Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я М-5473filedCriticalПредприятие П/Я М-5473
Priority to SU782692617ApriorityCriticalpatent/SU818981A1/en
Application grantedgrantedCritical
Publication of SU818981A1publicationCriticalpatent/SU818981A1/en
бой 7 и гайкой 8. Демонтаж производитс в обратном пор дке.Battle 7 and nut 8. Disassembly is performed in reverse order.
Подобным сразом устанавливаютс остальные скобы через определенный шаг. Шаг креплени скоб на цепи зависит от ширины (длины) рабочих органов.Similarly, the remaining brackets are installed through a specific step. The pitch of mounting brackets on the chain depends on the width (length) of the working bodies.
Claims (2)
1.Авторское свидетельство СССР № 243484, кл. В 65G 19/24, 1966.1. USSR Author's Certificate No. 243484, cl. In 65G 19/24, 1966.2.Авторское свидетельство СССР № 384753, кл. В 65G 17/00, 1970.2. USSR author's certificate number 384753, cl. In 65G 17/00, 1970.Фиг.FIG.
SU782692617A1978-12-061978-12-06Conveying member of conveyer
SU818981A1
(en)