SU829989A1 - Method of feeding filling material behind mobile enclosure on steep seams - Google Patents

Method of feeding filling material behind mobile enclosure on steep seams Download PDF

Info

Publication number
SU829989A1
SU829989A1 SU792799373A SU2799373A SU829989A1 SU 829989 A1 SU829989 A1 SU 829989A1 SU 792799373 A SU792799373 A SU 792799373A SU 2799373 A SU2799373 A SU 2799373A SU 829989 A1 SU829989 A1 SU 829989A1
Authority
SU
USSR - Soviet Union
Prior art keywords
filling material
material behind
behind mobile
mobile enclosure
feeding filling
Prior art date
Application number
SU792799373A
Other languages
Russian (ru)
Inventor
Владимир Егорович Жуков
Original Assignee
Донецкий Научно-Исследовательскийугольный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Донецкий Научно-Исследовательскийугольный Институт filed Critical Донецкий Научно-Исследовательскийугольный Институт
Priority to SU792799373A priority Critical patent/SU829989A1/en
Application granted granted Critical
Publication of SU829989A1 publication Critical patent/SU829989A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

кладочный материал транспортируют и аккумулируют в подготовительной выработке на участке, ее длины, равном ширине зоны смещени  закладочного массива, образуемой после очередной передвижки ограждени , затем осуществл ют передвижку ограждени  и одновременно с ее - передвижкой пополн ют объем ранее аккумулированного закладочного материала.the masonry material is transported and accumulated in the preparatory development at a site of its length equal to the width of the displacement zone of the backfill array formed after the next movement of the fence, then the movement of the fence is carried out and simultaneously with it the amount of previously accumulated backfill material is shifted.

На чертеже схематически изображен подача закладочного материала за передвижное ограждение (вид в плоскос .ти пласта).The drawing schematically shows the filing of the filling material for the mobile fence (view in the plane of the layer).

Очистной забой, оснащенный передвижным ограждением 1, работает в сочетании с полной закладкой выработанного пространства до начала очередной передвижки ограждени  1 закладочного массива. Закладочный ма.териал 2 транспортируют и аккумулируют в подготовительной :: выработке . 3 на участке ее длины, равном ширине зоны смещени  закладочного массива, образуемой после очередной передвижки ограждени , затем осуществл ют передвижку ограждени  и одновременно с ее передвижкой пополн ют объем ранее аккумулированного закладочного материала. При передвижке ограждени  1 независимо от количества одновременно передвигаемых секций и пор дка их передвижки закладочный материал 2 из штрека 3 с использованием гравитационных сил перемещаетс  в выработанное пространство на величину опускани  закладочного массива, без потери контакта с последним.The cleaning face, equipped with a mobile fence 1, works in conjunction with the complete laying of the goaf before the next shift of the fence 1 of the backfill array. The stowage material 2 is transported and accumulated in the preparatory :: development. 3, in a section of its length equal to the width of the zone of displacement of the backfill array formed after the next relocation of the fence, then the relocation of the fencing is carried out and at the same time as it moves, replenish the volume of previously accumulated backfill material. When moving the fence 1, regardless of the number of simultaneously moved sections and the order of their movement, the stowage material 2 from the drift 3 with the use of gravitational forces moves into the developed space by the amount of lowering of the stowing mass, without losing contact with the latter.

Способ осуществл етс  следующим образом.The method is carried out as follows.

На вентил ционном штреке на наиболее допустимой высоте располагают например, пневмозакладочный трубопровод 4 с боковыми выпусками закладочного материала, направленными под некоторым углом в сторону выработанного пространства. Длина трубопровода с боковыми выпусками определ етс  шириной зоны, оконтуренной линией устойчивого откоса закладочного материала 5 и линией положени  ограждени  1. Перед началом перемещени  ограждени  материал транспортируют при помощи сжатого воздуха, и путем последовательного включени  боковых выпусков аккумулируют (накопл ют) закладочный материал 2 на участке штрека. По мере опускани  материала его объем пополн етс  таким образом, чтобы не допустить образовани  обнажений боковых пород.On the ventilation drift at the most permissible height, for example, a pneumatic folding pipe 4 is disposed with side outlets of the backfill material directed at an angle towards the developed space. The length of the pipeline with side outlets is determined by the width of the zone, the contour line of the stable slope of the filling material 5 and the position line of the fence 1. Before the beginning of the movement of the fence, the material is transported using compressed air, and by successive switching on the side outlets the filling material 2 accumulates (accumulates) drift. As the material is lowered, its volume is replenished so as to prevent the formation of outcrops of lateral rocks.

Применение предлагаемого способа подачи закладочного материала позвол ет эффективно отрабатывать крутые пласты под охран емыми поверхностными объектами при помощи передвижных ограходений механизированных крепей и щитовых агрегатов в сочетании с полной заклсщкой выработанного пространства, а также решать вопрос утилизации породы от проведени  и ремонта выработок в очистных забо х оснащенных подобным оборудованием.The application of the proposed method for feeding backfill material allows for the efficient development of steep seams under protected surface objects with the help of mobile enclosures of mechanized roof supports and panel board units in combination with a complete sealing of the developed space, as well as to solve the problem of rock utilization from the construction and repair of workings in cleaning pits equipped with similar equipment.

Claims (2)

1.Трофимов В.П. Безлюдна  выемка. Киев, Техника, 1969. с. 44-45.1. Trofimov V.P. Deserted recess. Kiev, Technique, 1969. p. 44-45. 2.Добровольский В.В. и др. Закладка выработанного пространства при механизированной выемке тонких и средней мощности пластов угл .2. Dobrovolsky V.V. and others. Laying out of the open space during mechanized excavation of thin and medium thickness seams of coal. 5м., Недра, 1967, с. 19-21 (прототип ) .5m., Nedra, 1967, p. 19-21 (prototype). / .. -: V -.. . .. :-,. , / .. -: V - ... ..: - ,. , /-л--: -.--:/---;: - :/;/ -l--: -.--: / --- ;: -: /; .-.,--;;::f.-., - ;; :: f :.:;-.Л-.-дл; -:--:---:.и;:.:; - .L-.- dl; -:--:---:.and; :..: .. й:г Л;; --;;;:-V:; ,,:..:.-- -Л . - .:.: .- - А. . y: g L ;; - ;;: - V :; ,,: ..: .-- -L. - .:.: .- - BUT. . .. . ,,-, ,.. ,, -,, - :V-,-. -: V -, -. .4 --aV- itL.4 --aV- itL . .- ../. .vv. . .- ../. .vv. //////////////////////////////////////////// 7///////// 17 ///////// 1 . - :.. -:.
SU792799373A 1979-07-18 1979-07-18 Method of feeding filling material behind mobile enclosure on steep seams SU829989A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792799373A SU829989A1 (en) 1979-07-18 1979-07-18 Method of feeding filling material behind mobile enclosure on steep seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792799373A SU829989A1 (en) 1979-07-18 1979-07-18 Method of feeding filling material behind mobile enclosure on steep seams

Publications (1)

Publication Number Publication Date
SU829989A1 true SU829989A1 (en) 1981-05-15

Family

ID=20841975

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792799373A SU829989A1 (en) 1979-07-18 1979-07-18 Method of feeding filling material behind mobile enclosure on steep seams

Country Status (1)

Country Link
SU (1) SU829989A1 (en)

Similar Documents

Publication Publication Date Title
CN104131829B (en) A kind of solid filling coal mining hydraulic supporting building and withdrawing frame method
RU2635927C1 (en) Method of laying open face with eolian sand in shallow coal seam in western desert mining areas
WO2020098089A1 (en) Filling mining method for fully mechanized top coal caving working face
US5194689A (en) Earth excavation using blast casting and excavating apparatus
AU2018308953A1 (en) Zero-gangue-discharge short-wall face pillar-free mining method
US5180251A (en) Underground protection underneath a dump
SU829989A1 (en) Method of feeding filling material behind mobile enclosure on steep seams
GB2224053A (en) Mining method
CN212225213U (en) Inclined shaft construction equipment
RU2137922C1 (en) Method for optimal orientation of stoping operations
RU2091583C1 (en) Method of mining of mineral upper horizons
CN214660340U (en) Underground roadway type filling gangue tamping device
SU625059A1 (en) Method of conducting filling-up work
CN118208235A (en) Method for mining corner coal and three next-upper pressed coals by filling without coal pillar
SU838096A1 (en) Method of vibration compacting of filling area
SU1656124A1 (en) Method for mining thick steeply deeping coal seam with stowing
SU727863A1 (en) Mobile power-operated form
SU691578A1 (en) Method of filling a space after mining
SU883521A1 (en) Method of erecting filling-in strips while mining sloping mineral beds
Steinbock these results, correction factors are provided to account for near face effects if a simplified two dimensional approach is used. Effects of anisotropy are discussed.
CN115788437A (en) High-filling-degree hybrid filling mining method for coal mining
RU96117864A (en) METHOD OF UNDERGROUND MINING OF USEFUL FOSSIL
SU941631A1 (en) Method of filling-up excavated space
SU1665039A1 (en) Method of roof adjustment for driving steep bed
SU1460272A1 (en) Method of chamber mining of mineral with filling-up of excavated space