SU717940A1 - Method for preparing frozen alluvial deposits for excavation - Google Patents

Method for preparing frozen alluvial deposits for excavation Download PDF

Info

Publication number
SU717940A1
SU717940A1 SU782652530A SU2652530A SU717940A1 SU 717940 A1 SU717940 A1 SU 717940A1 SU 782652530 A SU782652530 A SU 782652530A SU 2652530 A SU2652530 A SU 2652530A SU 717940 A1 SU717940 A1 SU 717940A1
Authority
SU
USSR - Soviet Union
Prior art keywords
water
block
rocks
thawing
wells
Prior art date
Application number
SU782652530A
Other languages
Russian (ru)
Inventor
А.А. Егупов
В.П. Алебастров
В.В. Гриневич
Original Assignee
Всесоюзный научно-исследовательский институт золота и редких металлов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский институт золота и редких металлов filed Critical Всесоюзный научно-исследовательский институт золота и редких металлов
Priority to SU782652530A priority Critical patent/SU717940A1/en
Application granted granted Critical
Publication of SU717940A1 publication Critical patent/SU717940A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

СПОСОБ ПОДГОТОВКИ «EP3Jb!X РЫХЛЫХ ОТЛОЖЕНИЙ К ВЫЕМКЕ, включа- квдий бурение в подготавливаемом массива скв'ажин, зар жание скважин, взрывание в них разр дов ВВ и оттаивание взорванных пород, путем подачи в последние воды, о-т л и ч а ю- щ и и с   тем, что, с целью повышени  эффективности оттаивани , перед бурением скважин предварительно по ,' флангам подготавливаемого массив^ провод т водозаборную канаву .глубиной не менее мощности верхнего ела- ' бофильтрующего сло  пород и дренажную канаву глубиной не менее мощности подготавливаемого к выемке массива пород и заполн ют водозаборную .канаву Водой, а взрывание и отт^ива- ниё путем перепуска воды из водода-' борной канавы в дренажнуи через взорванные породы производ т поблочно с предварительным отстаиванием породы g врубового блока, причем перед отта- " иванием пород каждого последующего .блока осуществл ют уплотнение взор- 'ванных пород каждого предыдущего блока.(ЛMETHOD OF PREPARATION "EP3Jb! X LOOSE DEPOSITS TO EXTRACT, including drilling in the prepared array of wells, loading wells, blasting explosives in them and thawing blasted rocks by supplying water to the last, oh l and h so that, in order to increase thawing efficiency, before drilling wells, a drainage ditch with a depth not less than the power of the upper spruce rock filter and a drain depth less than prepared for excavation m rock formations and fill the water intake canal with Water, and blasting and repulsing by transferring water from the water ditch to the drainage and through the blasted rocks are performed block by block with preliminary settling of the rock g of the cut-in block, moreover, before melting each successive block is compacted of the exploded rocks of each previous block. (L

Description

-s}-s}

Изобретение относитс  к горной пТрЬ1 1ьпиЛённости и может быть использйвано при открытой разработке месторождений полезных ископаемых, например , дл  подготовки мерзл рыхлых отложений к выемке. Известен способ подгот овки мерзл рыхлых отложений к выемке, включающий создание фильтрационно-дрёнажнЬй системы и оттаивание пород ij Известен также способ подготовки мёрзлых рыхлых отложений к выемке, включакдчий бурение в подготавливаемом массиве скважин, зар жание скважин, взрывание в них зар дов ВВ и оттаивание взорванных пород путем подачи в последние воды l2j . Однако оба ука,занных способа характеризуютс  недостаточной эффективностью оттаивани . Целью изобретени   вл етс  повышение эффективности оттаивани . Это достигаете тем, что перед; бурением скважин предварительно по флангам псэдготавлив;аемого массива Провод т водозаборную канаву глубиной не менее мощности верхнего елабофильтруюиего сло  пород и дрёнажную канаву глубиной не менее мощнос ти подготавливаемого к выемке, масси Bk пород И заполн ют водозаборную канаву водой, а взрывание и оттаива ние путём перепуска воды из водозаборной канавы в дренажную Через . ванйые пвррды производ т, поблочно с предварительным оттаиванием пород врубовЬго блока, причем перед оттаиванием пород каждого -последующего блока осуществл ют уплотнение взор .ванных пород кайсдого пр5едыдущего ЛлОКЙ. . .. . . На фиг. 1 представлена схема подготовки к выемке отложений; на фиг. разрез по А-А фиг. 1. Способ заключаетс  в следующем. Предварительно по флангам подготавливаемого массива провод т водозаборную канаву 1 глубиной не менее мощности верхнего слабофильтрующего сло  пород и дренажную канаву 2 глу-биной не менее мощности подготавливаемого к выемке массива пород. В водозаборную канаву подают теплую воду . Между канавами бур т скважины 3 врубового блока 4 на всю глубину подгоТ 1вливаемого массива. В скважины помещают зар дьг ВВ и взрывают. Параметры буровзрывных работ выби- рают такими, чтобы взрывом было произведено только рыхленИе породы. При взрыве образуетс  врубова  полость , заполненна  частично разрушенным материалом . По этой полости вс  вода из .водозаборной канавы поступает в дренажную. При этом вода из водозаборной канавы проходит нижние слои подготавливаемой породы, мину  верхние со слабофильтрационными свойствами. Происходит интенсивный теплообмен мерзлой породы с водой по всей глубине подготавливаемого ivfaccHBa. После оттаивани  породы во врубовой полости взрывают зар ды в оконтуривающих скважинах 5 блока 6. При этом за один прием взрывают такой Объем мёрзлых , чтобы при заданном поступлении воды обеспечить движение фильтрующего потока по всему сечению разрушенных пород. Чтобы избежать утечек воды из оттаиваемого блока б, во врубовую полость блока 4 талую породу, наход щуюс  по врубовой полости, уплотн ют. Это производ т за счет кинетической энергии кусков породы массива, отбиваемого первым р дом отбойных скважин. Дл  этого в скважины первого р да помещают на 30% больще ВВ. При взрыве порода, заключенна  между первым р дом отбойных скважин блока б и врубовой полостью блока 4, перемещаетс  в сторону врубовой полости и уплотн ет ее талую породу. После оттаивани  взорва1 ных пород блока 6 при :тупают к подготовке блока 7 с повторением указ анных операций по подготовке блока 6. Предлагаемый способ позвол ет по ёысйть эффекХивность оттаивани .The invention relates to the mining industry and can be used in the open-pit mining of mineral deposits, for example, to prepare frozen deposits for excavation. There is a method of preparing frozen loose sediments for excavation, including the creation of a filtration-drainage system and thawing of rocks ij There is also known a method of preparing frozen loose sediments for excavation, including drilling in a prepared array of wells, charging wells, exploding explosives in them, and depleting explosives and depleting them. rocks by feeding in the last water l2j. However, both of these methods are characterized by insufficient thawing efficiency. The aim of the invention is to increase the efficiency of thawing. This is achieved by what is before; by drilling wells previously on the flanks of pseudo-preparing; a massif. water from the intake ditch to the drainage through. Water baths are produced, block by block with preliminary thawing of the rocks of the coalition block, and before thawing of the rocks of each subsequent block, the eyes are compacted to the eyes of the rocks of the Kaydian previous LlKOY. . .. . FIG. 1 shows a preparation scheme for excavation of sediments; in fig. A-A section of FIG. 1. The method is as follows. Preliminarily, along the flanks of the prepared massif, a water intake ditch 1 with a depth not less than the thickness of the upper weakly filtering layer of rocks and a drainage ditch 2 with a depth not less than the power of the rock mass prepared for excavation is conducted. Warm water is supplied to the water intake ditch. Between the trenches of the well bore 3 of the drilling unit 4 for the entire depth of the prepared 1 injected array. In the wells placed charge explosives and explode. The parameters of drilling and blasting operations are chosen so that the explosion produces only loose rock. In the explosion, a vrub cavity is formed, filled with partially destroyed material. Through this cavity, water from the water intake ditch enters the drainage one. At the same time, water from the water intake ditch passes through the lower layers of the prepared rock, the upper mine with weak filtration properties. Intense heat exchange of frozen rock with water occurs throughout the depth of the prepared ivfaccHBa. After thawing of the rock in the iron ore cavity, the charges in the contour wells 5 of block 6 are exploded. At one time, such a volume is frozen so that, with a given flow of water, to ensure the movement of the filtering flow throughout the section of the destroyed rocks. In order to avoid water leaks from the defrosting block b, the melted rock in the cavity of block 4 is compacted into the cut-off cavity of block 4. This is due to the kinetic energy of the pieces of rock in the massif, which is fought off by the first row of firing wells. For this, the wells of the first row are placed 30% more than explosives. During the explosion, the rock enclosed between the first row of boreholes of block b and the cut-in cavity of block 4 moves towards the cut-off cavity and compacts its thawed rock. After thawing of the explosive rocks of block 6 when: they are blunt to the preparation of block 7 with the repetition of the indicated operations for the preparation of block 6. The proposed method allows to increase the effectiveness of thawing.

Claims (1)

СПОСОБ ПОДГОТОВКИ МЕРЗЛЫХ РЫХЛЫХ ОТЛОЖЕНИЙ К ВЫЕМКЕ, включающий бурение в подготавливаемом массиве скважин, заряжание скважин, взрывание в них разрядов ВВ и отта ивание взорванных пород, путем подачи в последние воды, отличающийся тем, что, с целью повышения эффективности оттаивания, перед бурением скважин предварительно по / флангам подготавливаемого массивд проводят водозаборную канаву глубиной не менее мощности верхнего елабофильтрующего слоя пород и дренажную канаву глубиной не менее мощности подготавливаемого к выемке массива пород и заполняют водозаборную канаву водой, а взрывание и оттдиваниё путем перепуска воды из водозаборной канавы в дренажную через взорванные породы производят поблочно с предварительным оттаиванием породы р врубового блока, причем перед оттаиванием пород каждого последующего / .блока осуществляют уплотнение взор‘ванных пород каждого предыдущего ζ блока.METHOD FOR PREPARING FROZEN FLEED SEDIMENTS TO THE DIGGING, including drilling in a prepared array of wells, loading wells, blasting explosive discharges in them and thawing blasted rocks, by feeding them into the last water, characterized in that, in order to increase the thawing efficiency, before drilling wells along the / flanks of the prepared massd, a water ditch with a depth of at least the thickness of the upper elabofiltration layer of rocks and a drainage ditch with a depth of not less than the capacity of the mass prepared for excavation are carried out along the genus also fills the intake ditch with water, and blasting and thawing by passing water from the intake ditch to the drainage through blasted rocks is carried out in blocks with preliminary thawing of the rock of the cutting block, and before thawing the rocks of each subsequent / block, the blasted rocks of each previous ζ are compacted block. Фиг.4Figure 4 А наподготовки мерзлых выемке.And in preparation for the frozen recess. подготовки мерзлых выемке, включа-preparing a frozen notch, including-
SU782652530A 1978-07-31 1978-07-31 Method for preparing frozen alluvial deposits for excavation SU717940A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782652530A SU717940A1 (en) 1978-07-31 1978-07-31 Method for preparing frozen alluvial deposits for excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782652530A SU717940A1 (en) 1978-07-31 1978-07-31 Method for preparing frozen alluvial deposits for excavation

Publications (1)

Publication Number Publication Date
SU717940A1 true SU717940A1 (en) 1983-06-30

Family

ID=20780433

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782652530A SU717940A1 (en) 1978-07-31 1978-07-31 Method for preparing frozen alluvial deposits for excavation

Country Status (1)

Country Link
SU (1) SU717940A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Натоцинский В. И. Подготовительные работы при разработке россыпных месторождений. М., "Недра", • 1975, с. 136-137.2. Авторское свидетельство СССР № 541990, кл. Е 21 С 41/00, 1974 •(прототип). *

Similar Documents

Publication Publication Date Title
CN105571419B (en) Blasting method capable of effectively reducing blasting boulder yield of surface mine
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CA1123726A (en) Explosive fracturing of deep rock
CN103244124B (en) Method for coal mine tunnel working surface to pass through abandoned roadway in forced caving pressure relief mode
CN103983147A (en) Permafrost region road tunnel peripheral hole blasting construction method
RU2678245C1 (en) Method for explosive destruction of frozen rock mass
CN102778183B (en) Blast construction method
SU717940A1 (en) Method for preparing frozen alluvial deposits for excavation
CN209263807U (en) Micro-vibration rock and soil blasting structure
CN1029756C (en) Method to cut marble and granite, device to concentrate energy in hole and cutter
CN103900430B (en) Highlands Opencut coal mine mining peels off construction method
CN112459786B (en) Method for dividing roof-cutting gob-side entry retaining
CN109900175A (en) The low damage blasting method of underground mine tunnelling
RU2495238C1 (en) Method to prepare ore bodies in place of bedding to leaching of useful components
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
CN109630118A (en) Mining method for steeply inclined unstable thin ore body
CN111023933B (en) Mixed charging structure, charging method and blasting application thereof
SU901517A1 (en) Method for directional blasting out of permafrost rocks
RU2030508C1 (en) Method for prevention of open pit landslides
RU2039269C1 (en) Method for reconstruction of flooded open pits
SU829887A1 (en) Method of underground leaching-out of minerals
SU1164416A1 (en) Method of preparing rock to breaking for entry-driving
RU2265723C2 (en) Opened cast mining method
RU1789694C (en) Method for mining flat coal seams
SU1760116A1 (en) Method for opencast mining of mineral deposits