SU968193A1 - Pipe under high embankment - Google Patents

Pipe under high embankment Download PDF

Info

Publication number
SU968193A1
SU968193A1 SU802876362A SU2876362A SU968193A1 SU 968193 A1 SU968193 A1 SU 968193A1 SU 802876362 A SU802876362 A SU 802876362A SU 2876362 A SU2876362 A SU 2876362A SU 968193 A1 SU968193 A1 SU 968193A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pipe
embankment
frame
movable
bolt
Prior art date
Application number
SU802876362A
Other languages
Russian (ru)
Inventor
Виктор Фролович Илюшин
Original Assignee
За витель В.Ф.Илкшзин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by За витель В.Ф.Илкшзин filed Critical За витель В.Ф.Илкшзин
Priority to SU802876362A priority Critical patent/SU968193A1/en
Application granted granted Critical
Publication of SU968193A1 publication Critical patent/SU968193A1/en

Links

Description

(54) ТРУБА ПОД ВЫСОКОЙ НАСЫПЬЮ(54) HIGH BAND PIPE

Изобретение относитс  к строительству труб любого назначени , расположенных под высокими насыпными земл ными сооружени ми; дамбами, плотинами, дорогами, каналами и т.д.The invention relates to the construction of pipes for any purpose, located under high bulk earth structures; dams, dams, roads, canals, etc.

Известна труба под насыпью, включающа  замкнутую несущую конструкцию, выполненную, например, из железобетона 1.A well-known pipe under the embankment includes a closed supporting structure made, for example, of reinforced concrete 1.

Но така  конструкци  обладает большой жесткостью, что приводит к существенным перегрузкам трубы.But such a structure has high rigidity, which leads to significant pipe overloads.

Наиболее близким техническим решением к изобретению по технической сущности и достигаемому результату  вл етс  труба под насыпью, включающа  замкнутую несущую конструкцию, выполненную составной из нижней неподвижной и верхней подвижной сводчатой части f 2.The closest technical solution to the invention according to the technical essence and the achieved result is a pipe under the embankment, which includes a closed supporting structure made of a composite of the lower fixed and upper movable vaulted part f 2.

Недостатком известной трубы  вл етс  мала  зффёктивность ее разгрузки от насыпи; боковое давление грунта така  труба воспринимает полностью .A disadvantage of the known pipe is that its discharge from the embankment is small; the lateral pressure of the soil such a pipe perceives completely.

Целью изобретени   вл етс  уменьшение действук цих на трубу вертикального давлени  и горизонтальной нагрузки . The aim of the invention is to reduce the effect of vertical pressure and horizontal load on the pipe.

Поставленна  цель достигаетс  тем, что в трубе под высокой насыпью, включающей несущую конструкцию, выполненную составной из нижней неподвижной и верхней подвижной сводчатой части, нижн   неподвижна  часть трубы выполнена в виде замкнутой пр моугольной рамы, а верхн   подвижна  снабжена клиновидными опорными The goal is achieved by the fact that in a pipe under a high embankment, including a supporting structure, made of composite from the lower fixed and upper movable vaulted part, the lower fixed part of the pipe is made in the form of a closed rectangular frame, and the upper movable is equipped with wedge-shaped supporting

10 п тами, расположенными между верхним ригелем пр моугольной замкнутой рамы и насыпью, причем между верхней подвижной частью трубы и верхним ригелем нижней неподвижной части обра15 зована полость.10 points located between the upper girder of a rectangular closed frame and an embankment, and a cavity is formed between the upper movable part of the pipe and the upper girder of the lower fixed part15.

На чертеже изображена конструкци  трубы в разрезе.The drawing shows the sectional construction of the pipe.

jn Труба включает несущую конструкцию , выполненную составной из нижней и верхней частей. Нижн   часть трубы выполнена в виде замкнутой рамы 1, например, из железобетона. Верхн   часть трубы состоит из свода 2, jn The pipe includes a support structure made of a composite of the lower and upper parts. The lower part of the pipe is made in the form of a closed frame 1, for example, of reinforced concrete. The upper part of the pipe consists of a vault 2,

25 снабженного клиновидными опорными п тами 3, прикЕжающимн к верхнему ригелю 4 |рамы 1 и направленными вниз своими узкими концами. Между клиновидными стенками 3 и рамой 1 25 provided with wedge-shaped supporting points 3, which attach to the upper bolt 4 of frame 1 and are directed downwards with their narrow ends. Between the wedge-shaped walls 3 and the frame 1

30 нанесен слой смазки 5, например. из битума; между сводами 2 и ригелем 4 образована полость 6. Труба расположена в насыпи 7 на основании 8. Трубу сооружают следующим образ На подготовленном основании 8 возвод т нижнюю часть трубы - раму 1 и покрывают верхнюю часть стен напротив верхнего ригел  4 битумом Отсыпают насыпь 7, довод  ее верх до верхнего ригел  4 рамы 1, Затем бетонируют клиновидные стены 3 и досыпают до их верха насьшь 7. Бетонируют свод 2 и возвод т насыпь до проектной отметки. В процессе отсыпки насыпи выше верха свода 2, а также в период эксплуатации в насыпи 7 будут происходить осадки. При этом, благода р  тому, что свод 2 опираетс  чере клиновидные стенки 3 на боковые приз1 1ы насыпи 7, осадки свода буду такими же, как и у боковых околотрубных призм насыпи. А учитыва , что осадки боковых призм насыпи бол ше, чем у надтрубной призмы, свод будет как бы уходить от нагрузки надтрубной призмы. Благодар  наличию сло  смазки 5 клиновидные стенки 3 свободно перемещаютс  вниз, создава  распор в сторону верхнего ригел  и в боковые призмы насыпи 7 Боковое давление грунта на стенки рамы 1 существенно уменьшаютс .30 applied a layer of grease 5, for example. from bitumen; A cavity 6 is formed between the arches 2 and the bolt 4. The pipe is located in embankment 7 on the base 8. The pipe is constructed as follows. On the prepared base 8, the lower part of the pipe is erected - the frame 1 and cover the upper part of the walls opposite the upper crossbar with 4 bitumen. its top is up to the upper crossbar 4 of the frame 1, then the wedge-shaped walls 3 are concrete-cast and are poured up to their top 7. Concrete roof 2 and raise the embankment to the design mark. In the process of dumping embankment above the top of arch 2, as well as during operation in the embankment 7 precipitation will occur. At the same time, thanks to the fact that the arch 2 is supported through the wedge-shaped walls 3 on the lateral prizes of the embankment 7, the sediments of the arch will be the same as those of the lateral near-tube prisms of the embankment. And taking into account that the precipitation of the lateral prisms of the embankment is greater than that of the supra-pipe prism, the arch will seem to move away from the load of the supra-pipe prism. Due to the presence of a layer of lubricant 5, the wedge-shaped walls 3 freely move downwards, creating a thrust towards the upper bolt and into the side prisms of the embankment 7. The lateral pressure of the soil on the walls of the frame 1 is significantly reduced.

А xvA xv

Claims (2)

v Таким образом, предлагаема  конструкци  трубы обеспечивает существенное уменьшение вертикального и горизонтального давлени , благодар  чему трубу можно выполн ть облегченной конструкции. Формула изобретени  Труба под высокой насыпью, включающа  несущую конструкцию, выполненную составной из нижней неподвижной и верхней подвижной сводчатой части, отличающа с  тем, что, с целью уменьшени  действи  на трубу вертикального давлени  и горизонтальной нагрузки, нижн}ш неподвижна  часть трубы выполнена в виде замкнутой пр моугольной рамы, а верхн   подвижна  снабжена клиновидными опорными п тами, расположенными между верхним ригелем пр моугольной замкнутей рамы и насыпью, причем между верхней подвижной частью трубы и верхним ригелем нижней неподвижной части образована полость . Источники информации, прин тые во внимание при экспертизе 1.Справочник по гидротехнике. М.-/ Стройиздат, 1955, с. 734, фиг. 28-33. v Thus, the proposed pipe design provides a significant reduction in vertical and horizontal pressure, whereby the pipe can be made of lightweight construction. Claims of the Invention A pipe under a high embankment, comprising a supporting structure made of a composite of the lower fixed and upper movable vaulted part, characterized in that, in order to reduce the effect of vertical pressure and horizontal load on the pipe, the lower part of the fixed part of the pipe is closed. the upper frame is movable, and the upper one is fitted with wedge-shaped supporting points located between the upper bolt of the rectangular closed frame and the embankment, and between the upper movable part of the pipe and the upper he bolt the lower fixed part of the cavity is formed. Sources of information taken into account in the examination 1. Handbook of hydraulic engineering. M.- / stroiizdat, 1955, p. 734, FIG. 28-33. 2.Авторское свидетельство ;СССР №672296, кл. Е 02 D 29/10, 1977.2. The copyright certificate; USSR №672296, cl. E 02 D 29/10, 1977.
SU802876362A 1980-01-24 1980-01-24 Pipe under high embankment SU968193A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802876362A SU968193A1 (en) 1980-01-24 1980-01-24 Pipe under high embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802876362A SU968193A1 (en) 1980-01-24 1980-01-24 Pipe under high embankment

Publications (1)

Publication Number Publication Date
SU968193A1 true SU968193A1 (en) 1982-10-23

Family

ID=20875067

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802876362A SU968193A1 (en) 1980-01-24 1980-01-24 Pipe under high embankment

Country Status (1)

Country Link
SU (1) SU968193A1 (en)

Similar Documents

Publication Publication Date Title
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
US4537529A (en) Earth retaining end element for use with overfilled load support structures
SU968193A1 (en) Pipe under high embankment
ATE197617T1 (en) COMPOSED BUILDING SUPPORT CONSTRUCTION
GB1237468A (en) Method of advancing bridging structures
JPH01239217A (en) Method for protecting underground structure in sand base liable to be liquefied
US2211589A (en) Submerged bridge or tunnel construction
SU93239A1 (en) Arch bridge
SU896165A1 (en) Dam made of locally available materials
SU960355A1 (en) Overflow dam of locally available materials
SU1113451A1 (en) Hydraulic engineering structure of moorage type
RU2039151C1 (en) Washed-up hydraulic structure
SU1046405A1 (en) Concrete dam
SU428055A1 (en) TUNNEL TYPE PIPELINE
US1846840A (en) Dam
RU19844U1 (en) TUNNEL TYPE PIPELINE
SU1717693A1 (en) Reinforced beam bridge
SU1060748A1 (en) Dam made of soil materials
JPH0226027B2 (en)
SU897924A1 (en) Method of constructing dam of locally available materials
SU624868A1 (en) Rigid-ballast base for crane trackway
SU968149A1 (en) Dam
SU1095684A1 (en) Road paving structure
SU1451210A1 (en) Method of erecting a weir in a water reservoir
SU885448A1 (en) Foundation under column