Method of erecting a structure on pile foundationInfo
- Publication number
- SU684097A1 SU684097A1 SU772478717A SU2478717A SU684097A1 SU 684097 A1 SU684097 A1 SU 684097A1 SU 772478717 A SU772478717 A SU 772478717A SU 2478717 A SU2478717 A SU 2478717A SU 684097 A1 SU684097 A1 SU 684097A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- grillage
- piles
- pile
- cavity
- tip
- Prior art date
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Description
1one
Изобретение относитс к области строительства , в частности, к возведению сооружений на свайных фунда.ментах.The invention relates to the field of construction, in particular, to the construction of structures on pile foundations.
Известен способ возведени сооружени на свайном фундаменте, при котором сборный свайный ростверк образуют путем установки на головы свай сборных наголовников с последующим о.моноличиванием стыков, причем в арматуре каждой сваи приваривают днипде наголовника, снабженного кольцом и фасонками, .монтируют на свае стенки наголовника, ст гивают их болтами, после чего соедин ют сваркой стенки наголовsuiKa с днищем и провод т омоноличивание стыка 1.There is a method of erecting a structure on a pile foundation, in which a collective pile grillage is formed by installing prefabricated caps on the heads of piles, followed by monolithing the joints, and in the reinforcement of each pile, weld the bottom of the cap equipped with a ring and gussets. they are bolted, after which they are welded together with the wall of the top of the suiKa with the bottom and joint 1 is molded.
Недостатком известного способа вл етс сложность изготовлени и сборки свайного ростверка.The disadvantage of this method is the difficulty of manufacturing and assembling the pile grillage.
Наиболее близким к предложенно.му изобретению вл етс способ возведени сооружени на свайном фундаменте, включающий погружение в грунт свай, установки на них оголовков, выполнение ростверка и последуюн1ее возведение сооружени 2.The closest to the proposed invention is a method of erecting a structure on a pile foundation, including immersing piles in the ground, installing tips on them, performing a grillage and the subsequent erection of a structure 2.
Недостатком известного способа вл етс возможность неравномерных осадок и необходимость использовани свай значительной длины.The disadvantage of this method is the possibility of uneven sludge and the need to use piles of considerable length.
Цель насто щего изобретени - ycTjiaнение неравномерных осадок сооружени и уменьшение потребной длины свай.The purpose of the present invention is to make unequal sediments of a structure and reduce the required pile length.
Указанна цель достигаетс тем, что в известном способе возведени сооружени па свайном фундаменте, включающем погружение в грунт свай, установку на них оголовков , выполнение ростверка и последующее возведение сооружени , CBaii погружают в грунт до заглублени их верхних торнов ниже уровн ПОДОП1ВЫ ростверка на пубнну , не менее величины з-аданной осадки сооружени , устанавливают нолые оголовки с размещением их верха на уровне подошвы ростверка и соедин ют полость каждого оголовка с атмосферой, а после возведени сооружени заполн ют полость каждого оголовка твердеюнхей смесью.This goal is achieved by the fact that in the well-known method of erecting structures on a pile foundation, which includes immersing piles in the ground, installing tips on them, performing a grillage and the subsequent erection of the structure, CBaii is immersed in the ground before the upper torn depths are below the level of Podod1, you need to grind to public, not less than the value of the 3-adannial sediment of the structure, establish zero tips with their top on the level of the foot of the grillage and connect the cavity of each tip with the atmosphere, and after the construction of the structure they fill olost each tip tverdeyunhey mixture.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772478717A SU684097A1 (en) | 1977-04-25 | 1977-04-25 | Method of erecting a structure on pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU772478717A SU684097A1 (en) | 1977-04-25 | 1977-04-25 | Method of erecting a structure on pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
SU684097A1 true SU684097A1 (en) | 1979-09-05 |
Family
ID=20706036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU772478717A SU684097A1 (en) | 1977-04-25 | 1977-04-25 | Method of erecting a structure on pile foundation |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU684097A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5531544A (en) * | 1990-12-17 | 1996-07-02 | Perma Pile Foundation Restoration Systems, Inc. | Pile cap |
-
1977
- 1977-04-25 SU SU772478717A patent/SU684097A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5531544A (en) * | 1990-12-17 | 1996-07-02 | Perma Pile Foundation Restoration Systems, Inc. | Pile cap |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103741714B (en) | Full-cover excavation top-down construction method for underground engineering | |
US4163621A (en) | Method for forming a continuous footing with prefabricated footing blocks | |
SU684097A1 (en) | Method of erecting a structure on pile foundation | |
EP0186337A3 (en) | Foundation arrangement | |
US4818142A (en) | Method and apparatus for constructing a walled pool excavation | |
RU2082851C1 (en) | Precast pile | |
GB2085950A (en) | Driven composite piles | |
SU885446A1 (en) | Method of constructing pile foundation on sagging soil | |
RU2139974C1 (en) | Cast-in-place pile | |
SU699105A1 (en) | Foundation construction method | |
SU1004537A1 (en) | Method of constructing a structure in soil | |
CN217480216U (en) | Integrated cofferdam structure for near-shore side underwater bridge foundation construction | |
RU29538U1 (en) | Prefabricated foundation | |
JPH073813A (en) | Construction of building foundation | |
SU1060762A2 (en) | Foundation | |
RU2091542C1 (en) | Underground structure and method of construction of underground structure | |
SU914723A1 (en) | Method of erecting a structure on pile foundation | |
SU887733A1 (en) | Method of constructing a foundation | |
SU1021715A1 (en) | Foundation erection method | |
RU2101420C1 (en) | Method for building foundation shell | |
JPH0338275Y2 (en) | ||
SU947284A1 (en) | Method of constructing a root-like foundation | |
SU1224382A1 (en) | Pile foundation | |
SU1317139A1 (en) | Tunnel ramp | |
RU51638U1 (en) | BOARD WALL IN SOIL |