TH70674B - How to improve field production with gas or oil obtained at - Google Patents

How to improve field production with gas or oil obtained at

Info

Publication number
TH70674B
TH70674B TH1201006489A TH1201006489A TH70674B TH 70674 B TH70674 B TH 70674B TH 1201006489 A TH1201006489 A TH 1201006489A TH 1201006489 A TH1201006489 A TH 1201006489A TH 70674 B TH70674 B TH 70674B
Authority
TH
Thailand
Prior art keywords
borehole
new
field
production
wells
Prior art date
Application number
TH1201006489A
Other languages
Thai (th)
Other versions
TH128215B (en
TH128215A (en
Inventor
อาวรีย์
ฌอง-มาร์ค
ไฮน์ส
บรูโน่
เซ้นต์ เจอเมน เดอ
ฮิวจ์
โดดอน
เรมิ
เดสจาร์ดวนส์
เบนอต
Original Assignee
นางดารานีย์ วัจนะวุฒิวงศ์
นางสาวสนธยา สังขพงศ์
Filing date
Publication date
Application filed by นางดารานีย์ วัจนะวุฒิวงศ์, นางสาวสนธยา สังขพงศ์ filed Critical นางดารานีย์ วัจนะวุฒิวงศ์
Publication of TH128215B publication Critical patent/TH128215B/en
Publication of TH128215A publication Critical patent/TH128215A/en
Publication of TH70674B publication Critical patent/TH70674B/en

Links

Abstract

DC60 (14/12/55) วิธีการปรับปรุงการผลิตภาคสนามที่มีก๊าซหรือน้ำมันที่ได้ที่ โดยภาคสนามดังกล่าวประกอบด้วย หลุมเจาะที่มีอยู่เป็นจำนวนหลายหลุม และวิธีการดังกล่าวประกอบด้วย ดังนี้ - การให้ได้แบบจำลองภาคสนามที่สามารถคาดการณ์การผลิตภาคสนามดังกล่าว ตามฟังค์ชั่นของสถานการณ์จำลองที่กำหนด โดยสถานการณ์จำลองเป็นเซทของข้อมูลที่ประกอบด้วย พารามิเตอร์การผลิตของหลุมเจาะที่มีอยู่ และในบางกรณีอาจเป็นพารามิเตอร์ของตำแหน่งและการ ผลิตของหลุมเจาะใหม่หนึ่งหลุมหรือมากกว่า - การกำหนดพื้นที่การไหล (drainage area) ของหลุมเจาะที่มีอยู่ดังกล่าวด้วยการใช้ แบบจำลองภาคสนาม - การกำหนดตำแหน่งของหลุมเจาะใหม่ที่น่าจะมีโอกาส (candidate new well) เพื่อให้ ได้พื้นที่การไหลของหลุมเจาะใหม่ที่น่าจะมีโอกาสดังกล่าว ซึ่งถูกกำหนดด้วยการใช้แบบจำลอง ภาคสนาม ทั้งนี้โดยไม่ให้ทับซ้อนกับพื้นที่การไหลของหลุมเจาะที่มีอยู่ - การหาค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ (gain function) ซึ่งขึ้นอยู่กับการผลิต ภาคสนามด้วยการกำหนดเซทของหลุมเจาะจากเซทของหลุมเจาะหลายหลุม ซึ่งให้ค่าที่เหมาะสมที่สุด ของฟังค์ชั่นที่ได้ดังกล่าว ทั้งนี้แต่ละเซทของหลุมเจาะของเซทของหลุมเจาะหลายหลุมดังกล่าว ประกอบด้วยหลุมเจาะที่มีอยู่และหลุมเจาะใหม่ที่ถูกคัดเลือกจากหลุมเจาะใหม่ที่น่าจะมีโอกาส (รูปที่ 4) วิธีการปรับปรุงการผลิตภาคสนามที่มีก๊าซหรือน้ำมันที่ได้ที่ โดยภาคสนามดังกล่าวประกอบด้วย หลุมเจาะที่มีอยู่เป็นจำนวนหลายหลุม และวิธีการดงกล่าวประกอบด้วย ดังนี้ - การให้ได้แบบจำลองภาคสนามที่สามารถคาดการณ์การผลิตภาคสนามดังกล่าว ตามฟังค์ชั่นของสถานการณ์จำลองที่กำหนด โดยสถานการณ์จำลองเป็นเซทของข้อูลที่ประกอบด้วย พารามิเตอร์การผลิตของหลุมเจาะที่มีอยู่ และในบางกรณีอาจเป็นพารามิเตอร์ของตำแหน่งและการ ผลิตของหลุมเจาะใหม่หนึ่งหลุมหรือมากกว่า - การกำหนดตำแหน่งของหลุมเจาะใหม่ที่น่าจะมีโอกาส(candidate new well)เพื่อให้ ได้พื้นที่การไหลของหลุมเจาะใหม่ที่น่าจะมีโอกาสดังกล่าว ซึ่งถูกกำหนดด้วยการใช้แบบจำลอง ภาคสนาม ทั้งนี้โดยไม่ให้ทับซ้อนกับพื้นที่การไหลของหลุมเจาะที่มีอยู่ - การหาค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ (gain function)ซึ่งขึ้นอยู่กับการผลิต ภาคสนามด้วยการกำหนดเซทของหลุมเจาะจากเซทของหลุมเจาะหลายหลุม ซึ่งให้ค่าที่เหมาะสมที่สุด ของฟังก์ชั่นที่ได้ดังกล่าว ทั้งนี้แต่ละเซทของหลุมเจาะของเซทของหลุมเจาะหลายหลุมดังกล่าว (รูปที่ 4) DC60 (14/12/55) Method for improving field production with gas or oil obtained at In which the said field consists of There are many holes available for drilling. And how it works includes: - Obtaining a field model that can predict such field production. According to the function of the given scenario Where the scenario is a set of data consisting of Existing borehole production parameters And in some cases it may be a parameter of location and Produce one or more new wells - Determining the drainage area of the existing wells by using Field Model - Positioning a candidate new well to obtain such a potential new borehole flow area. This was determined using a field model without overlapping the existing borehole flow area. - Optimization of the gain function, depending on production. Field by defining the borehole set from the multi-well bore set Which gives the optimal value Of the aforementioned functions Each of the borehole sets of the aforementioned multi-wells set It consists of existing boreholes and new boreholes selected from potential new wells (Fig. 4). Methods for improving gas or oil field production at In which the said field consists of There are many holes available for drilling. And the methods are as follows: - Obtaining a field model that can predict such field production. According to the function of the given scenario In which the simulation is a set of data consisting of Existing borehole production parameters And in some cases it may be a parameter of location and Produce one or more new wells - Determination of potential new wells (candidate new wells) to provide Obtain the potential new borehole flow area. This was determined using a field model without overlapping the existing borehole flow area. - Optimization of the gain function, depending on the production. Field by defining the borehole set from the multi-well bore set Which gives the optimal value Of the aforementioned functions Each borehole set of the aforementioned multi-well well set (Figure 4)

Claims (1)

ข้อถือสิทธฺ์ (ทั้งหมด) ซึ่งจะไม่ปรากฏบนหน้าประกาศโฆษณา :แก้ไข 05/07/2562 ไม่มีข้อถือสิทธิ ------------------------------------- ------18/07/2561------(OCR) หน้า 1 ของจำนวน 3 หน้าข้อถือสิทธิ 1. วิธีการปรับปรุงการผลิตภาคสนามที่มีก๊าซหรือนํ้ามันที่ได้ที่ โดยภาคสนามดังกล่าวประกอบด้วยหลุมเจาะที่มีอยู่เป็นจำนวนหลายหลุม และวิธีการดังกล่าวประกอบด้วย ดังนี้- การให้ได้แบบจำลองภาคสนามที่สามารถคาดการณ์การผลิตภาคสนามดังกล่าว แบบหลุม ต่อหลุมตามฟังค์ชั่นของสถานการณ์จำลองที่กำหนด โดยสถานการณ์จำลองเป็นเซทของข้อมูลที่ประกอบด้วยพารามิเตอร์การผลิตของหลุมเจาะที่มีอยู่ และในบางกรณีอาจเป็นพารามิเตอร์ของตำแหน่งและการผลิต1ของหลุมเจาะใหม่หนี้งหลุมหรือมากกว่า- การกำหนดพื้นที่การไหล (drainage area) ของหลุมเจาะที่มีอยู่ด้วยการใช้แบบจำลองภาคสนาม - การกำหนดตำแหน่งของหลุมเจาะใหม่ที่น่าจะมีโอกาส (candidate new well) เพื่อให้ได้พื้นที่การไหลของหลุมเจาะใหม่ที่น่าจะมีโอกาสดังกล่าว ซํ่งถูกกำหนดด้วยการใช้แบบจำลองภาคสนาม ทั้งนี้โดยไม่ให้ทับซ้อนกับพื้นที่การไหลของหลุมเจาะที่มีอยู่การกำหนดเซทของหลุมเจาะจำนวนหนี้ง, แต่ละเซทของหลุมเจาะประกอบรวมด้วยหลุมเจาะที่มีอยู่และหลุมเจาะใหม่ที่ถูกคัดเลือกจากกลุ่มหลุมเจาะใหม่ที่น่าจะมีโอกาส - การกำหนดสำหรับแต่ละเซทของหลุมเจาะ, ค่าของฟังค์ชั่นที่ได้ (gain function), ซํ่งขึ้นอยู,คับการผลิตภาคสนาม- การเลือกเชทของหลุมเจาะซํ่งให้ค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ดังกล่าว, และ- การเจาะเซทของหลุมเจาะตามที่ถูกเลือกไว้ 2. วิธีการตามข้อถือสิทธิ 1 ที่ประกอบด้วย1ขั้นตอนการเสี่ยงทาย (heuristic step) ในที่ซํ่งหลุมเจาะ ใหม่ที่น่าจะมีโอกาส ถูกเลือกค่อนหรือถูกคัดออกด้วยการประยุกต์ใช้กฎการเสี่ยงทายอย่างน้อยที่สุดหนี้งครั้ง แต่ละเซทของหลุมเจาะของเซทของหลุมเจาะหลายหลุมดังกล่าวประกอบด้วยหลุมเจาะที่มีอยู่และหลุมเจาะใหม่ที่ถูกเลือกจากหลุมเจาะใหม่ทีน่าจะมีโอกาสทีถูกเลือกค่อนหน้า 2 ของจำนวน 3 หน้า 3. วิธีการตามข้อถือสิทธิ 2 ในที่ซึ่งกฎการเสี่ยงทายดังกล่าวประกอบด้วยการเลือกก่อนและการคัดออกหลุมเจาะแนวนอน (horizontal well) ใหม่ที่น่าจะมีโอกาส โดยขึ้นอยู่กับทิศทางแนวการไหล(orientation) ของหลุมเจาะนั้น 4. วิธีการตามข้อถือสิทธิ 2 ในที่ซึ่งกฎการเสี่ยงทายดังกล่าวประกอบด้วยการเลือกก่อนและการ คัดออกหลุมเจาะใหม่ที่น่าจะมีโอกาส โดยขึ้นอยู่กับระยะทางของหลุมเจาะใหม่กับหลุมเจาะที่มีอยู, 5. วิธีการตามข้อถือสิทธิ 2 ในที่ซึ่งกฎการเสี่ยงทายดังกล่าวประกอบด้วยการเลือกก่อนและการคัดออกหลุมเจาะใหม่ที่น่าจะมีโอกาส โดยขึ้นอยู่กับปริมาณการผลิตนํ้ามันสะสมของหลุมเจาะใหม่ที่ถูกกำหนดด้วยแบบจำลองภาคสนาม 6. วิธีการตามข้อถือสิทธิ 1 ในที่ซึ่งการหาค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ประกอบด้วยการ กำหนดพารามิเตอร์การผลิตที่เหมาะสมที่สุดสำหรับเซทที่กำหนดให้ของหลุมเจาะด้วยการประยุกต์ใช้วิธีการหาค่าที่เหมาะสมที่สุดที่ขึ้นกับเหตุการณ์ก่อนหน้าหรือที่ไม่ขึ้นกับเหตุการณ์ก่อนหน้า(deterministic or non-deterministic optimization methods) 7. วิธีการตามข้อถือสิทธิ 6 ที่ประกอบด้วยขั้นตอนของการกำหนดข้อจำกัดเพื่อเติมเต็มด้วยพารามิเตอร์การผลิตที่เหมาะสมที่สุดดังกล่าว 8. วิธีการตามข้อถือสิทธิ 1 ในที่ซึ่งการหาค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ประกอบด้วยการกำหนดเซทที่กำหนดให้ที่เหมาะสมที่สุดของหลุมเจาะด้วยการประยุกต์ใช้วิธีการหาค่าที่เหมาะสมที่สุดที่ไม่ขึ้นกับเหตุการณ์ก่อนหน้า (non-deterministic optimization methods) 9. วิธีการตามข้อถือสิทธิ 1 ในที่ซึ่งการหาค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ดังกล่าวประกอบด้วยการกำหนดเซทของอินเจ็ทเตอร์ซึ่งได้ค่าที่เหมาะสมที่สุดของฟังต์ชั่นที่ได้ดังกล่าวหน้า 3 ของจำนวน 3 หน้า1 0. วิธีการตามข้อถือสิทธิ 1 ในที่ซํ่งหลุมเจาะอย่างน้อยที่สุดหนื่งหลุมมีลักษณะของชั้นหินหลายชั้นและแบบจำลองภาคสนามสามารถคาดการณ์การผลิตภาคสนามดังกล่าวแบบหลุมต่อหลุมและตามชั้นหรือกลุ่มของชั้น1Disclaimer (all) which will not appear on the advertisement page: Edit 05/07/2019 No disclaimer. ------------------------------------- ------ 18/07 / 2018-- ---- (OCR) Page 1 of 3 pages. Disclaimer 1. Methods for improving field production with gas or oil obtained at The field consists of several wells. And how it works: - Obtaining a field model that can predict the said field production hole-to-hole according to the function of the given scenario. The scenario is a data set containing the production parameters of an existing well. And in some cases, it may be a parameter of location and production. 1 of a new well, or more. - Determination of the drainage area of an existing well using a field model. The candidate new well is the candidate new well to obtain the potential new borehole flow area. This was determined using a field model. Without overlapping the existing borehole flow area, the borehole set determination, number d, each borehole set consists of the existing borehole and the new borehole selected from the group. Potential new wells - Assignment for each borehole set, gain function value, dependent, field production - wells set selection The drill had the optimal value of the aforementioned function, and - the drilling of the borehole set as selected. 2. Method according to claim 1 consisting of 1 heuristic procedure. step) in the borehole New to have a chance Virtually chosen or eliminated with the application of at least some guessing rules. Each borehole set of the aforementioned multi-wells set consists of an existing borehole and a new borehole selected from the new borehole, tina would have a chance of being chosen rather than page 2 of 3 pages. 3. The take-2 approach, where the ruling rule includes pre-selection and the elimination of promising new horizontal wells. It depends on the direction of the borehole. 4. Method of claim 2, where the aforementioned rules consist of pre-selection and pre-selection. Eliminate potential new holes This depends on the distance of the new well to the existing borehole, 5. Method of claim 2 where the aforementioned rule of thumb consists of pre-selection and elimination of potential new wells. chance This depends on the cumulative oil production volume of the new well being determined with a field model. 6. The method of claim 1 where the optimal determination of the resulting function consists of: Determine the optimal production parameters for a given set of borehole by applying deterministic or non-deterministic optimization methods based on precedent or non-deterministic optimization methods. 7. Claim Method 6 consists of a procedure for setting constraints to complement such optimal production parameters. 8. Claim 1 method where determining the optimum value of the auditory The resulting function consists of defining an optimized set of borehole by applying an optimized method independent of previous events. (non-deterministic optimization methods) 9. Claim method 1, where the determination of the optimum function of the aforementioned function consists of defining the set of the most suitable injectors. Page 3 of the number 3 Page 1 0. Method for claim 1 In the presence of at least one well, the well has the characteristics of multi-layered shale and a field model. Such field production can be forecasted pit-by-pit and by layer or group of Class 1. 1. วิธีการตามข้อถือสิทธิ 1 ที่ประกอบด้วยชั้นตอนของการกำหนดข้อจำกัดเพื่อเติมเต็มด้วยเชทของ หลุมเจาะซํ่งได้ค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้ดังกล่าว ------------ 1.วิธีการปรับปรุงการผลิตภาคสนามที่มีก๊าซหรือน้ำมันที่ได้ที่ โดยภาคสนามดังกล่าวประกอบด้วย หลุมเจาะที่มีอยู่เป็นจำนวนหลายหลุม และวิธีการดังกล่าวประกอบด้วย ดังนี้ -การให้ได้แบบจำลองภาคสนามที่สามารถคาดการณ์การผลิตภาคสนามดังกล่าว แบบหลุม ต่อหลุมตามฟังค์ชั่นของสถานการณ์จำลองที่กำหนด โดยสถานการณ์จลองเป็นเซทของข้อมูล ที่ประกอบด้วยพารามิเตอร์การผลิตของหลุมเจาะที่มีอยู่ และในบางกรณีอาจเป็นพารามิเตอร์ของ ตำแหน่งและการผลิตของหลุมเจาะใหม่หนึ่งหลุมหรือมากกว่า -การกำหนดพื้นที่การไหล(drainage area)ของหลุมเจาะที่มีอยู่ด้วยการใช้แบบจำลอง ภาคสนาม -การกำหนดตำแหน่งของหลุมเจาะใหม่ที่น่าจะมีโอกาส(candidate new well)เพื่อให้ได้ พื้นที่การไหลของหลุมเจาะใหม่ที่น่าจะมีโอกาสดังกล่าว ซึ่งถูกกำหนดด้วยการใช้แบบจำลอง ภาคสนาม ทั้งนี้โดยไม่ให้ทับซ้อนกับพื้นที่การไหลของหลุมเจาะที่มีอยู่ -การหาค่าที่เหมาะสมที่สุดของฟังค์ชั่นที่ได้(gain function)ซึ่งขึ้นอยู่กับการผลิตภาคสนาม ด้วยการกำหนดเซทของหลุมเจาะจากเซทของหลุมเจาะหลายหลุม ซึ่งให้ค่าที่เหมาะสมที่สุดของ ฟังค์ชั่นที่ได้ดังกล่าว ทั้งนี้แต่ละเซทของหลุมเจาะของเซทของหลุมเจาะหลายหลุมดังกล่าว ประกอบด้วยหลุมเจาะที่มีอยู่และหลุมเจาะใหม่ที่ถูกคัดเลือกจากหลุมเจาะใหม่ที่น่าจะมีโอกาส1. The procedure for claim 1 that consists of a process of setting constraints to be complemented by a set of The borehole achieves the optimal value of the aforementioned functions. ------------ 1. Methods for improving gas or oil field production at In which the said field consists of There are many holes available for drilling. And how it works: - Obtaining a field model that can predict the said field production hole-to-hole according to the function of the given scenario. Where the situation is a set of data That contains the production parameters of the existing borehole And in some cases it may be a parameter of Location and production of one or more new wells. - Determination of the flow area (drainage area) of existing borehole by using a field model - determination of potential new borehole location (candidate new well) to achieve The new borehole flow area is likely to have such an opportunity. This was determined using a field model without overlapping the existing borehole flow area. - Finding the optimal value of the resulting function (gain function), which is based on field production. By defining the borehole set from the borehole set Which gives the optimal value of Functions that have been said Each of the borehole sets of the aforementioned multi-wells set It consists of existing boreholes and new boreholes selected from potential new wells.
TH1201006489A 2011-06-15 How to improve field production with gas or oil obtained at TH70674B (en)

Publications (3)

Publication Number Publication Date
TH128215B TH128215B (en) 2013-10-15
TH128215A TH128215A (en) 2013-10-15
TH70674B true TH70674B (en) 2019-07-05

Family

ID=

Similar Documents

Publication Publication Date Title
CN103003522A (en) Method of improving the production of a mature gas or oil field
CN105631078B (en) The method for numerical simulation of Natural fractures system self-adapting medium
US20180306030A1 (en) Method for improving reservoir performance by using data science
Park et al. Improved decision making with new efficient workflows for well placement optimization
CN110439519A (en) A kind of fracturing process and system based on the design of limit current limliting
CN106294915A (en) Beach shallow sea oil field based on well group platform development well location method for designing
Alyan et al. Field development plan optimization for tight carbonate reservoirs
Viswanathan et al. Completion evaluation of the eagle ford formation with heterogeneous proppant placement
Todd et al. An Evaluation of EOR Potential in the Elm Coulee Bakken Formation, Richland County, Montana
Lerza et al. Defining the optimal drawdown strategy in the Vaca Muerta formation
Thomas et al. Understanding water flood response in tight oil formations: A case study of the Lower Shaunavon
Karpov et al. Tight oil field development optimization based on experience of canadian analogs
CN103218750B (en) A kind of geology evaluation method for offshore sedimentary rock oil field
Zhang et al. Uncertainty Analysis and Assisted History Matching Workflow in Shale Oil Reservoirs
CN108756745A (en) Drilling method for platform cluster well
Sennhauser et al. A practical numerical model to optimize the productivity of multistage fractured horizontal wells in the cardium tight oil resource
Jaripatke et al. Eagle ford completions optimization-an operator's approach
Raoufi et al. Application of simulated annealing optimization algorithm to optimal operation of intelligent well completions in an offshore oil reservoir
Jaripatke et al. Completion Optimization of an Unconventional Shale Play: Implementation of a Successful Completion Design Optimization Plan and the Results
TH70674B (en) How to improve field production with gas or oil obtained at
Gruenwalder et al. Assisted and manual history matching of a reservoir with 120 wells, 58 years production history and multiple well recompletions
TH128215A (en) How to improve field production with gas or oil obtained at
Sivon et al. Developing guidelines for selection of appropriate fracture models in the numerical simulation of well performance behavior for liquid rich ultra-low permeability ULP reservoirs
Khan et al. Co-development plan optimization of complex multiple reservoirs for giant offshore Middle East Oil Field
Aslanyan et al. Production performance analysis of Volga-Ural mature waterflood with PRIME diagnostic metrics