SU983193A1 - Screw pile - Google Patents

Screw pile Download PDF

Info

Publication number
SU983193A1
SU983193A1 SU813307991A SU3307991A SU983193A1 SU 983193 A1 SU983193 A1 SU 983193A1 SU 813307991 A SU813307991 A SU 813307991A SU 3307991 A SU3307991 A SU 3307991A SU 983193 A1 SU983193 A1 SU 983193A1
Authority
SU
USSR - Soviet Union
Prior art keywords
barrel
plates
screw
pile
blade
Prior art date
Application number
SU813307991A
Other languages
Russian (ru)
Inventor
Вячеслав Николаевич Пчелин
Владимир Петрович Чернюк
Василий Тимофеевич Васильченко
Ольга Александровна Чернюк
Original Assignee
Брестский инженерно-строительный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Брестский инженерно-строительный институт filed Critical Брестский инженерно-строительный институт
Priority to SU813307991A priority Critical patent/SU983193A1/en
Application granted granted Critical
Publication of SU983193A1 publication Critical patent/SU983193A1/en

Links

Description

(54) ВИНТОВАЯ СВАЯ(54) SCREW PILED

Claims (2)

Изобретение относитс  к строительству в частности к фундаментостроению, и может быть использовано в качестве анкеров дл  креплени  конструкций к грунту, например опор трубопроводов, мостов, ли ний электропередач и св зи, пневмонаду&ных сооружений, работающих на знакопеременные нагрузки, а также в промышленном и гражданском строительстве. Известна винтова  сва , предназначе на  дл  работы на знакопеременные нагрузки , содержаща  ствол с винтовой лопастью и коническим наконечником Г ll. Недостатком такой сваи  вл етс  зна читальна  энергоемкость погружени  сван, что требует применени  мощных завинчивающих установок. Наиболее близкой к изобретению по технической сущности и достигаемому результату  вл етс  винтова  сва , включающа  ствол с наконечником и винтовую лопасть, выполненную составной из двух пластин 2, Недостатком такой сван  вл етс  авв чительна  энергоемкость погружени  сваи в грунт. Целью изобретени   вл етс  cHtOK ние энергоемкости погружени  в грунт. Поставленна  цель достигаетс  гвм, что в винтовой свае, включающей ствол с наконечником и винтовую лопасть, выполненную составной из двух пластин, ствол выполнен разрезным по винтовой линии, образованной примыкающей к поверхности ствола кромкой винтовой лопасти , причем верхн   и нижн   части ствола отсто т друг от друга, пластины лопасти соединены между собой по на- рунсным кромкам, а другие их кромки прикреплены соответственно к верхней в нижней част м ствола. На фиг. 1 изображена винтова  сва  в процессе погружени  в грунт, общий вид; на фиг. 2 - то же, в момент раз г движки пластин лопасти, продольный ра рез; на фиг. 3 - то же, в рабочем состо нии , общий вид. Винтова  сва  содержит полый ствоп 1 с винтовой лопастью 2 и коничесзким наконечником 3. Ствоп 1 разрезан по винтовой линпги 4, образуемой примыкаку1дей к поверхности ствола 1 кромкой винтовой лопасти 2, и пр мой 5, соедин ющей начало и конеп винтовой линии 4 на две части: верхнюю 6 и нижнюю 7. Лопасть 2 выполнена составной из двух пластин: верхней 8 и нижней 9. Пластины 8 и 9 соединены между собой по наружным кромкам 10. Внутреншзми кромк ми 11 верхн   пластина 8 закреплена к верхней части 6 ствола 1, а нижн   пла тина 9 - к нижней части 7 ствола 1, С целью облегчени  погрумсени  сваи в грунт 12, нижн   кромка лопасти 2 выполнена заостревдой путем устройства односторонних скосов 13 на .пластинах 8 и 9. При завинчивании винтовой сваи в грунт 12 за счет продольной силы, передаваемой от завинчивающей установки к верхней части 6 ствола 1 и отпора грунта 12 по нюкней части 7, пластины 8 и 9 прижаты друг к другу, обеспечива  тем самым наименьшее сопротивление при прорезке лопастью грунтового массива. После погружени  сваи на раочетнук ) отметку (выше проектной на вели чину раздвижки внутренних кромок 11 пластин 8 и 9) осуществл етс  раздвижка пластин 8 и 9 путем дальнейшего погружени  нижней части 7 ствола 1 забив кой при помощи штока 14 (фиг. 2). Дл  обеспечени  жесткого положени  верхней части 6 ствола 1 в процессе раздвижки пластин 8 и 9 верхн   пластина 8 может выполн тьс  несколько больше длины чем нижн   9 (не показано), В конце процесса раздвижки пластин 8 и 9 образовавша с  полость 15 заполн етс  бетоном 16с уплотнением штоком 14. Раздвижка пластин 8 и 9 может также осуществл тьс  путем поддергивани  верхней части 6 ствола 1. В этом случае погружение сваи осуществл етс  до проектной отметки. При воздействии на сваю одних лишь выдергивающих нагрузок заполнение полости 15 бетоном не об зательно . Предлагаема  винтова  сва  позвол ет существенно снизить энергоемкость погружени  в грунт и требуемую мощность завинчивающих установок за счет изготовлени  винтовой лопасти соста&ной из двух пластин с возможностью их раздвижки. Формула изобретени  Винтова  сва , включающа  ствол с наконечником и винтовую лопасть, выполненную составной из двух пластин, отиЛичающа с  тем, что, с целью сшокени  энергоемкости погружени  в грунт, ствол выполнен разрезным по винтовой линии, образованной примыкающей к поверхности ствола кромкой винтовой лопасти, причем верхн   и нижн   части ствола отсто т друг от друга, пластины лопасти соединены между собой по наружным кромкам, а другие их кром ки прикреплены соответственно к верхней и нижней част м ствола. Источники информации, прин тые во внимание при экспертизе 1.Иродов М. Д. Применение винтовых свай в строительстве. М., Стройиздат, 1968, с. 10, рис. 2. The invention relates to construction, in particular, to foundation construction, and can be used as anchors for fastening structures to the ground, such as pipeline supports, bridges, power lines and communications, pneumatic equipment & alternating loads, as well as in industrial and industrial construction. civil engineering. Known screw pile, designed to work on alternating loads, containing the barrel with a screw blade and a conical tip G ll. The disadvantage of such a pile is the significant energy consumption of the submersion, which requires the use of powerful screwdrivers. Closest to the invention to the technical essence and the achieved result is a screw pile, including a barrel with a tip and a screw blade, made of a composite of two plates 2. The disadvantage of such a swan is the automatic energy capacity of the pile to the ground. The aim of the invention is to reduce the energy content of immersion into the ground. The goal is achieved to ensure that in a screw pile, including a barrel with a tip and a screw blade, made of a composite of two plates, the barrel is split along the helix formed by the edge of the screw blade adjacent to the barrel surface, with the upper and lower parts of the barrel spaced apart from each other, the blades of the blade are interconnected along the rim edges, and their other edges are attached respectively to the upper in the lower parts of the trunk. FIG. 1 shows the screw in the process of being immersed in the ground, a general view; in fig. 2 - the same, at the time g of the slider plates of the blade, longitudinal section; in fig. 3 - the same, in a working condition, a general view. The screw shaft contains a hollow stem 1 with a screw blade 2 and a conical tip 3. The stem 1 is cut along a screw ling 4 formed adjacent to the surface of the trunk 1 by the edge of a screw blade 2 and a straight 5 connecting the beginning and end of the spiral line 4 into two parts : the upper 6 and lower 7. The blade 2 is made of a composite of two plates: the upper 8 and the lower 9. The plates 8 and 9 are interconnected along the outer edges 10. The inner edges 11 of the upper plate 8 are fixed to the upper part 6 of the barrel 1, and the lower platinum 9 - to the lower part 7 of the trunk 1, with the aim of The piling of the pile into the ground 12, the lower edge of the blade 2 is made sharp by installing one-sided bevels 13 on the plates 8 and 9. When screwing the screw pile into the ground 12 due to the longitudinal force transmitted from the screwing installation to the upper part 6 of the trunk 1 and repelling the ground 12 along the lower part 7, plates 8 and 9 are pressed against each other, thus providing the least resistance when cutting through the blade of the soil massif. After the pile is piled on the razhochnyuk) mark (higher than the project size of the inner edges 11 of the plates 8 and 9), the plates 8 and 9 are moved apart by further sinking the lower part 7 of the barrel 1 by clogging using the rod 14 (Fig. 2). To ensure that the upper part 6 of the barrel 1 is rigidly positioned during the process of sliding the plates 8 and 9, the upper plate 8 can be slightly longer than the lower 9 (not shown). At the end of the process of sliding the plates 8 and 9, the cavity 15 is filled with concrete 16c. rod 14. The sliding plates 8 and 9 can also be carried out by supporting the upper part 6 of the barrel 1. In this case, the pile is immersed to the design mark. When impacting only pulling loads on the pile, filling the cavity 15 with concrete is not necessary. The proposed screw pile allows to significantly reduce the energy consumption of the immersion in the ground and the required power of screwdrivers by producing a screw blade consisting of two plates with the possibility of their separation. Claims of the invention: Screw pile, comprising a barrel with a tip and a screw blade, made of a composite of two plates, which is designed so that, in order to reduce the energy intensity of the submersion into the ground, the barrel is split along the helix formed by the edge of the screw blade adjacent to the barrel surface the upper and lower parts of the barrel are spaced apart, the blades of the blades are interconnected along the outer edges, and their other edges are attached to the upper and lower parts of the barrel, respectively. Sources of information taken into account in the examination 1. M. irodov. The use of screw piles in construction. M., stroiizdat, 1968, p. 10, fig. 2 2.Авторское свидетельство СССР № 283044, кл. Е 02Т) 5/54, 1969.2. USSR author's certificate number 283044, cl. E 02T) 5/54, 1969.
SU813307991A 1981-06-29 1981-06-29 Screw pile SU983193A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813307991A SU983193A1 (en) 1981-06-29 1981-06-29 Screw pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813307991A SU983193A1 (en) 1981-06-29 1981-06-29 Screw pile

Publications (1)

Publication Number Publication Date
SU983193A1 true SU983193A1 (en) 1982-12-23

Family

ID=20965640

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813307991A SU983193A1 (en) 1981-06-29 1981-06-29 Screw pile

Country Status (1)

Country Link
SU (1) SU983193A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4650372A (en) * 1985-03-04 1987-03-17 The Dow Chemical Company Drive screw pile
AU723287B2 (en) * 1997-09-18 2000-08-24 Starfin Australia Pty Ltd Screw pile anchor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4650372A (en) * 1985-03-04 1987-03-17 The Dow Chemical Company Drive screw pile
AU723287B2 (en) * 1997-09-18 2000-08-24 Starfin Australia Pty Ltd Screw pile anchor

Similar Documents

Publication Publication Date Title
AU634150B2 (en) Drills for piles and soil stabilization
US3422629A (en) Construction support system and methods and apparatus for construction thereof
RU85919U1 (en) SCREW PILES
RU114692U1 (en) SCREW PILES
SU983193A1 (en) Screw pile
GB1576645A (en) Tool for use primarily in conjunction with a rockbreaker
US20150233075A1 (en) Full Displacement Pile Tip and Method for Use
CN105297732A (en) Slagging promoting device for ultra-thick clay layer positive-cycle cast-in-place pile and construction method of slagging promoting device
CN111501854A (en) Anti-floating anchor rod structure penetrating through water-rich gravel bottom layer and construction method thereof
KR20200001850U (en) Improved pile, pier, footing, caisson, foundation
CN113431036B (en) Prefabricated Z-shaped assembled type retaining wall for giant dry-operation bored pile
CN208563419U (en) A kind of set digging device
SU1776728A1 (en) Building auger drill
CN204982881U (en) Adaptability earth anchor
CN202626979U (en) High-pressure rotary jet grouting stiffening pile construction equipment with rib drilling method
RU178914U1 (en) PILED PIPE IN THE WELL
KR20200001851U (en) Improved, reinforced pile, pier, footing, caisson, foundation
SU596694A1 (en) Screw anchor
RU2333315C1 (en) System for bored piles construction
RU2002127704A (en) METHOD FOR STRENGTHENING THE PILED FOUNDATION OF SUPPORT
CN212104097U (en) Concrete pipe pile core clearance instrument
CN217206314U (en) Drill bit for salvaging stone slag block
CN215105206U (en) A simple and easy device of fetching earth for depths are fetched earth
CN210239593U (en) Variable cross-section mixing pile machine drill bit
AU723991B2 (en) Methods of and apparatus for forming in-ground columns