SU662662A1 - Excavator bucket - Google Patents

Excavator bucket

Info

Publication number
SU662662A1
SU662662A1 SU731923924A SU1923924A SU662662A1 SU 662662 A1 SU662662 A1 SU 662662A1 SU 731923924 A SU731923924 A SU 731923924A SU 1923924 A SU1923924 A SU 1923924A SU 662662 A1 SU662662 A1 SU 662662A1
Authority
SU
USSR - Soviet Union
Prior art keywords
plungers
bucket
pumps
shoulder
holes
Prior art date
Application number
SU731923924A
Other languages
Russian (ru)
Inventor
Николай Прокопьевич Волков
Original Assignee
Volkov Nikolaj P
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Volkov Nikolaj P filed Critical Volkov Nikolaj P
Priority to SU731923924A priority Critical patent/SU662662A1/en
Application granted granted Critical
Publication of SU662662A1 publication Critical patent/SU662662A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Claims (2)

(54) КОВШ ЭКСКАВАТОРА рычаги в виде буквы Т со скалками 6 и 7, которые взаимодействуют между собой. Плунжеры 8 поддерживаютс  в верхнем положении между головкой плунжера и корпусом насоса 9. Внутренние плечи 10 и 11 рычагов, закрепленных в шарнирах -12 стоек, взаимодействуют между собой посредством пружин 13. Отверсти  14 первого р да насосов 9 соединены трубопроводом 15 сотверсти ми 16 и 17 второго р да насосов 9. Рабоча  жидкость размещена в бочке, закрепленной на руко ти, а между емкостью и трубопроводом может размещатьс  электромагнитный гидравлический вентиль дистанционного управлени , включающийс  из кабины экскаватора. Емкость, руко ть и вентиль на чертежах не показаны. Устройство работает следующим образом . Когда ковш 1 прикрыт днищем 3 (фиг. 1), петли 4 со скалкой 6 дав т на плунжеры 8 нижнего р да насосов 9, сжима  их пружины 13, и плунжеры 8 перемещены в нижнее положение (фиг. 2 и 3), при этом перекрываютс  отверсти  14 в насосах 9. Плечо 10 давит снизу на удлиненное плечо 11 скалки 7, котора  давит на плунжеры 8 верхнего р да насосов, сжима  пружины 13, плунжеры 8 также перемещены в нижнее положение и перекрывают отверсти  14. При включении электромагнитного гид равлического вентил  жидкость от емкости через этот же вентиль поступит в отверсти  14 насосв 9 по трубопроводам 15. При открывании днища 3 (фиг. 4) последнее , враща сь на летл х 4 в шарнирах 5, освободит скалку 6 и плунжеры 8 нижнегор дч насосов 9, а пружины 13 (фиг. 5 и 6) приподнимают ее и плунжеры 8 вверх, открыв отверсти  14. Враща сь в шарнирах 12 стоек, плечо 10 опуститс  вниз. о.свободив плечо 11, и под действием пружин 13 верхнего р да насосов 9 плунжеры 8 перемест тс  вверх, открыв отверсти  14, и перемест т скалку 7 в верхнее положение, враща сь в стойках шарнира 12 плечо 11 пуститс  на плечо 10. Жидкость по отверсти м 14 поступит в полость под плунжеры 8. При закрывании днища 3 перед началом набора грунта петли 4, враща сь в шарнирах 5, опускаютс  вместе со скалкой 6 на плунжерах 8, перемеща  их вниз и сжима  пружины 13. Тогда через веерно расположенные отверсти  16 и 17 нижнего р да насосов 9 жидкость стру ми опрыскивает внутренние стенки ковша. Ъраща сь в шарнире 12, плечо 10 поднимаетс  вверх и поднимает вверх плечо 11, которое, перемеща сь в шарнире 12, скалкой 7 переместит плунжеры 8 в нижнее положение , сжав пружины 13, выдавив жидкость с больЩой скоростью через отверсти  16 и 17 второго р да насосов 9 на внутренние стенки ковща 1. Отверсти  14 перекроютс  плунжерами 8, и жидкость под плунжеры 8 поступать не будет. В это врем  производитс  набор грунта ковщом 1. Циклы повтор ютс . При необходимости обильного покрыти  внутренних стенок ковша жидкостью перед набором грунта днище 3 ковша 1 несколько раз открываетс  и закрываетс . Формула изобретени  Ковш экскаватора, включающий переднюю и заднюю стенки, днище, щарнирно закрепленное на корпусе ковща, и ус тройство дл  нанесени  защитного жидкостного сло  на внутреннюю поверхность ковща, отличающийс  тем, что, с целью повыщени  эффективности путем использовани  энергии инерционных сил днища ковЩа, устройство дл  нанесени  защитного жидкостного сло  выполнено в виде двуплечих рычагов, шарнирно закрепленных на задней стенке ковша, внутенние плечи которых установлены с возможностью взаимодействи  одно с другим, а наружные плечи опираютс  на подпружиненные плунжеры насосов, которые установлены на задней стенке ковша. Источники информации, прин тые во внимание при экспертизе 1.Авторское свидетельство № 367216, кл. Е 02 F 3/40, 1971. (54) BUCKET EXCAVATOR T-shaped levers with rolling pins 6 and 7, which interact with each other. The plungers 8 are supported in the upper position between the plunger head and the pump casing 9. The inner arms 10 and 11 of the levers fixed in the hinges of-12 pillars communicate with each other by means of springs 13. The holes 14 of the first row of pumps 9 are connected by pipe 15 in the perforations 16 and 17 second row of pumps 9. The working fluid is placed in a barrel fixed on the handle, and a remote-controlled electromagnetic hydraulic valve can be placed between the tank and the pipeline, which is turned on from the excavator's cabin. Capacity, handle and valve are not shown in the drawings. The device works as follows. When the bucket 1 is covered by the bottom 3 (Fig. 1), the loops 4 with the rolling pin 6 press on the plungers 8 of the lower row of pumps 9, compressing their springs 13, and the plungers 8 are moved to the lower position (Fig. 2 and 3), the holes 14 in the pumps 9 overlap. The shoulder 10 presses from below on the extended shoulder 11 of the rolling pin 7, which presses on the plungers 8 of the upper row of pumps, compressing the springs 13, the plungers 8 are also moved to the lower position and block the openings 14. When the electromagnetic hydraulic valve is turned on the liquid from the tank through the same valve will enter the holes 14 of the pump 9 through pipelines 15. When opening the bottom 3 (Fig. 4), the latter, rotating on the fly 4 in the hinges 5, will release the rolling pin 6 and the plungers 8 on the bottom of the pump 9, and the springs 13 (Fig. 5 and 6) lift it and the plungers 8 up, opening the holes 14. Rotating at the hinges of the 12 pillars, shoulder 10 goes down. freeing the shoulder 11, and under the action of the springs 13 of the upper row of pumps 9, the plungers 8 move upward, opening the holes 14, and move the rolling pin 7 to the upper position, rotating in the posts of the hinge 12, the shoulder 11 is allowed to fall onto the shoulder 10. The holes 14 will enter the cavity under the plungers 8. When the bottom 3 is closed, loops 4, turning in the hinges 5, lower together with the rolling pin 6 on the plungers 8, moving down and compressing the springs 13. and 17 of the lower row of pumps 9 liquid sprays inside Renny bucket walls. Growing up in hinge 12, shoulder 10 rises up and lifts up shoulder 11, which, moving in hinge 12, rolling pin 7, will move plungers 8 to the lower position, compressing the springs 13, squeezing out fluid at a high speed through holes 16 and 17 of the second row pumps 9 to the inner walls of the bucket 1. The holes 14 are blocked by the plungers 8, and no liquid will flow under the plungers 8. At this time, the soil is harvested with the aid of one. The cycles are repeated. If it is necessary to cover the inner walls of the bucket abundantly with liquid, before the ground is collected, the bottom 3 of the bucket 1 opens and closes several times. Claims of an excavator, including front and rear walls, a bottom hinged to the body of the bucket, and a device for applying a protective liquid layer on the inner surface of the bucket, characterized in that, in order to increase efficiency by using the energy of the inertial forces of the bottom, the bucket, the device for applying a protective liquid layer made in the form of double-arm levers hinged on the back wall of the bucket, the inner shoulders of which are mounted so that they can interact with one another and the outer shoulders rest on the spring-loaded plungers of the pumps, which are mounted on the back wall of the bucket. Sources of information taken into account in the examination 1.Certificate of certificate number 367216, cl. E 02 F 3/40, 1971. 2.Авторское. свидетельство № 453471, кл. Е 02 F 3/40, 1972. / / V 11 П и2. Authors. certificate number 453471, cl. E 02 F 3/40, 1972. // V 11 P and 15 / Р 7 15 (pui.315 / R 7 15 (pui.3 Фиг.55 Фиг.&Fig. & uz.7uz.7
SU731923924A 1973-05-30 1973-05-30 Excavator bucket SU662662A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU731923924A SU662662A1 (en) 1973-05-30 1973-05-30 Excavator bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU731923924A SU662662A1 (en) 1973-05-30 1973-05-30 Excavator bucket

Publications (1)

Publication Number Publication Date
SU662662A1 true SU662662A1 (en) 1979-05-15

Family

ID=20554198

Family Applications (1)

Application Number Title Priority Date Filing Date
SU731923924A SU662662A1 (en) 1973-05-30 1973-05-30 Excavator bucket

Country Status (1)

Country Link
SU (1) SU662662A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5839213A (en) * 1996-07-01 1998-11-24 Gpx Corp. Dipper door actuated lube pumping system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5839213A (en) * 1996-07-01 1998-11-24 Gpx Corp. Dipper door actuated lube pumping system

Similar Documents

Publication Publication Date Title
US4207741A (en) Power source using cyclically variable liquid level
US3983702A (en) Hydraulic energy extractor
US2652280A (en) Grapple
SU662662A1 (en) Excavator bucket
US2581981A (en) Well swab
US4174192A (en) Tide operated pumps
US3256721A (en) Press for textile goods
US3498066A (en) Soil compacting method and a means therefor
US2527184A (en) Pump for raising petroleum and other liquids from deep wells
CN109235524A (en) A kind of hydraulic engineering channel cleanout device
CN208605712U (en) A kind of automatic steam water trap
CN106437584B (en) A kind of continuous sand-bailing equipment of negative pressure
US1413165A (en) Pump
CN110523684A (en) A kind of Chinese medicine cleaning device
FR2360003A1 (en) LOAD RESPONSE DIRECTION AND FLOW FLOW CONTROL VALVE
CN108385618A (en) A kind of dyke strengthening plants planter for river levee side slope reparation
CN221253627U (en) Self-flushing grab bucket
CN209277942U (en) Drainage bucket
CN212358258U (en) Deep foundation tamping device for trestle construction
CN108114515A (en) A kind of oil-field flooding filter device
SU591556A1 (en) Hydraulic clamshell
US2345466A (en) Irrigation control system
SU1528949A1 (en) Mortar pump of variable delivery
SU861730A1 (en) Depth pumping unit
SU454876A1 (en) Irrigation closed system with intermittent sprinklers