Description
(54)СТРОИТЕЛЬНЫЙ ПОДЪЕМНИК(54) CONSTRUCTION LIFT
II
Изобретение относитс к строительным подъемным механизмам, а именно к подъемникам, и может быть использовано дл монтажа их секционныхThe invention relates to construction hoisting mechanisms, namely, lifts, and can be used for the installation of their sectional
мачт.5mast.5
Известны строительные подъемники, содержащие основание с опорной стойкой , соединенной с секционной мачтой, в основании которой смонтирован подхват с упорами и блоками дл монтажного каната, при этом на мачте устаноЕпены направл ющие с перемещающейс по ним кареткой, снабженной выкатной платформой, взаимодействующей посредством тросов с лебедкой fJ. isConstruction hoists are known that contain a base with a support post connected to a sectional mast, at the base of which is mounted a catch with stops and blocks for a mounting rope, while guides are mounted on a mast with a carriage moving along them, equipped with a roll-out platform, interacting with a winch by means of cables. fJ. is
Недостатками этого подъемника вл ютс сложность эксплуатации, отсутствие необходимого направлени движени подхвата и мачты при ее монтаже, излишний вес подъемника.оThe disadvantages of this lift are the complexity of operation, the lack of the necessary direction of movement of the pick-up and the mast during its installation, the excessive weight of the lift.
Цель изобретени - повьппение удобства монтажа мачты путем использовани выкатной Ilлaтфop tы дл монтажа ачты при снижении неса подъемника.The purpose of the invention is to improve the ease of installation of the mast by using the withdrawable Illaftops to install the tower while reducing the carrying of the lift.
Цель достигаетс тем, что на опорной стойке установлены кронштейны с Г -образным пазом, а выкатна платформа выполнена с направл ющими, взаимодействующими с Г-образным пазом, при этом подхват вьтолнен с ходовыми катками , перемещакнцимис по направл кицим стойки, соединенной с грузовой платформой в монтажном положении посредством стыковочных элементов.The goal is achieved by mounting brackets with an L-shaped groove on the support post, and the roll-out platform is made with guides that interact with the L-shaped groove, while the pickup is aligned with the rollers, moving the stand along the load carrier in mounting position by means of connecting elements.
На фиг. I изображен предлагаемый подъемник в рабочем положении, общий вид; на фиг. 2 - подъемник в монтируемом положении, монтаж мачты подращиванием секций снизу; на фиг.З установка в монтажное положение выкатной грузовой платформы и монтажного подхвата на основание подъемника; на фиг. 4 - монтажный подхват, снабженный ходовыми катками; на фиг. 5 - выкатна грузова платформа; на фиг. 6 - основание с опорной стойкой и кронштейнами с Г-образным пазом. Подъемник-состоит из основани 1 с опорной стойкой 2, грузовой каретки 3 с грузовой выкатной платформой 4, подвешенной на грузовом тросе 5, огибающем головные блоки 6, установленные на мачте 7. Трос 5 запасован в рабочем положении на барабане грузовой лебедки 8. К вершине опорной стойки 2 приварены два кронштейна 9 с Г-обра ным пазом, В нижней части ма ты 7 закреплен монтажный подхват 10, катки I1 которого вход т внутрь опорной , а поворотные крюки 12 кре п т мачту 7 к опорной стойке 2. В монтажном положении грузова выкатна платформа 4 устанавливаетс , использу кронштейн 9,на опорной стойке 2 ,а монтажный канат 13 запасовываетс ч рез блоки 14 выкатной платформы 4 и блок 15 монтажного подхвата 10 к барабану грузовой лебедки 8. В верхней части монтажного устройства на врем монтажа крепитс ограничительна скоба 16. Выкатна платформа 4 своими направл ющими 17 при помощи стыковочных элеме1 тов 18 в монтажном положении стыкуетс с опорной стойкой 2, котора служит продолжением направл ющих 17 и скрепл етс болтами 19. При этом на врем монтажа ригель 20 снимаетс . На грузовой выкатной платфор ме 4 предусмотрена доска 21 дл уста новки грузов в рабочем положении и отверстие 22 дл установки ломика при с Г-образным пазом кр взаимодействии штейнов 9, Монтаж мачты подъемника производи с следующим образом. На опорную стойку 2 устанавливаетс в вертикальное положение выкатна платформа 4, при зтом снимаетс ригель 20. Дл облегчеД1и установки сквозь паз кронштейна 9 и отверсти .22 в выкатной платформе 4 продеваетс ломик. По до1етижении вертикального полож ни паз кронштейна 9 позвол ет точно зафиксировать стыковку и скрепить бол тами t 9 выкатную платформу 4с опорной стойкой 2, так, что направл ю-щие 17 станов тс продолже тем опорной стойки 2. После этого ломик вынимаетс , Б нижней .части опорной стойки 2 устанавливаетс монтажный подхват 10 с ходовыми катками 11, блоком 15 и поворотными крюками 12, На основание 1 устанавливаетс голов 8 И р дова секци мачты 7 и скрепл етс посредством поворотных крюков 12 с монтажным подхватом 10. Запасовываетс монтажный канат 13 через блоки 14 выкатной платформы 4 и блок 15 монтажного подхвата 10 к барабану грузовой лебедки 8. Второй конец каната крепитс к коушу 23. Крепитс огра-, ничительна скоба 16. При включении лебедки 8 монтажный канат 13 наматываетс на барабан, а монтажный подхват 10, скрепленный с секцией мачты 7, перемеща сь своими катками 1I вдоль опорной стойки 2, а потом вдоль выкатной платформы 4 поднимает мачту 7 в крайнее верхнее положение . Под мачту 7 устанавливаетс очередна секци , на которую сажаетс мачта 7, после чего она скрепл етс с секцией болтами. Затем подхват 10 отсоедин етс от мачты 7 и опускаетс в крайнее ижнее положение дл закреплени на очередной секции мачты 7, после чего снова включаетс лебедка 8 на подъем и подхват 10 вместе с мачтой 7 поднимаетс в крайнее верхнее положение. ,Так повтор етс до тех пор, пока мачта не достигнет требуемой высоты. Дл придани устойчивости мачте при мон- . таже используютс скобы 16, креп щиес к зданию по мере подращивани мачты . В зависимости от высоты мачта 7 в одном или нескольких местах крепитс к зданию. Последн секци крепитс к основанию 1. Ограничительные скобы 16 снимаютс , в барабан грузовой лебедки запасовываетс грузовой трое 5, навешиваетс грузова каретка 3, снимаетс с опорной стойки 2 выкатна платформа 4 и устанавливаетс на каретке 3. К выкатной платформе 4 ирикрепл етс ригель 20. Подъемник готов к работе. Демонтаж подъемника производ т в обратном пор дке. Вьшолнение монтажного устройства с использованием имеющейс грузовой выкатной платформы посредством стыковочных элементов с опорной стойкой, снабжение подхвата ходовыми катками, перемещающимис по жестким направл ющим , на которых установлены кронштейны с Г-образным пазом позвол ет повысить удобство монтажа при упрощении конструкции подъемника, IFIG. I shows the proposed lift in working position, general view; in fig. 2 - lift in mounted position, mounting the mast by growing sections from the bottom; in Fig.Z installation in the installation position of the withdrawable cargo platform and the mounting pickup on the base of the lift; in fig. 4 - assembly pickup, equipped with running rollers; in fig. 5 - roll out cargo platform; in fig. 6 - base with support stand and brackets with L-shaped groove. The elevator consists of a base 1 with a support stand 2, a cargo carriage 3 with a cargo withdrawable platform 4, suspended on a cargo cable 5, enveloping the head blocks 6 mounted on the mast 7. The cable 5 is stockpiled in the working position on the drum of the cargo winch 8. To the top The support stand 2 is welded by two brackets 9 with a L-shaped groove. In the lower part of the mate 7, a mounting pickup 10 is fixed, the rollers I1 of which go inside the bearing bracket, and the turning hooks 12 are mounted on the mast 7 to the support stand 2. In the mounting position cargo vykatna platform 4 is installed using the bracket 9, on the support post 2, and the mounting cable 13 is stockpiled by the blocks 14 of the withdrawable platform 4 and the block 15 of the mounting pickup 10 to the drum of the cargo winch 8. In the upper part of the mounting device, the restraining bracket 16 is attached for the time of installation 16. Retractable platform 4 with their guides 17 in the mounting position, they are joined with a support post 2, which serves as a continuation of the guides 17 and fastened with bolts 19. At the time of installation, the bolt 20 is removed. On the cargo withdrawable platform 4, a board 21 is provided for placing the goods in the working position and an opening 22 for installing the crowbar when the matte 9 interacts with the L-groove and interacting with the matte. Installation of the lift mast is as follows. The roll-out platform 4 is installed in the upright position 2, with this, the bolt 20 is removed. To facilitate installation, a crowbar is passed through the slot of the bracket 9 and the hole .22 in the roll-out platform 4. When the vertical position of the bracket 9 is achieved, the docking can be precisely fixed and bolted with t 9 to the withdrawable platform 4c with the support pillar 2, so that the guides 17 become more extended with the support pole 2. Thereafter, the crowbar is removed, B from the bottom. part of the support post 2 is installed mounting pickup 10 with road rollers 11, block 15 and pivoting hooks 12, heads 8 are installed on base 1 and the mast section of the mast 7 is fastened by means of pivoting hooks 12 with mounting pickup 10. Mounting rope 13 through the blocks 14 of the withdrawable platform 4 and the block 15 of the mounting pickup 10 to the drum of the cargo winch 8. The second end of the rope is fastened to the cage 23. The tie bar is attached, a nonsignificant clip 16. When the winch 8 is turned on, the mounting rope 13 winds onto the drum, and the mounting pickup 10 fastened to the mast section 7, moving with its rollers 1I along the support post 2, and then along the withdrawable platform 4 lifts the mast 7 to the extreme upper position. Under the mast 7, the next section is mounted on which the mast 7 is planted, after which it is bolted to the section. Then, the grab 10 is disconnected from the mast 7 and lowered to the extreme lower position to be fixed to the next section of the mast 7, after which the winch 8 is turned on again and the grab 10 together with the mast 7 rises to the extreme upper position. So repeats until the mast reaches the required height. To stabilize the mast at mon-. Staples 16 are also used, fastened to the building as the mast is raised. Depending on the height, the mast 7 is attached to the building in one or several places. The last section is fastened to the base 1. The restriction brackets 16 are removed, a cargo three is stored in the cargo winch drum, a cargo carriage 3 is mounted, the withdrawable platform 4 is removed from the uprights 2 and mounted on the carriage 3. A crossbar 20 is attached to the withdrawable platform 4. ready for work. The lift is dismantled in reverse order. Making the mounting device using the existing cargo withdrawable platform by means of connecting elements with a support post, supplying the pickup with road rollers moving along rigid guides, on which L-groove brackets are mounted, improves installation convenience while simplifying the lift design, I
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792748360A SU854858A1 (en) | 1979-04-06 | 1979-04-06 | Construction hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792748360A SU854858A1 (en) | 1979-04-06 | 1979-04-06 | Construction hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
SU854858A1 true SU854858A1 (en) | 1981-08-15 |
Family
ID=20820223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792748360A SU854858A1 (en) | 1979-04-06 | 1979-04-06 | Construction hoist |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU854858A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117185180A (en) * | 2023-11-06 | 2023-12-08 | 安格诺尔(江苏)智能电气有限公司 | 110kV dry-type outdoor terminal |
-
1979
- 1979-04-06 SU SU792748360A patent/SU854858A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117185180A (en) * | 2023-11-06 | 2023-12-08 | 安格诺尔(江苏)智能电气有限公司 | 110kV dry-type outdoor terminal |
CN117185180B (en) * | 2023-11-06 | 2024-01-23 | 安格诺尔(江苏)智能电气有限公司 | 110kV dry-type outdoor terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5230404A (en) | Erection scaffolding which is movable in an elevator shaft for the mounting of shaft equipment | |
US11053098B2 (en) | Elevator system and method for constructing such an elevator system | |
AU2013201162B2 (en) | A method and an elevator arrangement | |
RU2044687C1 (en) | Method of and device for mounting guides in mine | |
CN215756065U (en) | Quick hoist device of construction is contained to prefabricated box of bridge | |
SU854858A1 (en) | Construction hoist | |
NL1004066C2 (en) | Erection system for long and/or heavy items in vertical position | |
CN112627043A (en) | Installation device and method for composite cable saddle of narrow cavern of suspension bridge in mountainous area | |
SU901255A2 (en) | Hoist for servicing vehicles | |
CN214143337U (en) | Installation device of composite cable saddle of narrow cavern of mountain suspension bridge | |
JPH04358698A (en) | Carriage type crane | |
CN217323160U (en) | Cable-stayed bridge floor crane auxiliary cable hanging device | |
US3116838A (en) | Cableway for bridge construction | |
SU737337A1 (en) | Construction hoist | |
CN217297087U (en) | Lifting machine for building engineering is with longer article balance of being convenient for | |
SU1585269A1 (en) | Construction hoist | |
JP2549726Y2 (en) | Construction lift | |
JPS63685Y2 (en) | ||
SU1516455A1 (en) | Tower crane | |
SU401625A1 (en) | CONSTRUCTION LIFT | |
SU1054264A1 (en) | Method of erecting the mast of construction hoist | |
SU1705231A1 (en) | Self-hoisting crane | |
SU695954A2 (en) | Crane | |
SU958290A1 (en) | Construction hoist | |
JP3477672B2 (en) | Skew elevator installation equipment |