SU815111A1 - Method of transverse shifting of heavy loads - Google Patents

Method of transverse shifting of heavy loads Download PDF

Info

Publication number
SU815111A1
SU815111A1 SU792759932A SU2759932A SU815111A1 SU 815111 A1 SU815111 A1 SU 815111A1 SU 792759932 A SU792759932 A SU 792759932A SU 2759932 A SU2759932 A SU 2759932A SU 815111 A1 SU815111 A1 SU 815111A1
Authority
SU
USSR - Soviet Union
Prior art keywords
bridge
span
jacks
heavy loads
support
Prior art date
Application number
SU792759932A
Other languages
Russian (ru)
Inventor
Лев Борисович Шапиро
Герман Евгеньевич Зоткин
Original Assignee
Специальное Конструкторское Бюроглавмостостроя Министерства Транспорт-Ного Строительства Cccp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Специальное Конструкторское Бюроглавмостостроя Министерства Транспорт-Ного Строительства Cccp filed Critical Специальное Конструкторское Бюроглавмостостроя Министерства Транспорт-Ного Строительства Cccp
Priority to SU792759932A priority Critical patent/SU815111A1/en
Application granted granted Critical
Publication of SU815111A1 publication Critical patent/SU815111A1/en

Links

Description

1one

Изобретение относитс  к мосто- строению и может быть использовано преимущественно дл  поперечной передвижки пролетных строений моста при установке их на опорные части.The invention relates to bridge construction and can be used primarily for transverse movement of bridge span structures when installed on supporting parts.

Известен способ поперечной передвижки пролетного строени  моста, включающий устройствоооковых упоров на ригеле опоры, размещение между упорами и пролетным, строением горизонтально установленных гидравлических домкратов и циклическое перемещение ими пролетного строени  ЩThe known method of transverse shifting of the bridge span, including the installation of the lateral stops on the support bolt, the placement between the stops and the span, the structure of horizontally installed hydraulic jacks and their cyclic movement of the span structure

Недостаток известного способа заключаетс  в значительной трудоемкости поперечной передвижки вследствие необходимости устройства воспринимать значительное давление боковых упоров.The disadvantage of this method lies in the considerable labor intensity of the transverse advancing due to the need of the device to absorb the significant pressure of the side stops.

Наиболее близким к изобретению по технической сущности  вл етс  способ поперечной передвижки т желых грузов, преимущественно пролетных строений моста при установке их на опорные части, включающий установку батареи гидравлических домкратов на опору моста под домкратную балку и циклический подъем и перемещение пролетного строени , причем перед началом очередного цикла между домкратной балкой и домкратом устанавливают клиновидные колодки и между колодками размещают катки 2j .The closest to the invention to the technical essence is the method of transverse movement of heavy loads, mainly bridge span structures, when installed on supporting parts, including the installation of a battery of hydraulic jacks on a bridge support under the jack beam and cyclic lifting and moving of the span structure, and Cycle between jack beam and jack set wedge-shaped pads and placed between the pads rollers 2j.

Недостаток этого способа также заключаетс  в значительной трудоемкости операций по передвижке ввиду необходимости устройства клиновидт ных колодок с точной пригонкой их по месту и закреплением части из них на The disadvantage of this method also lies in the considerable labor-intensiveness of the shifting operations due to the need to arrange the wedge-shaped shoes with their exact fit in place and securing some of them to

0 пролетном строении, а также в необ- , ходимости размещени  между колодками катков.0 spans, as well as the need for placement between the pads of the rollers.

Цель изобретени  - уменьшение трудоемкости операций по передвижке.The purpose of the invention is to reduce the labor intensity of shifting operations.

5five

Указанна  цель достигаетс  тем, что в способе поперечной передвижки т желых грузов, преимущественно пролетны .. строений моста при установке их на опорные части, включающем установку батареи гидравлических домкратов на опору моста под домкратную балку и циклический подъем и перемещение пролетного строени ,This goal is achieved by the fact that in the method of transverse shifting of heavy loads, predominantly flying structures of the bridge when installed on supporting parts, including the installation of a battery of hydraulic jacks on the bridge support under the jack beam and the cyclic lifting and moving of the span,

перед началом очередного цикла между верхними опорными гран ми домкратов и домкратной балкой, нижними опорными гран ми домкратов и опорой моста размещают кососимметрично с эксцентриситетом относительно вертикальной оси каждого из домкратов опорные листы.Before the beginning of the next cycle between the upper bearing edges of the jacks and the jack beam, the lower bearing faces of the jacks and the bridge support are placed skew-symmetrical with eccentricity about the vertical axis of each of the jacks, the supporting sheets.

На . 1 изображен мост у опоры перед очередным циклом передвижки, поперечное сечение/ на фиг. 2 - гидравлический домкрат с эксцентрично установленными опорными листами перед началом очередного цикла передвижки; на фиг. 3 - то же, в момент передвижки.On . 1 shows the bridge at the support before the next shifting cycle, cross section / in FIG. 2 - hydraulic jack with eccentrically mounted support sheets before the beginning of the next shifting cycle; in fig. 3 - the same at the time of shifting.

Способ поперечной передвижки пролетного строени  1 моста при установке его на опорные части 2 включает установку батареи гидравлических домкратов 3 на опору 4 моста под домкратную балку 5 и циклический подъем и перемещение пролетного строени , причем гидравлические домкраты 3 перед началом очередного цикла устанавливают в вертикальное положение, а между их верхними опорными гран ми и домкратной балкой 5, нижними опорными гран ми и опорой 4 моста размещают кососимметрично с эксцентриситетом е (фиг. 2) относительно вертикальной оси каждого из домкратов опорные листы, соответственно б и 7. Величина эксцентриситета е зависит от величины необходимого смещени  пролетного строени  и принимаетс  обычно равно 30-50 мм.The method of transverse shifting of the bridge span 1 when installing it on the support parts 2 involves installing a battery of hydraulic jacks 3 on the bridge support 4 under the jack 5 and cyclically lifting and moving the span bridge, with the hydraulic jacks 3 being set to the vertical position and between their upper bearing edges and the jack beam 5, the lower bearing edges and the bridge support 4 are placed antisymmetrically with eccentricity e (Fig. 2) with respect to the vertical axis of each The supporting sheets of the jacks, respectively, b and 7. The magnitude of the eccentricity e depends on the magnitude of the required displacement of the span and is usually 30-50 mm.

Перед началом передвижки опорные части 2 временно закрепл ют на пролетном строении 1 посредством верхних балансиров 8.Before the beginning of the advancement, the support parts 2 are temporarily fixed on the superstructure 1 by means of upper balancers 8.

При подъеме пролетного строени  домкратами в момент отрыва пролетного строени  от опоры домкраты 3, обединенные в батарею, получают наклонWhen jacks are lifted by the jacks at the moment when the span is detached from the support, the jacks 3 connected to the battery get a slope

в результате чего происходит перемещение конца пролетного строени ; при этом нижние балансиры опорных частей 2 скольз т, например, по слою сухого цемента, уложенного на опоре . После окончани  цикла передвижки домкраты 3 освобождают, устанавливают опорные листы 6, 7 с эксцентриситетом е и начинают следующий цикл передвижки.resulting in movement of the end of the span; while the lower balancers of the supporting parts 2 slide, for example, over a layer of dry cement laid on a support. After completion of the shifting cycle, the jacks 3 are released, set the supporting sheets 6, 7 with eccentricity e and begin the next shifting cycle.

Claims (2)

1.Кручинкин А.В. и др. монтаж стальных пролетных строений мостов М., Транспорт, 1978, с. 122.1. Kruchinkin A.V. et al. Installation of steel span structures for bridges, M., Transport, 1978, p. 122. 2.Авторское свидетельство СССР 461197, кл. Е 01 О 21/00, 1972.2. Authors certificate of the USSR 461197, cl. E 01 O 21/00, 1972. // х4x4 t3utZt3utZ .d.d
SU792759932A 1979-05-03 1979-05-03 Method of transverse shifting of heavy loads SU815111A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792759932A SU815111A1 (en) 1979-05-03 1979-05-03 Method of transverse shifting of heavy loads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792759932A SU815111A1 (en) 1979-05-03 1979-05-03 Method of transverse shifting of heavy loads

Publications (1)

Publication Number Publication Date
SU815111A1 true SU815111A1 (en) 1981-03-23

Family

ID=20825040

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792759932A SU815111A1 (en) 1979-05-03 1979-05-03 Method of transverse shifting of heavy loads

Country Status (1)

Country Link
SU (1) SU815111A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2556766C1 (en) * 2014-07-17 2015-07-20 Общество с ограниченной ответственностью "НПП СК МОСТ" Bridge reconstruction method using transverse relocation of existing reinforced-concrete solid superstructure
RU2557020C1 (en) * 2014-07-17 2015-07-20 Общество с ограниченной ответственностью "НПП СК МОСТ" Method for transverse relocation of bridge superstructure for extended collar beam
CN109629443A (en) * 2019-01-15 2019-04-16 中铁局集团有限公司 Cast-in-place trough girder bikini pushing tow system and construction method across existing road

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2556766C1 (en) * 2014-07-17 2015-07-20 Общество с ограниченной ответственностью "НПП СК МОСТ" Bridge reconstruction method using transverse relocation of existing reinforced-concrete solid superstructure
RU2557020C1 (en) * 2014-07-17 2015-07-20 Общество с ограниченной ответственностью "НПП СК МОСТ" Method for transverse relocation of bridge superstructure for extended collar beam
CN109629443A (en) * 2019-01-15 2019-04-16 中铁局集团有限公司 Cast-in-place trough girder bikini pushing tow system and construction method across existing road

Similar Documents

Publication Publication Date Title
CN102080356B (en) Box girder positioning temporary supporting seat and positioning construction method of box girder
RU2381326C1 (en) Device for lifting and erecting units of superstructure
CN110886233A (en) Construction method for connecting T-shaped beam with bridge
CN103030070B (en) A kind of can the transfer crane of traveling and operation on ramp
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN206668276U (en) Arch device is changed in the movement that a kind of tunnel initial support invades limit section
SU815111A1 (en) Method of transverse shifting of heavy loads
CN109629449B (en) Mounting and positioning support and alignment method for steel-concrete combined section of arch foot of steel box arch bridge
CN206095814U (en) Monospar static test loading system
CN113215991B (en) Rapid steel box girder erection device and construction method thereof
US4970773A (en) Method of and apparatus for locating operational surfaces on a track electromagnetically levitated vehicles
CN202954289U (en) Pier bottom arrangement structure for pushing continuous rigid framework bridge for springing after midspan closure
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
CN106677076A (en) Simple and rapid method and device for mounting box girder at the top of adjacent bent cap by using span pier gantry crane
CN208379448U (en) A kind of twin beams Bridge Erector with balance support
CN115262304A (en) Auxiliary tool for replacing anchor rod of small-space track beam and anchor rod replacing method
CN206683961U (en) A kind of concrete prefabricated element structural clays device
JPH11222819A (en) Execution method of elevated structure using building girder
CN115305835A (en) Construction method for erecting double-section whole-section steel truss girder by using girder erection crane
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN212052371U (en) Hanging basket device for variable width concrete box girder suspension casting construction
CN102535532A (en) Anchor rib-steel beam combined counter-force device
CN104213512B (en) Fortune frame railway D beam one chassis and D beam installation method
JPH03241200A (en) Method and device for setting precast board for tunnel
CN209493829U (en) The hydraulic combined trestle of large span inverted arch construction