SU726269A1 - Jig for setting anchor bolts into foundation - Google Patents
Jig for setting anchor bolts into foundation Download PDFInfo
- Publication number
- SU726269A1 SU726269A1 SU742003371A SU2003371A SU726269A1 SU 726269 A1 SU726269 A1 SU 726269A1 SU 742003371 A SU742003371 A SU 742003371A SU 2003371 A SU2003371 A SU 2003371A SU 726269 A1 SU726269 A1 SU 726269A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- anchor bolts
- foundation
- conductor
- jig
- guides
- Prior art date
Links
Landscapes
- Foundations (AREA)
Description
с Ш| й5онтальнйми направл ющими 3 пбсрёдствЬм регулируемых винтов 4, фиксируюдае приспособлени. 5, св занные с горизонтальными направл ющими хомутами б и снабженные пл анками 7 под анкерные болты 8,К:оторые закрепл ютс в них с помощью гаек 9. .В нижней части опорной рамы выполнены отверсти 10, предназначенные дл закреплени анкерных болтов по их нижней части.with sh | The tonal guides are 3 adjustable brakes for adjustable screws 4, fixed by fixtures. 5, connected to the horizontal guide clamps b and fitted with anchoring bolts 7 for the bolts 8, K: which are fixed in them with the help of nuts 9. In the lower part of the support frame there are holes 10 for fixing the anchor bolts along their lower parts.
Кондуктор монтируют по рхеме, составл емэй на каждый фундамент, по которой определ ют необходима количество анкерных болтов и фиксирующих приспособлений.The conductor is mounted on a pkheme, they are made on each foundation, according to which the number of anchor bolts and fixing devices is necessary.
Перед монтажом опорную раму кондуктора вместе с вертикальными стойками и горйзбйтальнымй направл ющими устанавливают на опалубке 11 фундамента и закрепл ют с )щьюструбцин 12 с винтами 13 и жёстко прикрепленных площадок 14. После закреплени опорной рамы на опалубке на гбрИ:з6-нталЁ ае н-апр:авл ющие устанавливают необходимое количество фиксируюмих приспособлений и анкерных болтов с планками. Путем взаимно -перпе-ндикул рного перемещени фи.ксирующий приспособлений ад-Ш ГЭО-йталь-HbiM нап1 айл юШмйпланб{с tf аМкерными болтами по фиксируюгцим приспособлени мустанавливают заданное взаимное распбложение айкерных бойт бв и зат гивают гайки 9, обеспечива этим жесткую фиксацию анкерных Волтов и исключа их смещение в процессе бетонировани фундамента. Установка и фиксаци анкерных болтов по высоте фундамента обеспечиваетс с помбщью регулируемых винтов и контргаек 15. Before mounting, the support frame of the conductor together with the vertical uprights and the horizontal guides are mounted on the foundation formwork 11 and fixed with a tool 12 with screws 13 and rigidly attached pads 14. After fixing the support frame on the formwork on the bridge: A6 : The drivers install the required number of fixtures and anchor bolts with slats. By mutually moving the fic-axial device ad-SH GEO-Ytal-HbiM First1 YSchMyPlan {with tf amker bolts on a fixed attachment fixes the specified mutual unbundling of Eiker boyts and tightening the 5, I get the 5, I get 5, I get 5, I have to go to the 5, I have to go to the lines, I have to go to the 5, I have to go to the 5, I’m not going to put the rest on my way. and excluding their displacement in the process of concreting the foundation. The installation and fixation of anchor bolts along the height of the foundation is provided with adjustable screws and lock nuts 15.
После забетонировани нкерных болтов элементы кондуктора освобождаютс , опорна рама снимаетс и переноситс на другой фундамент.After the concrete bolts are concreted, the elements of the conductor are released, the support frame is removed and transferred to another foundation.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU742003371A SU726269A1 (en) | 1974-03-01 | 1974-03-01 | Jig for setting anchor bolts into foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU742003371A SU726269A1 (en) | 1974-03-01 | 1974-03-01 | Jig for setting anchor bolts into foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
SU726269A1 true SU726269A1 (en) | 1980-04-05 |
Family
ID=20578015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU742003371A SU726269A1 (en) | 1974-03-01 | 1974-03-01 | Jig for setting anchor bolts into foundation |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU726269A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953394A (en) * | 2011-08-24 | 2013-03-06 | 同济大学 | Precise foundation bolt positioning device |
WO2017044541A1 (en) * | 2015-09-10 | 2017-03-16 | Laliberte Gerald A | Anchor device positioning and plumbing tool and methods related thereto |
CN107268666A (en) * | 2017-07-27 | 2017-10-20 | 山东莱钢建设有限公司 | A kind of localization method of auxiliary locator and foundation bolt |
-
1974
- 1974-03-01 SU SU742003371A patent/SU726269A1/en active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953394A (en) * | 2011-08-24 | 2013-03-06 | 同济大学 | Precise foundation bolt positioning device |
CN102953394B (en) * | 2011-08-24 | 2015-02-18 | 同济大学 | Precise foundation bolt positioning device |
WO2017044541A1 (en) * | 2015-09-10 | 2017-03-16 | Laliberte Gerald A | Anchor device positioning and plumbing tool and methods related thereto |
CN107268666A (en) * | 2017-07-27 | 2017-10-20 | 山东莱钢建设有限公司 | A kind of localization method of auxiliary locator and foundation bolt |
CN107268666B (en) * | 2017-07-27 | 2019-02-15 | 山东莱钢建设有限公司 | A kind of localization method of auxiliary locator and foundation bolt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3219308A (en) | Form locator | |
TR199900327T2 (en) | Detachable building exterior frame | |
US3900182A (en) | Construction form support member | |
US3472477A (en) | Support bracket for concrete forms | |
SU726269A1 (en) | Jig for setting anchor bolts into foundation | |
CN109279480A (en) | A kind of steel structure lift shaft splicing apparatus and method | |
US3763617A (en) | Tieback apparatus | |
ATE90984T1 (en) | METHOD AND DEVICE FOR ANCHORING THE SHEDS TO A REINFORCED EARTH WALL. | |
CN211118632U (en) | Adjustable assembled measuring frame | |
SU983196A1 (en) | Jig for placing anchor bolts into foundation | |
SU855156A1 (en) | Jig for mounting constructional structures | |
SU586261A1 (en) | Jig for assembling beam-type construction elements | |
JPS6055125A (en) | Setter for foundation bolt for installing apparatus | |
JPH038440B2 (en) | ||
RU2790542C2 (en) | Method for control of concreting level of vertical structures and device for its implementation | |
SU625094A1 (en) | Method of erecting machinery on foundation | |
JPH0711236Y2 (en) | Scaffolding equipment | |
SU1010396A1 (en) | Device for mounting support elements onto foundation | |
SU1644723A3 (en) | Support and method of installation of same | |
SU503011A1 (en) | The conductor for the installation of elevators in the mines of the volume elements | |
SU991006A1 (en) | Form board | |
SU1642030A1 (en) | Device for setting roof support in stopes | |
KR20050009837A (en) | Apparatus for fixing bridge checking device to bridge | |
SU452657A1 (en) | Console formwork | |
SU579392A1 (en) | Suspended scaffolds for erection work |