SU861169A1 - Boring ship - Google Patents

Boring ship Download PDF

Info

Publication number
SU861169A1
SU861169A1 SU792777546A SU2777546A SU861169A1 SU 861169 A1 SU861169 A1 SU 861169A1 SU 792777546 A SU792777546 A SU 792777546A SU 2777546 A SU2777546 A SU 2777546A SU 861169 A1 SU861169 A1 SU 861169A1
Authority
SU
USSR - Soviet Union
Prior art keywords
drilling
ship
platform
vertical
boring
Prior art date
Application number
SU792777546A
Other languages
Russian (ru)
Inventor
Василий Пантелеевич Пипенко
Виктор Михайлович Потапов
Александр Александрович Алисейчик
Николай Дмитриевич Великосельский
Original Assignee
Предприятие П/Я Р-6109
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я Р-6109 filed Critical Предприятие П/Я Р-6109
Priority to SU792777546A priority Critical patent/SU861169A1/en
Application granted granted Critical
Publication of SU861169A1 publication Critical patent/SU861169A1/en

Links

Description

путем нат жени  тросов 9 и регулировки запаса плавучести понтона 4 последний погружаетс  на требуемую глубину, преимущественно ниже подошвы наибольшей возможной волны. После этого стабилизируема  в вертикальном положении платформа 2 с комплексом бурового оборудовани  оказываетс  зафиксированной на определенном от дна мор  рассто нии, например над водой на недос гаемой дл  вершины волны высоте.by tensioning the cables 9 and adjusting the buoyancy margin of the pontoon 4, the latter is submerged to the required depth, preferably below the bottom of the greatest possible wave. After that, the platform 2 with a complex of drilling equipment that is stabilized in a vertical position is fixed at a certain distance from the sea bottom, for example, above water at a height not reachable by the apex.

Затем устанавливаютс  устьевое оборудование и водоотдел юш,а  .колонна 12, закрепл ема  шарнирными соединени ми у усть  скважЕны на дне и «а стабилизируемой платформе 2 (на чертеже шарнирные соединени  не показаны).Then, the wellhead equipment and the drainage section are installed, and column 12, fixed by hinged connections at the wellhead at the bottom and on the stabilized platform 2 (hinged connections are not shown in the drawing).

После этого со стабилизируемой платформы 2 производитс  бурение посредством колонны буровых труб 11. При выполнении буровых работ во врем  волнени  мор  судно 1 имеет возможность беспреп тственно перемешатьс  вследствие вертикальной качки в вертикальном направлении относительно неподвижной в этом направлении платформы 2 с понтоном 4. Одновременно посредством вертикальных направл ющих 5 и Катков 6 и 7 обеспечиваютс  дл  судна 1 и платформы 2 с понтоном 4 их совместные отклонени  от бортовой и килевой качки и возможные горизонтальные перемещени .After this, drilling is carried out from the stabilized platform 2 by means of a string of drill pipes 11. When performing drilling operations during the swell, the vessel 1 can freely mix due to vertical rolling in a vertical direction relative to the platform 2 fixed in this direction with a pontoon 4. At the same time 5 and skating rinks 6 and 7 are provided for vessel 1 and platform 2 with pontoon 4, their joint deviations from pitching and pitching and possible horizontal movement.

Созданное с применением предлагаемого технического решени  буровое судно дл  бурени  разведочных скважин на большом удалении от берега в местах с глубиной воды до 300 м и более обладает высокими техническими характеристиками, в том числе обеспечивает безопасную работу и надежную защиту колонны буровых труб от поломок во врем  бурени  на волнении до 7-8 баллов и более при вертикальных перемещени х судна до 10 м и более и, таким образом, значительно продлевает врем  использовани  сооружени  по назначению в море, тогда как примен емые в насто щее врем  буровые суда могут безопасно работать лишь при состо нии мор  до 4-5 баллов и Вертикальных перемещени х судна до 3,5-4,0 м.The drilling vessel built using the proposed technical solution for drilling exploration wells at a large distance from the shore in places with water depths of up to 300 m and more has high technical characteristics, including ensuring safe operation and reliable protection of the drill pipe string from damage during drilling excitement up to 7-8 points and more with vertical ship movements of up to 10 m and more and, thus, significantly prolongs the time of use of the structure to its intended purpose at sea, whereas those used in the In the meantime, drilling vessels can work safely only when the sea state is up to 4-5 points and the ship’s vertical movements are up to 3.5-4.0 m.

Claims (1)

1. Патент Великобритании № 1278986, кл. Е 1Н, 1972 (прототип).1. Patent of Great Britain No. 1278986, cl. E 1H, 1972 (prototype).
SU792777546A 1979-06-08 1979-06-08 Boring ship SU861169A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792777546A SU861169A1 (en) 1979-06-08 1979-06-08 Boring ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792777546A SU861169A1 (en) 1979-06-08 1979-06-08 Boring ship

Publications (1)

Publication Number Publication Date
SU861169A1 true SU861169A1 (en) 1981-09-07

Family

ID=20832604

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792777546A SU861169A1 (en) 1979-06-08 1979-06-08 Boring ship

Country Status (1)

Country Link
SU (1) SU861169A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0207915A1 (en) * 1985-07-03 1987-01-07 Ingeniorforretningen Atlas A/S A bearing structure and a floating vessel comprising such structure
RU2470200C2 (en) * 2007-03-02 2012-12-20 Фрамо Инжиниринг Ас Elastic bearing, and method for its routine repair and maintenance
RU2596005C2 (en) * 2013-11-08 2016-08-27 Офшор Текнолоджи Девелопмент Пте Лтд Protective structure for riser self-lifting platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0207915A1 (en) * 1985-07-03 1987-01-07 Ingeniorforretningen Atlas A/S A bearing structure and a floating vessel comprising such structure
US4753553A (en) * 1985-07-03 1988-06-28 Ingenirforretningen Atlas A/S Bearing structure and a floating vessel comprising such structure
RU2470200C2 (en) * 2007-03-02 2012-12-20 Фрамо Инжиниринг Ас Elastic bearing, and method for its routine repair and maintenance
RU2596005C2 (en) * 2013-11-08 2016-08-27 Офшор Текнолоджи Девелопмент Пте Лтд Protective structure for riser self-lifting platform

Similar Documents

Publication Publication Date Title
US3472032A (en) Production and storage system for offshore oil wells
US3017934A (en) Casing support
GB2201981A (en) Offshore oil/gas production
NO172572C (en) HALF-SUBMITABLE FARTOEY
US3780685A (en) Tension leg offshore marine apparatus
CA1102570A (en) Sea-floor template
US3996754A (en) Mobile marine drilling unit
GB1522897A (en) Marine platform for offshore submarine drilling operations and the like
US3397545A (en) Marine structure
GB1310142A (en) Buoyant offshore structures
GB1485657A (en) Marine drilling arrangement
FR2274499A1 (en) GREAT DEPTH OCEANIC MINING VESSEL
KR880002109B1 (en) Work platform
US3064437A (en) Offshore structure
JPS5916047B2 (en) marine structures
SU861169A1 (en) Boring ship
US4038830A (en) Modular geometric offshore structures system
CA1086514A (en) Scissor well template
US2895300A (en) Method and apparatus for stabilizing submersible vessels
US3515084A (en) Conversion of mat jack-up drill platforms to floating drill platforms
US3097495A (en) Platform for afloat-condition drilling
US2873581A (en) Marine platform
US4165706A (en) Submersible vehicle deployment and recovery system for rough water
SU606919A1 (en) Semi-submersible drilling platform
US2612759A (en) Submergible drilling barge