SU726269A1 - Jig for setting anchor bolts into foundation - Google Patents

Jig for setting anchor bolts into foundation Download PDF

Info

Publication number
SU726269A1
SU726269A1 SU742003371A SU2003371A SU726269A1 SU 726269 A1 SU726269 A1 SU 726269A1 SU 742003371 A SU742003371 A SU 742003371A SU 2003371 A SU2003371 A SU 2003371A SU 726269 A1 SU726269 A1 SU 726269A1
Authority
SU
USSR - Soviet Union
Prior art keywords
anchor bolts
foundation
conductor
jig
guides
Prior art date
Application number
SU742003371A
Other languages
Russian (ru)
Inventor
Всеволод Семенович Софронов
Original Assignee
Sofronov Vsevolod S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sofronov Vsevolod S filed Critical Sofronov Vsevolod S
Priority to SU742003371A priority Critical patent/SU726269A1/en
Application granted granted Critical
Publication of SU726269A1 publication Critical patent/SU726269A1/en

Links

Landscapes

  • Foundations (AREA)

Description

с Ш| й5онтальнйми направл ющими 3 пбсрёдствЬм регулируемых винтов 4, фиксируюдае приспособлени.  5, св занные с горизонтальными направл ющими хомутами б и снабженные пл анками 7 под анкерные болты 8,К:оторые закрепл ютс  в них с помощью гаек 9. .В нижней части опорной рамы выполнены отверсти  10, предназначенные дл  закреплени  анкерных болтов по их нижней части.with sh | The tonal guides are 3 adjustable brakes for adjustable screws 4, fixed by fixtures. 5, connected to the horizontal guide clamps b and fitted with anchoring bolts 7 for the bolts 8, K: which are fixed in them with the help of nuts 9. In the lower part of the support frame there are holes 10 for fixing the anchor bolts along their lower parts.

Кондуктор монтируют по рхеме, составл емэй на каждый фундамент, по которой определ ют необходима количество анкерных болтов и фиксирующих приспособлений.The conductor is mounted on a pkheme, they are made on each foundation, according to which the number of anchor bolts and fixing devices is necessary.

Перед монтажом опорную раму кондуктора вместе с вертикальными стойками и горйзбйтальнымй направл ющими устанавливают на опалубке 11 фундамента и закрепл ют с )щьюструбцин 12 с винтами 13 и жёстко прикрепленных площадок 14. После закреплени  опорной рамы на опалубке на гбрИ:з6-нталЁ ае н-апр:авл ющие устанавливают необходимое количество фиксируюмих приспособлений и анкерных болтов с планками. Путем взаимно -перпе-ндикул рного перемещени  фи.ксирующий приспособлений ад-Ш ГЭО-йталь-HbiM нап1 айл юШмйпланб{с tf аМкерными болтами по фиксируюгцим приспособлени мустанавливают заданное взаимное распбложение айкерных бойт бв и зат гивают гайки 9, обеспечива  этим жесткую фиксацию анкерных Волтов и исключа  их смещение в процессе бетонировани  фундамента. Установка и фиксаци  анкерных болтов по высоте фундамента обеспечиваетс  с помбщью регулируемых винтов и контргаек 15. Before mounting, the support frame of the conductor together with the vertical uprights and the horizontal guides are mounted on the foundation formwork 11 and fixed with a tool 12 with screws 13 and rigidly attached pads 14. After fixing the support frame on the formwork on the bridge: A6 : The drivers install the required number of fixtures and anchor bolts with slats. By mutually moving the fic-axial device ad-SH GEO-Ytal-HbiM First1 YSchMyPlan {with tf amker bolts on a fixed attachment fixes the specified mutual unbundling of Eiker boyts and tightening the 5, I get the 5, I get 5, I get 5, I have to go to the 5, I have to go to the lines, I have to go to the 5, I have to go to the 5, I’m not going to put the rest on my way. and excluding their displacement in the process of concreting the foundation. The installation and fixation of anchor bolts along the height of the foundation is provided with adjustable screws and lock nuts 15.

После забетонировани  нкерных болтов элементы кондуктора освобождаютс , опорна  рама снимаетс  и переноситс  на другой фундамент.After the concrete bolts are concreted, the elements of the conductor are released, the support frame is removed and transferred to another foundation.

Claims (2)

Предлагаемый кондуктор многократного использовани  обеспечивает высокую точность .установки и надежную фиксацию анкерных болтов при бетонировании- . :Формула изобретени The proposed reusable conductor provides high precision. Installations and reliable fixation of anchor bolts during concreting. : Invention Formula Кондуктор дл  установки анкерных болтов в фундамент, включающий стойки, соёдинейные с ними горизонтальные направл ющие с установленными на них фиксирующими приспособлени ми анкерных болтов, отличающий с   тем, что, с целью обеспечени  возможности многократного использовани  кондуктора и расширени  его техно югических возможностей он снабжен опорной рамой с крепежными элементами, с которой жестко св заны стойки, причем последние соединены с горизонтальными, направл ющими посредством регулируемых винтов, а фиксирующие приспособлени  выполнены в виде расположенных перпендикул рно направл ющим и св занных с ними хомутами Поперечин с установленными на них с возможностью перемещени  планкми под анкерные болты. . . Источники информации, прин тие во внимание при экспертизеA conductor for installing anchor bolts in the foundation, including racks, connecting them with horizontal guides with fixing devices of anchor bolts mounted on them, characterized in that, in order to ensure the reusable use of the conductor and the expansion of its technical capabilities, it is equipped with a support frame with fasteners, with which the stands are rigidly connected, the latter being connected to horizontal ones by means of adjustable screws, and the fixing members are adapted and made in the form of perpendicular guides and associated collars Cross-pieces with mounted on them with the ability to move the planks under the anchor bolts. . . Sources of information taken into account in the examination , 1. Бел ев А.В. и др. Монтаж сбор, 1. Belev A.V. and others. Installation fee Высша  школаHigher School ных конструкций. М,, 1970, с. -229.constructions M ,, 1970, p. -229. 2. Монтаж оборудовани  и трубопроводов , Реферативна  информаци  о передовом опыте, сери  1 ЦБТИ, 1969, с. 8-11. . . .2. Installation of equipment and pipelines, Reference information on best practices, series 1 TsBTI, 1969, p. 8-11. . . . 4- J154- J15 тt
SU742003371A 1974-03-01 1974-03-01 Jig for setting anchor bolts into foundation SU726269A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU742003371A SU726269A1 (en) 1974-03-01 1974-03-01 Jig for setting anchor bolts into foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU742003371A SU726269A1 (en) 1974-03-01 1974-03-01 Jig for setting anchor bolts into foundation

Publications (1)

Publication Number Publication Date
SU726269A1 true SU726269A1 (en) 1980-04-05

Family

ID=20578015

Family Applications (1)

Application Number Title Priority Date Filing Date
SU742003371A SU726269A1 (en) 1974-03-01 1974-03-01 Jig for setting anchor bolts into foundation

Country Status (1)

Country Link
SU (1) SU726269A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953394A (en) * 2011-08-24 2013-03-06 同济大学 Precise foundation bolt positioning device
WO2017044541A1 (en) * 2015-09-10 2017-03-16 Laliberte Gerald A Anchor device positioning and plumbing tool and methods related thereto
CN107268666A (en) * 2017-07-27 2017-10-20 山东莱钢建设有限公司 A kind of localization method of auxiliary locator and foundation bolt

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953394A (en) * 2011-08-24 2013-03-06 同济大学 Precise foundation bolt positioning device
CN102953394B (en) * 2011-08-24 2015-02-18 同济大学 Precise foundation bolt positioning device
WO2017044541A1 (en) * 2015-09-10 2017-03-16 Laliberte Gerald A Anchor device positioning and plumbing tool and methods related thereto
CN107268666A (en) * 2017-07-27 2017-10-20 山东莱钢建设有限公司 A kind of localization method of auxiliary locator and foundation bolt
CN107268666B (en) * 2017-07-27 2019-02-15 山东莱钢建设有限公司 A kind of localization method of auxiliary locator and foundation bolt

Similar Documents

Publication Publication Date Title
US3219308A (en) Form locator
TR199900327T2 (en) Detachable building exterior frame
US3900182A (en) Construction form support member
US3472477A (en) Support bracket for concrete forms
SU726269A1 (en) Jig for setting anchor bolts into foundation
CN109279480A (en) A kind of steel structure lift shaft splicing apparatus and method
US3763617A (en) Tieback apparatus
ATE90984T1 (en) METHOD AND DEVICE FOR ANCHORING THE SHEDS TO A REINFORCED EARTH WALL.
CN211118632U (en) Adjustable assembled measuring frame
SU983196A1 (en) Jig for placing anchor bolts into foundation
SU855156A1 (en) Jig for mounting constructional structures
SU586261A1 (en) Jig for assembling beam-type construction elements
JPS6055125A (en) Setter for foundation bolt for installing apparatus
JPH038440B2 (en)
RU2790542C2 (en) Method for control of concreting level of vertical structures and device for its implementation
SU625094A1 (en) Method of erecting machinery on foundation
JPH0711236Y2 (en) Scaffolding equipment
SU1010396A1 (en) Device for mounting support elements onto foundation
SU1644723A3 (en) Support and method of installation of same
SU503011A1 (en) The conductor for the installation of elevators in the mines of the volume elements
SU991006A1 (en) Form board
SU1642030A1 (en) Device for setting roof support in stopes
KR20050009837A (en) Apparatus for fixing bridge checking device to bridge
SU452657A1 (en) Console formwork
SU579392A1 (en) Suspended scaffolds for erection work