SU968330A1 - Method of producing temporary plug in a well - Google Patents
Method of producing temporary plug in a well Download PDFInfo
- Publication number
- SU968330A1 SU968330A1 SU813272480A SU3272480A SU968330A1 SU 968330 A1 SU968330 A1 SU 968330A1 SU 813272480 A SU813272480 A SU 813272480A SU 3272480 A SU3272480 A SU 3272480A SU 968330 A1 SU968330 A1 SU 968330A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- formation
- well
- briquettes
- binder
- water
- Prior art date
Links
Landscapes
- Solid Fuels And Fuel-Associated Substances (AREA)
Description
(54) СПОСОБ СОЗДАНИЯ-ВРЕМЕННОЙ ПРОБКИ В СКВАЖИНЕ(54) METHOD FOR ESTABLISHMENT-TIME PLUG IN THE WELL
Изобретение относитс к нефтегазодобывающей промышленности к области капитального ремонта скважин,в частности к способам создани временной пробки в скважине.The invention relates to the oil and gas industry in the field of well workover, in particular to methods for creating a temporary plug in a well.
Известен способ создани пробки путем нагнетани в скважину суспензии песка в жидкости-носителе с последующим заполнением колонны труб жидкостью 1.There is a known method of creating a plug by injecting a suspension of sand in a carrier fluid into the well, followed by filling the pipe string with liquid 1.
Недостаток данного способа состоит в том, что его осуществление требует спуска и подъема колонны труб, ниличи насосного и пескосмссительного агрегата.The disadvantage of this method is that its implementation requires the descent and ascent of the pipe string, the pumping and sanding unit.
Наиболее близким к изобретению вл етс способ создани пробок, включающий формирование из смеси глины с песком брикетов и сбрасывание их в скважину 2.Closest to the invention is a method for creating plugs, comprising forming briquettes from a mixture of clay and sand and dropping them into the well 2.
Недостатком этого способа вл етс то, что часть глины выглываетс из состава пробки и загр зн ет призабойную зону пласта, ухудша тем самым его коллекторские свойства.The disadvantage of this method is that part of the clay comes out of the plug composition and contaminates the bottomhole formation zone, thereby deteriorating its reservoir properties.
Целью изобретени вл етс исключение загр знени прискважинной зоны пласта.The aim of the invention is to eliminate contamination of the near-wellbore formation zone.
Эта цель достигаетс тем, что согласно способу, включающему формирование брикетов из смеси сьшучего и св зующего материалов и сбрасывание их в скважину, в качестве св зующего используют водные растворы неорганических солей, например хлористого кольци или натри .This goal is achieved by the fact that according to the method, which includes forming briquettes from a mixture of bulk and binder materials and dropping them into the well, aqueous solutions of inorganic salts, such as chloride or sodium chloride, are used as a binder.
Использование водных растворов солей в качестве св зующего позвол ет предотвратить ухуд1аение коллекторс10 ких свойств пласта, регулировать скорость формировани пробки, при этом не требуетс утрамбовка пробки.The use of aqueous salt solutions as a binder helps to prevent deterioration of reservoir properties of the reservoir, to regulate the rate of formation of the plug, while no plugging of the plug is required.
Способ осуществл ют следующим образом .The method is carried out as follows.
1515
Сыпучий материал, например песок, загрухсают в цилиндрические формы, выполненные из полиэтилена, пропитывают его насыщенным гор чим раствором какой-либо соли и выдерживают при Bulk material, such as sand, is poured into cylindrical forms made of polyethylene, impregnated with a saturated hot solution of any salt and kept at
20 комнатной или повышенной температуре. В зимнее врем года брикеты можно формовать из песка, смоченного пресной водой путем замораживани .20 room or elevated temperature. In winter, briquettes can be molded from sand moistened with fresh water by freezing.
Полученные таким образом брикеты Briquettes so obtained
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813272480A SU968330A1 (en) | 1981-04-03 | 1981-04-03 | Method of producing temporary plug in a well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813272480A SU968330A1 (en) | 1981-04-03 | 1981-04-03 | Method of producing temporary plug in a well |
Publications (1)
Publication Number | Publication Date |
---|---|
SU968330A1 true SU968330A1 (en) | 1982-10-23 |
Family
ID=20952224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813272480A SU968330A1 (en) | 1981-04-03 | 1981-04-03 | Method of producing temporary plug in a well |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU968330A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108641689A (en) * | 2018-06-12 | 2018-10-12 | 中国石油集团渤海钻探工程有限公司 | It is a kind of can be with the liquid and preparation method thereof of water flooding and brine workover fluid compatibility simultaneously |
-
1981
- 1981-04-03 SU SU813272480A patent/SU968330A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108641689A (en) * | 2018-06-12 | 2018-10-12 | 中国石油集团渤海钻探工程有限公司 | It is a kind of can be with the liquid and preparation method thereof of water flooding and brine workover fluid compatibility simultaneously |
CN108641689B (en) * | 2018-06-12 | 2020-11-24 | 中国石油集团渤海钻探工程有限公司 | Liquid capable of being compatible with formation water and brine workover fluid simultaneously and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Iijima et al. | Silica diagenesis of Neogene diatomaceous and volcaniclastic sediments in northern Japan | |
Tardy et al. | Formation of clay from granite and its distribution in relation to climate and topography | |
Shiraki et al. | Experimental study on water–rock interactions during CO2 flooding in the Tensleep Formation, Wyoming, USA | |
Feazel et al. | Prevention of carbonate cementation in petroleum reservoirs | |
Fyfe | Magma underplating of continental crust | |
US3258072A (en) | Water flooding with sulfite solutions | |
SU968330A1 (en) | Method of producing temporary plug in a well | |
Fulford | Effects of brine concentration and pressure drop on gypsum scaling in oil wells | |
Paraguassu | Experimental silicification of sandstone | |
Smith et al. | Removal and inhibition of calcium sulfate scale in waterflood projects | |
Campbell | A comparison of sodium orthosilicate and sodium hydroxide for alkaline waterflooding | |
Jiang | Solubility and solubility constant of barium sulfate in aqueous sodium sulfate solutions between 0 and 80° C | |
Lang et al. | Sedimentation-calcrete cycles in the Mesozoic Red Formations from the central High Atlas (Telouet area), Morocco | |
RU2111351C1 (en) | Method of shutoff of formation water inflow | |
RU2157451C2 (en) | Method of working of oil deposit | |
Asperger | Rapid, high-temperature, field test method for evaluation of geothermal calcium carbonate scale inhibitors | |
RU2124124C1 (en) | Method for isolation of water-permeable bed | |
RU2137905C1 (en) | Compound for isolation of brine water in well | |
RU2191894C1 (en) | Method of oil formation development control | |
SU916745A1 (en) | Composition for isolation of water inflow from formation | |
SU975774A1 (en) | Method for treating flushing fluid | |
SU1451260A1 (en) | Method of hydraulic fracturing of formation | |
SU883337A1 (en) | Method of plugging absorption zones in a well | |
SU1739012A1 (en) | Method for selecting chemical agent for bottomhole treatment | |
Yakovlev et al. | Salt corrosion of ceramic brick |