SU80559A1 - Mounting boom mast crane - Google Patents

Mounting boom mast crane

Info

Publication number
SU80559A1
SU80559A1 SU4018A SU358772A SU80559A1 SU 80559 A1 SU80559 A1 SU 80559A1 SU 4018 A SU4018 A SU 4018A SU 358772 A SU358772 A SU 358772A SU 80559 A1 SU80559 A1 SU 80559A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mast
crane
boom mast
mast crane
mounting boom
Prior art date
Application number
SU4018A
Other languages
Russian (ru)
Inventor
Е.Ш. Каминский
Original Assignee
Е.Ш. Каминский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Е.Ш. Каминский filed Critical Е.Ш. Каминский
Priority to SU4018A priority Critical patent/SU80559A1/en
Application granted granted Critical
Publication of SU80559A1 publication Critical patent/SU80559A1/en

Links

Landscapes

  • Jib Cranes (AREA)

Description

Известны стреловые мачтовые краны дл  строительных работ, опирающихс  на возводимое сооружение, поднимающие при помощи лебедок и ползущей по мачте трубчатой обоймы, служащей направл ющей дл  мачты и снабженной опорным элементом.Jib mast cranes for construction work are known, which are supported by the erected structure, lifting with the help of winches and a tubular yoke crawling along the mast, which serves as a guide for the mast and provided with a support member.

Эти краны исключают возможность применени  их дл  посекционного наращивани  металлических конструкций возводимых сооружений .These cranes exclude the possibility of using them for sectional build-up of metal structures of erected structures.

Описываемый монтажный кран не имеет указанных недостатков.The described installation crane does not have the indicated disadvantages.

На чертежах изображено: фиг. 1 - кран, опирающийс  на секции металлоконструкций, вид сбоку; фиг. 2 - то же вид с торца. На фиг. 3 разрез по ББ на фиг. 1; на фиг. 4 разрез но АА на фиг. 1.The drawings show: FIG. 1 - crane, supported on the section of metal structures, side view; FIG. 2 - the same end view. FIG. 3 a section along BB in FIG. one; in fig. 4 is a section but AA in FIG. one.

Трубчата  обойма 1 крана (фиг. 1-4) имеет на концах ригели 2 с хомутами 3 к 4, вращающимис  вокруг горизонтальной оси. При помощи хомутов 3 и 4 кран крепитс  к рещетке установленной секции колонны.The tubular ferrule 1 of the crane (Figs. 1-4) has girders 2 at the ends with 3 to 4 clamps rotating around a horizontal axis. Using clamps 3 and 4, the valve is attached to the grille of an installed column section.

На верхнем и нижнем концах обоймы / имеютс  кронштейны с трубчатыми ос ми. К оси верхнего кронштейна крепитс  трос 6 дл  перемещени  обоймы на следующую секцию, а к оси нижнего кронщтейна - неподвижный блок 7 полиспаста дл  перемещени  мачты 8.Brackets with tubular axles are provided at the upper and lower ends of the yoke /. To the axis of the upper bracket, the cable 6 is attached to move the yoke to the next section, and to the axis of the lower bracket - the fixed block 7 of the tackle for moving the mast 8.

Мачта 8 на нижнем конце имеет горизонтальный ригель 9 с двум  хомутами W, которые присоедин ютс  к опорным столикам колонны 5. Хомуты 10 служат дл  передачи вертикальной реакции крана на колонну 5 во врем  перемещени  обоймы на следующую секцию.The mast 8 at the lower end has a horizontal bolt 9 with two W clamps, which are attached to the supporting tables of the column 5. The clamps 10 serve to transmit a vertical crane response to the column 5 during the movement of the yoke to the next section.

Во врем  перемещени  обоймы верхн   часть мачты удерживаетс  в вертикальном положении двум  распорками 11, прикрепленными одним концом к мачте 8, а другим к фланцам колонны 5. Мачта 8 заканчиваетс  трубой, на которую надета укосина 12, служаща  дл  подъема секции. В укосину вмонтированы два ролика 14, служащие дл  пропуска ходовой нитки 15 полиспаста в середину мачты и далее к лебедке на земле.During the movement of the cage, the upper part of the mast is held in a vertical position by two spacers 11, attached at one end to the mast 8, and the other to the flanges of the column 5. The mast 8 ends with a pipe on which a boom 12 is attached, which serves to lift the section. Two rollers 14 are mounted in the lug, serving to skip the spider 15 in the center of the mast and further to the winch on the ground.

К верхней части мачты под поворотным кругом 16 прикреплен кронштейн, па котором размещены отводные ролики 17 тросов 18 поiM/U u Фиг.1To the upper part of the mast, under the turntable 16, is attached a bracket, along which the diverting rollers 17 of the cables 18 are mounted. IM / U u FIG. 1

Фиг.ЗFig.Z

фуг. fug.

SU4018A 1947-08-25 1947-08-25 Mounting boom mast crane SU80559A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4018A SU80559A1 (en) 1947-08-25 1947-08-25 Mounting boom mast crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4018A SU80559A1 (en) 1947-08-25 1947-08-25 Mounting boom mast crane

Publications (1)

Publication Number Publication Date
SU80559A1 true SU80559A1 (en) 1948-11-30

Family

ID=48254197

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4018A SU80559A1 (en) 1947-08-25 1947-08-25 Mounting boom mast crane

Country Status (1)

Country Link
SU (1) SU80559A1 (en)

Similar Documents

Publication Publication Date Title
US3923163A (en) Crane
US3198345A (en) Crane
US3861498A (en) Counterbalancing chassis for aerial platform apparatus
US3127996A (en) Climbing cranes
US4027441A (en) Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
US3148778A (en) Stiff leg derrick
US1864934A (en) Derrick scaffold
SU80559A1 (en) Mounting boom mast crane
US2621820A (en) Hoist
US3034661A (en) Beam jib and crane assembly
US2391440A (en) Crane boom suspension
US2335522A (en) Factory jib crane
US2858945A (en) Pivoting and hoisting arrangement for the distributing assembly of a tower crane
JPH0253356B2 (en)
SU838086A1 (en) Water tower
SU1049415A1 (en) Tower crane
SU568590A1 (en) Load lifting device
SU60227A1 (en) Jib crane for construction jobs with swing arm
CN211569923U (en) Derrick mast hoisting equipment for large-scale component
SU1388382A1 (en) Tower crane
SU912626A1 (en) Tower crane for construction, installation and concreting operations
SU100342A1 (en) Construction crane
SU765490A1 (en) Arrangement for erecting tower structures
SU413108A1 (en)
SU573436A1 (en) Cargo-lifting tower crane for operation at successively rising levels