On-Site Construction Work That Accompanies The Preparation And Application Of Concrete
(AREA)
Abstract
The present invention provides a construction method of combining geogrid rack and concrete, geogrid racks are rapidly combined so as to define an area needed by the construction via a continuous geogrid rack structure, and each of rack members of the geogrid racks is provided with through holes, so when concrete is grouted, each of the rack members of the geogrid racks are connected and fastened; the construction method provided has advantages of fast construction and lower cost.
TW96105733A2007-02-152007-02-15Construction method of combining geogrid rack and concrete
TW200833903A
(en)
Improved supporting structure for noise barrier where the foundation and the structural post are arranged as a single continuous piece, and respective method of assemblage
Protective screen for the structures built on foundations on deformable sub-soil, preferably susceptible to the soil creeping down or soil spread creeping