SU739235A1 - Method of stripping deep quarries - Google Patents
Method of stripping deep quarriesInfo
- Publication number
- SU739235A1 SU739235A1 SU782619630A SU2619630A SU739235A1 SU 739235 A1 SU739235 A1 SU 739235A1 SU 782619630 A SU782619630 A SU 782619630A SU 2619630 A SU2619630 A SU 2619630A SU 739235 A1 SU739235 A1 SU 739235A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- stripping
- quarries
- deep quarries
- point
- deep
- Prior art date
Links
Landscapes
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
Description
Изобретение относитс к горной промышленности и может быть использовано при вскрытии глубоких карьеров .The invention relates to the mining industry and can be used in the opening of deep quarries.
Известен способ вскрыти карьеров , при котором конвейеры дл транспортировани горной массы устанавливают на нерабочем и рабочем бортах карьера с последующим наращиванием конвейеров 1.There is a known method of opening quarries, in which conveyors for transporting rock mass are installed on the non-working and working sides of the quarry with the subsequent buildup of conveyors 1.
Известен также, способ вскрыти глубоких карьеров, включающий проведение наклонного ствола, его углубку по мере понижени горных работ и проведение кверилагов от ствола на концентрационные горизонты карьера 2 ,There is also known a method of opening deep quarries, including carrying out an inclined shaft, deepening it as the mining operations go down and carrying out querilages from the trunk to concentration horizons of open pit 2,
Однако данные способы характеризуютс значительным, рассто нием транспортировани горной массы до перегрузочных пунктов, что снижает эффективность ведени горных работ,However, these methods are characterized by a considerable distance of transportation of the rock mass to transshipment points, which reduces the efficiency of mining operations,
Целью насто щего изобретени вл етс устранение указанного недостатка .The purpose of the present invention is to eliminate this drawback.
Поставленна цель достигаетс тем, что при понижении горных работ относительно квершлага от усть последнего по борту карьера проход тThe goal is achieved by the fact that when mining operations are lowered relative to the cross-section from the mouth of the latter,
крутую траншею с сооружением дополнительного концентрационного горизонта и размещают в траншее переносной конвейер, св зывающий квершлаг с перегрузочным пунктом на дополнительном концентрационном горизонте .A steep trench with the construction of an additional concentration horizon and a portable conveyor belt is placed in the trench, connecting the crosscut with the transshipment point on the additional concentration horizon.
На фиг. 1 - поперечный разрез карьера; на фиг. 2 - вид :сверху.FIG. 1 - cross section of a pit; in fig. 2 - view: from above.
oo
Способ заключаетс в следующем. Проход т наклонный ствол 1;и квер- шлаг 2, в котором размещают перегрузочный пункт 3. При понижении гор5 ных работ относительно квершлага 2 по борту карьера от усть квершлага проход т крутую траншею 4, в которой устанавливают переносной конвейер 5, и отрабатывают дополнитель0 ный концентрационный горизонт 6. Перегрузочный пункт перемещают в пункт 7. Одновременно с этими работами углубл ют наклонный ctBon 1 и проход т кваршлаг 8 с установлен5 ным в его устье перегрузочным пунктом 9.. Затем проход т крутую траншею 10,..в которую перемещают конвейер 5, св зывающий перегару в очный пункт 9 с перегруз,очным пунктом 11The method is as follows. An inclined shaft 1 passes; and a jug 2, in which transshipment point 3 is placed. When mining works lower relative to junction 2, a steep trench 4 is installed along the pit from the mouth of the jib and 4, where a portable conveyor 5 is installed, concentration horizon 6. The transfer point is moved to point 7. Simultaneously with these works, the inclined ctBon 1 is deepened and the quarter gate 8 passes with the transfer point 9 installed at its mouth. Then a steep trench 10 is passed ... into which the conveyor is moved ep 5 connecting fume on-site point 9 with overload, on-site point 11
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782619630A SU739235A1 (en) | 1978-05-23 | 1978-05-23 | Method of stripping deep quarries |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782619630A SU739235A1 (en) | 1978-05-23 | 1978-05-23 | Method of stripping deep quarries |
Publications (1)
Publication Number | Publication Date |
---|---|
SU739235A1 true SU739235A1 (en) | 1980-06-05 |
Family
ID=20766317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU782619630A SU739235A1 (en) | 1978-05-23 | 1978-05-23 | Method of stripping deep quarries |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU739235A1 (en) |
-
1978
- 1978-05-23 SU SU782619630A patent/SU739235A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU739235A1 (en) | Method of stripping deep quarries | |
GB1532923A (en) | Mineral-mining installations for underground workings | |
FR2433097A1 (en) | PLANER FELLING INSTALLATION EQUIPPED WITH A CURVILINE PROFILE CONVEYOR WITH RETURNING STATION | |
SU717335A1 (en) | Method of stripping mineral fields at open-cast mining | |
SU516820A1 (en) | The way the open development of mineral deposits | |
SU641100A1 (en) | Method of open-pit mining of mineral deposits | |
SU1756567A1 (en) | Method for mineral opencast mining | |
SU659747A1 (en) | Method of mineral deposit opening | |
SU1642011A1 (en) | Method of mining steep coal seams | |
US1915411A (en) | Mining method | |
SU699181A1 (en) | Method of internal dump formation | |
Eng et al. | Aggregates: sand, gravel and crushed rock aggregates for construction purposes | |
SU729349A1 (en) | Method of open-cut mining of mineral deposits | |
SU635248A1 (en) | Method of developing and mining formation of thin steep seams disposed to sudden outbursts or rock burst shocks | |
SU1624160A1 (en) | Method of mining sloping mineral bed deposits | |
RU2005181C1 (en) | Process of combined development of deposit of mineral resources | |
SU806865A1 (en) | Stripping work conducting method | |
RU2096617C1 (en) | Method for development of mineral deposits | |
SU694639A1 (en) | Method of the open mining of minerals | |
SU1700248A1 (en) | Method of mineral opencast mining | |
SU1021782A1 (en) | Method of open-cast mining of mineral deposits | |
SU1705574A1 (en) | Method of opencast mining of steep deposits | |
SU783475A1 (en) | Conveyer mining method | |
SU937723A1 (en) | Method of working thin gently sloping and sloping seams | |
SU605000A1 (en) | Method of bypassing rock from quarry steps |