SU950930A1 - Working-face filling-up pipeline - Google Patents
Working-face filling-up pipeline Download PDFInfo
- Publication number
- SU950930A1 SU950930A1 SU813234049A SU3234049A SU950930A1 SU 950930 A1 SU950930 A1 SU 950930A1 SU 813234049 A SU813234049 A SU 813234049A SU 3234049 A SU3234049 A SU 3234049A SU 950930 A1 SU950930 A1 SU 950930A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- sections
- section
- pipe
- pipeline
- mechanized
- Prior art date
Links
Description
(54) ЗАБОЙНЫЙ ЗАКЛАДОЧНЫЙ ТРУБОПЮВОД(54) BOTTOM HANDLING PIPE
1one
Изобретение относитс к горной промышленности и может быть использовано дл подачи закладочного материала в выработанное пространство при отработке угольных пластов механизированными комплексами.The invention relates to the mining industry and can be used to feed a filling material into the mined-out space when mining coal seams with mechanized complexes.
Известен забойный закладочный трубопровод , включающий отрезки трубы, смонтированные внутри секций крепи, и устройства дл дистанционного соединени отрезков труб 1.A downhole backfill pipe is known, including pipe sections mounted inside the support sections, and devices for remotely connecting pipe sections 1.
Недостатком указанного трубопровода вл етс наличие на нем устройства дистанционного соединени и рассоединени в каждой секции крепи, что приводит к необходимости обслуживани его рабочими, а также расположение трубопровода внутри крепи. Это не позвол ет передвигать крепь к забою при движении в трубопроводе закладочного материала, чтобы он не попадал в рабочее пространство. В результате этого снижаетс 1 производительность механизированного комплекса в лаве по добыче угл . Кроме того, трубопровод , расположенный внутри крепи, создает помехи дл перемещени людей и движени воздушной струи, что сказываетс при разработке тонких пластов.The disadvantage of this pipeline is the presence of a device for remote connection and disconnection in each section of the lining, which leads to the need for maintenance of its workers, as well as the location of the pipeline inside the lining. This prevents the support from moving to the bottom when moving the filling material in the pipeline so that it does not get into the working space. As a result, the productivity of a mechanized coal mining complex in lava decreases. In addition, the pipeline, located inside the lining, interferes with the movement of people and the movement of the air jet, which affects the development of thin layers.
Известен также забойный закладочный трубопровод , включающий отрезки труб, смо тировшшые в ограждении механизированной крепи очистного забо и армированные износостойкими вкладышами 2.Also known is the downhole backfill pipelines, including pipe sections, fitted in the fence of the mechanized support of the clearing face and reinforced with wear-resistant liners 2.
Недостатками указанного трубопровода вл ютс сложность его конструкции, так как он вл етс неразделимой частью огражде1ш механизированной крепи, и неудовлетворительна стыковка отрезков труб при нарушении пр молинейного расположени секций крепи.The disadvantages of this pipeline are the complexity of its design, since it is an inseparable part of the protection of mechanized supports, and the joining of pipe sections in case of violation of the linear arrangement of the support sections is unsatisfactory.
. Целью изобретени вл етс упрощение конструкции и улучшение стыковки труб при нарушеиии пр молинейного расположени секций механизированной крепи.. The aim of the invention is to simplify the design and improve the joining of pipes in case of violation of the straight line arrangement of the mechanized support sections.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813234049A SU950930A1 (en) | 1981-01-12 | 1981-01-12 | Working-face filling-up pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813234049A SU950930A1 (en) | 1981-01-12 | 1981-01-12 | Working-face filling-up pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
SU950930A1 true SU950930A1 (en) | 1982-08-15 |
Family
ID=20937973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813234049A SU950930A1 (en) | 1981-01-12 | 1981-01-12 | Working-face filling-up pipeline |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU950930A1 (en) |
-
1981
- 1981-01-12 SU SU813234049A patent/SU950930A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU781313B2 (en) | Mining method | |
US3999804A (en) | Longwall mining with chain pillar recovery | |
SU950930A1 (en) | Working-face filling-up pipeline | |
US4195886A (en) | Radial mining method | |
Curth | Design of longwall mining system | |
SU1089265A1 (en) | Method of protecting mine workings for water break-ins | |
RU2299984C1 (en) | Method for unmanned extraction of thick, over 30 meters, sloping coal formation | |
SU989091A2 (en) | Coal-winning unit | |
SU512290A1 (en) | The method of underground mining of ore deposits | |
SU883527A1 (en) | Method of filling worked area at excavating thin gently sloping seams | |
SU826032A1 (en) | Face filling pipeline | |
RU2001134620A (en) | The method of laying the mined-out space of chambers in underground mining of mineral deposits | |
RU1789736C (en) | Method for filling gobs after powered mining complex in stoping steeply dipping beds by long stoop along the strike | |
SU699184A1 (en) | Method of mining mineral fields | |
SU1666725A1 (en) | Method for construction of protective wall made of ore blocks | |
SU621879A1 (en) | Method of excavating orebodies | |
SU705127A1 (en) | Chamber filling machine | |
SU1680994A1 (en) | Method for working steep coal seams having tendency towards gas dynamic effects | |
RU1774995C (en) | Method of protecting chipped-away structures | |
SU1745938A1 (en) | Thick pitching coal seam exploitation method | |
SU890793A1 (en) | Method for working formation deposits | |
SU934003A1 (en) | Method of working thick coal beds with use of flexible partition | |
RU1776816C (en) | Rock-compaction mechanism for selective mining of mineral deposits | |
SU605004A1 (en) | Method of mining steep lode deposits | |
SU1138522A1 (en) | Method of filling up an excavated space |