SU880941A1 SU792845358A SU2845358A SU880941A1 SU 880941 A1 SU880941 A1 SU 880941A1 SU 792845358 A SU792845358 A SU 792845358A SU 2845358 A SU2845358 A SU 2845358A SU 880941 A1 SU880941 A1 SU 880941A1
Authority
SU
USSR - Soviet Union
Prior art keywords
skip
sections
parts
skips
section
Prior art date
Application number
SU792845358A
Other languages
Russian (ru)
Inventor
Валерий Константинович Куриленко
Анатолий Иванович Соломенцев
Original Assignee
Всесоюзный Научно-Исследовательский Институт Горной Механики Им.М.М.Федорова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский Институт Горной Механики Им.М.М.Федорова filed Critical Всесоюзный Научно-Исследовательский Институт Горной Механики Им.М.М.Федорова
Priority to SU792845358A priority Critical patent/SU880941A1/en
Application granted granted Critical
Publication of SU880941A1 publication Critical patent/SU880941A1/en

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Description

(54) СКИП(54) SKIP

Изобретение относитс  в основном к горнодобывающей промышленности и предназначено дл  вьщачй горной массы на поверхность.5The invention relates primarily to the mining industry and is intended for a superior rock mass to the surface.

Известен скип, содержащий раму, кузов, затвор, подвесные и направл ющие устройства. Рама представл ет собой цельную металлоконструкцию, состо щую из вертикальных стоек, жестко 10 соединенных по концам несущими балками , к которым присоедин ютс  через подвесные устройства головной и уравновешивающий канаты. На рйме установлены направл ющие устройства, а меж- j ду ее стойками расположен кузов, имеющий один или два поперечных разъема 1 .A skip is known, comprising a frame, a body, a bolt, suspension and guide devices. The frame is a solid metal structure consisting of vertical posts, rigidly 10 connected at the ends by carrying beams, to which they are connected through head-mounted devices and balancing ropes. In the timing, guide devices are installed, and between the pillars of its struts is a body having one or two transverse connectors 1.

Однако в св зи с тем, что рама  вл етс  цельной, количество типораз- 20 меров скипов остаетс  большим, так как дл  каждой емкости требуетс  свой типоразмер.However, due to the fact that the frame is integral, the number of size-20 skips remains large, since each tank needs its own size.

Наиболее близким техническим решением к изобретению  вл етс  разъем- 25 ный скип, который состоит из кузова, затвора, подвесных и направл ющих устройств, выполненных из двух или более частей с поперечным разъемом, соединенных замкнутми канатом, охватывающим блоки, расположенные на стенках соедин емых частей 2. The closest technical solution to the invention is a split skip, which consists of a body, a bolt, suspension and guide devices made of two or more parts with a transverse connector, connected by a closed rope covering blocks located on the walls of the parts to be joined. 2

Нар ду со сложностью и удорожанием конструкции и трудност ми, возникающими при соединении разъемных частей, скип во врем  эксплуатации в услови х шахтного ствола быстро тер ет подвижность из-за заштыбовки зазоров, агрессивности водовоздушной среды и коррозии материала, т.е. соединение не выполн ет свои функции и разъемные части со временем зафиксируютс  в перекошенном друг относительно друга положении,.что отрицательно сказываетс  на взаимодействии движущегос  сосуда с проводниками армировки. Кроме того, увеличиваютс  зксплуатационные затраты, так как соединение требует более тщательного ухода и контрол , неоднократной замены каната в течение срока службы скипа. При этом данное соединение ненадежно , так как при нарушении целостности каната, например, падающими кусками , горной массы происходит рассоединение частей скипа, что приводит к аварии с длительной остановкой подъема .Along with the complexity and cost of construction and the difficulties that arise when connecting detachable parts, a skip quickly loses mobility during operation under conditions of a mine shaft due to gagging, aggressiveness of the air-water medium and corrosion of the material, i.e. the connection does not perform its functions and the detachable parts will eventually lock in a skewed position relative to each other, which adversely affects the interaction of the moving vessel with the reinforcement conductors. In addition, the operational costs are increased, as the connection requires more careful maintenance and control, repeated replacement of the rope during the service life of the skip. At the same time, this connection is unreliable, since if the integrity of the rope is violated, for example, by falling pieces of the rock mass, parts of the skip are disconnected, which leads to an accident with a long stop of the ascent.

Целью изобретени   вл етс  увелиение долговечности скипа.The aim of the invention is to increase the durability of the skip.

Указанна  цель достигаетс  тем, то в скипе, включающем верхнюю загузсэчную часть и нижнюк) разгрузочную асть с затвором и расположенным межу ними кузовом, подвесные и направ ющие приспособлени  и обшивку скиа и кузова, кузов выполнен из одиаковых секций, при этом части скипа секции кузова снабжены обв зочнь 1И о сами, установленными с торцов по ериметру с возможностью их соединени  между собой.This goal is achieved by the fact that in the skip, which includes the upper zaguzsechny part and the bottom) unloading part with the gate and body located between them, the suspension and guiding devices and the skia and body plating, the body is made of the same sections, while the skip parts of the body section are equipped Wrap about 1 and O themselves, installed from the ends of the perimeter with the possibility of their connection with each other.

Кроме того, кра  обшивки частей кипа и секций кузова расположены ниже наружных поверхностей обв зочных по сов, соединенных между собой.In addition, the edges of the skin of the parts of the bale and body sections are located below the outer surfaces of the binding bands interconnected.

На фиг. 1 изображен скип, общий Вид; на фиг. 2 - разрез А-А на фиг.1.FIG. 1 shows skip, general view; in fig. 2 shows a section A-A in FIG.

Скип представл ет собой металлоконструкцию , состо щую из трех основных частей; верхней приемной 1, нижней разгрузочной 2 и средней - кузова , имеющего одинаковое поперечное сечение и выполненного из одной или нескольких секций 3. Верхн   и нижн   части имеют вертикальные стойки 4, соединенные несущими балками 5, к которым креп тс  головные и уравновешивающие канаты. На балках расположены направл ющие приспособлени  б. Меж.цу стойками верхней части расположен кожух 7, а между стойками нижней части - затвор 8. Секции кузова имеют обв зочные по са 9, расположенные по кра м и св занные между собой вертикальными листами обшивки Ю. Такие же по са 11 имеют верхн   и нижн   части скипа в местах, примыкающих к кузову. Обв зочные по са всех разъемных частей контактируют друг с другом по контуру разъема и соедин ютс  мевду собой с помощью, например, болтовых , клиновых соединений, или Побразных скоб, охватывающих смежные .по са соедин емых частей. Дл  увеличени  прочности, обшивка секций имеет наружные вертикальные ребра жесткости 12. Дл  перекрыти  зазора по контуту разъема вертикальные листы обшивки 10 секций кузова и верхней части скипа выступают аа габарит своих нижних обв зочных по сов и недоход т на такую же величину до габарита верхних по сов. На заводе отдельно изготовл ютс  верхние и нижние части скипа, одинаковые дл  всего р да данного сечени , а также секции кузова, которые с,цел х унификации целесообразно изготавливать A skip is a metal structure consisting of three main parts; upper receiving 1, lower unloading 2 and middle - body, having the same cross section and made of one or several sections 3. The upper and lower parts have vertical posts 4 connected by supporting beams 5, to which the head and balance ropes are attached. Guides are located on the beams. B. Between the upper legs, there is a casing 7, and between the lower legs, a shutter 8. Body sections have obshchasny sa 9, located along the edges and interconnected by vertical sheeting Y sheets. The same sa 11 have upper and lower part of the skip in places adjacent to the body. The cords for all detachable parts are in contact with each other along the contour of the connector and are connected with each other by means of, for example, bolted, wedge joints, or Pendant clips, which adjoin adjacent parts. To increase strength, the cladding of sections has external vertical stiffening ribs 12. To close the gap along the connector pinout, vertical cladding sheets of 10 body sections and the upper part of the skip protrude aa dimension of its lower straps and less income t by the same amount to the dimension of the upper sections. . The plant manufactures separate upper and lower parts of the skip, the same for the whole row of this section, as well as body sections, which, for the purpose of unification, it is advisable to make

так и по одинаковыми как по высоте, 5 м . объему, равному, например, -так как примен емые большегрузные скипы имеют емкости, кратные п ти: 15, 20, 25 м и т.д. Отдельные части отправл ют на шахту обычным транспортом , где скип собираетс  на нулевой плсицадке и крепитс  к канатам. В случае необходимости увеличени  емкости эксплуатируемого скипа при увеличении производительности шахты достаточно добавить одну или две секции, а не замен ть скип новым, что, учитыва  разницу в затратах на изготовление, транспортировку и монтаж , значительно дешевле. Дл  этого необходимо установить скип на нуле вой площадке, отсоединить верхнюю часть, приподн ть ее, установить добавочную секцию и соединить все части.and the same as in height, 5 m. a volume equal to, for example, since the used heavy skips have capacities that are multiples of five: 15, 20, 25 m, etc. Separate parts are sent to the mine by conventional transport, where the skip is assembled on a zero rail and fastened to the ropes. If it is necessary to increase the capacity of the operated skip while increasing the productivity of the mine, it is enough to add one or two sections, and not to replace the skip with a new one, which, taking into account the difference in costs for manufacturing, transportation and installation, is much cheaper. To do this, you need to install a skip at the zero platform, detach the top part, lift it up, install the extension section and connect all the parts.

В предлагаемом скипе в случае выхода из стро  какого-либо элемента ,дл  дальнейшей его эксплуатации достаточно заменить секцию кузова или соответствующую часть, которые унифицированы дл  всего р да скипов данного сечени , что значительно увеличивает срок службы скипов. Завод может поставл ть действующим шахтам не скипы , а отдельные их сменные унифицированные части, что дает большой экономический эффект, учитыва  количество действующи скиповых подъемны установок и средний срок службы скипов , который не превышает 3 лет. Таким образом, применение данного скипа взамен известных целесообразно и экономически выгодно с точки зрени  как уменьшени  затрат на изготовление , транспортирование, монтаж и ремонт скипов, так и экономии матери алла.In the proposed skip, in the event of the breakdown of any element, for its further operation, it is sufficient to replace the body section or the corresponding part, which are unified for the whole range of skips of this section, which significantly increases the lifespan of the skips. The plant can supply operating mines not with skips, but with their individual replaceable unified parts, which gives a great economic effect, taking into account the number of operating skip hoisting installations and the average lifespan of skips that does not exceed 3 years. Thus, the use of this skip instead of the known ones is expedient and economically beneficial from the point of view of both reducing the costs of manufacturing, transporting, installing and repairing skips, and saving the material of the alla.

Claims (2)

1.Скип, йключающий верхнюю загрузочную часть и нижнюю разгрузочную часть с затвором, с расположенным между ними кузовом, подвесные и направл ющие приспособлени  и обшивку скипа и кузова, отличающийс   тем, что, с целью увеличени  долговечности скипа, кузов выполнен из одинакйвых секций, при этом части .скипа и секции кузова снабжены обв зочными по сами, установленными с торцов по периметру с возможностью их соединени  между собой.1. A skip, including an upper loading part and a lower unloading part with a gate, with a body located between them, suspended and guiding devices and a skip and body casing, characterized in that, in order to increase the durability of the skip, the body is made of identical sections, with In this part, the skip and body sections are equipped with straps on their own, installed at the ends along the perimeter with the possibility of their interconnection. 2.Скип по п. 1, отличаю щ и и с   тем, что кра  обшивки2. Skip on p. 1, I differ u and with the fact that the edge of the skin частей скипа и секций кузова расположены ниже наружных поверхностей 5 обв зочных по сов, соединенных между собой.parts of the skip and body sections are located below the outer surfaces of the 5 side panels connected together. Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination 1.Патент ФРГ 1241071, Q кл. 35 а 9/03, опублик. 1967.1. The patent of the Federal Republic of Germany 1241071, Q class. 35 a 9/03, published 1967. 2.Авторское свидетельство СССР №. 367035, кл. В 66 В 17/04, 1973 (прототип) .2. USSR author's certificate №. 367035, cl. B 66 B 17/04, 1973 (prototype). А-АAa Ю. S-Yu S- 912Фиг .1912Fig .1 ФиггFigg
SU792845358A 1979-11-30 1979-11-30 Skip SU880941A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792845358A SU880941A1 (en) 1979-11-30 1979-11-30 Skip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792845358A SU880941A1 (en) 1979-11-30 1979-11-30 Skip

Publications (1)

Publication Number Publication Date
SU880941A1 true SU880941A1 (en) 1981-11-15

Family

ID=20861702

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792845358A SU880941A1 (en) 1979-11-30 1979-11-30 Skip

Country Status (1)

Country Link
SU (1) SU880941A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007079504A1 (en) * 2006-01-03 2007-07-12 Berend Jan Werkman Mining skip
RU2607137C2 (en) * 2013-11-25 2017-01-10 Сюйчжоу Коул Майн Сейфти Эквипмент Мануфакчур Ко., Лтд. Large-size unloading skip installed on curvilinear guide having external drive and elongated structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007079504A1 (en) * 2006-01-03 2007-07-12 Berend Jan Werkman Mining skip
RU2607137C2 (en) * 2013-11-25 2017-01-10 Сюйчжоу Коул Майн Сейфти Эквипмент Мануфакчур Ко., Лтд. Large-size unloading skip installed on curvilinear guide having external drive and elongated structure

Similar Documents

Publication Publication Date Title
SU934905A3 (en) Scraper chain conveyor for underground workings
PL128383B1 (en) Trough for a trough conveyor
SU880941A1 (en) Skip
CN109436677A (en) Medium and heavy Distribution Warehouse drag conveyor for washing coal works
GB2249115A (en) Apparatus for guiding a mining machine
CN108438177B (en) Diving cage for underwater detection operation
AU6934687A (en) Inspection line pans
CN216582400U (en) Split type middle part groove
AU2005279706B2 (en) Haulage system for pit mining
WO2006024097A1 (en) Haulage system for pit mining
CN212924170U (en) Light door machine system for mounting prefabricated panel of wharf
US4561697A (en) Guides for mineral mining
CN2301537Y (en) Split cast-welded coal conveying shute
CN212245096U (en) Hopper type conveyor
US2331724A (en) Locomotive coaling apparatus
SU880903A1 (en) Flight conveyer framework
SU932975A3 (en) Body for cargo vehicle
RU2701631C1 (en) Multi-drive vertical-inclined conveyor
US4766992A (en) Coal conveyor construction
CN218908602U (en) Ore bin overhauling room
SU623981A1 (en) Arrangement for transporting people and cargoes through inclined workings
SU676521A1 (en) Load transfer device for ships with cargo modules
SU1046527A1 (en) Frame mining roof support
SU658295A1 (en) Scraper arrangement
SU905332A1 (en) Cathode assembly of aluminium electrolyzer cell