SU942168A1 - Method of testing mine cables for fire-proofness - Google Patents

Method of testing mine cables for fire-proofness Download PDF

Info

Publication number
SU942168A1
SU942168A1 SU782604449A SU2604449A SU942168A1 SU 942168 A1 SU942168 A1 SU 942168A1 SU 782604449 A SU782604449 A SU 782604449A SU 2604449 A SU2604449 A SU 2604449A SU 942168 A1 SU942168 A1 SU 942168A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cable
testing
cables
fire
time
Prior art date
Application number
SU782604449A
Other languages
Russian (ru)
Inventor
Владимир Афанасьевич Ихно
Юрий Александрович Дикий
Михаил Александрович Нагорный
Эдуард Пименович Островский
Иван Федорович Сумин
Original Assignee
Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности filed Critical Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности
Priority to SU782604449A priority Critical patent/SU942168A1/en
Application granted granted Critical
Publication of SU942168A1 publication Critical patent/SU942168A1/en

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Description

(54) СПОСОБ ИСПЫТАНИЯ ШАХТНЫХ КАБЕЛЕЙ НА ПОЖАРОБЕЗОПАСНОСТЬ(54) METHOD FOR TESTING FIRE CABLES FOR FIRE SAFETY

1one

Изобретение относитс  к электротехнике и может быть использовано дл  испытани  кабелей, используемых в пожаро опасных услови х.The invention relates to electrical engineering and can be used to test cables used in fire hazardous conditions.

Известны способвы испытаний кабелей на пожаробезопасность, по которым на оболочку кабел  воздействуют внешним источником тепла (пламени) и по результатам воздействи  суа т о пожаробезопасностй кабел  l и 2 .There are known methods for testing fire safety, by which an external heat source (flame) is applied to the cable sheath and, according to the results of exposure, the fire safety of the cable l and 2.

Наиболее близким по технической сущности к предлагаемому  вл етс  способ, учитывающий предварительный нагрев кабел  током в течение регламентированного времени з .15The closest in technical essence to the present invention is a method that takes into account the preheating of the cable with current for a regulated time of s .15

Общим недостатком известных способов  вл етс  то обсто тельство, что факторы воздействи  на испытываемый кабель не соответствуют фактическим причинам возникновени  пожаров от не- 20 исправности кабе шного хоз йства.A common drawback of the known methods is the fact that the factors affecting the cable under test do not correspond to the actual causes of the fires caused by the cable inoperability.

Цель изобретени  - повышение надежности кабел  путем увеличени  объективности контрол .The purpose of the invention is to increase the reliability of the cable by increasing the objectivity of the control.

Указанна  цель достигаетс  тем, что в качестве источника дополнительной тепловой энергии используют энергию возбуждаемого в кабеле короткого дугового замыкани , а врем  воздействи  дуги принимают paBHbnvf контролируемому времени срабатывани  защитного аппарата.This goal is achieved by using the energy of a short arc circuit excited in the cable as a source of additional thermal energy, and the arc action time takes paBHbnvf for the controlled response time of the protective apparatus.

При испытании кабелей, предназначенных дл  питани  мощных электродвигателей , к испытываемому кабелю дополнительно подключают соответствующий электродвигатель .When testing cables designed to power powerful electric motors, an appropriate electric motor is additionally connected to the cable under test.

На фиг. 1 представлена блок-схема дл  испытани  шахтных кабелей на пожаробезопасность; на фиг. 2 и 3 - примеры перемыкани  жил кабел  дл  воз ждени  дугового к.з. с разрезами.FIG. 1 is a block diagram for testing fire safety of mine cables; in fig. Figures 2 and 3 are examples of the cross-section of a cable core to augment an arc short-circuited cable. with cuts.

Испытательна  установка содержит трансформаторную подстанцию 1, коммутационный аппарат 2, автоматический выключатель 3, штепсельные разъемы 4 дл  подключени  образца испытываемого кабел  автоматический выключатель 5,The test facility contains a transformer substation 1, a switching device 2, a circuit breaker 3, plug connectors 4 for connecting a sample of the cable under test, a circuit breaker 5,

3942168439421684

устройство 6 дл  регулировани  тока на-Проведенные исспедовани  покааали,a current adjustment device 6 for on-the-off examinations;

грузки, коммутационный аппарат 7 дЛ что пожаробезопасность испытанныхload, switching device 7 dL that fire safety tested

подключени  электродвигател  8. Величи- кабелей можно считать удовлетворительmotor connections 8. Cable sizes can be considered satisfactory

на тока, напр жени  и времени срабатывани  защитной аппаратуры регистрируетс  осциллографом 9, Испытываемый разец 10 кабел  надрезаетс  и зачищаетс  изол ци  11 фаз до обнажени  жил 12 (фиг. 2 и 3). Возбо ждение дугового к.з. производ т проволочкой 13, диаметр которой равен диаметру проволочек .жил испытываемого образца кабел . Способ осуществл етс  следующим обррзом . Испытываемый образец 10 кабел  длиной 5 м с обнаженнь1ми жилами 12 подключают к штепсельным разъемам 4 испытательной установки. Включают коммутационный аппарат 2 и автоматический выключатель 3, подают напр жение, равное l.OSUn. от трансформаторной подстанции 1 на испытываемый образец 10 кабетш. Протекающий по образцу кабел  ток нагревает его до максимально допустимой температуры жил в рабочем режиме . Причем величину тока регулируют устройством 6, которое подключено к испытываемому образцу 1О кабел  через автоматическиП выключатель 5. Температура измер етс  при помощи термопары (не указана). При достижении установившейс  температуры производ т дуговое к. 3. путем перемыкани  обнаженных жил 12 образца 10 кабел  проволочкой 13. При этом врем  срабатывани  защитной аппаратуры равно полуторакратному времени срабатывани  защитной аппаратуры в реальных услови х эксплуатации . При испытани х каб&лей, предназначенных дл  питани  электродвигателей мощностью свыще 1ОО кВт, перед образованием дугового к. 3. к,испытываемому образцу 1О кабел  подключают электродвигатель 8 при помощи коммутационного аппарата 7. В этом случае реализуетс  добавочнь1й фактор при отключении испытательного напр жени  за счет энергии электродвигател , работающего за вр м  выбега в режим генератора. Оценка пожаробезопасности производитс  визуаль ным путем и при отсутствии воспламен©ни  оболочки повтор етс  многократно при увеличении каждый раз мощности питани .On the current, voltage, and response time of the protective equipment, an oscilloscope 9 is recorded. Test cable 10 is notched and the insulation of the 11 phases is peeled before the cores are exposed 12 (Figs. 2 and 3). The revival of the arc short-circuit the wire 13 is produced, the diameter of which is equal to the wire diameter of the test specimen cable. The method is carried out as follows. A test specimen 10 of a cable 5 m long with exposed conductors 12 is connected to plug-in sockets 4 of a test installation. The switching device 2 and the circuit breaker 3 are turned on, a voltage equal to l.OSUn is applied. from the transformer substation 1 to the test sample 10 kabetsh. The current flowing through the cable model heats it up to the maximum allowable temperature of the cores in operation. Moreover, the amount of current is controlled by the device 6, which is connected to the test sample 1O of the cable through an automatic switch 5. The temperature is measured using a thermocouple (not specified). When the established temperature is reached, the arc is produced. 3. By bridging the exposed cores 12 of sample 10 of the cable with a wire 13. At the same time, the response time of the protective equipment is one and a half times the response time of the protective equipment under actual operating conditions. When testing cabs & lems designed to supply electric motors with a power of 1OO kW before forming an arc voltage. 3. To test cable sample 1O, the electric motor 8 is connected using a switching device 7. In this case, an additional factor is realized when the test voltage is disconnected energy account of an electric motor operating during run-in time in generator mode. The fire safety assessment is carried out visually and, in the absence of ignition, the envelope is repeated many times with an increase in the power supply each time.

Claims (3)

ной при отсутствии воспламенени  оболочки кабел  после шестикратных испытаний при времени срабатывани  защитного аппарата в предлагаемой системе эксплуатации . Применение изофетени  позвол ет повысить безаварийность эксплуатации электрических энергосистем в услови х повышенной пожароопасности. Формула изобретени  1; Способ испытаний шахтных кабелей не пожаробезштасностъ, включающий предварнтельные испытани  путем нагрева 1 °°.... рабочем режиме темпераутры, последу-ющее воздействие на кабель дополиительной тепловой энергии в течение регламентированного времени воздействи , повторные истытани  при повь.шенных значени х мощности питани  предварительного нагрева и оценку результатов по состо нию оболочки кабел  после воздействи  испытательных факторов, о т л и чающийс  тем, что, с целью повьшени  надежности кабел  путем увеличени  объективности контрол , в качестве источника дсзполнительной тепловой энергии используют энергию воз ждаемо кабеле короткого дугового замыка««« врем  воздействи  дуги принимают равным пол гторакратному времени срабатывани  защитного аппарата. 2. Способ по П.1, отличающийс  тем, что испытани  кабелей, предназначенных дл  подключени  мощных электродвигателей, производ т с дополнительным подключением электродвигател  к испытьгеаемому кабелю, Источники информации, прин тые во внимание при экспертизе 1.ГОСТ 7006-72, п. 4.11, с. 17. in the absence of ignition of the cable sheath after six times of testing with the response time of the protective apparatus in the proposed system of operation. The use of izofeteny allows you to increase the trouble-free operation of electrical power systems in conditions of increased fire hazard. Claim 1; The method of testing mine cables is not fire safe, including preliminary tests by heating 1 ° .... .... operating temperature, the subsequent impact on the cable of additional thermal energy during the regulated exposure time, repeated tests at the pre-heating power levels and evaluation of the results on the condition of the cable sheath after exposure to test factors, that is, in order to increase the reliability of the cable by increasing the objectivity and control, as the source of dszpolnitelnogo thermal energy using energy supplied by the cable of the short arc closure "" "the time of action of the arc is equal to half the time of operation of the protective apparatus. 2. The method according to Claim 1, characterized in that the tests of cables intended for connecting powerful electric motors are carried out with an additional connection of electric motor to the cable to be tested. Sources of information taken into account in the examination 1. GOST 7006-72, paragraph 4.11 , with. 17 2.Стандарт ГДР, УДЕ 0472. 2. GDR standard, CLE 0472. 3.Толдобин Г. Д., Пончик С. X. Методы испытаний щахтных кабелей на пожаробезопасность . ,Реф. сб. Техника безопасности , охрана труда и горноспасательное дело, М., 1976 , № 2 (прототип).3.Toldobin GD, Ponchik S. X. Test methods for testing fire safety cables. , Ref. Sat Safety, labor and mine rescue, M., 1976, No. 2 (prototype).
SU782604449A 1978-04-12 1978-04-12 Method of testing mine cables for fire-proofness SU942168A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782604449A SU942168A1 (en) 1978-04-12 1978-04-12 Method of testing mine cables for fire-proofness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782604449A SU942168A1 (en) 1978-04-12 1978-04-12 Method of testing mine cables for fire-proofness

Publications (1)

Publication Number Publication Date
SU942168A1 true SU942168A1 (en) 1982-07-07

Family

ID=20759672

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782604449A SU942168A1 (en) 1978-04-12 1978-04-12 Method of testing mine cables for fire-proofness

Country Status (1)

Country Link
SU (1) SU942168A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105911392A (en) * 2016-04-26 2016-08-31 施婷婷 Tinned wire heat-resistant detection device
CN107680722A (en) * 2017-09-23 2018-02-09 贵州固达电缆有限公司 A kind of resistance to compression mine cable

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105911392A (en) * 2016-04-26 2016-08-31 施婷婷 Tinned wire heat-resistant detection device
CN107680722A (en) * 2017-09-23 2018-02-09 贵州固达电缆有限公司 A kind of resistance to compression mine cable

Similar Documents

Publication Publication Date Title
JP2004170093A (en) Testing device and testing method for electric equipment protection circuit
CN108318766A (en) Operation vehicle for contact wire's AC power distribution cabinet/AC distribution panel device for fast detecting
SU942168A1 (en) Method of testing mine cables for fire-proofness
GB2118310A (en) An instrument for testing circuit breakers
US3488580A (en) Telephone cable fault locator employing first and second potential means to create a sustained arcing action
CN206594251U (en) A kind of power cable phasing device
RU181195U1 (en) Experimental bench for creating primary and secondary signs of short circuit
GB2217028A (en) Electrical test device
Lshikawa et al. discharge-induced ignition of combustibles on AC power-supply cords
Takenaka et al. Condition monitoring of damaged AC power supply cord using voltage waveform
Kim et al. Verification of insulated overhead cables and underground cable systems for MVDC applications
US3701927A (en) Location of faults in cables
GB2015754A (en) Insulation and earth leakage testing
US2840781A (en) Testing device
RU213421U1 (en) Experimental stand for the effect of load currents on the conductor insulation
CN217766809U (en) Detection apparatus for arc fault protector
RU191656U1 (en) Experimental stand
CN215300543U (en) Automatic heating high-voltage motor control circuit
CN114167097B (en) Electric heating combined test system and method for gas insulated switchgear isolating switch
CN210487929U (en) No-load test cabinet for direct current motor
CN219872640U (en) Electrical fire multiple cause and prevention and control experiment platform
CN216748038U (en) A school examines device for motor three-phase wiring
JP2003255005A (en) Protection circuit testing apparatus for on-site power supply facilities
SU1000937A1 (en) Device for forecasting transformer insulation resource consumption
SU896583A1 (en) Method of testing distributing cable lines