatus, and change management analysis program - Google Patents

Change management analysis method, change management analysis apparatus, and change management analysis program Download PDF

Info

Publication number
TW201205505A
TW201205505A TW100105406A TW100105406A TW201205505A TW 201205505 A TW201205505 A TW 201205505A TW 100105406 A TW100105406 A TW 100105406A TW 100105406 A TW100105406 A TW 100105406A TW 201205505 A TW201205505 A TW 201205505A
Authority
TW
Taiwan
Prior art keywords
change
information
recorded
recording
layout
Prior art date
Application number
TW100105406A
Other languages
Chinese (zh)
Other versions
TWI437510B (en
Inventor
Satoshi Kai
Shin Ichi Sawamura
Satoshi Someya
Yoshinori Honda
Takeshi Aoki
Original Assignee
Hitachi Information & Amp Comm Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Information & Amp Comm Engineering Ltd filed Critical Hitachi Information & Amp Comm Engineering Ltd
Publication of TW201205505A publication Critical patent/TW201205505A/en
Application granted granted Critical
Publication of TWI437510B publication Critical patent/TWI437510B/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

An information processing apparatus performs processes of reading, from a storage unit, layout information of devices included in a room entry/exit management system in a predetermined area; receiving, through an input unit, a change scenario for a layout of the room entry/exit management system; displaying the layout information as a change configuration plan on an output unit in such a manner that, when the change scenario indicates addition or change of a device or the like, a candidate device including a function satisfying a request of a change content is identified by matching the change content against a product information table storing therein function information, and the candidate device is displayed additionally or in place of an existing device in a change location, and in such a manner that, when the change scenario indicates deletion of a device or the like, a device in the change location is deleted; and simulating a behavior in which the devices are run under an operation condition for the change configuration plan applied to the information on functions of devices in the product information table, and outputting a result in the displayed change configuration plan.

Description

201205505 六、發明說明: 【發明所屬之技術領域】 本發明係有關於變更管理分析方法、變更管理分析裝 置' 及變更管理分析程式’具體而言係有關於,能將房室 進出管理系統中的設置佈局變更之影響資訊,迅速且有效 率地提供給使用者的技術。 【先前技術】 房室進出管理系統,係於企業或組織的安全對策中, 擔任實體安全的核心之角色》在如此之房室進出管理系統 導入以前’是在建築物的入口或房間的門等裝上實體的Η 鎖’用來打開該門鎖所需的鑰匙,是由總務部或警衛室等 來管理。此時’通行者經常要登記在本子裡然後才能借出 、歸還該鑰匙。另一方面,在房室進出管理系統導入以後 ’就變成在建築物的入口或房間的門等設置認證裝置,_ 先對通行者配發非接觸IC卡等,以下記所示的方法來ρ艮 制通行者。 •設置數字鍵輸入裝置,在輸入所定之祕密代碼時, 將門解鎖。 •設置非接觸1C卡讀卡機,當放上所定之1C卡時, 將門解鎖。 •設置生物特徵(指紋、靜脈、臉、虹膜、聲紋等) 之感測器,在提示出所定生物特徵時,將門解鎖。 •備妥對講機,藉由位於房間內的秘書的談話,判斷201205505 VI. Description of the Invention: [Technical Field of the Invention] The present invention relates to a change management analysis method, a change management analysis device, and a change management analysis program. Specifically, it is possible to move a room into and out of a management system. Set the impact of layout changes to quickly and efficiently provide the user with the technology. [Prior Art] The room entrance and exit management system is the core role of physical security in the security measures of enterprises or organizations. "Before the introduction of such a room entrance and exit management system, it is at the entrance of a building or the door of a room." The key required to open the door lock is the one required to open the door lock, which is managed by the General Affairs Department or the Guard House. At this time, the 'passer often has to register in the book before he can lend and return the key. On the other hand, after the introduction of the room access management system, the authentication device is installed at the entrance of the building or the door of the room. _ First, the non-contact IC card is distributed to the passer-by, and the method shown below is used. Curb the passer. • Set the number key input device to unlock the door when entering the specified secret code. • Set the non-contact 1C card reader to unlock the door when the 1C card is placed. • Set up sensors for biometrics (fingerprints, veins, faces, irises, voiceprints, etc.) to unlock the door when prompted for a given biometric. • Prepare the walkie-talkie, judged by the conversation of the secretary in the room

S -5- 201205505 是正確的通行者時’按下解鎖鈕而將門解鎖。 此種房室進出管理系統,係隨著建築物或房間之佈局 、必要之安全等級而被設置。建築物或房間之佈局是每個 企業或組織都不同’房室進出管理系統係可配合如此多樣 性的佈局’高彈性地設置。又,隨著欲保護的建築物或房 間的安全等級,以密碼等祕密代碼之認證手段就足夠之情 況,或必須要採用生物特徵等嚴格之認證手段才行的情況 等,能適用的認證手段也很多樣化。 作爲此種房室進出管理的技術,係已被提出有例如以 下之房室進出管理方法(參照日本特開2000-2 59968號公 報)等,其特徵爲,在實現相應於房室進出狀況之多樣性 房室進出路徑的房室進出管理之目的下,將複數讀卡機的 各自之認證,藉由每張卡片所被指派的ID碼,和每張前 記卡片及每個前記讀卡機之至少每一方所被設定的解鎖旗 標之組合而進行之,藉此以決定房室進出的許可及不許可 ,並且隨著前記解鎖旗標的設定狀態而動態變更前記卡片 所有者的房室進出狀況。 又,還有以下之房室進出管理裝置(參照日本特開 2003-4489 1號公報)等也已被提出,其特徵爲,具備: 房間佈局檔案,係將各辨識裝置所被安裝之辨識場所與可 從該辨識場所直接移動的其他辨識場所,預先建立對應關 連;和居室檔案,係登錄了各利用者所應存在的所定之居 室;和辨識資訊檔案,係用來保存已藉由該辨識裝置所實 測到的實測辨識資訊及漏測(在房室進出管理系統中,因 ⑧ -6- 201205505 卡片的讀取不良或共連等導致原本應獲得之辨識資訊無法 獲得)的該辨識裝置之漏測辨識資訊;和在室狀態檔案, 係用來保存各利用者的最新之辨識場所;和處理裝置,係 參照該房間佈局檔案而判定該最新之辨識場所是否爲可能 從剛才的辨識場所直接移動到達,只有在無法直接移動到 的情況下,將基於該房間佈局檔案而推定的移動路徑上的 漏測之辨識裝置,設定至該漏測辨識資訊,並且該最新之 辨識場所是該所定居室以外的情況下,沒有下次辨識而經 過了所定時間時,該所定之居室就被推定成該最新之辨識 場所而將該最新之辨識場所的漏測之辨識裝置,設定至該 漏測辨識資訊。 【發明內容】 [發明所欲解決之課題] 然而,關於房室進出管理系統,若其設置佈局是可高 彈性地構成,則當系統全體或系統之一部分變更時,使用 者要掌握其影響地點、影響範圍、影響內容等,是很困難 的。 例如,在現狀下僅在大樓內的1樓層進行房室進出管 理,但在變更其而在大樓內的全樓層進行房室進出管理的 狀況下,要一面考慮每樓層承租戶不同=房室進出管理的 權限範圍也不同,一面讓使用者迅速、有效率地掌握房室 進出管理系統中的管理權限之變更管理等的範圍,是很困S -5- 201205505 is the correct passer' Press the unlock button to unlock the door. This room access management system is set up with the layout of the building or room and the necessary level of security. The layout of a building or room is different for each business or organization. The room access management system can be flexibly set up with such a diverse layout. In addition, with the security level of the building or the room to be protected, the authentication means such as a password or the like is sufficient, or the strict authentication means such as biometrics must be used, and the applicable authentication means can be applied. It is also very diverse. For example, the above-mentioned room access management method (see Japanese Patent Laid-Open Publication No. 2000-2 59968), etc., is proposed as a technique for the ingress and egress management of the room. For the purpose of room management of the multi-room access system, the individual authentication of the card readers, the ID code assigned by each card, and each pre-card and each pre-card reader At least the combination of the unlock flag set by each party is performed, thereby determining the permission and non-permission of the room entrance and exit, and dynamically changing the room entry and exit status of the card owner of the preceding card according to the setting state of the pre-recorded unlock flag. . In addition, there is also proposed a room access management device (refer to Japanese Laid-Open Patent Publication No. 2003-4489 No. 1), etc., which is characterized in that it includes: a room layout file, which is a recognition place where each identification device is installed. Corresponding associations are established in advance with other identification sites that can be moved directly from the identification site; and the room files are registered with the predetermined rooms that the users should have; and the identification information files are used to save the identification. The measured identification information and the missing measurement measured by the device (in the room access management system, the identification device that the originally obtained identification information cannot be obtained due to poor reading or co-connection of the 8-6-201205505 card) Missing measurement identification information; and the presence status file is used to store the latest identification location of each user; and the processing device refers to the room layout file to determine whether the latest identification location is possible from the identification site directly The arrival of the movement, only if it is not possible to move directly, the missing measurement on the movement path based on the room layout file The identification device is set to the missing identification information, and when the latest identification location is outside the settlement room, the predetermined room is presumed to be the latest identification place when the predetermined time has elapsed without the next identification. And the identification device for the missing measurement of the latest identification site is set to the missing identification information. [Problem to be Solved by the Invention] However, with regard to the room entrance and exit management system, if the layout of the system is highly flexible, when the system is partially changed or part of the system is changed, the user must grasp the location of the influence. , the scope of influence, the content of the impact, etc., is very difficult. For example, in the current situation, room access management is carried out only on the first floor of the building. However, in the case of changing the room and managing the room on the whole floor in the building, it is necessary to consider the different tenants per floor. The scope of management has different scopes, and it is very difficult for users to quickly and efficiently grasp the scope of change management of management authority in the room access management system.

S 難的。 201205505 又例如,將房室進出管理時所使用的讀卡機,爲了安 全強化而變更成生物特徵認證裝置的此種情況下,要讓使 用者迅速、有效率地掌握哪台機器需要作何種變更,是很 困難的。 又例如,當房室進出管理系統的一部分機器故障時, 要讓使用者迅速、有效率地掌握其影響所及之影響範圍有 多大、修理時應該讓哪些機器暫停工作等資訊,是很困難 的。 亦即,若關於房室進出管理系統而高彈性地構成設置 佈局,則沒有一種方式能夠隨應於其而迅速、有效率地提 供使用者所應掌握之資訊。 本說明書所揭露的係爲,一種可將房室進出管理系統 的設置佈局變更之影響資訊,迅速且有效率地提供給使用 者的技術。 [用以解決課題之手段] 所揭露的變更管理分析方法,係由分析房室進出管理 系統之變更管理所造成之影響的資訊處理裝置,執行以下 之處理。亦即,資訊處理裝置係執行:從記憶部讀取將所 定領域之房室進出管理系統加以構成之機器的佈局資訊之 處理。 又,前記資訊處理裝置係執行:將前記佈局資訊顯示 在輸出部,由輸入部受理變更情境其中含有房室進出管理 系統之佈局中的構成之變更場所及變更內容之處理。 -8 - ⑧ 201205505 又’前記資訊處理裝置係執行:當前記變更情境是表 示機器或機能之追加乃至變更時,在儲存著可能構成房室 進出管理系統之機器之機能資訊的產品資訊表中,核對前 記變更內容,將具備有滿足變更內容之要求之機能的候補 機器加以特定,進行前記佈局中的對前記變更場所之候補 機器之追加、或前記變更場所中的既存機器與候補機器之 置換的顯示,當前記指定資訊是表示機器或機能之刪除時 ’進行前記佈局中的前記變更場所之機器的刪除,成爲變 更構成案而顯示在輸出部之處理。 又’前記資訊處理裝置係執行:針對前記變更構成案 ’以輸入部受理運用條件之指定,將前記運用條件適用於 前Ϊ5產品資訊表中的機器之機能資訊而在前記運用條件下 模擬機器運作之際的舉動,將模擬結果輸出至變更構成案 的顯示中之處理。 又’所揭露之變更管理分析系統,係屬於分析房室進 出管理系統之變更管理所造成之影響的資訊處理裝置,其 特徵爲’具備:構成資訊輸入部,係從記憶部讀取將所定 領域之房室進出管理系統加以構成之機器的佈局資訊;和 變更情境輸入部,係將前記佈局資訊顯示在輸出部,由輸 入部受理變更情境其中含有房室進出管理系統之佈局中的 構成之變更場所及變更內容;和影響地點分析部,係當前 g己變更丨胃境是表不機器或機能之追加乃至變更時,在儲存 著可能構成房室進出管理系統之機器之機能資訊的產品資 訊表中’核對前記變更內容,將具備有滿足變更內容之要 -9 - 201205505 求之機能的候補機器加以特定,進行前記佈局中的 變更場所之候補機器之追加、或前記變更場所中的 器與候補機器之置換的顯示,當前記指定資訊是表 或機能之刪除時,進行前記佈局中的前記變更場所 的刪除,成爲變更構成案而顯示在輸出部;和運用 ’係針對前記變更構成案,以輸入部受理運用條件 ,將前記運用條件適用於前記產品資訊表中的機器 資訊而在前記運用條件下模擬機器運作之際的舉動 擬結果輸出至變更構成案的顯示中。 又,所揭露之變更管理分析程式,係爲一種程 分析房室進出管理系統之變更管理所造成之影響的 理裝置,執行:從記憶部讀取將所定領域之房室進 系統加以構成之機器的佈局資訊之處理;和將前記 訊顯示在輸出部,由輸入部受理變更情境其中含有 出管理系統之佈局中的構成之變更場所及變更內容 ;和當前記變更情境是表示機器或機能之追加乃至 ’在儲存著可能構成房室進出管理系統之機器之機 的產品資訊表中,核對前記變更內容,將具備有滿 內容之要求之機能的候補機器加以特定,進行前記 的對前記變更場所之候補機器之追加、或前記變更 的既存機器與候補機器之置換的顯示,當前記指定 表不機器或機能之刪除時,進行前記佈局中的前記 所之機器的刪除’成爲變更構成案而顯示在輸出部 :和針對前記變更構成案,以輸入部受理運用條件 對前記 既存機 示機器 之機器 模擬部 之指定 之機能 ,將模 式,令 資訊處 出管理 佈局資 房室進 之處理 變更時 能資訊 足變更 佈局中 場所中 資訊是 變更場 之處理 之指定 -10- ⑧ 201205505 ,將前記運用條件適用於前記產品資訊表中的機器之機能 資訊而在前記運用條件下模擬機器運作之際的舉動,將模 擬結果輸出至變更構成案的顯示中之處理。 [發明效果] 若依據揭露,則可將房室進出管理系統的設置佈局變 更之影響資訊,迅速且有效率地提供給使用者。 【實施方式】 —貫施例1 — 以下,一面適宜參照圖面,一面說明實施形態。圖1 係含有變更管理分析裝置1的系統全體之圖示。變更管理 分析裝置1,係針對被設置在企業等之建築物中的房室進 出管理系統10,在其構成有變更時會進行其影響等之分 析的裝置,是想定爲PC等之資訊處理裝置。 該變更管理分析裝置1係例如爲,由房室進出管理系 統10的管理者、或向該管理者提議房室進出管理系統10 之變更的身爲業務擔當者的變更管理者30所操作之終端 。該終端係爲了容易對關於房室進出管理系統10之業務 活動發揮較大效用,因此若爲可攜式則更爲理想。變更管 理分析裝置1係想定爲,透過通訊線路41而與房室進出 管理系統1 0連接成可通訊,並且透過通訊線路40而與網 際網路2 0連接之狀況。當然,網路的種類或通訊協定係 不拘。 -11 - 201205505 另一方面,房室進出管理系統10係爲具有構 表1 1、行程表1 2、認證資訊表1 3的既存之電腦系 室進出管理系統10係使用這些表格11〜13,爲了 建築物或房間的通行者作適宜限制,而會發出門開 或上鎖/解鎖等之動作指令。 又’在前記網際網路20上,想定是由房室進 系統10的開發廠商或維護廠商,來管理著變更情j 、運用情境表22、產品資訊表23之狀況。甚至, 訊表24係爲儲存有前記房室進出管理系統1〇運作 建築物等之地圖資料的表格,是可在網際網路20 的地圖資訊。當然,這些表格21〜24之拷貝係亦 或不定期地,保持在變更管理分析裝置1的記憶部 並管理之。只要能被變更管理分析裝置1所存取, 2 1〜24的所在地點並沒有限定。 圖2係變更管理分析裝置1的內部構造的區塊 著說明變更管理分析裝置1所具備之構成、機能。 理分析裝置1係由身爲資訊處理裝置所應該具備的 置之控制或資料之計算·加工的中央演算處理裝 CPU ( Central Processing Unit) 201、暫時記憶資 式並可被CPU201直接讀寫的記億體202、即使切 仍不會讓資料或程式消失地加以保存的不揮發性之 203、以有線或無線方式與通訊線路40或通訊線路 行通訊所需的通訊部204、用來對變更管理者30 之計算·加工的結果顯示在顯示器等所需的輸出部 成資訊 統。房 對出入 閉機構 出管理 竟表21 地圖資 對象之 上利用 可定期 203中 則表格 圖。接 變更管 進行裝 置亦即 料或程 斷電源 記憶部 41進 將資料 205 ' ⑧ -12- 201205505 用來受理來自變更管理者30之鍵盤輸入或滑鼠輸入等所 需的輸入部206,是以匯流排207彼此連接而成的硬體構 成。 例如,在前記記憶部2 0 3中,係以程式的方式,保持 有構成資訊輸入部2、變更情境輸入部3、影響地點分析 部4、運用模擬部5,藉由CPU201將這些程式予以讀出 並執行,就達成必要機能的實作。 以下說明由程式所實現的變更管理分析裝置1的機能 部。前記變更管理分析裝置1係具備,將構成所定領域之 房室進出管理系統10的機器的佈局資訊,從房室進出管 理系統1 〇 (或已經由房室進出管理系統1 0儲存好必要資 料的記憶部2 03 )加以讀取的構成資訊輸入部2。本實施 例中的構成資訊輸入部2,係透過前記網路41而向房室 進出管理系統1 0進行存取,讀取前記構成資訊表1 1、行 程表1 2、認證資訊表1 3,透過網際網路40而讀取前記地 圖資訊表24,基於這些資訊而在表示房室進出管理裝置 的地圖上配置房室進出管理用之機器的小圖示等,而作成 佈局資訊。 此外,前記構成資訊輸入部2係亦可從以輸入部206 乃至網路40、41等而連結成可通訊的其他裝置,受理對 前記產品資訊表2 3的機器乃至機能之資訊追加,來更新 則記產品資訊表2 3。S is difficult. 201205505 For example, in the case where the card reader used for the room entrance and exit management is changed to a biometric authentication device for security enhancement, it is necessary for the user to quickly and efficiently know which machine needs to be made. Changes are very difficult. For example, when a part of the machine in the room access management system is faulty, it is very difficult for the user to quickly and efficiently grasp the information on the extent of the impact and the machines that should be suspended during the repair. . That is, if the layout is highly flexible with respect to the room access management system, there is no way to provide the information that the user should grasp quickly and efficiently in accordance with it. What is disclosed in the present specification is a technique for providing information on the influence of changes in the layout of the room entrance and exit management system to the user quickly and efficiently. [Means for Solving the Problem] The change management analysis method disclosed is an information processing device that analyzes the influence of the change management of the room entrance and exit management system, and performs the following processing. That is, the information processing apparatus executes processing for reading the layout information of the machine configured to enter and exit the management system of the room in the specified area from the storage unit. Further, the pre-recording information processing apparatus executes the process of displaying the pre-recorded layout information on the output unit, and the input unit accepts the process of changing the configuration of the change in the layout of the room entrance management system and the content of the change. -8 - 8 201205505 In addition, the 'pre-recording information processing device is executed: the current change situation is a product information table that stores the function information of the device that may constitute the room access management system when the device or function is added or changed. By checking the contents of the pre-recording change, the candidate device having the function that satisfies the requirements of the change content is specified, and the candidate device for the pre-recording change place in the pre-recording layout is added, or the replacement of the existing device and the candidate device in the pre-recorded change place is performed. In the case where the current recording designation information indicates that the device or the function is deleted, the process of deleting the device in the pre-recording place in the pre-recording layout is performed, and the process is displayed in the output unit. In addition, the 'pre-recording information processing device is executed: for the pre-recording change configuration', the input unit accepts the designation of the operating conditions, and the pre-recording operating conditions are applied to the functional information of the machine in the front-end 5 product information table, and the machine operation is simulated under the pre-recording operating conditions. At the time of the move, the simulation result is output to the process of displaying the change composition. Further, the disclosed change management analysis system is an information processing device that analyzes the influence of the change management of the room entrance and exit management system, and is characterized by: "having: forming an information input unit, and reading a predetermined field from the memory unit. The layout information of the machine configured by the room entrance and exit management system; and the change context input unit displays the pre-recorded layout information on the output unit, and the input unit accepts the change in the configuration in which the change scenario includes the room entrance management system. The location and the content of the change; and the influence location analysis department are the product information sheets that store the functional information of the devices that may constitute the room access management system when the system is changed or even changed. In the case of the change of the pre-recorded content, the candidate device that meets the requirements of the change -9 - 201205505 is specified, and the candidate device in the change location in the pre-recording layout is added, or the device and the candidate in the pre-recorded change place are added. The display of the replacement of the machine, when the current specified information is the deletion of the table or function, The deletion of the pre-recorded change place in the pre-deployment layout is displayed in the output unit as the change configuration; and the application is based on the change of the pre-recorded configuration, and the input condition is accepted by the input unit, and the pre-recorded application conditions are applied to the pre-recorded product information table. The machine information is output to the display of the change composition when the simulation of the operation of the machine under the pre-existing conditions is output. Further, the disclosed change management analysis program is a device for analyzing the influence of the change management of the room entrance management system, and executes: reading a machine that integrates the room of the designated field into the system from the memory unit. The processing of the layout information; and the display of the pre-message in the output unit, the input unit accepts the change scenario including the change location and the change content of the configuration in the layout of the management system; and the current record change scenario indicates the addition of the device or function. In the product information table that stores the machine that may constitute the room access management system, check the contents of the pre-record change, and specify the candidate device that has the function of the full content, and perform the pre-recorded change to the pre-recorded place. In the case of the addition of the candidate device or the display of the replacement of the candidate device and the candidate device, the deletion of the device in the pre-recorded layout in the pre-recorded layout is displayed in the change configuration. Output department: and the case for the change of the pre-record, and the input unit accepts the application condition Record the function specified by the machine simulation department of the existing machine, and set the mode to make the information out of the management layout. The room can be changed. The information in the place is changed. The information in the place is the designation of the change field. 8 201205505 , the pre-recording application conditions are applied to the function information of the machine in the pre-recorded product information table, and the behavior of the simulation machine operation is performed under the pre-recording conditions, and the simulation result is output to the display of the change composition. [Effect of the Invention] According to the disclosure, the influence information of the setting layout of the room entrance and exit management system can be changed, and the information can be quickly and efficiently provided to the user. [Embodiment] - Embodiment 1 Hereinafter, an embodiment will be described with reference to the drawings as appropriate. FIG. 1 is a diagram showing the entire system including the change management analysis device 1. The change management analysis device 1 is an information processing device that is designed as a PC or the like for a room entrance management system 10 that is installed in a building such as a company, and that analyzes the influence of the room management system 10 when the configuration is changed. . The change management analysis device 1 is, for example, a manager operated by the change manager 30 who is a business owner who proposes the change of the room entrance management system 10 to the administrator of the room entrance management system 10 . The terminal is more effective for the business activities related to the room access management system 10, and therefore is more desirable if it is portable. The change management analysis device 1 is intended to be connected to the room access management system 10 via the communication line 41 to be communicable, and connected to the Internet 20 via the communication line 40. Of course, the type of network or communication protocol is not limited. -11 - 201205505 On the other hand, the room access management system 10 is an existing computer room access management system 10 having a configuration table 1 and a schedule information table 1 and 2, and these forms 11 to 13 are used. In order to make appropriate restrictions for the passer of the building or the room, an action command such as door opening or locking/unlocking is issued. Further, in the pre-recorded Internet 20, it is assumed that the developer or maintenance vendor of the room-in-the-box system 10 manages the situation of the change situation j, the use situation table 22, and the product information table 23. In addition, the watch 24 is a table in which map data of the front office access control system, the operation building, and the like is stored, and is map information available on the Internet 20. Of course, the copies of these forms 21 to 24 are also held and managed by the memory of the change management analysis device 1 or irregularly. As long as it can be accessed by the change management analyzer 1, the location of 2 1 to 24 is not limited. Fig. 2 is a block diagram showing the internal structure of the change management analysis device 1. The configuration and function of the change management analysis device 1 will be described. The analysis device 1 is a central processing unit (CPU) which is a central processing unit for calculating and processing the control or data that the information processing device should have, and a memory that can be read and written directly by the CPU 201. Billion 202, a non-volatile 203 that does not allow data or programs to be saved, or a communication unit 204 that communicates with a communication line 40 or a communication line in a wired or wireless manner, and is used for change management. The result of the calculation and processing of the person 30 is displayed on the output unit required for the display or the like. The room is closed to the management of the institution. The map is used. The object of the map can be used regularly. The input change unit performs the device or the process power supply unit 41. The data 205 ' 8 -12- 201205505 is used to receive the input unit 206 required for the keyboard input or the mouse input from the change manager 30. The bus bar 207 is formed by a hard body connected to each other. For example, in the pre-recorded memory unit 203, the configuration information input unit 2, the change context input unit 3, the influence point analysis unit 4, and the operation simulation unit 5 are held in a program, and these programs are read by the CPU 201. Out and execute, the implementation of the necessary functions is achieved. The functional portion of the change management analysis device 1 implemented by the program will be described below. The pre-recording change management analysis device 1 is provided with layout information of a device constituting the room entrance and exit management system 10 in a predetermined area, and is stored in the room management system 1 (or has been stored in the room access management system 10). The memory unit 2 03 ) is configured to read the information input unit 2 . The configuration information input unit 2 in the present embodiment accesses the room access management system 10 through the pre-recording network 41, and reads the pre-recorded information table 1 1 , the itinerary table 2 , and the authentication information table 13 . The pre-post map information table 24 is read through the Internet 40, and based on the information, a small icon of a device for accessing and managing the room is placed on a map indicating the room entrance management device, and layout information is created. Further, the pre-recording information input unit 2 may be connected to other devices that are communicable by the input unit 206 or the network 40, 41, etc., and the information of the device or the function of the pre-recorded product information table 23 is received and updated. Then record the product information table 2 3.

S 又,前記變更管理分析裝置1係具備:變更情境輸入 部3,係將前記佈局資訊顯示在輸出部205,由輸入部 -13- 201205505 206受理變更情境其中含有房室進出管理系統ι〇之佈局 中的構成之變更場所及變更內容。 此外’該變更情境輸入部3若是將含有前記佈局資訊 的場所資訊之清單,例如可用下拉式選單等而加以選擇地 顯示在輸出部2〇5,受理從該場所清單中的前記變更場所 之選擇’並將記憶部203中所預先保持之變更內容之清單 例如可用下拉式選單等而加以選擇地顯示在輸出部205, 受理從該變更內容清單中的前記變更內容之選擇,藉此以 受理前記變更情境,則爲理想。 此處’本實施形態的變更情境輸入部3,係將儲存有 :受理前記變更場所之選擇的前記場所資訊之清單、和受 理前記變更內容之選擇的變更內容之清單的變更情境表 21,保持在記億部203中。此情況下,變更情境輸入部3 若是係從輸入部206乃至以網路40、41連結成可通訊的 其他裝置,受理前記變更情境表2 1中的對前記場所資訊 之清單的場所資訊追加、乃至對前記變更內容之清單的變 更內容追加’而更新前記變更情境表2 1,則爲理想。 又’前記變更管理分析裝置1,係具備影響地點分析 部4 ’係當前記變更情境是表示機器或機能之追加乃至變 更時’在儲存著可能構成房室進出管理系統10之機器之 機能資訊的產品資訊表23中,核對前記變更內容,將具 備有滿足變更內容之要求之機能的候補機器加以特定,進 行前記佈局中的對前記變更場所之候補機器之追加、或前 記變更場所中的既存機器與候補機器之置換的顯示,當前 "14- 201205505 記指定資訊是表示機器或機能之刪除時,進行前記佈局中 的前記變更場所之機器的刪除,成爲變更構成案而顯示在 輸出部205。 此外,該影響地點分析部4係亦可當前記變更情境是 表示機器或機能之追加乃至變更時,在前記產品資訊表 23中核對前記變更內容,將具備有滿足變更內容之要求 之機能的候補機器加以複數特定,對每一候補機器進行前 記佈局中的對前記變更場所之候補機器之追加或前記變更 場所中的既存機器與候補機器之置換的顯示,生成複數個 滿足前記變更情境的變更構成案並顯示在輸出部205。例 如,關於房室進出管理系統1〇之變更,進行業務活動的 擔當者會將該變更管理分析裝置1予以攜帶而拿到客戶那 邊進行系統提案。如此狀況下,就一般而言,前記變更構 成案與其僅提示1種’不如向客戶側提示出複數種而讓其 有選擇的餘地,較爲理想。 又’前記影響地點分析部4若是針對各變更構成案所 示的追加乃至變更或刪除之對象的機器,從前記產品資訊 表23讀出追加乃至變更或刪除之際的必要費用之資料, 就每一變更構成案來合算該必要費用而算出估算價格,輸 出至該當變更構成案之顯示中,則爲理想。例如,當追加 導入某機器群時,將各機器的關連費用從產品資訊表23 中抽出並合算,就可算出前記估算價格。至於其他作業也 同樣如此。 又’前記變更管理分析裝置1係具備:運用模擬部5 -15- 201205505 ,係針對前記變更構成案,以輸入部206受理運用條件之 指定,將前記運用條件適用於前記產品資訊表23中的機 器之機能資訊而在前記運用條件下模擬機器運作之際的舉 動,將模擬結果輸出至變更構成案的顯示中。作爲運用條 件係可想定爲,例如,於某個閘門(=場所之條件)在1 小時內會有1 000位職員進出房室(=運用內容之條件)。 因此,在該情況下,前記運用模擬部5係將被設置在「某 個閘門」的房室進出管理用之機器所具備的機能,例如1 次認證時所必要之處理時間“ 1秒”,從產品資訊表23 中抽出資訊。然後,在想要處理「1小時內有3000人的 房室進出」的情況下,算出“ 60x60/1 ” = 3600人>3000 人,判定爲滿足運用條件,將處理所花費的時間,算定成 “ 3000/1 ” = 3000 秒=50 分。 此外,前記運用模擬部5若是將基於前記變更情境的 機器之追加乃至置換或刪除、或藉由前記模擬所判明之所 定運用條件下的機器之停止乃至更換所及之影響地點、影 響範圍、及其影響內容之至少一種資訊,在前記變更構成 案的顯示中作加強顯示,則爲理想β這是爲了,例如機器 替換等而當然要將既存機器之顯示改成新機器之顯示,還 有也是爲了讓該當地點容易被目視確認,而做的處理。例 如,針對變更後的機器之顯示,將線條種類設成比其他還 粗,或是改變顏色或圖案,或是配置用來告知變更用的文 字或小圖不等即可。 又,前記運用模擬部5若是針對各變更構成案而執行 -16- 201205505 前記模擬,將每一變更構成案的模擬結果,輸出至該當變 更構成案之顯示中,以輸入部206受理操作者判斷爲最佳 的變更構成案之指定,將該當變更構成案當成最佳案而顯 示在輸出部205,則爲理想。 又,前記運用模擬部5若是將前記佈局資訊所含有之 場所資訊之清單顯示成可用下拉式選單等加以選擇,受理 從該場所清單中的前記運用條件當中的場所之選擇,並將 記憶部203中所預先保持之運用內容之清單顯示成可用下 拉式選單等加以選擇,受理從該運用內容清單中的前記運 用條件當中之運用內容之選擇,藉此以受理前記運用條件 之指定,則爲理想。 又,前記運用模擬部5若是將儲存有:受理前記運用 條件當中之場所之選擇的前記場所資訊之清單、和前記運 用內容之清單的運用情境表22,保持在記憶部203中, 則爲理想。此情況下,前記運用模擬部5若是執行從輸入 部2 06乃至以網路40、41連結成可通訊的其他裝置,受 理前記運用情境表22中的對前記場所資訊之清單的場所 資訊追加、乃至對前記運用內容之清單的運用內容追加, 而更新前記運用情境表22之處理,則爲理想。 —表格結構例1 — 接著,關於房室進出管理系統1 0所保有之構成資訊 表1 1、行程表1 2、認證資訊表1 3的資料結構例,根據圖 3來作說明。構成資訊表1 1係爲,管理伺服器、控制器 -17- 201205505 、讀卡機(CR、Card Reader)、電子鎖(ΕΚ Key )等用來構成房室進出管理系統ι〇的機器 資訊311、和設置機器之種類及版本等之設 3 1 2、和上位及下位所連接之機器的資訊亦即 訊313,所建立對應關連而成之紀錄的集合體 設置場所資訊3 1 1,係可想定例如表示該當於 料庫24的哪個地圖之哪個座標的“地圖”、 中的所在樓層的“樓數”、表示在樓層內的所 區劃”、用來指示門之位置的資訊“門”、以 ”等項目。 又,行程表1 2係每年、月、日、星期、 將表示房室進出管理系統1〇之運行預定的運 設成1個活頁,具有由複數活頁所成之資料結 又,認證資訊表1 3係將認證用的資訊例 區劃而加以儲存的表格,以該當的區劃資訊3 ID資訊3 3 2、通行者ID資訊3 3 3爲1行,具 所成之表格結構的資料。前記通行者ID資訊 關於該當區劃的可進出房室之人物的資訊。 —表格結構例2 — 接著,將連接至前記網際網路20、變更 置1所能存取的變更情境表2 1 '運用情境表 訊表23的資料結構之一例,沿用圖4來說明 情境表2 1,係以變更模態資訊4 1 1、變更對應 、Electronic 的設置場所 置機器資訊 連接機器資 。作爲前記 地圖資訊資 表示建築物 在區劃的“ 及其“用途 時間帶地, 行資訊3 2 1 構。 如按照每一 3 1、管理者 有由複數行 3 3 3,係爲 管理分析裝 2 2、產品資 。前記變更 資訊4 1 2爲 ⑧ -18- 201205505 1行,具有由複數行所成之表格結構的資料。此外’ 變更情境表2 1中的前記變更模態資訊4 1 1裡,含有 場所之資訊(圖中係爲“場所”)、及變更內容之資 作爲前記變更內容的資訊係可舉例如“〇〇地區 大樓〗F ” ,又作爲前記變更內容之資訊係可舉例如 與讀卡機追加”。作爲變更內容係可想定例如門的追 機器的變更、與其他系統的連動、及任意的要求等。 前記變更對應資訊4 1 2,係前記影響地點分析部4在 產品資訊表23中核對前記變更內容,設定將具備滿 變更內容之要求之機能的候補機器予以特定後之結果 〇 又,前記運用情境表22係以運用模態資訊42 1 用模擬資訊422爲1行,具有由複數行所成之表格結 資料。作爲前記運用模態資訊,係可想定例如指定門 門等的“場所”之條件、和「通行尖峰期」之類的運 容之條件等。關於符合該運用內容之條件的模擬內容 於前記運用模擬資訊422中設定例如“1小時內有 位職員進出房室”等。 此外,於此運用情境表22中,作爲前記運用內 清單,係可想定有:將頻繁進出處理時之狀況加以推 選項亦即通行尖峰期、將所定期間之日誌保管所需資 以推定之選項亦即日誌保管期間、將透過網路而由其 置收集曰誌並顯示時所需時間加以推定之選項亦即日 示時間、將進行所定處理之際的網路使用率加以推定 在該 變更 訊。 的 A “門 加、 又, ——J 刖記 足該 內容 、運 構的 或閘 用內 ,係 1000 容之 定之 源加 他裝 誌顯 -19 - 201205505 項亦即網路使用率、將向讀卡機的控制器配送使用者ID 清單所需之時間加以推定之選項亦即卡片ID配訊、將其 他機器或機能故障時必須跟著停止或更換之機器加以推定 之選項亦即故障對應、將對應於部門或地區之間不同休假 曰而運作時的機器的運作狀況加以推定之選項亦即假曰變 更、將對應於隨人事異動而產生之處理人數之變化而運作 時的機器的運作狀況加以推定之選項亦即人事異動、將承 租戶間不同之進出管理之權限有所變更時的機器的運作狀 況加以推定之選項亦即管理者變更等。 又,前記產品資訊表23,係儲存有可適用於房室進 出管理系統1 〇之機器之資訊的表格,是以機器種別資訊 431、可對應之變更內容431a、連接機器資訊432、選配 機能資訊43 3、價格資訊434爲1行,具有由複數行所成 之表格結構的資料。在前記機器種別資訊43 1中係含有例 如機器的ID乃至名稱、及版本之各資訊。又,前記可對 應之變更內容43 1 a,係例如該當機器所具備之機能,含 有描述了可對應於前記變更情境表21之變更內容的資訊 。又,前記連接機器資訊432裡係含有該當機器所連接之 機器的資訊。又,前記選配機能資訊43 3中係含有,例如 該當機器所能具備之選配機能的資訊。又,前記價格資訊 434裡係含有該當機器的導入費用之資訊。 處理流程例— 根據以上說明的變更管理分析裝置1之機能或可利用 ⑧ -20- 201205505 之表格類的說明,同時使用圖5〜圖9來說明本實施形態 的變更管理分析方法之處理程序。圖5係本實施形態的變 更管理分析方法之處理程序的流程圖。此處係假設例如, 前記變更管理者30啓動身爲資訊處理裝置的變更管理分 析裝置1,開始變更管理分析之處理。 此時,首先,構成資訊輸入部2係透過前記網路41 而向房室進出管理系統10進行存取,讀取前記構成資訊 表1 1、行程表1 2、認證資訊表1 3,透過網際網路40而 讀取前記地圖資訊表24 (步驟501 )。 又,前記構成資訊輸入部2,係基於前記步驟5 0 1所 讀取到的資訊,在表示房室進出管理領域之地圖(=從地 圖資訊表24所取得之地圖資料)上,將房室進出管理用 之機器的小圖示等,配置在表示該當機器之設置場所資訊 3 1 1的位置(地圖上的座標値等)而作成佈局資訊,顯示 在輸出部205(步驟502)。藉此,前記管理負責人3〇係 可確認房室進出管理系統1 〇變成哪種佈局=機器是被如何 配置,而進行佈局的編輯。亦即,構成資訊輸入部2,係 透過前記輸出部2〇5中所顯不的佈局資訊,而受理前記管 理負責人30所做的佈局編輯之作業。 圖6(a)中係圖不了佈局編輯中的畫面介面6〇〇之 一例。此畫面介面600係由:用來編輯該當要素所需之按 鈕群601、和設置佈局的描繪領域6〇2所成。在圖6 ( a) 所示之一例,係在具有「區劃1」與「區劃2」的樓層中 ,在「區劃1」的出入口配置有「門1」,在「區劃2」 -21 - 201205505 的出入口配置有「門2」。然後,在「門1」係具備有電 子鎖「EK1」,並配置有,人要進入「區劃1」之際所使 用的讀卡機「CR1」、和從「區劃1」退出之際所使用的 讀卡機「CR2」。「EK1」與「CR1」與「CR2」係以序列 式纜線而連接至「控制器1」。「控制器1」係以LAN纜 線而連接至「管理伺服器1」。 此外,前記構成資訊輸入部2係亦可在作成如此佈局 時,若只有構成資訊表11中的設置場所資訊311是不足 的情況下,則將設置機器資訊3 1 2予以讀出而顯示在輸出 部205,受理前記變更管理者30針對這些設置機器之設 置場所或連接方法,透過輸入部206所下達之指定。 接著,前記變更情境輸入部3,係在如上述而被顯示 在輸出部205的佈局上,藉由輸入部2 06受理含有構成變 更場所及變更內容的變更情境之輸入(步驟5 03 )。此外 ,前記變更情境輸入部3,係亦可從以輸入部206乃至網 路40、41而連結成可通訊的其他裝置,受理前記變更情 境表21中的對前記場所資訊之清單的場所資訊追加、乃 至對前記變更內容之清單的變更內容追加,而更新前記變 更情境表2 1。藉由如此處理,就可增加使用者的選項。 圖6(b)中係圖示了前記步驟5〇3中的變更情境輸 入時的畫面介面610之一例。此畫面介面610係由:用來 輸入情境所需的按鈕群611、和設置佈局之指定領域612 所成。在圖6(b)所示的例子中,假設從用來輸入情境 所需的按鈕群611之中,點選了「門追加」。此時,變更 -22- 201205505 情境輸Λ部3 ’係將變更場所的清單以下拉式選單等而加 以顯示’並接收例如針對r區劃2」的出入口的來自前記 管理負責人30的選擇。收到其的變更情境輸入部3,係 在前記所定地點’讀出「門2」的小圖示資料而進行描繪 °又’假設該「門2」被點選。此時,前記變更情境輸入 部3係於指定領域61 2中,進行將前記「門2」以矩形 6 1 3圍繞的描繪處理。又,若該矩形6 1 3被點選,則變更 情境輸入部3係例如將裝置的變更內容清單予以蹦現等, 從前記清單中受理「EK追加」、入室用的「CR追加」、 退室用的「CR追加」等變更內容之指定。 接著’前記影響地點分析部4,係當前記變更情境是 表示機器或機能之追加乃至變更時,在前記產品資訊表 23中核對前記變更內容,將具備有滿足變更內容之要求 之機能的可適用之產品=候補機器加以特定(步驟504 ) 。然後’影響地點分析部4係對每一候補機器進行前記佈 局中的對前記變更場所之候補機器之追加或前記變更場所 中的既存機器與候補機器之置換的顯示,生成變更構成案 而顯示在輸出部205上(步驟505)。此外,當前記指定 資訊是表示機器或機能的刪除時,前記影響地點分析部4 係進行前記佈局中的前記變更場所的機器之刪除,作爲變 更構成案而顯示在輸出部205。 在圖7(c-l)和(c-2)及圖8(c-3)中係圖示變更 構成案的畫面介面700、710、800之一例。前記畫面介面 7〇〇,係由表示變更構成案之一覽的分頁一覧7〇1、變更 -23- 201205505 後之佈局的描繪領域702、價格估算鈕703所成。在圖7 (c-1)所示之一例中’作爲變更構成的案1,在「門2」 增設「EK2」與「CR3」與「CR4」,並增設將它們予以 序列連接的「控制器2」,將「控制器2」以LAN連接而 連接至既設的「控制器1」,係爲如此之佈局。在此例中 ,關於新設的「EK2」、「CR3」、「CR4」、「控制器2 」係會成爲影響地點,因此其顯示上係用粗線等來加強顯 示。其他例子也同樣如此。 又,在圖7 ( c-2 )所示之一例,係作爲變更構成的案 2,將既設的「控制器1」變更成新的「控制器3」,在「 門2」增設「EK2」與「CR3」與「CR4」,將它們序列連 接至新設的「控制器3」,將新設的「控制器3」以LAN 連接而連接至既設的「控制器1」,係爲如此之佈局。 又,在圖8 ( c-3 )所示之一例,係作爲變更構成的案 3,將既設的「控制器1」變更成新的「控制器4」,在「 門2」增設「EK2」與「CR3」與「CR4」,將它們序列連 接至新設的「控制器4」,然後取代既設的「管理伺服器 1」改成可以用Web瀏覽器管理房室進出,係爲如此之設 置佈局。 亦即,隨著以前記圖6 ( b )的變更情境輸入而追加 了「EK」'入室用「CR」、退室用「CR」,在影響地點 分析部4如此追加機器時,在產品資訊表23中檢索出該 當機器運作所必須之控制器的規格,表示可特定出「控制 器2」、「控制器3」、「控制器4」之3種的狀況。由 -24- ⑧ 201205505 於規格上「控制器3」、「控制器4」所能控制之機器的 數目是「控制器1」或「控制器2」的2倍,因此可取代 既存的控制器,變成圖7(c·2)、圖8(c-3)所示之佈 局。 例如,關於房室進出管理系統1 〇之變更,進行業務 活動的擔當者=前記管理負責人30會將該變更管理分析裝 置1予以攜帶而拿到客戶那邊進行系統提案。在此種狀況 下’就一般而言’與其僅提示1個前記變更構成案,不如 上述的圖7(c-l) 、(C-2)及圖8(c-3)般地複數提示 而讓顧客側有選擇的餘地,對顧客而言選擇較爲容易,對 業務擔當側而言可用比較論來提案系統,因此具有較容易 成案之優點。 此外,前記影響地點分析部4,係在來自圖7 ( c -1 ) 的變更構成案的畫面介面上,當價格估算鈕7 03被按下時 ’算出在變更成該當之變更構成案的佈局時的估算額而力口 以顯示。在該處理之際,影響地點分析部4係針對該當變 更構成案所示的追加乃至變更或刪除之對象的機器,從前 記產品資訊表23讀出追加乃至變更或刪除之際的必要費 用之資料,關於該當變更構成案來合算該必要費用而算出 估計價格。所算出的估算額的資訊,若能輸出至該當變更 構成案的顯示中,則爲理想。 接著,前記運用模擬部5,係針對前記變更構成案, 以輸入部2〇6受理運用條件之指定,將前記運用條件適用 於前記產品資訊表23中的機器之機能資訊而在前記運用 -25- 201205505 條件下模擬機器運作之際的舉動,將模擬結果輸出至變更 構成案的顯示中(步驟506 )。 作爲前記運用條件係可想定爲,例如,於某個門(= 場所之條件)「通行尖峰期」=1小時內會有1 0 0 0位職員 進出房室(=運用內容之條件)。因此,在該情況下,前 記運用模擬部5係將被設置在例如「門2」的例如讀卡機 「CR4」所具備的機能,例如1次認證時所必要之處理時 間“ 1秒”,從產品資訊表2 3中抽出資訊。然後,在想 要處理「1小時內有3000人的房室進出」的情況下,算 出“ 60x6 0/1 ” = 3600人>3000人,判定爲滿足運用條件 ,將處理所花費的時間,算定成“ 3000/1 ” = 3000,秒=50 .分。如此之結果係被輸出在該當變更構成案的顯示中。 圖8(d)中係圖示了運用模擬時的畫面介面810之 —例。該畫面介面810,係由在運用條件當中輸入運用內 容所使用的按鈕群8 1 1、和在運用條件當中輸入場所條件 及確認結果所需的描繪領域8 1 2所成。在圖8 ( d )所示 的一例中’假設從按鈕群8 1 1中點選「曰誌保管期間」來 作爲運用內容’在前記描繪領域8 1 2中指定「門1」。收 到其的運用模擬部5,係作爲屬於前記「日誌保管期間」 之運用內容所對應的運用模擬資訊,而以輸入部2〇6受理 曰誌保管期間的長度及房室進出頻率之指定。又,前記運 用模擬部5 ’係對「門1」之顯示,作爲運用模擬資訊而 顯示出「房室進出日誌想要保管1年(=保管期間的長度 )°當1日通訊10位時(=房室進出頻率),儲存空間需 ⑧ -26- 201205505 要多少GB ?」之資訊。當然,前記運用模擬部5,係執 行符合此種運用條件的前記步驟5 06的模擬。 又同樣地,假設從前記按鈕群8 1 1中點選「通行尖峰 期」來作爲運用內容,在前記描繪領域812中指定「門2 」。收到其的運用模擬部5 ’係作爲屬於前記「通行尖峰 期」之運用內容所對應的運用模擬資訊,而以輸入部206 受理尖峰時間帶及房室進出頻率之指定。又,前記運用模 擬部5,係對「門2」之顯示’作爲運用模擬資訊而顯示 出「早上1小時(=尖峰時間帶)有1 〇〇〇名職員通行(= 房室進出頻率)時,等待時間大槪要多久?」之資訊。當 然’前記運用模擬部5,係執行符合此種運用條件的前記 步驟5 06的模擬。 前記變更管理者30係瀏覽在變更構成案的所定運用 條件下的運用模擬之結果,關於變更構成案判斷有無問題 等,以輸入部206輸入判斷結果。運用模擬部5係受理前 記判斷結果,盼定其內容(步驟507 )。若爲沒有問題的 判斷結果(步驟507 :無問題),則前記運用模擬部5係 將該變更構成案當作最佳案,以電子檔案、紙文件、其他 可積存之手段而加以輸出(步驟5 08 )。另一方麵,若是 有問題的判斷結果(步驟507 :有問題),則前記運用模 擬部5係再次返回前記步驟505,在關於其他變更構成案 的運用條件下執行模擬,再度確認有無問題。 此外,前記運用模擬部5若是將基於前記變更情境的 機器之追加乃至置換或刪除、或藉由前記模擬所判明之所 -27- 201205505 定運用條件下的機器之停止乃至更換所及之影響地點、影 響範圍、及其影響內容之至少一種資訊,在前記變更構成 案的顯示中作加強顯示,則爲理想。這是爲了,例如機器 替換等而當然要將既存機器之顯示改成新機器之顯示,還 有也是爲了讓該當地點容易被目視確認,而做的處理。例 如,針對變更後的機器之顯示,將線條種類設成比其他還 粗,或是改變顏色或圖案,或是配置用來告知變更用的文 字或小圖示等即可。 又,前記運用模擬部5若是將儲存有:受理前記運用 條件當中之場所之選擇的前記場所資訊之清單、和前記運 用內容之清單的運用情境表22,保持在記憶部2 03中, 則爲理想。此情況下’前記運用模擬部5若是執行從輸入 部206乃至以網路40、41連結成可通訊的其他裝置,受 理前記運用情境表22中的對前記場所資訊之清單的場所 資訊追加、乃至對前記運用內容之清單的運用內容追加, 而更新前記運用情境表22之處理,則爲理想。 ---貫施例2--- 在實施例2中’作爲房室進出管理系統1 〇之變更, 說明變更認證方法之情形。實施例2中的變更管理分析裝 置1之構成、表格等之資料結構、流程圖,係和上記實施 例1相同。又’作爲畫面介面,設置佈局之編輯畫面(圖 6)、運用模擬之畫面(圖8(d))也是和實施例1相同 ⑧ -28- 201205505 圖9(b)中係圖示了實施例2的變更情境輸入之畫 面介面900之一例,在圖9(c)中係圖示了變更構成案 確認的畫面介面910之一例。在前記畫面介面900中,作 爲變更情境,係表示將「門1」的出入口的認證裝置,從 讀卡機變更成生物資訊讀取機的情形。此時,管理負責人 3〇係在用來輸入情境的按鈕群901當中,點選「裝置變 更」,在佈局的指定領域902上點選「門1」,輸入「變 更成生物讀取機」之意旨。另一方面,影響地點分析部4 ,係和實施例1同樣地,進行隨應於如此變更情境之指定 的機器候補之選定。 又,在前記畫面介面9 1 0中,作爲影響地點分析部4 所特定出來的變更構成案,是將讀卡機「CR1」變更成「 生物讀取機1」時的設置佈局,顯示在描繪領域9 1 1。此 處’增設「管理伺服器2」、「控制器2」、「生物讀取 機1」’新設的「控制器2」係將既設的「EK1」與「CR2 j及新設的「生物讀取機1」做序列連接,將新設的「控 制器2」與「管理伺服器2」做LAN連接,是顯示出如此 的設置佈局。 前記變更管理者3 〇 ’係可藉由確認畫面介面9 1 〇,就 可在現在的設置佈局當中’迅速且容易掌握要將哪個機器 做如何變更會比較好。 —貫施例3 — 在實施例3中,作爲房室進出管理系統1 〇之變更,Further, the pre-review management analysis device 1 includes a change context input unit 3 that displays the pre-recorded layout information on the output unit 205, and receives the change scenario from the input unit-13-201205505206, which includes the room entrance management system. The location of the change in the layout and the content of the change. Further, if the change context input unit 3 is a list of place information including the pre-recorded layout information, for example, it can be selectively displayed on the output unit 2〇5 by a pull-down menu or the like, and the selection of the place of change from the place list in the place list can be accepted. The list of the changed contents held in advance in the storage unit 203 is selectively displayed on the output unit 205 by, for example, a pull-down menu, and the selection of the content of the change from the list of the changed contents is accepted, thereby accepting the pre-recorded It is ideal to change the situation. Here, the change context input unit 3 of the present embodiment stores a list of the pre-recorded location information that accepts the selection of the pre-recorded change place, and a change context table 21 that accepts the list of the change contents of the change of the pre-recorded change content, and maintains In the 203 billion department. In this case, if the change context input unit 3 is connected to the other devices that are communicable by the network 40 and 41, the change context input unit 3 accepts the location information of the list of the pre-recorded information in the pre-recorded change context table 21, It is ideal to add the change to the list of changes to the previous record and update the situation table 2 1 before the change. Further, the 'previous change management analysis device 1 is provided with the influence location analysis unit 4'. The current change context indicates that the device or the function is added or changed, and the function information of the device that may constitute the room access management system 10 is stored. In the product information table 23, the change of the pre-recorded content is specified, and the candidate device having the function of satisfying the change request is specified, and the candidate device of the pre-recorded change place in the pre-recording layout or the existing device in the pre-recorded change place is performed. In the display of the replacement of the candidate device, the current "14-201205505" designation information indicates that the deletion of the device in the pre-recording place in the pre-recording layout is performed when the device or function is deleted, and is displayed in the output unit 205 as a modified configuration. In addition, the influence location analysis unit 4 may also check the change of the pre-recorded product information table 23 in the pre-recorded product information table 23 when the change situation is the addition or the change of the device or function, and the candidate having the function of satisfying the change content is provided. The machine is specified in a plural number, and the candidate device is added to the candidate device in the pre-recording place in the pre-recording layout or the display of the replacement of the existing device and the candidate device in the pre-recording place, and a plurality of changes satisfying the pre-recording situation are generated. The case is displayed on the output unit 205. For example, regarding the change of the room entrance management system, the person performing the business activity carries the change management analysis device 1 and takes it to the client to make a system proposal. Under such circumstances, in general, it is preferable that the pre-recording change structure and the suggestion of only one type are not as good as suggesting a plurality of kinds to the client side and giving them a choice. Further, in the case of the device that is added or even changed or deleted as shown in each change configuration, the information on the necessary fee for the addition or the change or deletion is read from the previous product information table 23, It is desirable to change the composition to calculate the estimated price and calculate the estimated price, which is output to the display of the change composition. For example, when a certain machine group is additionally imported, the related cost of each machine is extracted from the product information table 23 and calculated, and the estimated price is calculated. The same is true for other assignments. Further, the pre-recording change management analysis device 1 includes an operation simulation unit 5 -15-201205505, which is configured to change the configuration of the pre-recording, and the input unit 206 accepts the designation of the operation condition, and applies the pre-recording operation condition to the pre-recorded product information table 23. The function information of the machine is used to simulate the operation of the machine under the pre-recording conditions, and the simulation result is output to the display of the change configuration. As a condition of use, it can be assumed that, for example, in a gate (=condition of a place), there will be 1,000 employees entering and leaving the room within one hour (= conditions for applying content). Therefore, in this case, the pre-recording simulation unit 5 is a function of the equipment for the room entrance and exit management of the "a certain gate", for example, the processing time required for one authentication, "1 second". Extract information from Product Information Sheet 23. Then, when you want to process "rooms with 3,000 people in and out within one hour", calculate "60x60/1" = 3600 people> 3000 people, and judge that the operating conditions are met, and the time taken for processing is calculated. Into "3000/1" = 3000 seconds = 50 minutes. In addition, the pre-recording simulation unit 5 is the place of influence, the scope of influence, and the impact of the cessation or replacement of the machine under the specified operating conditions determined by the addition of the pre-recorded situation. At least one kind of information that affects the content is enhanced in the display of the change structure of the pre-recording. It is ideal β, for example, for machine replacement, etc., of course, the display of the existing machine is changed to the display of the new machine, and also In order to make the local point easy to be visually confirmed, the treatment is done. For example, for the display of the changed machine, set the line type to be thicker than the others, or change the color or pattern, or configure the text or thumbnail to be used to notify the change. In addition, the pre-commissioning simulation unit 5 executes the -16-201205505 pre-compilation simulation for each change configuration, and outputs the simulation result of each change configuration to the display of the change configuration, and accepts the operator judgment by the input unit 206. It is preferable to designate the change configuration as the best case and display it in the output unit 205 for the designation of the best change configuration. Further, the pre-recording simulation unit 5 selects a list of the location information included in the pre-recording information to be displayed in a pull-down menu or the like, and accepts a selection from a place in the pre-recording operation condition in the list of the places, and the storage unit 203 is selected. The list of the contents of the application held in advance is displayed as a drop-down menu, and the selection of the application contents from the pre-recorded operation conditions in the application content list is accepted, thereby making it possible to accept the designation of the pre-recording operation conditions. . In addition, it is preferable that the pre-recording simulation unit 5 holds the list of the pre-recorded site information for which the selection of the place in the pre-recording operation condition and the use scenario table 22 of the list of the pre-recorded operation contents are stored in the storage unit 203. . In this case, the pre-recording simulation unit 5 performs the addition of the location information of the list of the pre-recorded location information in the pre-recording use context table 22, if it is executed by the input unit 206 or other devices connected to each other by the network 40 and 41. It is added to the use of the list of the contents of the pre-recorded contents, and it is ideal to use the processing of the situation table 22 before the update. - Table Structure Example 1 - Next, the configuration information of the configuration information table 1 1 , the itinerary 1 2 and the authentication information table 13 held by the room access management system 10 will be described with reference to Fig. 3 . The composition information table 1 1 is the machine information 311 used to form the room access management system, such as the management server, the controller -17-201205505, the card reader (CR, Card Reader), and the electronic lock (ΕΚ Key). And the setting of the type and version of the machine, etc. 3 1 2. The information of the machine connected to the upper and lower positions is also the message 313, and the set-up setting information of the related records is established. For example, a "map" indicating which of the maps of the library 24 is located, a "number of floors" of the floor in which the floor is located, a zone indicating the floor, a message "gate" indicating the position of the door, Take "etc. In addition, the schedule 1 2 is an annual, a month, a day, and a week, and the operation schedule of the room entrance management system is set to one leaflet, and the data sheet formed by the plurality of sheets is added, and the certification information table 1 3 is a table in which the information used for authentication is divided and stored, and the zoning information 3 ID information 3 3 2. The passer ID information 3 3 3 is 1 line, and the data of the formed table structure is obtained. Foreword Passer ID Information Information about the person who can enter and leave the room. - Table Structure Example 2 - Next, a case structure of the change context table 2 1 'Using the Situation Table Table 23 that is connected to the pre-recorded Internet 20 and the Change Set 1 is used, and the situation table is described using FIG. 2 1, the machine information is connected to the machine information by changing the modal information 4 1 1 , changing the correspondence, and setting the location of the Electronic. As a pre-recorded map information, it means that the building is in the “and its use” of the zoning, time and land, and information 3 2 1 structure. For example, according to each 3 1 , the manager has a plurality of lines 3 3 3, which is the management analysis package 2 2, product capital. Pre-changes Information 4 1 2 is 8 -18- 201205505 1 line, with data of the table structure formed by multiple lines. In addition, in the change of the modal information 4 1 1 in the change situation table 2, the information including the place information (the "place" in the figure) and the information on the change contents are as follows: 〇 〇 大楼 〗 〗 〗 〗 〗 〗 〗 〗 〗 资讯 资讯 资讯 资讯 资讯 资讯 资讯 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 。 The pre-recording correspondence information 4 1 2, the pre-recorded influence location analysis unit 4 checks the pre-recorded change content in the product information table 23, and sets the result of specifying the candidate device having the function of changing the content of the content. The context table 22 uses the modal information 42 1 to use the simulation information 422 as one line, and has the form data formed by the plurality of lines. As the pre-recording modal information, it is possible to specify a "place" such as a door. Conditions, conditions of transportation capacity such as "peak period", etc. The simulation contents in accordance with the conditions of the application contents are set in the pre-recording simulation information 422, for example, "a staff member enters and exits the room within one hour". In addition, in the context table 22, as an example of the use of the internal list, it is conceivable that the option of pushing the frequent entry and exit processing, that is, the peak period, and the requirement for preserving the log for the specified period, is presumed. In other words, during the log storage period, the time required to estimate the time required to collect and display the information through the network, that is, the time of day, and the network usage rate at the time of the scheduled processing are estimated. A "Gate, again, - J 刖 足 该 该 该 该 该 该 该 该 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 - - - - - - - - - - - - - - - - - The time required for the card reader's controller to deliver the user ID list to be presumed, that is, the card ID matching, the option to prejudge the machine that must be stopped or replaced when other machines or functions are faulty, that is, the fault corresponding, The option to presume the operation of the machine in response to different vacations between departments or regions is to change the operation of the machine in response to changes in the number of people handled as a result of personnel changes. The presumed option is the change of the operation status of the machine when the authority to change the access control between the tenants is changed, that is, the manager changes, etc. Also, the pre-recorded product information table 23 is stored. The table for the information of the machine of the room access management system is the machine type information 431, the corresponding change content 431a, and the connection machine information 432. Optional function information 43 3. The price information 434 is one line, and has a table structure formed by a plurality of lines. The pre-recorded machine type information 43 1 contains information such as the ID of the machine, the name, and the version. The change content 43 1 a corresponding to the pre-recording is, for example, a function of the machine, and includes information describing the change content that can correspond to the pre-recorded change situation table 21. Further, the pre-recorded machine information 432 contains the machine. The information of the connected machine. In addition, the pre-recorded function information 43 3 contains, for example, information about the optional functions that the machine can have. Also, the pre-record price information 434 contains information on the import cost of the machine. Flowchart— The process of the change management analysis method according to the present embodiment will be described based on the functions of the change management analysis device 1 described above or the description of the table type of 8-20-201205505. 5 is a flowchart of a processing procedure of the change management analysis method according to the present embodiment. Here, for example, it is assumed that the change manager 30 starts The change management analysis device 1 that is an information processing device starts the process of changing the management analysis. At this time, first, the configuration information input unit 2 accesses the room access management system 10 through the pre-recording network 41, and reads the pre-record. The composition information table 1 1 , the itinerary 1 2 , the authentication information table 13 , and the pre-record map information table 24 are read through the Internet 40 (step 501 ). Further, the pre-recording information input unit 2 is based on the pre-recording step 50. 1 The information read in the room indicating the access control area of the room (= the map data obtained from the map information table 24), the small icon of the machine for entering and leaving the room, etc. The layout information of the installation location information 3 1 1 of the machine (the coordinates on the map, etc.) is created and displayed on the output unit 205 (step 502). By this, the predecessor management person in charge can confirm the layout of the room entry and exit management system 1 = how the machine is configured, and edit the layout. In other words, the information input unit 2 receives the layout editing work performed by the pre-record management person 30 through the layout information displayed in the pre-recording unit 2〇5. An example of the screen interface 6 in the layout editing is not shown in Fig. 6(a). This screen interface 600 is composed of a button group 601 required for editing the element and a drawing field 6〇2 for setting the layout. In the example shown in Figure 6 (a), in the floor with "District 1" and "Division 2", "Door 1" is placed at the entrance and exit of "Division 1", and "Division 2" -21 - 201205505 The entrance and exit are equipped with "Door 2". Then, the "door 1" is equipped with an electronic lock "EK1", and is used to read the "CR1" used by the person to enter the "District 1" and to exit from the "Division 1". The card reader "CR2". "EK1" and "CR1" and "CR2" are connected to "Controller 1" by a serial cable. "Controller 1" is connected to "Management Server 1" with a LAN cable. Further, in the case where the layout information input unit 2 is configured such that only the installation location information 311 in the configuration information table 11 is insufficient, the installation device information 3 1 2 is read and displayed on the output. The part 205 accepts the designation of the setting device or the connection method of the setting device 30 through the input unit 206. Next, the pre-recording change context input unit 3 is displayed on the layout of the output unit 205 as described above, and the input unit 206 accepts the input of the change context including the change place and the change content (step 503). Further, the pre-recording change context input unit 3 may be connected to another device that is communicable by the input unit 206 or the network 40 or 41, and may receive the location information of the list of the pre-recorded information in the pre-recording change context table 21. The content of the change to the list of changes to the previous note is added, and the situation table 2 1 is changed before the update. By doing so, the user's options can be increased. Fig. 6(b) shows an example of the screen interface 610 at the time of changing the context input in the step 5〇3. This screen interface 610 is composed of a button group 611 required for inputting a context and a designated field 612 for setting a layout. In the example shown in Fig. 6 (b), it is assumed that "door addition" is selected from among the button group 611 required for inputting a situation. At this time, the change -22-201205505 situation server 3' is a selection from the pre-record management person 30 who displays the list of changed places, such as a pull-down menu or the like, and receives the entry and exit of, for example, the r-zone 2. The change situation input unit 3 that has received the change is to read the small icon data of "gate 2" at the predetermined place's location, and to perform the drawing. It is assumed that the "door 2" is clicked. At this time, the pre-recording change scenario input unit 3 is in the designated field 61 2, and performs a drawing process in which the predecessor "gate 2" is surrounded by a rectangle 6 1 3 . When the rectangle 6 1 3 is clicked, the change context input unit 3 receives, for example, a list of changed contents of the device, and accepts "EK addition" from the list, and "CR addition" for entering the room. Designation of changes such as "CR addition". Then, the 'pre-affected location analysis unit 4 is a change in the current situation when the device or function is added or changed, and the change in the pre-recorded product information table 23 is checked, and the function that satisfies the requirements of the changed content is applicable. Product = candidate machine is specified (step 504). Then, the influence location analysis unit 4 displays the replacement device of the pre-recorded change place in the pre-recording layout or the replacement of the existing device and the candidate device in the pre-recorded change place in each of the candidate devices, and displays the change configuration and displays The output unit 205 is on (step 505). Further, when the current record designation information indicates the deletion of the device or the function, the pre-recorded influence location analysis unit 4 deletes the device of the pre-recorded change place in the pre-recorded layout, and displays it in the output unit 205 as a change configuration. An example of the screen interfaces 700, 710, and 800 in which the configuration is changed is shown in Figs. 7(c-1) and (c-2) and Fig. 8(c-3). The pre-recorded screen interface 7 is composed of a page 7 of a list indicating a change of the configuration, a drawing field 702 of the layout after the change -23-201205505, and a price estimation button 703. In the example shown in Fig. 7 (c-1), "In the case of the modified configuration 1, "EK2" and "CR3" and "CR4" are added to "Door 2", and a controller for sequentially connecting them is added. 2", the "controller 2" is connected to the "controller 1" provided by LAN connection, and is such a layout. In this example, the newly created "EK2", "CR3", "CR4", and "Controller 2" are affected places, so the display is highlighted by thick lines. The same is true for other examples. In addition, in the case shown in Fig. 7 (c-2), the "controller 1" is changed to the new "controller 3", and the "gate 2" is added as the "EK2". With "CR3" and "CR4", connect them to the new "Controller 3" and connect the newly created "Controller 3" to the existing "Controller 1" by LAN. This is the layout. In addition, in the case of the example shown in Fig. 8 (c-3), the "controller 1" is changed to the new "controller 4", and the "door 2" is added as the "EK2". With "CR3" and "CR4", connect them to the new "Controller 4", and then replace the existing "Management Server 1" and change it to use the Web browser to manage the room entrance and exit. . In other words, the "EK" for entering the room and the "CR for retiring room" are added as in the case of the change of the situation in Fig. 6 (b). When the device is added to the influence location analysis unit 4, the product information sheet is added. In 23, the specifications of the controller necessary for the operation of the device are searched, and three types of "controller 2", "controller 3", and "controller 4" are specified. By -24- 8 201205505 The number of machines that can be controlled by "Controller 3" and "Controller 4" is twice that of "Controller 1" or "Controller 2", so it can replace the existing controller. It becomes the layout shown in FIG. 7 (c. 2) and FIG. 8 (c-3). For example, regarding the change of the room entrance management system, the person in charge of the business activity = the person in charge of the pre-recording management 30 will carry the change management analysis device 1 and take it to the client to make a system proposal. In this case, 'in general,' and only one change of the pre-recognition configuration is presented, and the customer is not prompted as in the above-mentioned Figures 7 (cl), (C-2), and 8 (c-3). There is room for choice on the side, it is easier for the customer to choose, and the comparison theory can be used to propose the system for the business side, so it has the advantage of being easy to make a case. Further, the pre-recorded influence location analysis unit 4 calculates the layout changed to the changed configuration when the price estimation button 307 is pressed on the screen interface from the change configuration of Fig. 7 (c-1). The estimated amount of time is displayed by force. In the process of the process, the influence location analysis unit 4 reads the information of the necessary fee for the addition or the change or deletion from the pre-recorded product information table 23 for the device that is to be added or changed or deleted as shown in the configuration example. The estimated price is calculated by changing the composition to calculate the necessary fee. It is ideal if the information of the estimated amount is output to the display of the change composition. Next, the pre-recording simulation unit 5 is configured to change the configuration of the pre-recording, and the input unit 2〇6 accepts the designation of the operating conditions, and applies the pre-recording operating conditions to the function information of the machine in the pre-recorded product information table 23, and uses the function in the pre-recording-25 - 201205505 The behavior of the simulation machine is output, and the simulation result is output to the display of the change configuration (step 506). As a pre-recording condition, it can be assumed that, for example, in a certain gate (= condition of a place), "pass peak period" = 1 hour, there will be 1 000 employees entering and leaving the room (= conditions for applying content). Therefore, in this case, the pre-recording simulation unit 5 is provided with, for example, the function of the "gate 2", for example, the card reader "CR4", for example, the processing time required for one-time authentication is "one second". Extract information from Product Information Sheet 23. Then, when it is desired to process "the room entrance and exit of 3,000 people in one hour", it is calculated that "60x6 0/1" = 3600 people > 3000 people, and it is determined that the operation time is satisfied, and the time taken for processing is determined. Calculated as "3000/1" = 3000, seconds = 50 points. Such a result is outputted in the display of the change configuration. Fig. 8(d) shows an example of the screen interface 810 when the simulation is applied. The screen interface 810 is formed by a button group 8 1 1 used for inputting the content in the operation condition, and a drawing field 8 1 2 required for inputting the site condition and the confirmation result in the operation condition. In the example shown in Fig. 8 (d), it is assumed that the "storage storage period" is selected from the button group 8 1 1 as the operation content. "Door 1" is designated in the pre-recording field 8 1 2 . The application simulation unit 5 receives the application simulation information corresponding to the operation content of the pre-recorded "log storage period", and the input unit 2〇6 accepts the length of the storage period and the designation of the room entrance and exit frequency. In addition, the display of the "door 1" by the simulation unit 5' is used to display the "room entrance and exit log for one year (=the length of the storage period) when the simulation information is used. = room access frequency), storage space needs 8 -26- 201205505 how much GB?" information. Of course, the pre-recording simulation unit 5 performs the simulation of the pre-recording step 560 in accordance with the above-described operating conditions. In the same manner, it is assumed that the "pass peak period" is selected from the previous button group 8 1 1 as the operation content, and "gate 2" is designated in the pre-recording field 812. The application simulation unit 5' is used as the operation simulation information corresponding to the operation content belonging to the pre-recorded "peak period", and the input unit 206 accepts the designation of the peak time zone and the room entrance and exit frequency. In addition, the simulation section 5 is used to display the "gate 2" display as "using the simulation information" when "1 hour in the morning (= spike time zone) has 1 employee turnover (= room entrance and exit frequency) How long does it take to wait for a long time?" Of course, the simulation section 5 is used in the pre-recording, and the simulation of the pre-recording step 506 conforming to such an operating condition is performed. The pre-recording change manager 30 browses the result of the use simulation under the predetermined operating conditions of the change configuration, and determines whether or not there is a problem in the change configuration, and inputs the determination result by the input unit 206. The simulation unit 5 receives the pre-determination result and looks forward to the content (step 507). If there is no problem judgment result (step 507: no problem), the pre-commissioning simulation unit 5 uses the change configuration as the best case, and outputs it as an electronic file, a paper file, or other means of accumulation (steps) 5 08 ). On the other hand, if there is a problematic judgment result (step 507: There is a problem), the pre-recording simulation unit 5 returns to the pre-recording step 505 again, and executes the simulation under the operating conditions regarding the other change configuration, and reconfirms whether or not there is a problem. In addition, the pre-recording simulation unit 5 adds or even replaces or deletes the machine based on the pre-recording situation, or the stoppage of the machine under the conditions of use -27-201205505 as determined by the pre-compression simulation. At least one type of information, the scope of influence, and the content of its influence are ideal for enhanced display in the display of the change composition. This is for the purpose of, for example, replacing the machine, and of course changing the display of the existing machine to the display of the new machine, and also for the purpose of making the local point easy to visually confirm. For example, for the display of the changed machine, the line type is set to be thicker than the others, or the color or pattern is changed, or the text or small icon for the change is configured. In addition, the pre-recording simulation unit 5 holds the list of the pre-recorded location information for selecting the location of the pre-recording operation condition and the usage scenario table 22 of the list of the pre-recorded operation contents in the storage unit 203. ideal. In this case, the pre-recording simulation unit 5 performs the addition of the location information of the list of the pre-recorded location information in the pre-recording use context table 22 to the other devices that are connected from the input unit 206 to the network 40 and 41. It is ideal to add the content of the list of the contents of the pre-recorded use, and to update the pre-recorded use of the situation table 22. --- Example 2 - In the second embodiment, the change of the authentication method is described as a change of the room access management system 1 . The data structure and flowchart of the configuration, the table, and the like of the change management analysis device 1 in the second embodiment are the same as those in the first embodiment. In addition, as the screen interface, the layout editing screen (Fig. 6) and the simulation screen (Fig. 8(d)) are the same as in the first embodiment. 8-28-201205505 Fig. 9(b) shows an embodiment. An example of the screen interface 900 for changing the context input of 2 is an example of the screen interface 910 for changing the configuration confirmation in FIG. 9(c). In the pre-recorded screen interface 900, the change scenario is a case where the authentication device of the entrance and exit of the "door 1" is changed from the card reader to the biometric information reader. At this time, the management person in charge 3 clicks "Device Change" in the button group 901 for inputting the situation, and selects "Door 1" in the designated area 902 of the layout, and inputs "Change to Bio-Reader". Intention. On the other hand, in the same manner as in the first embodiment, the influence location analysis unit 4 performs the selection of the device candidates corresponding to the designation of the change scenario. Further, in the pre-recorded screen interface 910, the change configuration specified by the influence location analysis unit 4 is a setting layout when the card reader "CR1" is changed to the "biological reader 1", and is displayed in the drawing. Field 9 1 1. Here, the "management server 2", "controller 2", and "biological reader 1" newly created "controller 2" are the "EK1" and "CR2 j" and the new "biological reading". The machine 1" is connected in series, and the newly set "controller 2" and "management server 2" are connected to the LAN, and this arrangement layout is displayed. The pre-recording change manager 3 〇 ’ can confirm the screen interface 9 1 〇, and it is better to quickly and easily know which machine to change in the current setting layout. - Example 3 - In the third embodiment, as a change of the room access management system 1

S -29- 201205505 說明進行監視攝影機連動之情形。實施例3中的變更管理 分析裝置1之構成、表格類之資料結構、流程圖,係和實 施例1相同。又,作爲衋面介面,設置佈局之編輯畫面( 圖6)、運用模擬之畫面(圖8(d))也是和實施例1相 同。 圖10(b)中係圖示了實施例3的變更情境輸入之畫 面介面1 0 00之一例,在圖10(C)中係圖示了變更構成 案確認的畫面介面1010之一例。在前記畫面介面1000中 ,作爲變更情境,係表示想要在「門1」的出入口防止挾 帶進出之情形。此時,管理負責人30係在用來輸入情境 的按鈕群1001當中點選「任意要求」按鈕,在佈局的指 定領域1 002上點選「門〗J ,輸入「欲防止挾帶進出J 之意旨。另一方面,影響地點分析部4,係和實施例1同 樣地,進行隨應於如此變更情境之指定的機器候補之選定 〇 又,在前記畫面介面1010中,作爲影響地點分析部 4所特定之變更構成案’係增設「監視攝影機1」,將該 新設的「監視攝影機1」序列連接至既設的「控制器1」 ,在描繪領域911上顯示出以既設的「控制器1」做「設 定變更J即可之事實。具體的設定變更之內容,係與「設 定變更」1012的顯示領域建立關連,而在變更管理分析 裝置1的記憶部2〇3中做管理。管理負責人3 0係一旦點 選前記「設定變更」1 012,則變更管理分析裝置1係將設 定內容之資訊’顯示在輸出部205。 -30- ⑧ 201205505 變更管理者30,係可藉由確認畫面介面1010,就可 從現在的設置佈局,迅速且容易掌握要新增何種機器至哪 裡、還有要對其做哪些必要的設定變更。 ---實施例4 — 在實施例4中,作爲房室進出管理系統10之運用模 擬,說明將讀卡機故障時的影響範圍進行分析之情形。實 施例4中的變更管理分析裝置1之構成、表格類之資料結 構、流程圖,係和實施例1相同。又,作爲畫面介面,設 置佈局之編輯畫面(圖6)、變更情境的輸入畫面(圖6 (b ))、變更構成案的確認畫面(圖7 ( c-1 ) 、( c-2 ) 、圖8(c-3)),也是和實施例1相同。 在圖1 1 ( d-1 ) ' ( d-2 )中係圖示,實施例4中的運 用模擬之畫面介面1100、1110之一例。在前記畫面介面 1 1 00中,針對案1的變更構成案(圖7 ( c-1 ))而表示 了進行模擬後的結果。在此畫面中,假設管理負責人3 0 係在輸入運用條件時所使用之按鈕群1101當中點選「故 障對應」按鈕,並點選「CR1」的顯示領域。如此一來, 前記運用模擬部5係將正在控制「CR1」的「控制器1」 的資訊,從控前記產品資訊表23中讀出,其中係規定了 例如,在所連接之讀卡機的故障更換時,必須要停止自己 與自己所控制之機器。如此一來,前記運用模擬部5係由 於前記「CR1」之故障,而在「控制器1」、「EK1」、 「CR2」的顯示附近,顯示出在機器更換時必須停止之意 -31 - 201205505 旨=“必須停止”(相當於影響內容之顯示)。此外,在 塗得例子中,位於「門2」的出入口周邊的「EK2」、「 CR3 j 、「CR4」係沒有影響,而不做任何顯示。 又,在畫面介面1110中,針對案2的變更構成案( 圖7(c-2))而表示了進行模擬後的結果。在此畫面中, 和上述同樣地,假設管理負責人30點選「故障對應」按 鈕,並點選「CR1」的顯示領域。如此一來,前記運用模 擬部5係將正在控制「CR1」的「控制器3」的資訊,從 控前記產品資訊表23中讀出,其中係規定了例如,在所 連接之讀卡機的故障更換時,必須要停止自己與自己所控 制之機器。如此一來,前記運用模擬部5係由於前記「 CR1」之故障,而在「控制器3」、「EK1」、「CR2」、 「EK2」、「CR3」、「CR4」的顯示附近,顯示出在機 器更換時必須停止之意旨=“必須停止”(相當於影響內 容之顯示)。 變更管理者30係藉由觀看比較畫面介面11〇〇與畫面 介面1110,就可迅速且容易地掌握當CR1故障時,在案 1的變更構成案、與案2的變更構成案中,何者會有何種 影響》 —貫施例5--- 在實施例5中,作爲房室進出管理系統10之運用模 擬’說明將卡片ID對全部控制器配訊之狀況的模擬之情 形。實施例5中的變更管理分析裝置1之構成、表格類之 ⑧ -32- 201205505 資料結構、流程圖,係和實施例1相同。又,作爲畫面介 面,設置佈局之編輯畫面(圖6(a))、變更情境的輸 入畫面(圖6(b))、變更構成案的確認畫面(圖7( ο-ΐ ) 、.(c-2 )、圖8 ( c-3 ))也是和實施例1相同。 圖12(d)中係圖示了實施例5中的運用模擬之畫面 介面1200之一例。假設在該畫面介面1200中,前記管理 負責人30係在運用條件輸入所使用之按鈕群12〇1當中點 選「卡片ID配訊」按鈕,在運用條件輸入及結果確認用 的描繪領域1 202上,輸入運用模擬之資訊。如此一來, 前記運用模擬部5係針對例如身爲卡片id之配訊源的「 管理伺服器1」,和身爲配訊目標的「控制器3」、「控 制器4」' 「控制器5」所各自具備的通訊機能等(每單 位時間的資料通訊量等),從產品資訊表23中抽出資訊 。然後’當想要進行「1〇〇〇人」的卡片ID配訊時,每一 人的卡片ID之資料大小X往該當控制器之配訊人數,將其 除以前記管理伺服器1與該當控制器當中較低之通訊機能 ,計算卡片ID配訊結束爲止的時間,而顯示在例如前記 描繪領域1 202中。除了如此必要之配訊時間以外,亦可 計算在配訊中對LAN (將伺服器1與控制器之間做連結 的線路)所造成的負荷。該負荷計算,係例如在產品資訊 表23中所描述之LAN的頻寬的數値當中,算出伺服器1 與各控制器之間的通訊量之總和所佔有之比率即可。 變更管理者30,係藉由確認畫面介面丨2〇〇,就可在 變更後的設置佈局中,迅速且容易掌握卡片ID配訊的模 -33- 201205505 擬結果。 以上雖然做了具體說明,但並非限定於此’在不脫離 其要旨的範圍內,可做各種變更。 若依據如此之本實施形態,則可將房室進出管理系統 的設置佈局變更之影響資訊,迅速且有效率地提供給使用 者。 根據本說明書之記載,至少可以了解以下事項。亦即 ,在前記變更管理分析方法中,資訊處理裝置係亦可將基 於前記變更情境的機器之追加乃至置換或刪除、或藉由前 記模擬所判明之所定運用條件下的機器之停止乃至更換所 及之影響地點、影響範圍、及其影響內容之至少一種資訊 ,在前記變更構成案的顯示中作加強顯示。 又,在前記變更管理分析方法中,前記資訊處理裝置 係亦可進行:當前記變更情境是表示機器或機能之追加乃 至變更時,在前記產品資訊表中核對前記變更內容,將具 備有滿足變更內容之要求之機能的候補機器加以複數特定 ,對每一候補機器進行前記佈局中的對前記變更場所之候 補機器之追加或前記變更場所中的既存機器與候補機器之 置換的顯示,生成複數個滿足前記變更情境的變更構成案 並顯示在輸出部之處理;和針對各變更構成案而執行前記 模擬,將每一變更構成案的模擬結果,輸出至該當變更構 成案之顯示中之處理;和以輸入部受理操作者判斷爲最佳 的變更構成案之指定,將該當變更構成案當成最佳案而顯 示在輸出部之處理。 ⑧ -34- 201205505 又,在前記變更管理分析方法中,前記資訊處理裝置 係亦可執行:針對各變更構成案所示的追加乃至變更或刪 除之對象的機器,從前記產品資訊表讀出追加乃至變更或 刪除之際的必要費用之資料,就每一變更構成案來合算該 必要費用而算出估算價格,輸出至該虽變更構成案之顯不 中之處理。 又,在前記變更管理分析方法中,前記資訊處理裝置 係亦可執行:將前記佈局資訊所含有之場所資訊之清單顯 示成可選擇,受理從該場所清單中的前記變更場所之選擇 ,並將記憶部中所預先保持之變更內容之清單顯示成可選 擇,受理從該變更內容清單中的前記變更內容之選擇,藉 此以受理前記變更情境之處理:和將前記佈局資訊所含有 之場所資訊之清單顯示成可選擇,受理從該場所清單中的 前記運用條件當中的場所之選擇,並將記憶部中所預先保 持之運用內容之清單顯示成可選擇,受理從該運用內容清 單中的前記運用條件當中之運用內容之選擇,藉此以受理 前記運用條件之指定之處理。 又,在前記變更管理分析方法中,前記資訊處理裝置 係亦可將儲存有:受理前記變更場所之選擇的前記場所資 訊之清單、和受理前記變更內容之選擇的變更內容之清單 的變更情境表,保持在記憶部中;並執行:從輸入部乃至 以網路連結成可通訊的其他裝置,受理前記變更情境表中 的對前記場所資訊之清單的場所資訊追加、乃至對前記變 更內容之清單的變更內容追加,而更新前記變更情境表之 -35- 201205505 處理。 又,在前記變更管理分析方法中,前記資訊處理裝置 係亦可執行:從輸入部乃至以網路連結成可通訊的其他裝 置,受理對前記產品資訊表的機器乃至機能之資訊追加, 而更新前記產品資訊表之處理。 又,在前記變更管理分析方法中,前記資訊處理裝置 係亦可將儲存有:受理前記運用條件當中之場所之選擇的 前記場所資訊之清單、和前記運用內容之清單的運用情境 表,保持在記憶部中;並執行:從輸入部乃至以網路連結 成可通訊的其他裝置,受理前記運用情境表中的對前記場 所資訊之清單的場所資訊追加、乃至對前記運用內容之清 單的運用內容追加,而更新前記運用情境表之處理。 此外,前記資訊處理裝置係亦可在前記記憶部的變更 情境表中,作爲前記變更內容之清單,記憶著門的追加、 機器的變更、與其他系統的連動、及任意的要求之至少任 一者;將含有門的追加、機器的變更、與其他系統的連動 、及任意的要求之至少任一選項的變更內容之清單加以顯 示,從該當清單中受理前記變更內容之選擇。 又,前記資訊處理裝置係亦可在前記記憶部的運用情 境表中,作爲前記運用內容之清單,記憶著:將頻繁進出 處理時之狀況加以推定之選項亦即通行尖峰期、將所定期 間之日誌保管所需資源加以推定之選項亦即日誌保管期間 、將透過網路而由其他裝置收集日誌並顯示時所需時間加 以推定之選項亦即日誌顯示時間、將進行所定處理之際的 -36- ⑧ 201205505 網路使用率加以推定之選項亦即網路使用率、將向讀卡機 的控制器配送使用者ID清單所需之時間加以推定之選項 亦即卡片ID配訊、將其他機器或機能故障時必須跟著停 止或更換之機器加以推定之選項亦即故障對應、將對應於 部門或地區之間不同休假日而運作時的機器的運作狀況加 以推定之選項亦即假日變更、將對應於隨人事異動而產生 之處理人數之變化而運作時的機器的運作狀況加以推定之 選項亦即人事異動、將承租戶間不同之進出管理之權限有 所變更時的機器的運作狀況加以推定之選項亦即管理者變 更之至少一者。 此情況下,前記資訊處理裝置係若將含有前記的通行 尖峰期、日誌保管期間、日誌顯示時間、網路使用率、卡 片ID配訊、故障對應、假日變更、人事異動、管理者變 更之至少一個選項的運用內容之清單,加以顯示,從該當 清單中受理前記運用內容之選擇,則爲理想》 【圖式簡單說明】 [圖1]含有本實施形態的變更管理分析裝置的網路構 成之例示圖。 [圖2]變更管理分析裝置之內部構造的區塊圖。 [圖3 ]本實施形態的表格之結構例1之圖示。 [圖4]本實施形態的表格之結構例2之圖示》 [圖5 ]本實施形態的變更管理分析方法之處理程序例 的流程圖。S -29- 201205505 Describes how to monitor camera linkage. The configuration of the change management analysis device 1 and the data structure and flowchart of the table in the third embodiment are the same as those in the first embodiment. Further, as the face interface, the layout screen for the layout (Fig. 6) and the screen for the simulation (Fig. 8(d)) are the same as those of the first embodiment. Fig. 10(b) shows an example of the screen interface 1 0 00 of the change context input of the third embodiment, and Fig. 10(C) shows an example of the screen interface 1010 for changing the configuration confirmation. In the pre-recorded screen interface 1000, as a change scenario, it is indicated that it is desired to prevent the entrance and exit of the entrance and exit of the "door 1". At this time, the management person in charge 30 selects the "arbitrary request" button among the button group 1001 for inputting the situation, and selects "door" J in the designated field 1 002 of the layout, and inputs "to prevent the intrusion into and out of J". On the other hand, in the same manner as in the first embodiment, the influence location analysis unit 4 performs the selection of the device candidates corresponding to the designation of the change scenario, and the influence location analysis unit 4 in the pre-screen interface 1010. In the specific change configuration, the "monitor camera 1" is added, and the new "monitor camera 1" sequence is connected to the existing "controller 1", and the "controller 1" provided in the drawing field 911 is displayed. The fact that the setting change J is made is made. The content of the specific setting change is related to the display area of the "setting change" 1012, and is managed in the memory unit 2〇3 of the change management analysis device 1. When the management person in charge 30 clicks the "setting change" 1 012, the change management analysis device 1 displays the information of the setting content in the output unit 205. -30- 8 201205505 Change manager 30, by confirming the screen interface 1010, it is possible to quickly and easily grasp which machine to add from the current layout, and what settings are necessary for it. change. ---Embodiment 4 - In Embodiment 4, as an operational simulation of the room access management system 10, a case where the influence range at the time of a card reader failure is analyzed will be described. The configuration of the change management analysis device 1 and the data structure and flowchart of the table in the fourth embodiment are the same as those in the first embodiment. In addition, as the screen interface, an edit screen for the layout (Fig. 6), an input screen for changing the situation (Fig. 6(b)), and a confirmation screen for changing the configuration (Fig. 7 (c-1), (c-2), Fig. 8 (c-3)) is also the same as the first embodiment. An example of the screen interface 1100, 1110 of the application simulation in the fourth embodiment is shown in Fig. 1 1 (d-1)' (d-2). In the preamble screen interface 1 00, the result of the simulation is shown for the change configuration of the case 1 (Fig. 7 (c-1)). On this screen, assume that the management person in charge 30 clicks the "Fault Correspondence" button among the button groups 1101 used when inputting the operating conditions, and clicks on the display area of "CR1". In this way, the pre-recording simulation unit 5 reads the information of the "controller 1" that is controlling "CR1" from the pre-recorded product information table 23, which specifies, for example, the connected card reader. When replacing a fault, you must stop yourself and the machine you are controlling. In this way, the pre-recording simulation unit 5 shows that it is necessary to stop at the time of machine replacement in the vicinity of the display of "controller 1", "EK1", and "CR2" due to the failure of the previous "CR1". 201205505 Purpose = "must stop" (equivalent to the display of the affected content). In addition, in the painted example, "EK2", "CR3 j, and "CR4" located around the entrance and exit of "Door 2" have no effect and are not displayed. Further, in the screen interface 1110, the result of the simulation is shown in the modified configuration of the case 2 (Fig. 7 (c-2)). In this screen, similarly to the above, assume that the management person in charge 30 clicks the "Fault Correspondence" button and clicks on the display area of "CR1". In this way, the pre-recording simulation unit 5 reads the information of the "controller 3" that is controlling "CR1" from the pre-recorded product information table 23, which specifies, for example, the connected card reader. When replacing a fault, you must stop yourself and the machine you are controlling. In this way, the pre-recording simulation unit 5 displays in the vicinity of the display of "controller 3", "EK1", "CR2", "EK2", "CR3", and "CR4" due to the failure of the previous "CR1". The intention to stop when the machine is replaced = "must stop" (equivalent to the display of the affected content). By changing the comparison screen interface 11 and the screen interface 1110, the change manager 30 can quickly and easily grasp the case where the CR1 failure occurs, the change configuration of the case 1 and the change configuration of the case 2, which will What is the effect? - Example 5 - In the fifth embodiment, as an application simulation of the room access management system 10, a case where the card ID is simulated for all controllers is described. The configuration and the table type of the change management analysis device 1 in the fifth embodiment are the same as those in the first embodiment. In addition, as the screen interface, an edit screen for the layout (Fig. 6(a)), an input screen for changing the situation (Fig. 6(b)), and a confirmation screen for changing the configuration (Fig. 7 (ο-ΐ), . -2) and Fig. 8 (c-3)) are also the same as in the first embodiment. An example of the screen interface 1200 of the application simulation in the fifth embodiment is shown in Fig. 12(d). It is assumed that in the screen interface 1200, the pre-recording management person in charge 30 selects the "card ID matching" button among the button groups 12〇1 used for the operation condition input, and the drawing field for the operation condition input and result confirmation 1 202 On, enter the information using the simulation. In this way, the pre-recording simulation unit 5 is for the "management server 1" which is the source of the card id, and the "controller 3" and "controller 4" which are the communication targets. 5) The communication functions (the amount of data traffic per unit time, etc.) that are provided by each of them are extracted from the product information table 23. Then, when you want to carry out the card ID of "1 〇〇〇人", the size of the card ID of each person is X to the number of the controllers of the controller, and it is divided into the management server 1 and the control. The lower communication function among the devices calculates the time until the end of the card ID assignment, and is displayed, for example, in the predescriptive field 1 202. In addition to the necessary communication time, it is also possible to calculate the load on the LAN (the line connecting the server 1 and the controller) during the distribution. This load calculation is, for example, a ratio of the total amount of communication between the server 1 and each controller among the number of bandwidths of the LAN described in the product information table 23. The change manager 30 can quickly and easily grasp the result of the card ID matching in the changed layout by confirming the screen interface 丨2〇〇. Although the above is specifically described, it is not limited thereto, and various modifications can be made without departing from the spirit and scope of the invention. According to this embodiment, the influence information of the setting layout change of the room entrance and exit management system can be quickly and efficiently provided to the user. According to the description of this manual, at least the following items can be understood. In other words, in the pre-report management analysis method, the information processing device may also add or even replace or delete the device based on the pre-recording situation, or stop or replace the device under the specified operating conditions determined by the pre-compression simulation. At least one type of information on the location, scope of influence, and its impact is highlighted in the display of the change composition. Further, in the pre-recording change management analysis method, the pre-recording information processing device may perform: when the current change context indicates that the device or the function is added or changed, the change in the pre-recorded product information table is checked, and the change is satisfied. The candidate device that is required for the content is specified in a plural number, and the candidate device is added to the candidate device in the pre-recording place in the pre-recording layout, or the display of the replacement of the existing device and the candidate device in the pre-recording site is generated. The change configuration that satisfies the pre-requisite change situation is displayed and displayed in the output unit; and the pre-compilation simulation is performed for each change configuration, and the simulation result of each change configuration is output to the display of the change configuration; The input unit accepts the designation of the change configuration that the operator has determined to be the best, and displays the change configuration as the best case and displays it in the output unit. 8 -34- 201205505 In the pre-recording change management analysis method, the pre-recording information processing device can also execute the addition of the product information table from the previous product information table for the device to be added or changed or deleted as shown in each change configuration. The information on the necessary expenses at the time of the change or deletion is calculated by calculating the estimated cost for each change composition, and outputting the estimated price to the processing of the change composition. Further, in the pre-recording change management analysis method, the pre-recording information processing device may perform: displaying a list of the location information included in the pre-recorded layout information as an option, and accepting a selection from the pre-recorded change place in the list of the places, and The list of the contents of the changes held in advance in the memory unit is displayed as a selection, and the selection of the content of the change from the list of the contents of the change is accepted, whereby the process of changing the context of the pre-recording is accepted: and the location information included in the layout information of the pre-recording The list is displayed as selectable, and the selection of the place from the pre-recorded use conditions in the list of the place is accepted, and the list of the contents of the work held in advance in the memory unit is displayed as a selection, and the pre-record from the list of the use contents is accepted. The selection of the application content in the application conditions is adopted to accept the designation of the pre-recording application conditions. Further, in the pre-recording change management method, the pre-recording information processing apparatus may store a list of the pre-recorded location information for accepting the selection of the pre-recorded change place and a change context table of the list of the change contents of the selection of the pre-recorded change content. And being held in the memory unit; and executing: from the input unit to other devices that are connected by the network to be communicable, and accepting the list information of the list of the pre-recorded information in the pre-recorded change context table, and even the list of the changes to the pre-recorded content The change content is added, and the update before the change situation table is -35- 201205505. Further, in the pre-recording change management analysis method, the pre-recording information processing device can also perform an update from the input unit to another device that can be communicated by the network, and accepts information on the device and function of the pre-recorded product information table. The handling of the product information sheet of the predecessor. Further, in the pre-recording change management analysis method, the pre-recording information processing device may store the list of the pre-recorded site information for which the selection of the place in the pre-recording operation condition is received, and the use context table of the list of the pre-recorded operation contents. In the memory unit, and executing: from the input unit to other devices that are connected by the network to communicate, the content of the location information of the list of the pre-recorded information in the context table is used, and the contents of the list of the pre-recorded contents are used. Append, and update the pre-record using the processing of the situation table. In addition, the pre-recording information processing device may also be a list of the contents of the pre-recording change in the change context table of the pre-recorded memory unit, and memorize at least one of the addition of the door, the change of the device, the interlocking with other systems, and any of the arbitrary requirements. The list of the contents of the change including at least one of the option of adding the door, the change of the device, the interlocking with the other system, and any of the arbitrary requests is displayed, and the selection of the content of the previous change is accepted from the list. Further, the pre-recording information processing device may be used as a list of the pre-recorded operation contents in the usage context table of the pre-recorded memory unit, and remembers that the option of estimating the situation when the frequent entry and exit processing is performed is the peak period and the predetermined period. The option to presume the resources required for log storage, that is, the time during which the log is kept, the time required to collect logs from other devices through the network and displayed, that is, the log display time, and the time when the scheduled processing will be performed -36 - 8 201205505 The estimated usage of network usage is the network usage rate, the option to estimate the time required to distribute the user ID list to the controller of the card reader, ie card ID matching, other machines or The option to be presumed by the machine that is stopped or replaced when the function is faulty, that is, the fault corresponding to the operation of the machine when the operation is performed corresponding to different holidays between departments or regions, that is, the holiday change will correspond to The presumption of the operation of the machine when operating with changes in the number of people handled by personnel changes That personnel changes, will lease out the management of user rights between differences have to be presumed when the operation status of the machine that is the option to change the management of at least one more change. In this case, the pre-recording information processing device will include at least the prevailing peak period, the log storage period, the log display time, the network usage rate, the card ID matching, the fault response, the holiday change, the personnel change, and the manager change. A list of the contents of an option is displayed, and it is desirable to accept the selection of the pre-recorded content from the list. [Simplified illustration] [FIG. 1] A network configuration including the change management analysis device of the present embodiment An illustration. [Fig. 2] A block diagram of the internal structure of the change management analysis device. Fig. 3 is a view showing a configuration example 1 of a table of the present embodiment. [Fig. 4] Fig. 4 is a diagram showing an example of a processing procedure of a change management analysis method according to the present embodiment.

S -37- 201205505 [圖6]本實施形態的畫面介面例1之圖示。 [圖7]本實施形態的畫面介面例2之圖示。 [圖8 ]本實施形態的畫面介面例3之圖示。 [圖9]第2實施例的畫面介面例之圖示。 [圖10]第3實施例的畫面介面例之圖示。 [圖11]第4實施例的畫面介面例之圖示。 [圖12]第5實施例的畫面介面例之圖示。 【主要元件符號說明】 1 :變更管理分析裝置 2 :構成資訊輸入部 3 :變更情境輸入部 4 :影響地點分析部 5 :運用模擬部 1 〇 :房室進出管理系統 1 1 :構成資訊表(佈局資訊) 1 2 :行程表 1 3 :認證資訊表 2 0 :網際網路 2 1 :變更情境表 22 :運用情境表 2 3 :產品資訊表 2 4 :地圖資訊表 30 :變更管理者 ⑧ -38- 201205505 4 Ο、4 1 :通訊線路S -37-201205505 [Fig. 6] Illustration of the screen interface example 1 of the present embodiment. Fig. 7 is a view showing an example 2 of the screen interface of the embodiment. Fig. 8 is a view showing an example 3 of the screen interface of the embodiment. Fig. 9 is a view showing an example of a screen interface of the second embodiment. Fig. 10 is a view showing an example of a screen interface of the third embodiment. Fig. 11 is a view showing an example of a screen interface of the fourth embodiment. Fig. 12 is a view showing an example of a screen interface of the fifth embodiment. [Description of main component symbols] 1 : Change management analysis device 2 : Configuration information input unit 3 : Change context input unit 4 : Impact location analysis unit 5 : Operation simulation unit 1 : Room access management system 1 1 : Composition information table ( Layout information) 1 2 : Itinerary 1 3 : Certification Information Sheet 2 0 : Internet 2 1 : Change Situation Table 22 : Use Situation Table 2 3 : Product Information Sheet 2 4 : Map Information Table 30 : Change Manager 8 - 38- 201205505 4 Ο, 4 1 : Communication line

201 : CPU 202 :記億體 203 :記億部 204 :通訊部 205 :輸出部 206 :輸入部 2 0 7 :匯流排 3 1 〇 :構成資訊表(佈局資訊) 3 20 :行程表 3 3 0 :認證資訊表 4 1 0 :變更情境表 420 :運用情境表 430 :產品資訊表201 : CPU 202 : Billion 203 : Kee 204 : Communication unit 205 : Output unit 206 : Input unit 2 0 7 : Bus 3 1 〇 : Composition information table (Layout information) 3 20 : Itinerary 3 3 0 : Certification Information Sheet 4 1 0 : Change Situation Table 420: Use Situation Table 430: Product Information Sheet

S -39-S -39-

Claims (1)

201205505 七、申請專利範圍: 1. 一種變更管理分析方法,其特徵爲, 由分析房室進出管理系統之變更管理所造成之影響的 資訊處理裝置,執行: 從記憶部讀取將所定領域之房室進出管理系統加以構 成之機器的佈局資訊之處理;和 將前記佈局資訊顯示在輸出部,由輸入部受理變更情 境其中含有房室進出管理系統之佈局中的構成之變更場所 及變更內容之處理;和 當前記變更情境是表示機器或機能之追加乃至變更時 ,在儲存著可能構成房室進出管理系統之機器之機能資訊 的產品資訊表中,核對前記變更內容,將具備有滿足變更 內容之要求之機能的候補機器加以特定,進行前記佈局中 的對前記變更場所之候補機器之追加、或前記變更場所中 的既存機器與候補機器之置換的顯示,當前記指定資訊是 表示機器或機能之刪除時,進行前記佈局中的前記變更場 所之機器的刪除,成爲變更構成案而顯示在輸出部之處理 :和 針對前記變更構成案,以輸入部受理運用條件之指定 ,將前記運用條件適用於前記產品資訊表中的機器之機能 資訊而在前記運用條件下模擬機器運作之際的舉動,將模 擬結果輸出至變更構成案的顯示中之處理。 2. 如申請專利範圍第1項所記載之變更管理分析方 法,其中, -40- ⑧ 201205505 前記資訊處理裝置,係 將基於前記變更情境的機器之追加乃至置換或刪除、 或藉由前記模擬所判明之所定運用條件下的機器之停止乃 至更換所及之影響地點、影響範圍、及其影響內容之至少 一種資訊,在前記變更構成案的顯示中作加強顯示。 3-如申請專利範圍第1項或第2項所記載之變更管 理分析方法,其中, 前記資訊處理裝置係執行: 當前記變更情境是表示機器或機能之追加乃至變更時 ,在前記產品資訊表中核對前記變更內容,將具備有滿足 變更內容之要求之機能的候補機器加以複數特定,對每一 候補機器進行前記佈局中的對前記變更場所之候補機器之 追加或前記變更場所中的既存機器與候補機器之置換的顯 示’生成複數個滿足前記變更情境的變更構成案並顯示在 輸出部之處理;和 針對各變更構成案而執行前記模擬,將每一變更構成 案的模擬結果,輸出至該當變更構成案之顯示中之處理; 和 以輸入部受理操作者判斷爲最佳的變更構成案之指定 ,將該當變更構成案當成最佳案而顯示在輸出部之處理。 4 ·如申請專利範圍第3項所記載之變更管理分析方 法,其中, 前記資訊處理裝置係執行: 針對各變更構成案所示的追加乃至變更或刪除之對象 -41 - 201205505 的機器,從前記產品資訊表讀出追加乃至變更或刪除之際 的必要費用之資料’就每一變更構成案來合算該必要費用 而算出估算價格,輸出至該當變更構成案之顯示中之處理 0 5 ·如申請專利範圍第1項〜第4項之任一項所記載 之變更管理分析方法,其中, 前記資訊處理裝置係執行: 將前記佈局資訊所含有之場所資訊之清單顯示成可選 擇,受理從該場所清單中的前記變更場所之選擇,並將記 憶部中所預先保持之變更內容之清單顯示成可選擇,受理 從該變更內容清單中的前記變更內容之選擇,藉此以受理 前記變.更情境之處理;和 將前記佈局資訊所含有之場所資訊之清單顯示成可選 擇,受理從該場所清單中的前記運用條件當中的場所之選 擇,並將記憶部中所預先保持之運用內容之清單顯示成可 選擇,受理從該運用內容清單中的前記運用條件當中之運 用內容之選擇,藉此以受理前記運用條件之指定之處理。 6.如申請專利範圍第5項所記載之變更管理分析方 法,其中, 前記資訊處理裝置係爲, 將儲存有:受理前記變更場所之選擇的前記場所資訊 之清單、和受理前記變更內容之選擇的變更內容之清單的 變更情境表,保持在記憶部中; 並執行:從輸入部乃至以網路連結成可通訊的其他裝 ⑧ -42- 201205505 置’受理前記變更情境表中的對前記場所資訊之清單的場 所資訊追加、乃至對前記變更內容之清單的變更內容追加 ,而更新前記變更情境表之處理。 7-如申請專利範圍第5項或第6項所記載之變更管 理分析方法,其中, 前記資訊處理裝置係執行: 從輸入部乃至以網路連結成可通訊的其他裝置,受理 對前記產品資訊表的機器乃至機能之資訊追加,而更新前 記產品資訊表之處理。 8 ·如申請專利範圍第5項〜第7項之任一項所記載 之變更管理分析方法,其中, 前記資訊處理裝置係爲, 將儲存有:受理前記運用條件當中之場所之選擇的前 記場所資訊之清單、和前記運用內容之清單的運用情境表 ,保持在記憶部中; 並執行:從輸入部乃至以網路連結成可通訊的其他# 置,受理前記運用情境表中的對前記場所資訊之清單的_ 所資訊追加、乃至對前記運用內容之清單的運用內容追加 ,而更新前記運用情境表之處理。 9. 一種變更管理分析裝置,係屬於分析房室進出管 理系統之變更管理所造成之影響的資訊處理裝置’其特徵1 爲,具備: 構成資訊輸入部,係從記憶部讀取將所定領域之房室 進出管理系統加以構成之機器的佈局資訊;和 S. -43- 201205505 變更情境輸入部,係將前記佈局資訊顯示在輸出部’ 由輸入部受理變更情境其中含有房室進出管理系統之佈局 中的構成之變更場所及變更內容;和 影響地點分析部,係當前記變更情境是表示機器或機 能之追加乃至變更時,在儲存著可能構成房室進出管理系 統之機器之機能資訊的產品資訊表中’核對前記變更內容 ,將具備有滿足變更內容之要求之機能的候補機器加以特 定,進行前記佈局中的對前記變更場所之候補機器之追加 、或前記變更場所中的既存機器與候補機器之置換的顯示 ,當前記指定資訊是表示機器或機能之刪除時,進行前記 佈局中的前記變更場所之機器的刪除’成爲變更構成案而 顯示在輸出部;和 運用模擬部,係針對前記變更構成案’以輸入部受理 運用條件之指定,將前記運用條件適用於前記產品資訊表 中的機器之機能資訊而在前記運用條件下模擬機器運作之 際的舉動,將模擬結果輸出至變更構成案的顯示中。 10. —種變更管理分析程式,其特徵爲,係令分析房 室進出管理系統之變更管理所造成之影響的資訊處理裝置 ,執行: 從記憶部讀取將所定領域之房室進出管理系統加以構 成之機器的佈局資訊之處理;和 將前記佈局資訊顯示在輸出部,由輸入部受理變更情 境其中含有房室進出管理系統之佈局中的構成之變更場所 及變更內容之處理;和 -44- 201205505 當前記變更情境是表示機器或機能之追加乃至變更時 ,在儲存著可能構成房室進出管理系統之機器之機能資訊 的產品資訊表中,核對前記變更內容,將具備有滿足變更 內容之要求之機能的候補機器加以特定,進行前記佈局中 的對前記變更場所之候補機器之追加、或前記變更場所中 的既存機器與候補機器之置換的顯示,當前記指定資訊是 表示機器或機能之刪除時,進行前記佈局中的前記變更場 所之機器的刪除,成爲變更構成案而顯示在輸出部之處理 :和 針對前記變更構成案,以輸入部受理運用條件之指定 ,將前記運用條件適用於前記產品資訊表中的機器2機能 資訊而在前記運用條件下模擬機器運作之際的舉8¾ ’ ^胃 擬結果輸出至變更構成案的顯示中之處理。 S -45-201205505 VII. Scope of application for patents: 1. A change management analysis method, characterized in that an information processing device that analyzes the impact of the change management of the room entrance and exit management system performs: reading the house in the designated area from the memory unit The processing of the layout information of the machine constituted by the room entrance and exit management system; and the display of the pre-recorded layout information in the output unit, and the input unit accepts the change situation in which the change location and the change content of the configuration of the room entrance management system are included. ; and the current change situation is to indicate the addition or even change of the machine or function, in the product information table storing the function information of the machine that may constitute the room access management system, check the change of the pre-record, and have the content that meets the change. The candidate device of the required function is specified, and the addition of the candidate device to the pre-recording site in the pre-recording layout or the display of the replacement of the existing device and the candidate device in the pre-recording site is performed, and the current designation information indicates the machine or function. When deleting, proceed to the front of the layout The deletion of the device in the changed place is displayed in the output unit as the change configuration, and the change is made to the pre-recording configuration. The input unit accepts the designation of the operating conditions and applies the pre-recording operating conditions to the machine in the pre-recorded product information table. The function information is used to simulate the operation of the machine under the pre-recorded conditions, and the simulation result is output to the display of the change configuration. 2. For the change management analysis method described in the first paragraph of the patent application, the -40- 8 201205505 pre-recording information processing device adds or deletes or deletes the device based on the pre-recorded situation, or At least one of the information on the location, scope of influence, and its impact of the cessation of the machine under the specified conditions of use, and the content of the impact, is highlighted in the display of the change structure. 3- The change management analysis method according to the first or second aspect of the patent application, wherein the pre-recording information processing device executes: the current record change situation indicates that the device or function is added or even changed, and the product information table is recorded in the preceding paragraph. In the case of the change of the pre-recording, the candidate device that has the function of satisfying the requirements of the change is specified in the plural, and the candidate device in the pre-recording place in the pre-recording layout is added to the candidate device in the pre-recording site or the existing device in the pre-recording site is changed. The display of the replacement with the candidate device 'generates a plurality of changes that satisfy the change scenario of the previous record and displays them in the output unit; and executes the pre-compilation simulation for each change configuration, and outputs the simulation result of each change configuration to The processing in the display of the change configuration is performed; and the input unit accepts the designation of the change configuration that the operator determines to be the best, and displays the change configuration as the best case and displays it in the output unit. 4. The change management analysis method described in the third paragraph of the patent application, wherein the pre-recording information processing device executes: a device for adding or even changing or deleting the object of the change composition -41 - 201205505 The product information sheet reads the information of the necessary expenses for the addition or even the change or deletion. 'Establish the estimated price for each change of the composition to calculate the estimated cost, and output it to the display of the change composition. 0 5 ·If the application The change management analysis method according to any one of the preceding claims, wherein the pre-recording information processing device executes: displaying a list of location information included in the pre-registration information as an option, and accepting from the location The selection of the change place in the list is displayed, and the list of the change contents held in advance in the memory unit is displayed as a selection, and the selection of the change contents from the change list is accepted, thereby accepting the change before the change. Processing; and displaying a list of location information contained in the pre-post layout information as optional, subject to The selection of the place in the pre-recording operation condition in the list of the place, and the list of the use contents held in advance in the memory unit are displayed as selectable, and the selection of the use contents from the pre-recorded use conditions in the use list is accepted. In order to accept the designation of the pre-recorded conditions. 6. The change management analysis method according to claim 5, wherein the pre-recording information processing device stores a list of pre-recorded site information for accepting a selection of a pre-recorded change place, and a selection of a pre-recorded change content. The change context table of the change contents list is kept in the memory unit; and execution: from the input unit to other devices that are connected by the network to be communicable. 8-42-201205505 Set the pre-recorded change situation table in the pre-recorded place The location information of the list of information is added, and the content of the change of the list of the contents of the change is added, and the process of changing the situation table is updated before the update. 7- The change management analysis method described in the fifth or sixth aspect of the patent application, wherein the pre-recording information processing device performs: receiving information on the pre-recorded product from the input unit to other devices connected by the network to be communicable The information of the machine and even the function of the watch is added, and the processing of the pre-recorded product information table is updated. The change management analysis method according to any one of the items 5 to 7 of the patent application, wherein the pre-recording information processing device stores a pre-recorded place for accepting a selection of a place in the pre-recording operation condition. The list of information and the use context list of the pre-recorded content list are kept in the memory department; and the execution is performed from the input department to the other network that can be communicated by the network, and the pre-recorded use context table in the pre-recorded place The information of the list of information is added, and the content of the list of the contents of the pre-recorded content is added, and the processing of the situation table is used before the update. 9. A change management analysis device, which is an information processing device that analyzes the influence of the change management of the room entrance management system, characterized in that: the configuration information input unit reads the predetermined field from the memory unit. The layout information of the machine that is formed by the room entrance and exit management system; and the S.-43-201205505 change context input unit displays the pre-recorded layout information in the output unit'. The input area accepts the change situation, and the layout of the room entrance and exit management system is included. The change location and the change content of the composition in the middle; and the influence location analysis unit is a product information indicating that the device or the function is added or changed, and the function information of the device that may constitute the room access management system is stored. In the table, the contents of the pre-review change are specified, and the candidate devices having the functions that satisfy the requirements of the change are specified, and the candidate devices in the pre-recorded place are added to the candidate device, or the existing devices and candidate devices in the pre-recorded change place are added. The display of the replacement, the current information specified is the machine When the function is deleted, the deletion of the device in the pre-recorded change place in the pre-recorded layout is displayed in the output unit as the change configuration, and the operation simulation unit is used to specify the operation conditions in the input unit. The pre-recording conditions apply to the function information of the machine in the pre-recorded product information sheet, and the behavior of the simulation machine is operated under the pre-recording conditions, and the simulation result is output to the display of the change configuration. 10. A change management analysis program, characterized in that the information processing device for analyzing the influence of the change management of the room entrance and exit management system is executed: reading from the memory unit to enter and exit the management system of the room in the designated area Processing of the layout information of the configured machine; and displaying the pre-recorded layout information on the output unit, and accepting, by the input unit, the process of changing the configuration and the content of the change in the layout of the room access management system; and -44- 201205505 The current change situation is the product information table that stores the function information of the machine that may constitute the room access management system when the machine or function is added or changed. Check the change of the pre-record and have the requirement to meet the change content. The candidate device of the function is specified, and the addition of the candidate device to the pre-recorded change place in the pre-recording layout or the display of the replacement of the existing device and the candidate device in the pre-recorded change place is performed, and the current record designation information indicates the deletion of the machine or function. At the time of the pre-recording The deletion of the device is shown in the process of changing the configuration and is displayed in the output unit: and the configuration for the change of the pre-recording, the designation of the operating conditions is accepted by the input unit, and the pre-recording operating conditions are applied to the device 2 function information in the pre-recorded product information table. The pre-recording process of simulating the operation of the machine under the condition of the operation of the machine is output to the display of the change composition. S -45-
TW100105406A 2010-04-21 2011-02-18 Change management analysis method, change management analysis apparatus, and change management analysis program TWI437510B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010098131A JP5028506B2 (en) 2010-04-21 2010-04-21 Change management analysis method, change management analysis apparatus, and change management analysis program

Publications (2)

Publication Number Publication Date
TW201205505A true TW201205505A (en) 2012-02-01
TWI437510B TWI437510B (en) 2014-05-11

Family

ID=44887469

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100105406A TWI437510B (en) 2010-04-21 2011-02-18 Change management analysis method, change management analysis apparatus, and change management analysis program

Country Status (4)

Country Link
JP (1) JP5028506B2 (en)
CN (1) CN102236837A (en)
SG (1) SG175493A1 (en)
TW (1) TWI437510B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI634511B (en) * 2013-03-19 2018-09-01 中華電信股份有限公司 Situational linkage system and method applied to intelligent buildings

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6160401B2 (en) * 2013-09-25 2017-07-12 大日本印刷株式会社 Entrance / exit management device, entrance / exit management method, and program
CN111667384B (en) * 2013-09-30 2024-04-26 施耐德电气楼宇美国股份有限公司 Building automation management apparatus and method
WO2019026576A1 (en) * 2017-07-31 2019-02-07 株式会社フジキン Information processing device, manufacturing assistance system, valve assembly method, and device replacement method
KR101915602B1 (en) * 2017-12-28 2018-11-07 주식회사 신화시스템 A management method of access rights for access control system and computer readable medium recorded programs carry out thereof
JP7400228B2 (en) * 2019-07-08 2023-12-19 富士フイルムビジネスイノベーション株式会社 Information processing device and program

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3982938B2 (en) * 1999-03-05 2007-09-26 日立情報通信エンジニアリング株式会社 Entrance / exit management system
JP4794082B2 (en) * 2001-08-02 2011-10-12 富士通株式会社 Entrance / exit management device and method
JP2008152332A (en) * 2006-12-14 2008-07-03 Fuji Xerox Co Ltd Device, controller, and method for updating control software

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI634511B (en) * 2013-03-19 2018-09-01 中華電信股份有限公司 Situational linkage system and method applied to intelligent buildings

Also Published As

Publication number Publication date
SG175493A1 (en) 2011-11-28
JP5028506B2 (en) 2012-09-19
TWI437510B (en) 2014-05-11
JP2011227774A (en) 2011-11-10
CN102236837A (en) 2011-11-09

Similar Documents

Publication Publication Date Title
CN103460259B (en) The distribution of buildings visit information
CN104240342B (en) Access control method and device based on identity authentication
JP5201904B2 (en) Distributed user confirmation / profile management system and method
TWI437510B (en) Change management analysis method, change management analysis apparatus, and change management analysis program
US20110231364A1 (en) Id management method, id management system, and computer-readable recording medium
KR20040066804A (en) Method and apparatus for work management for facility maintenance
US20140156318A1 (en) User interface for onboard ticket validation and collection
US20150106150A1 (en) System and method for managing event participant authorizations
JP5288762B2 (en) Entrance / exit management system and entrance / exit management method
CN108171482A (en) A kind of intelligent interactive system, information data processing terminal
US20170004437A1 (en) Systems, apparatus and methods for generating and displaying a schedule impact map
WO2016064337A1 (en) System and method for work task assignment and follow-up of a building or construction project
AU2006252035B2 (en) Access Management System
JP2020087129A (en) Entry management system and entry management method
JP6848480B2 (en) Management program, management method, and management system
JP6870882B1 (en) Information processing method, information processing system, program
KR102491459B1 (en) Multilateral collaboration-based security vulnerability management method, system, and device therefor
JP6093133B2 (en) Station service equipment maintenance system
US20240152830A1 (en) Method for presenting data about a construction site
JP4897531B2 (en) Entrance / exit management device and method
JP5604183B2 (en) Security management apparatus and method
JP2008197728A (en) Change management support method, change management support device, and computer program
JP2021128395A (en) Business processing device, information processing method, and program
JP2024048560A (en) Information processing device, information processing method, and program
JP2024033815A (en) Elevator maintenance support system, elevator maintenance support method, and maintenance terminal used for elevator maintenance support