Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Arken Jeneratoer Anonim SirketifiledCriticalArken Jeneratoer Anonim Sirketi
Priority to TR2020/07409UpriorityCriticalpatent/TR202007409U4/tr
Publication of TR202007409U4publicationCriticalpatent/TR202007409U4/tr
Water Treatment By Electricity Or Magnetism
(AREA)
Abstract
Buluş, elektrik şebekesinin olmadığı veya kesintili veya kalitesiz olduğu ihtiyaç bölgelerinde sulama ihtiyacını kesintisiz ve kaliteli bir şekilde sağlamak üzere bir kesintisiz sulama sistemidir.
TR2020/07409U2020-05-122020-05-12Yeni̇lenebi̇li̇r enerji̇yle çalişabi̇len kesi̇nti̇si̇z sulama si̇stemi̇
TR202007409U4
(tr)
Power generation system having a single working medium circulating the system wherein the system comprises a first heat exchanger, a turbine, a condenser and a second heat exchanger