SU838084A1 - Corner anchorage support of power transmission line - Google Patents

Corner anchorage support of power transmission line Download PDF

Info

Publication number
SU838084A1
SU838084A1 SU782666109A SU2666109A SU838084A1 SU 838084 A1 SU838084 A1 SU 838084A1 SU 782666109 A SU782666109 A SU 782666109A SU 2666109 A SU2666109 A SU 2666109A SU 838084 A1 SU838084 A1 SU 838084A1
Authority
SU
USSR - Soviet Union
Prior art keywords
support
transmission line
power transmission
racks
anchorage support
Prior art date
Application number
SU782666109A
Other languages
Russian (ru)
Inventor
Олег Николаевич Малинин
Лев Александрович Мартынов
Original Assignee
Казахское Отделение Всесоюзного Госу-Дарственного Проектно-Изыскательскогои Научно-Исследовательского Института"Сельэнергопроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Казахское Отделение Всесоюзного Госу-Дарственного Проектно-Изыскательскогои Научно-Исследовательского Института"Сельэнергопроект" filed Critical Казахское Отделение Всесоюзного Госу-Дарственного Проектно-Изыскательскогои Научно-Исследовательского Института"Сельэнергопроект"
Priority to SU782666109A priority Critical patent/SU838084A1/en
Application granted granted Critical
Publication of SU838084A1 publication Critical patent/SU838084A1/en

Links

Description

II

Изобретение относитс  к опорам высоковольтных линий электропередачи, в частности к двухцепным анкерно-угловым опорам с анкерным креплением проводов и тросов, и может быть использовано при сооружении воздушных линий.The invention relates to supports of high-voltage power lines, in particular to double-circuit anchor-angle supports with anchorage of wires and cables, and can be used in the construction of overhead lines.

Известно устройство, содержащее три составные стойки из труб, удерживаемые по концам на одинаковом риссто нии и через некоторые равные интервалы равносторонними треугольными металлическими диафрагмами и диагональными св з ми, так что образуетс  жестка  пространственна  конструкци  в виде трехгранной призмы flA device is known that comprises three composite tube racks held at the ends at the same risk and at certain equal intervals by equal-sided triangular metal diaphragms and diagonal connections, so that a rigid spatial structure is formed in the form of a triangular prism fl

Однако указанна  мачта предназначена дл  установки антенн, молниеотводов и т.п. и не может быть использована 3 качестве двухцепной анкерно-угловой опоры линии электропередачи . Принципиальные осооенности данной конструкции (база между несущими стойками не пропорциональна высоте конструкции, выполнение стоек составленными из отрезков труб) не позвол ют ей воспринимать значительные горизонтальные нагрузки. Кроме того, конструкци  эта относительно сложна  и металлоемка .However, this mast is intended for installation of antennas, lightning rods, and the like. and 3 can not be used as a double-chain anchor-angle support of the power line. The fundamental characteristics of this structure (the base between the supporting struts is not proportional to the height of the structure, the design of the struts made up of pipe sections) does not allow it to perceive significant horizontal loads. In addition, this structure is relatively complex and bulky.

Известна двухцепна  металлическа  анкерно-углова  опора воздушных линий электропередачи напр жением 110 и 150 кВ, включак ца  четыре стойки, скрепленные между собой диафрагмами и обрешеткой, траверсы, жестко закрепленные на теле опоры,,и тросостойку . Траверсы соедин ют каждую пару стоек 21.: The double-chained metal anchor-angle support of overhead transmission lines with a voltage of 110 and 150 kV is known, including four racks fastened together with diaphragms and a crate, traverses rigidly fixed on the body of the support, and cable-resistant. Traverses connect each pair of pillars 21 .:

Недостатком указанной опоры  вл етс  ее неэкономичность, выражающа с  в металлоемкости, в необходимости установки ее на многотонные грибовидные железобетонные фундаменты, котбрые , в свою очередь, устанавливаютс  в открытые котлованы. Все это обусловливает значительный расход металла , железобетона большой объем работ,The disadvantage of this support is its uneconomical, expressed in metal consumption, in the need to install it on multi-ton mushroom-shaped reinforced concrete foundations, which, in turn, are installed in open pits. All this leads to a significant consumption of metal, reinforced concrete, a large amount of work,

применение сложной строительной техники и пр.the use of complex construction equipment, etc.

Наиболее близким техническим решением к тфедлагаемому  вл етс  опора линии электропередачи треугольной формы в поперечном сечении, включающа  стойку, установленные с образованием конструкции пирамидальной формы траверсы, прикрепленные стойками и образующие замкнутый треугольник, и гибкие св зи, соедин ющие каждую пару стоек .The closest technical solution to the teplagable is a triangular shaped transmission line in cross section, including a stand, fixed with the formation of a pyramid-shaped structure, traverses, attached by racks and forming a closed triangle, and flexible connections connecting each pair of racks.

Недостатком этой опоры  вл етс  невозможность монтажа двух и более цепей линии электропередачи. The disadvantage of this support is the impossibility of mounting two or more power line circuits.

Цель изобретени  - снижение материалоемкости , и уменьшение габаритов опоры при монтаже двух и более цепей линии электропередачи.The purpose of the invention is to reduce the consumption of materials, and to reduce the dimensions of the support when installing two or more power line circuits.

Цель достигаетс  тем,, что анкерноуглова  опора линии электропередачи треугольной формы в поперечном сечении , включающа  стойки, основные траверсы, образующие замкнутый треугольник , прикрепленные к ним провода и гибкие св зи, соедин ющие каждую пару стоек, снабжена дополнительными траверсами, жестко прикрепленными к стойкам опоры,и прикрепленными к дополнительным траверсам проводами допол нительных цепей линии электропередачи, причем дополнительные траверсы установлены параллельно основным траверсам, а провода дополнительных цепей прикреплены к основным и дополнительным траверсам, при этом стойки установлены вертикально.The goal is achieved by the fact that the anchor angle support of a triangular transmission line in cross section, including racks, main traverses that form a closed triangle, wires attached to them and flexible connections connecting each pair of racks, is equipped with additional traverses rigidly attached to the racks of the support , and wires attached to additional cross-arms of additional power line circuits, with additional cross-bars installed parallel to the main cross-bars, and additional wires epey attached to the primary and secondary traverse, the racks are arranged vertically.

ria чертеже схематически приведена опора, общий вид.ria drawing shows schematically the support, general view.

Опора включает три железобетонные стойки I, основные траверсы 2, образующие равносторонний треугольник, дополнительные траверсы 3, гибкие св зи 4. Провода 5 прикреплены к траверсам анкерным креплением 6.The support includes three reinforced concrete pillars I, main cross members 2, forming an equilateral triangle, additional cross bars 3, flexible links 4. Wires 5 are attached to the cross bars by anchor fixing 6.

Кажда  из стоек 1 установлена вертикально на равном от другой рассто нии в сверленый (пробуренный)котлован и укреплена в нем известными способами . Затем стойки, ближе к вершинам , скрепл ют между собой основными траверсами 2.Each of the racks 1 is installed vertically at an equal distance from another to the drilled (drilled) pit and strengthened in it by known methods. Then the pillars, closer to the tops, are fastened together by the main cross-beams 2.

Дополнительные траверсы жестко прикреплены к стойкам опоры ниже уровн  основных траверс и установлены параллельно основным траверсам. Провода основных дополнительных цепей линии электропередачи креп тс  к основным и дополнительным, траверсам. Дл  придани  большой прочности конструкции кажда  пара стоек соединена гибкими св з ми 4.Additional traverses are rigidly attached to the support posts below the level of the main traverses and installed parallel to the main traverses. The wires of the main additional circuits of the transmission line are attached to the main and additional traverses. In order to impart great strength to the structure, each pair of racks is connected by flexible couplings 4.

Применение опоры взамен типовой экономит металл на 63%, железобетон на 11%, снижает стоимость строительства на 20%, сокращает земл ные работы на 84% и площадь земли, занимаемую опорой,в 17 раз. В таблице приведены сравнени  технико-экономических показателей предлагаемого и известного объектов (расчет дан на одну опору).The use of support instead of standard saves metal by 63%, reinforced concrete by 11%, reduces construction costs by 20%, reduces land works by 84% and the land area occupied by the support, 17 times. The table shows a comparison of technical and economic indicators of the proposed and known objects (the calculation is given for one support).

При замене известных опор предлагаемой годова  экономи  ориентировочно составл ет: по металлу 9-11 тыс.т| по железобетону 1100-1400 м ; по земл ным работам 300-360 тыс.м ; по сметной стоимости 750-900 тыс.р.When replacing the known supports of the proposed year, the economy is approximately: for metal 9-11 thousand tons | on reinforced concrete 1100-1400 m; 300-360 thousand m for land works; at an estimated cost of 750-900 thousand rubles.

2000 7704 5704 742000 7704 5704 74

на ад1480 1772 292on ad 1480 1772 292

3480 9476 5996 63,23480 9476 5996 63.2

16,516.5

Расход железобеrtj Reinforced iron consumption

6,03 6,8 0,77 11,3 тона, м Земл ные рабо37 237 200 ты , м 1800 2300 500 Стоимость, р. Площадь, занимаема  опорой, м 2 То же, м6.03 6.8 0.77 11.3 tones, m Terrestrial work37 237 200 you, m 1800 2300 500 Cost, p. The area occupied by the support, m 2 The same, m

Claims (3)

1.Патент Франции № 2129268, кл. Е 04 Н 12/09, опублик. 1972.1.Patent of France No. 2129268, cl. E 04 H 12/09, published 1972. 2.Типовой проект Энергосельпроекта 3078 тм. т. 10, лист 12602. Type project of Energoselproekt 3078 tm. v. 10, sheet 1260 3.Авторское свидетельство СССР №536306, кл. Е 04 Н 12/00, 1974. В сравнении с опорой У110-2 В сравнении с 2-м  железобетонными опорами типа. УБ110-13. USSR author's certificate number 536306, cl. E 04 H 12/00, 1974. In comparison with support U110-2 In comparison with 2nd reinforced concrete supports of type. UB110-1 Опорна  ,Support t Ригелиt crossbars
SU782666109A 1978-09-01 1978-09-01 Corner anchorage support of power transmission line SU838084A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782666109A SU838084A1 (en) 1978-09-01 1978-09-01 Corner anchorage support of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782666109A SU838084A1 (en) 1978-09-01 1978-09-01 Corner anchorage support of power transmission line

Publications (1)

Publication Number Publication Date
SU838084A1 true SU838084A1 (en) 1981-06-15

Family

ID=20786082

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782666109A SU838084A1 (en) 1978-09-01 1978-09-01 Corner anchorage support of power transmission line

Country Status (1)

Country Link
SU (1) SU838084A1 (en)

Similar Documents

Publication Publication Date Title
EP0089808A2 (en) Transmission line suspension assembly
CN213268605U (en) Steel bar support and raft foundation steel bar structure comprising same
SU838084A1 (en) Corner anchorage support of power transmission line
CN215817991U (en) Supporting structure of flexible photovoltaic support
US4589156A (en) Support structure, particularly for a long span bridge
RU51069U1 (en) 6-10 kV CLASS ELECTRIC TRANSMISSION AIR LINE (OPTIONS)
CN211848842U (en) Stiffness skeleton invisible bent cap small box girder structure
CN104563554B (en) For the combined type lattice girder of 500kV transformer stations integrated form framework
US2998473A (en) Wall-mounted high-voltage take-off structure
US4357786A (en) Steel tower for supporting high- and very high-tension lines in electric networks
CN220685830U (en) Door type bracket
CN216713950U (en) Steel construction assembled supports bed-jig
CN214939381U (en) Bent cap template supports suspension system
CN210468574U (en) 500kV transformer substation HGIS power distribution device framework with crossed cable supporting system
CN219450400U (en) Butterfly-shaped suspension bridge
CN219499262U (en) Photovoltaic system with floating rope structure
RU220429U1 (en) Temporary mobile power line support
SU607937A1 (en) High-voltage power transmission line support
RU17790U1 (en) POWER SUPPLY LINES
RU197874U1 (en) EIGHT-MIXED INTERMEDIATE MULTI-DIMENSIONAL SUPPORT OF THE ELECTRIC TRANSMISSION LINE
CN219322037U (en) High-span power bridge
CN214090384U (en) Supporting structure for plate-shell type living building
RU2025011C1 (en) Open type transformer substation
CN219181101U (en) Bridge cantilever type cable frame structure
CN208417787U (en) A kind of steel construction cable bearer of the substation of high-stability