SU885274A1 - Charging device of blast furnace - Google Patents

Charging device of blast furnace Download PDF

Info

Publication number
SU885274A1
SU885274A1 SU802891291A SU2891291A SU885274A1 SU 885274 A1 SU885274 A1 SU 885274A1 SU 802891291 A SU802891291 A SU 802891291A SU 2891291 A SU2891291 A SU 2891291A SU 885274 A1 SU885274 A1 SU 885274A1
Authority
SU
USSR - Soviet Union
Prior art keywords
furnace
dome
feeder
bunker
loading
Prior art date
Application number
SU802891291A
Other languages
Russian (ru)
Inventor
Владимир Иванович Логинов
Геннадий Юрьевич Крячко
Олег Антонович Бабенко
Original Assignee
Днепродзержинский Ордена Трудового Красного Знамени Индустриальный Институт Им.М.И.Арсеничева
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Днепродзержинский Ордена Трудового Красного Знамени Индустриальный Институт Им.М.И.Арсеничева filed Critical Днепродзержинский Ордена Трудового Красного Знамени Индустриальный Институт Им.М.И.Арсеничева
Priority to SU802891291A priority Critical patent/SU885274A1/en
Application granted granted Critical
Publication of SU885274A1 publication Critical patent/SU885274A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/18Bell-and-hopper arrangements
    • C21B7/20Bell-and-hopper arrangements with appliances for distributing the burden

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)

Description

(5) ЗАГРУЗОЧНОЕ УСТРОЙСТВО ДОМЕННОЙ ПЕЧИ(5) DOWNLOAD LOADING DEVICE

1one

Изобретение относитс  к черной ме-1, таллургии, а более конкретно к оборудованию дл  загрузки шихтовых материалов в доменные печи.The invention relates to ferrous metal me-1, tallurgy, and more specifically to equipment for loading charge materials into blast furnaces.

Известное загрузочное устройство доменной печи, содержащее приемную воронку, соединенную с ней промежуточную емкость, вращающиес  внутри посредством привода и подвешенные на вертикальной штанге воронку и распределительный желоб с регулируемым углом наклона 1 }.A known blast furnace charging device containing a receiving funnel, an intermediate tank connected to it, rotating inside by means of a drive and a funnel suspended from a vertical rod and a distribution chute with an adjustable tilt angle 1}.

Однако транспортировка шихтовых материалов от приемной воронки к распределительному желобу и загрузка их в печь производитс  сверху самотеком, что требует большой высоты загрузочных устройстй. Распределительный желоб , приводы его перемещени  установлены в верхней части купола печи, через который также производитс  загрузка шихтовых материалов. Это приводит к тому, что во врем  ремонта или демонтажа вращающейс  воронкиHowever, the transportation of charge materials from the receiving hopper to the distribution chute and loading them into the furnace is performed from above by gravity, which requires a large height of the loading devices. The distribution chute, its movement drives are installed in the upper part of the dome of the furnace, through which the charge materials are also loaded. This leads to the fact that during the repair or dismantling of the rotating funnel

или желоба необходимо отсоедин ть шихтопроводы , что усложн ет процесс ремонта . Кроме того, при аварийных ремонтах , при замене распределительного устройства происход т выбросы доменного газа, что создает опасные услови  работы.or chutes need to disconnect the bridges, which complicates the repair process. In addition, during emergency repairs, when replacing a switchgear, blast furnace gas emissions occur, which creates hazardous working conditions.

Наиболее близким к предлагаемому по технической сущности  вл етс  загрузочное устройство доменной печи,  The closest to the proposed technical essence is the boot device of a blast furnace,

10 установленное на ее куполе и устройство , содержащее бункер-шлюз дл  приема шихтовых материалов, горизонтальную камеру, сообщающую, бункершлюз с рабочим пространством печи и 10 installed on its dome and a device containing a bunker-gateway for receiving charge materials, a horizontal chamber that communicates the bunker lock with the working space of the furnace and

15 питатель дл  загрузки печи с возможностью перемещени  вдоль своей оси и с возможностью углового перемещени  в горизонтальной плоскости, приемную воронку, расположенную ниже.разгру70 зочного конца питател  и pacJnpeдeлительный желоб, выполненный с возможностью вррцени  и изменени  угла наклона посредством приводов 2j. Недостатком этого устройства  вл ютс  высокие затраты на его.ремонт и низка  стойкость. Цель изобретени  - повышение ремонтоспособности а также улучшение условий обслуживани  устройства. Указанна  цель достигаетс  тем, что загрузочное устройство, содержащее бункер-шлюз, горизонтальную камеру с шибером, соедин ющую бункершлюз с рабочим пространством печи, питатель дл  загрузки печи, приемную воронку, расположенную ниже разгрузо него конца питател  и распределительный желоб, с приводами вращени  и изменени  угла наклона, снабжено установленной на куполе печи промежуточной камерой с газоуплотнительным клапаном, размещенным под куполом , причем объем камеры обеспечивае размещение в ней приемной воронки и желоба, подвешенными.на штанге. На чертеже схематически показано устройство дл  загрузки доменной печи . Устройство состоитиз приемного бункера 1 с газоуплотнительным клапа ном 2, накопительного бункера 3 с шихтовым затвором и газоуплотнител ным клапаном 5. Бункер 3 сообщаетс  с горизонтальной камерой 6, им1|ощей выход в купольную часть печи. мере 6 установлен шихтовый питатель ( например скребковый конвейер) с воз можностью перемещени  в горизонтальном направлении. Камера 6 имеет шибер 8, с помощью которого можно отделить ее от рабочего пространства печи, а также крышку 9 дл  установки или извлечени  питател  7. Дл  распределени  шихтового материала по се чению печи имеетс  приемна  воронка 10 с распределительным желобом 11,. подвешенные в купольной части печи на полой вертикальной штанге 12, сквозь которую проходит т га 13 дл  изменени  угла наклрна желоба 11 посредством привода I. Возможность вращени  распределительного устройст ва обеспечиваетс  приводом 15. Дл  обеспечени  безопасных условий работ и повышени  ремонтоспособности устройства на опорном колошниковом флан це 16 установлена промежуточна  17 с возможностью отсечени  ее от рабочего пространства печи посредством клапана 18 (привод перемещени  и запирани  клапана не показан Камера 17 имеет в верхней части 4 крышку 19 В месте ввода в промежуточную камеру 17 вертикальной штанги 12 установлено сальниковое уплотнение 20, Дл  установки и демонтажа распределительного -устройства имеетс  кронштейн 2. Устройство работает следующим образом . Шихтовый материал конвейером подаетс  в приемный бункер 1. При этом клапан 2 открыт, а шихтовый -затвоп и клапан 5 закрыты. Материал накапливаетс  в накопительном бункере 3. После заполнени  бункера 3 открывают клапан 5, затем шихтовый затвор h и материал поступает на ленту питател  7. Питателем 7 материал подаетс  в приемную воронку 10, вращательное движение котдрой обёспечиваетс  приводом 15 через вертикальную штангу 12. .Затем материал из воронки 10 поступает в распределительный желоб 11 и из него высыпаетс  в печь. Изменение угла наклона желоба производитс  посредством соединенной с ним т ги 13 приводом k, При выходе из стро  распределительного устройства операции по. его демонтажу и замене осуществл ютс  следующим образом. Грузоподъемным механизмом приемна  воронка 10 с желобом 11 извлекаютс  из печи и попадают в промежуточную камеру 17, котора  отсекаетс  от рабочего пространства печи клапаном 18. После этого снимаетс  крышка 20 и распределительное устройство извлекаетс  из промежуточной камеры и замен етс  новым. Операции по установке производ тс  в обратной последовательности. Благодар  наличию отдельного тракта подачи шихтовых материалов и обо-собленной установке распределительного устройства созданы более благопри тные услови  обслуживани , и ремонта загрузочного оборудовани . По вилась возможность уменьшить высоту колошниковых надстроек и вспомогательного .оборудовани . Установка вращающегос  распределител  шихты позвол ет более равномерно распредел ть материал по сечению колошника, Наличие промежуточной камеры на куполе печи позвол ет более оперативно производить демонтаж и установку деталей распределительного устройства улучшает услови  труда. формула изобретени  Загрузочное устройство доменной печи, установленное на куполе, содержащее бункер-шлюз дл  приема шихтовых материалов, горизонтальную камеру с шибером, сообщающую-.бункер-шлюз с рабочим пространством печи, питатель дл  загрузкипечи, приемную воронку, расположенную ниже разгрузочного конца питател  и распределительный желоб с приводами вращени  и изменени , угла наклона отличающеес  тем, что, с целью1 повышени  ремонто88 способности, устройство снабжено установленной на куполе печи промежуточ ной камерой с газоуплотнительным клапаном , размещенным внутри купола, причем объем камеры обеспечивает раз- мещение в ней приемной воронки и желоба , подвешенными по штанге. Источники информации, прин тые -во внимание при экспертизе t, Авторское свидетельство СССР If 427097, кл. С 21 В 6/20, 1975. 2, За вка ФРГ (f 2657211, кл. С 21 В 7/18, 1979.15 is a feeder for loading the furnace with the possibility of moving along its axis and with the possibility of angular movement in a horizontal plane, a receiving funnel located below the load end of the feeder and a positive chute made with the possibility of temporary and tilting angle by means of drives 2j. A disadvantage of this device is the high cost of its repair and low durability. The purpose of the invention is to improve the maintainability as well as improve the service conditions of the device. This goal is achieved by the fact that a loading device containing a bunker gateway, a horizontal chamber with a gate connecting the bunker lock with the working space of the furnace, a feeder for loading the furnace, a receiving funnel located below the discharge end of the feeder and a distribution chute with rotation and change drives angle of inclination, provided with an intermediate chamber installed on the furnace dome with a gas sealing valve placed under the dome, and the chamber volume ensures that the receiving funnel and the groove accommodate it ennymi.na bar. The drawing schematically shows a device for charging a blast furnace. The device consists of a receiving bunker 1 with a gas sealing valve 2, an accumulative bunker 3 with a charge gate and a gas sealing valve 5. The bunker 3 communicates with a horizontal chamber 6, named after the exit to the dome part of the furnace. At least 6 a charge feeder (e.g. a scraper conveyor) is installed with the possibility of moving in a horizontal direction. Chamber 6 has a gate 8 with which it can be separated from the working space of the furnace, as well as a cover 9 for installing or removing the feeder 7. For distributing the charge material across the furnace, there is a receiving funnel 10 with a distribution chute 11 ,. suspended in the dome of the furnace on a hollow vertical rod 12, through which traction 13 passes to change the angle of the slope of the grooves 11 by means of drive I. The possibility of rotation of the switchgear is provided by the drive 15. To ensure safe working conditions and increase the serviceability of the device on the support collar 16 is installed intermediate 17 with the possibility of cutting it off from the working space of the furnace by means of a valve 18 (the actuator displacing and locking the valve is not shown) Part 4 cover 19 At the point of entry into the intermediate chamber 17 of the vertical rod 12, a gland seal 20 is installed. For mounting and dismounting the distribution device, there is a bracket 2. The device works as follows: The charge material is conveyed to the receiving hopper 1 by a conveyor. The charge lock and valve 5 are closed. The material accumulates in the storage bin 3. After filling the hopper 3, the valve 5 is opened, then the charge valve h and the material is fed to the feeder tape 7. The feeder 7 material is fed a hopper 10, a rotary motion kotdroy obospechivaets actuator 15 through a vertical post 12. Then, the material from the hopper 10 enters into the distribution trough 11 and therefrom is dropped into the furnace. The change in the angle of inclination of the groove is carried out by means of a drive 13 connected to it by a drive k, When the switchgear device fails, the operation on. its disassembly and replacement is carried out as follows. The lifting hopper 10 with the groove 11 is removed from the furnace and into the intermediate chamber 17, which is cut off from the working space of the furnace by the valve 18. After that, the lid 20 is removed and the distributor is removed from the intermediate chamber and replaced with a new one. Installation operations are performed in reverse order. Due to the presence of a separate path for the supply of charge materials and the installed installation of a switchgear, more favorable conditions for servicing and repairing the loading equipment have been created. There was an opportunity to reduce the height of top stock superstructures and auxiliary equipment. Installing a rotating charge distributor allows you to more evenly distribute the material over the cross-section of the furnace top. The presence of an intermediate chamber on the furnace dome allows for faster dismantling and installation of parts of the switchgear to improve working conditions. Claims of a blast furnace loading device mounted on a dome, containing a bunker-gateway for receiving charge materials, a horizontal chamber with a gate, communicating-a bunker-gateway to the furnace working space, a feeder for loading furnace, a receiving funnel located below the discharge end of the feeder and distribution A chute with rotational drives and a change in the angle of inclination is characterized by the fact that, in order to increase the ability of the repair facility, the device is equipped with an intermediate chamber with gas heaters installed on the dome of the furnace A relative valve located inside the dome, the volume of the chamber providing for the receiving funnel and the chute suspended in it along the rod. Sources of information taken into consideration in the examination of t, USSR Copyright Certificate If 427097, cl. C 21 V 6/20, 1975. 2, German Application (f 2657211, cl. C 21 V 7/18, 1979.

Claims (1)

Формула изобретенияClaim Загрузочное устройство доменной печи, установленное на куполе, содержащее бункер-шлюз для приема шихтовых материалов, горизонтальную камеру с шибером, сообщающую.бункер-шлюз с . рабочим пространством печи, питатель для загрузки'печи, приемную воронку, расположенную ниже разгрузочного конца питателя и распределительный желоб с приводами вращения и изменения, угла наклона, отличающееся тем, что, с целью повышения ремонто1·A blast furnace loading device mounted on a dome containing a bunker-gateway for receiving charge materials, a horizontal chamber with a gate communicating with the bunker-gateway the working space of the furnace, a feeder for loading the furnace, a receiving funnel located below the discharge end of the feeder and a distribution chute with drives for rotation and change, the angle of inclination, characterized in that, in order to increase repair 885274 « способности, устройство снабжено установленной на куполе печи промежуточ* ной камерой с газоуплотнительным клапаном, размещенным внутри купола,причем объем камеры обеспечивает разч мешение в ней приемной воронки и желоба, подвешенными по штанге.885274 “capabilities, the device is equipped with an intermediate chamber installed on the furnace dome * with a gas sealing valve located inside the dome, and the chamber volume provides for the separation of the receiving funnel and trough suspended in it by the rod.
SU802891291A 1980-03-10 1980-03-10 Charging device of blast furnace SU885274A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802891291A SU885274A1 (en) 1980-03-10 1980-03-10 Charging device of blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802891291A SU885274A1 (en) 1980-03-10 1980-03-10 Charging device of blast furnace

Publications (1)

Publication Number Publication Date
SU885274A1 true SU885274A1 (en) 1981-11-30

Family

ID=20881538

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802891291A SU885274A1 (en) 1980-03-10 1980-03-10 Charging device of blast furnace

Country Status (1)

Country Link
SU (1) SU885274A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2636726A1 (en) * 1988-09-22 1990-03-23 Wurth Paul Sa LOADING SYSTEM FOR A TANK OVEN

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2636726A1 (en) * 1988-09-22 1990-03-23 Wurth Paul Sa LOADING SYSTEM FOR A TANK OVEN
BE1004404A3 (en) * 1988-09-22 1992-11-17 Wurth Paul Sa Loading installation of four a tank.

Similar Documents

Publication Publication Date Title
BR8601267A (en) INSTALLATION OF LOADING A CUBA OVEN
CA1064699A (en) Supply of charge material to shaft furnaces
EA016935B1 (en) Distributor device
SU885274A1 (en) Charging device of blast furnace
GB2224723A (en) Installation for charging a shaft furnace
CN101014819B (en) Distributor of hot feed material
CA1157271A (en) Furnace for heating solid material, e.g. for pyrolysing pieces of solid tyre material
US4307987A (en) Shaft furnace charging apparatus
UA47469C2 (en) A charging plant for the blast furnace
US3963128A (en) Charging device for a blast-furnace
US4949940A (en) Charging arrangement for shaft furnaces, in particular blast furnaces
US4909821A (en) Apparatus for granulating metallurgical melt
CN102230044A (en) Four-bucket bell-less charging device
US3054497A (en) Rotary feeder table
US4728352A (en) Glass batch feed arrangement with directional adjustability
CN102417943A (en) Bellless feeding device
US4143777A (en) Blast furnace charging device
US3764027A (en) Blast furnace high top pressure charging system
KR920004675B1 (en) Installation with a refractorily lined metallurgical vessel
US3479438A (en) Apparatus and method for preheating of metal scrap for furnace charging
US2965249A (en) Charging devices for shaft furnaces
SU891782A1 (en) Loading apparatus of blast furnace
SU92719A1 (en) Device for loading blast furnaces
US1031478A (en) Blast-furnace top.
RU2237726C1 (en) Blast-furnace charging unit