SU62558A1 - Room double Russian stove - Google Patents
Room double Russian stoveInfo
- Publication number
- SU62558A1 SU62558A1 SU1184A SU317725A SU62558A1 SU 62558 A1 SU62558 A1 SU 62558A1 SU 1184 A SU1184 A SU 1184A SU 317725 A SU317725 A SU 317725A SU 62558 A1 SU62558 A1 SU 62558A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- furnace
- rus
- channels
- dead
- side walls
- Prior art date
Links
Landscapes
- Tunnel Furnaces (AREA)
Description
Изобретение относитс к комнатным двухъ русным печам с последовательным обогревом обоих русов от общего топливника. Задн стенка топливника снабжена вылетами дл пропуска газов (с целью обогрева цокол ) в опускные каналы, св занные с подъемными газоходами у боковых стенок печи. В каждом русе у боковых стенок печи расположены тупиковые каналы, сообщающиес с боковыми газоходами своего руса.The invention relates to room two-furnace stoves with a sequential heating of both Rus from the common firebox. The back wall of the firebox is equipped with overhangs for the passage of gases (with the purpose of heating the base) to the down channels connected with the lifting ducts at the side walls of the furnace. In each tusk, at the side walls of the furnace there are dead-end channels communicating with the side ducts of their tusk.
Помимо ука занной системы тупиковых каналов в предлагаемой лучщей аккумул ции тепла газоходы св заны со второй системой тупиковых каналов (газовых мешков), расположенных по периметру печи и выт нутых по всей ее высоте.In addition to the specified system of dead-end channels in the proposed better heat storage, the ducts are connected to the second system of dead-end channels (gas bags) located along the perimeter of the furnace and stretched along its entire height.
Газоходы каждого руса выполнены в виде подъемно-опускных каналов , которые в первом русе присоединены к газоходам второго руса , а во втором русе - к выводному каналу дымовой трубы.The flues of each Rus are made in the form of lifting and lowering channels, which are connected to the ducts of the second Rus in the first one, and to the exhaust pipe of the chimney in the second one.
На фиг. 1 изображен вертикальный разрез печи по А-Б; на фиг. 2 - то же, по В-Г; на фиг. 3 - то же, по Д-Е; на фиг. 4 - то же, по Ж-3; на фиг. 5 - то же, по К-Л; на фиг. 6-19 .изображен РЯД горизонтальных разрезов печи по р дам кладки.FIG. 1 shows a vertical section of the furnace along AB; in fig. 2 - the same, according to VG; in fig. 3 - the same, according to DE; in fig. 4 - the same, on Zh-3; in fig. 5 - the same, for KL; in fig. 6-19. A ROW OF horizontal oven cuts along the rows of masonry are shown
Предлагаема двухъ русна (двухэтажна ) печь обогреваетс от расположенного в первом русе топливника 2, расположенного над поддувалом ; и снабженного в задней стенке каналами 5, 3, служащими дл пропуска газов в расположенные у задней стенки каналы 4. Опускающиес по каналам 4, 4 газы объедин ютс общим каналом 5 и через перемычку 6 поступают в расположенные в цоколе под топливником горизонтальные каналы 7, 7 , из которых проход т в боковые каналы 9 и W первого руса печи. Р1з каналов 10, 10 газы поднимаютс до верха первого руса, переход т в центральную часть печи, проход т по опускному каналу 11 и 12 до оборотной камеры 13 над сводом топливника и, поднима сь по каналу 14, поступают в камеру 15, котора соединена с каналом /6 второго руса печи. Подн вщись во второй рус, газы проход т после канала 16 через оборотную камеру 77 и далее в канал 18 центральной части печи, после чего опускаютс в каме№ 62558- 2 ру 19 и по пр мому восход щему каналу 20 уход т в дымовую трубу. Дл лучшей аккумул ции тепла в печи расположены тупиковые каналы (газовые мешки) двух родов: малые, размеш,енные в каждом русепечи , и большие, размешенные по периферии вокруг топливника и имеюшие высоту в два руса.The proposed two-Russian (two-story) furnace is heated from the firebox 2 located in the first floor and located above the ash-pit; and provided in the rear wall with channels 5, 3 serving to pass gases into rear channels 4. The gases descending through channels 4, 4 are joined by a common channel 5 and through bridge 6 they enter horizontal channels 7, 7 from which they pass into the side channels 9 and W of the first kiln of the furnace. P1z channels 10, 10 gases rise to the top of the first Russ, pass into the central part of the furnace, pass through the descending channel 11 and 12 to the circulating chamber 13 above the roof of the firebox and, lifting through channel 14, enter the chamber 15, which is connected to channel / 6 second Rusa furnace. Rising in the second rus, the gases pass after channel 16 through reversing chamber 77 and further into channel 18 of the central part of the furnace, after which they descend into chamber 192558-2 and then go down the chimney through the ascending channel 20. To better accumulate heat in the furnace, dead-end channels (gas bags) of two kinds are located: small, mixed in each tintrée, and large, placed around the periphery around the firebox and having a height of two Russ.
Малые каналы 10 и /5расположены у боковых стенок печи р дом с параллельными каналами 10 и 16 первого и второго русов.The small channels 10 and / 5 are located at the side walls of the furnace adjacent to the parallel channels 10 and 16 of the first and second Rus.
У каждой стенки печи размешены большие тупиковые каналы 8 и 5, 9, которые снабжаютс газами из нижних горизонтальных каналов 7. У задней стенки печи расположены тупиковые каналы 4, 4, вл ющиес продолжением опускных газовых каналов 4, 4.Each wall of the furnace contains large dead-end channels 8 and 5, 9, which are supplied with gases from the lower horizontal channels 7. At the rear wall of the furnace there are dead-end channels 4, 4, which are a continuation of the descending gas channels 4, 4.
Предмет изобретени Subject invention
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1184A SU62558A1 (en) | 1937-04-13 | 1937-04-13 | Room double Russian stove |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1184A SU62558A1 (en) | 1937-04-13 | 1937-04-13 | Room double Russian stove |
Publications (1)
Publication Number | Publication Date |
---|---|
SU62558A1 true SU62558A1 (en) | 1942-11-30 |
Family
ID=48243694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1184A SU62558A1 (en) | 1937-04-13 | 1937-04-13 | Room double Russian stove |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU62558A1 (en) |
-
1937
- 1937-04-13 SU SU1184A patent/SU62558A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU62558A1 (en) | Room double Russian stove | |
SU47065A1 (en) | Oven for heating and cooking | |
SU62228A1 (en) | Room stove | |
SU54749A1 (en) | A lot of Russian oven | |
SU54748A1 (en) | Brick combined oven | |
SU61370A1 (en) | Brick room large heat furnace | |
SU76730A1 (en) | Multi-floor oven | |
SU54747A1 (en) | Combined stove for single and multi-storey buildings | |
SU15199A1 (en) | Multi-floor oven | |
US1734885A (en) | Kiln | |
SU45394A1 (en) | Device for fencing off working gases | |
SU63912A3 (en) | Combined stove for space heating and cooking | |
US1351281A (en) | Furnace construction | |
SU547A1 (en) | Room stove | |
SU75745A1 (en) | Heating stove | |
SU38762A1 (en) | Room stove | |
SU10565A1 (en) | Suspended vaulted ceiling for flue devices | |
SU3573A1 (en) | Device for heating a high-rise building | |
SU51632A1 (en) | Two-room oven | |
SU18908A1 (en) | Modifying room oven | |
SU89614A1 (en) | Bakery Oven | |
SU23347A1 (en) | Regenerative Combined Coke Furnace | |
SU107882A1 (en) | Cast Iron Sectional Boiler | |
SU67241A1 (en) | Two-chamber oven for baking | |
SU19124A1 (en) | Horn for roasting of porcelain, Fans or other ceramic products |