SU989670A2 - Device for releiving electric main region - Google Patents
Device for releiving electric main region Download PDFInfo
- Publication number
- SU989670A2 SU989670A2 SU813345311A SU3345311A SU989670A2 SU 989670 A2 SU989670 A2 SU 989670A2 SU 813345311 A SU813345311 A SU 813345311A SU 3345311 A SU3345311 A SU 3345311A SU 989670 A2 SU989670 A2 SU 989670A2
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- unloading
- command
- unit
- block
- stages
- Prior art date
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
Изобретение относитс к области автоматизации электрических сетей.The invention relates to the field of automation of electrical networks.
По основному авт. св. № 656142 известно устройство дл разгрузки -, района электрической сети с выключател ми на питающем конце линии и на приемной подстанции, содержащее на питак цем конце линии командный блок противоаварийной автоматики и блок отключени , на приемной подстанции - блок фиксации повреждени , пусковой.и отключени нагрузки, на. питающем конце линии - блок разгрузки , имеющий несколько ступеней, блок восстановлени питани и включени линий, причем входы блоков разгрузки и восстановлени питани соединены с командным блоком, а их выходы - с входами отключени и включени , при этом входы блока включени предназначены дл подключени к выклю- , чател м питающих линий, на приемной подстанции -блоки разгрузки и пусковые , выполненные с отключением по числу ступеней разгрузки, блоки снижени частоты, по влени напр жени , восстановлени питани и включени нагрузки, при этом входы блоков снижени частоты и по влени напр жени предназначены дл подключени на напр жение питакнцей линии, а их выходы соединены с входами блоков всех ступеней разгрузки и воечтановлени питани , выходы которых. соединены соответственно с входами блоков отключени и включени нагрузки , причем выходы последних лредназна ,ченыдл подключени .к выключател м приемной подстанций 1. According to the main author. St. No. 656142 a device for unloading is known, the area of the electrical network with switches at the power end of the line and at the receiving substation, which contains the emergency control command unit and the shutdown unit at the pit end of the line, and the damage fixing unit and the load disconnecting unit at the receiving substation. , on. the power end of the line is an unloading unit having several stages, a power recovery unit and powering on lines, the inputs of the power unloading and power restoration units are connected to the command unit, and their outputs are connected to the shutdown and activation inputs, and -, power supply lines, at the receiving substation - unloading and starting blocks, made with disconnection according to the number of unloading stages, blocks of frequency reduction, voltage occurrence, power recovery and load switching, and inputs this frequency blocks and reduce the occurrence of voltage intended for connection to the voltage pitakntsey lines, and their outputs are connected to inputs of all the blocks and unloading stages voechtanovleni power whose outputs. connected, respectively, to the inputs of the disconnecting and switching on load units, the outputs of the latter being degraded or connected to the switches of the receiving substation 1.
fOfO
Недостатком известного устройства вл етс то, что в случае, если при ; передаче команды на разгрузку, командное устройство выдает новую команду; на более старшую ступень, то устройст15 во может отказать или подействовать неправильно, в зависимости от момента поступлени второй команды.A disadvantage of the known device is that if; transfer command to unload, the command device issues a new command; to a higher level, the device may fail or act incorrectly, depending on the moment the second command arrives.
Цель изобретени - повышение надежности электроснабжени .The purpose of the invention is to improve the reliability of power supply.
2020
Поставленна цель достигаетс тем, что в устройстве дл разгрузки района электрической сети выходы каждой ступени блока разгрузки соединены с всеми старшими ступен ми этого The goal is achieved by the fact that in the device for unloading the area of the electrical network, the outputs of each stage of the discharge unit are connected to all the upper stages of this
25 блока, также введен дополнительно блок повторной команды разгрузки, имеющий такие же ступени, что и блок разгрузки (кроме первой) , 1ри этом входы и выходы каждой ступени блока 25 blocks, an additional unit of a repeated unloading command, having the same steps as the unloading block (except for the first one), was also introduced, while the inputs and outputs of each step of the block
30 повторной команды разгрузки. соедиКб .1ы соответственно с выходгши и одноименной и всеми младшими сту-f пен ми блока разгрузки,, кроме того, входы всех ступеней блоков разгрузки и повторной команды разгрузки св заны с блоком включени . Не чертеже представлеиа фуйкциональна схема устройства. Устройство .состоит из размещенных на питаклдей подстанции 1 командного блока 2 про тивоаварийной автоматики, служащего дл вьвдачи краткозременных команд на разгрузку и восстановление питании потребителей, блока 3 разгрузки с различными ступен ми разгрузки и блика 4 восстановлени питани потребителей , служащих дл формировани команд на отключение выключателей пи тгиощих линий 5, через блок 6 отключе ни и обратное их включение через блок 7 включени с различными интерв лами межйу отключением и включением в зависимости от номера ступени разгрузки или передаваемой, команды на восстановление питани потребител . На приемном конце линий 5 устройс4- i й6 содержит трансформатор напр жени 8, подключенный к питающей линии 5, пусковые блоки 9 разгрузки по числу ступеней разгрузки и пусковой блок 10 восстановлени питани потреб 1телей служсодие дл фиксаций продолжительностиперерыва питани подстанций 11 и разрешени работы соответствующего блока 12 отключени нагрузки или блока 13 включени нагрузки только вблизи фиксированной вьщержки времени перерыва питани , блок 14 по влени напр жени , служащий дл . фиксации факта и длительности по влени напр жени на питающей линии 5 и повышени селективности работы пусковы блоков 9 и 10. Блок 14 не фиксирует кратковременное по вление напр жени на линии 5, например, в течение времени менее 0,2с при неуспешном АПВ и работе быстродействующей защиты линии и разрешает работать пусковым блокам 9 и10 на блоки 12 отключени и 13 включени в течение небольшого времени, например 0,1 с. Кроме того, устройство содержит трансформатор на пр жени 15, включенный на шины подстанции 11 и служащий дл питани блока 16 фиксации повреждени и блока 17 снижени частоты. Блок 16 фиксации повреждени служит дл блокировки н врем цикла АПВ питающей линии блоков 12 отключени нагрузкии блока 13 включени нагрузки при от ключении питаницей линии 5 из-за ее повреждени . Блок 17 снижени частот служит дл ускорени запуска пусковы блоков 9 и 10 при снижении частоты в случа х, если после отключени питаН к цей линии 5, напр жение на н лоддерживаетс , например, синхронными двигател ми, вход щими в состав нагрузки 18 и 19. В устройство введен блок 20 повторной команды разгрузки, состо щий из тех же ступеней, что и блок 3 разгрузки , кроме первой. Кажда ст.упень блока 20 повторной команды разгрузки служит дл фиксации сигнала данной ступени блока разгрузки во врем исполнени сигна ла включени линии 5 и выдачи повторного сигнала на эазгруЭку данной ступени. Дополнительные св зи ступеней блока 3 Л разгрузки служат дл запуска отсчета времени всех старших ступеней /ipH подаче команды на любую ступень, кроме N-й, и обеспечиван т отсчет времени самой старшей ступени из поступивших от командного блока 2 противоаварийной автоматики в промежуток времени между сигналом .на от-, ключение питающей линии 5 и сигналом на ее включение. Устройство работает следующим образом . При возникновении условий дл действи противоаварийной автоматики на одну из ступеней разгрузки, например, на первую ступень, командный блок 2 противоаварийной автоматики выдает кратковременный сигнал на срабатывание первой ступени блока 3 разгрузки. При этом происходит отключение выключател питающей линии 5 и начинаетс отсчет выдержек времени всех ступеней от второй до N-й.с Одновременно подготавливаютс К работе все последующие (от 2-й до N-й) ступени блока йсгвт рной команды 20.. Если до момента по влени сигнала , на обратное включение выключате:Я , т.е. до срабатывани блока включени 7, возникают услови ,дл де.йстг ВИЯ командного блока 2 противоаварийной автоматики на одну или. несколько старщих ступеней, например, на вторую и третью, то старша из действующих ступеней блока 3 разгрузки (треть ) через подготовленную ранее к работе ;третью ступень блока 20 повторной крМанды разгрузки прекращает отсчет выдержек времени всех младших ступеней (первой и второй) блока 3 разгрузки и с выдержкой времени, зафиксированной за третьей ступенью разгрузки через блок включени 7 дает сигнал на включение выключател пи; тающей линии 5. Работа устройства на приемной подстанции 11 ..осуществл етс так же, как и на питающей подстанции 1,и происходит исполнение разгрузки по третьей ступени. Так же работает устройство и при одновременной подаче сигнала на несколько ступеней блока 3 р&згрузки.30 reloading command. CompoundKb .1y, respectively, with the output and the same and all junior stu-f pen unloading block, in addition, the inputs of all stages of the unloading block and the repeated unloading command are associated with the switch-on unit. Not a drawing representing the fuctional scheme of the device. The device consists of command and control automated control unit 2 placed on the pit-substation 1 of the substation, which serves to issue short-term commands for unloading and restoring power to consumers, block 3 unloading with different unloading stages and glint 4 of restoring power to consumers to form commands for switching off the switches power lines 5, through block 6 of disconnection and their reverse switching on through block 7 of switching on with different intervals between switching off and on depending on the number of steps and unloading or transmitted, at a power recovery command of the user. At the receiving end of lines 5, the device 4- i d6 contains a voltage transformer 8 connected to the power line 5, starting blocks 9 for unloading according to the number of stages of unloading and starting block 10 for restoring the power consumption of service stations for fixing the duration of power interruption of the substations 11 and allowing operation of the corresponding block 12 disconnecting the load or switching on the load unit 13 only in the vicinity of the fixed power interruption time lag, block 14 on the occurrence of a voltage serving for. fixing the fact and duration of voltage on supply line 5 and increasing the selectivity of operation of starting blocks 9 and 10. Block 14 does not detect short-term voltage on line 5, for example, for less than 0.2 s with unsuccessful reclosing and high-speed operation protection of the line and allows the starting blocks 9 and 10 to work on the blocks 12 shutdown and 13 on for a short time, for example, 0.1 s. In addition, the device includes a transformer on the yarn 15 connected to the busbars of the substation 11 and used to power the damage fixing unit 16 and the frequency decreasing unit 17. Damage latching unit 16 serves to block the AR cycle time of the power supply line of the load disconnecting unit 12 and the load switching unit 13 when the power supply 5 is disconnected due to its damage. The frequency decreasing unit 17 serves to accelerate the start-up of the starting units 9 and 10 when the frequency decreases in cases where, after the supply to the line 5 is disconnected, the voltage is kept on, for example, by synchronous motors that are part of the load 18 and 19. A unit 20 of a second unloading command, consisting of the same steps as the unloading unit 3, except for the first one, has been entered into the device. Each station level of the unloading repeated command block 20 is used to fix the signal of a given stage of the unloading unit during the execution of the turn on signal of line 5 and to issue a repeated signal to the augg of this stage. Additional links of steps of the 3 L unloading unit are used to start the countdown of time for all senior stages (ipH) to give commands to any stage except the Nth, and the time of the highest stage from the emergency automation from the command unit 2 .to disconnect power supply line 5 and a signal to turn it on. The device works as follows. When conditions arise for the operation of an emergency control system at one of the unloading stages, for example, at the first stage, the command control unit 2 of the emergency control system issues a short-term signal to trigger the first stage of the unloading unit 3. When this happens, the power supply switch 5 is disconnected and the time delay of all steps from the second to the Nth begins. At the same time, all the subsequent (from the 2nd to the Nth) steps of the command command 20 are prepared. If occurrences of the signal, on the reverse switch off: I, i.e. Before the activation of the switch-on unit 7, conditions arise for the response of the command unit 2 of the emergency control automation to one or the other. several senior stages, for example, the second and third, then the highest of the current stages of the discharge unit 3 (one third) through the previously prepared for work; the third stage of the unit 20 of the second discharge command stops counting the time of all the lower stages and with a time delay fixed for the third stage of unloading through the switch unit 7, it gives a signal to turn on the switch pi; The operation of the device at the receiving substation 11. is carried out in the same way as at the feeding substation 1, and the discharge of the third stage takes place. The device also works when a signal is simultaneously applied to several stages of the 3 p & load unit.
Старша из получивших сигнал сту- ;пеней блока 3 разгрузки блокирует через свою ступень блока 20 повторной команды разгрузки все младшие ступени и выполн етс команда на разгрузку по старшей ступени.- The eldest of the received signals — the block of unloading block 3 blocks, through its level of block 20, of the repeated unloading command, all the lower stages, and the unloading command is executed at the upper level.
При поступлении сигнала на стар иЯё ступени блока 3 :разгрузки во врем работы блока 7 вкл очен11Я от одной из fлaдшиx ступеней сигнал на вкточение выключател питашцей линии .5 не прерываетс , так как блок включени 7 на врем своей работы разры:гвает цепи на отключение выключател питающей линии 5.When a signal arrives at the old stage of block 3: unloading during block 7 on operation, the signal to enter the switch of the pitachtsey line .5 is not interrupted by one of the first steps, because the on block 7 for the time of its operation breaks: turns on the circuit to open the switch supply line 5.
Все полхэившйе сигнал ступени бл4ка 3 разгрузки воздействуют на соот4 .ветствующие ступени блока 20 повтор-г ной команды. Старша из этих ступе ней срабатывает, блокирует остальные запрещенные ступени и через spet м , большее времен работы блока Т включени г выдает повторную команду ,на соответствующую старшую ступень блока 3. разгрузки, т.е. вначале йсполн етс команда/ котора выдала , кдма:нду на включение выключател питающей линии 5, а затем передаетс .ко- манда на старшую из ступеней, посту4 пивших во врем завершени предьщу14ей команды. Таким образ ж, примейенне предло женного устройства обеспечивает передачу упраълен и старшей ступени разгрузки ( в какой бы момент време ни она не поступила) одновременно с командой а младшие ступени в про4 цессе передачи сигнала или в момент выдачи команды на включение жакД15 чател питающей линии.All the half-emitted signal of the block 3 unload stage acts on the corresponding 4 stages of the block 20 of the repeated command. The older of these steps triggers, blocks the rest of the forbidden steps and through spet m, the longer the operation time of the T-switch block g, issues a repeated command to the appropriate upper step of the unloading block 3., i.e. first, the command / which issued the command is executed, cdma: I have to turn on the power supply switch 5, and then the command is transmitted to the highest of the stages, which were drunk at the time of completion of the previous command. Thus, the device offered by the device provides transmission to the control unit and the upper stage of unloading (at whatever time it arrives) simultaneously with the command and the lower stages during the signal transmission process or at the time of issuing the command to turn on the power supply cable.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813345311A SU989670A2 (en) | 1981-07-16 | 1981-07-16 | Device for releiving electric main region |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813345311A SU989670A2 (en) | 1981-07-16 | 1981-07-16 | Device for releiving electric main region |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU656152 Addition |
Publications (1)
Publication Number | Publication Date |
---|---|
SU989670A2 true SU989670A2 (en) | 1983-01-15 |
Family
ID=20979446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813345311A SU989670A2 (en) | 1981-07-16 | 1981-07-16 | Device for releiving electric main region |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU989670A2 (en) |
-
1981
- 1981-07-16 SU SU813345311A patent/SU989670A2/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3970898A (en) | Method of automatically isolating a faulty section of a power line belonging to an electrical energy supply network, and arrangement for carrying out this method | |
AU702228B2 (en) | Transfer switch system with subnetwork | |
EP1544977A2 (en) | Power distribution system with a transfer switch | |
EP0771059B1 (en) | Method and apparatus for transferring between electrical power sources with adaptive blocks transfer until load voltage decays to safe value | |
SU989670A2 (en) | Device for releiving electric main region | |
CN112398344B (en) | Drive control method and circuit of switching device | |
JPH0693692B2 (en) | Loop-type local area network concentrator | |
CN112383034B (en) | Operation relay device, converter transformer protection tripping system and tripping method | |
JPS5561288A (en) | Restart method of motor | |
KR0124040B1 (en) | Distribution line on/off system & line switch control apparatus | |
SU656152A1 (en) | Device for relieving electric network region | |
EP0580217B1 (en) | Electronic switching-on apparatus and a switching-on method | |
WO2020109172A1 (en) | Protection system for a railway electrification system and method of operating | |
CN216390588U (en) | Double-direct-current system control circuit | |
SU951552A2 (en) | Device for electric network region unloading | |
SU1257736A1 (en) | Device for programmed automatic reclosing of electric motors | |
SU993387A1 (en) | Method of stopping asynchronous run in electric power transmission line | |
US1746182A (en) | Automatic control equipment | |
RU2012974C1 (en) | Device for matching of operation of stepped protections of power lines | |
CN113629846A (en) | Double-direct-current system control circuit | |
SU783908A1 (en) | Device for off-loading region of electric mains | |
SU1277276A1 (en) | Method of automatic reclosing of groups of electric motors at substation | |
US2258234A (en) | Protection of alternating current electric systems | |
SU792437A1 (en) | Device for protective disconnection of secondary power supply source | |
SU1690075A1 (en) | Device for back-up of protections of connection of assembly lines of substations |