SU61897A1 - Water intake facility - Google Patents

Water intake facility

Info

Publication number
SU61897A1
SU61897A1 SU42450A SU42450A SU61897A1 SU 61897 A1 SU61897 A1 SU 61897A1 SU 42450 A SU42450 A SU 42450A SU 42450 A SU42450 A SU 42450A SU 61897 A1 SU61897 A1 SU 61897A1
Authority
SU
USSR - Soviet Union
Prior art keywords
water intake
water
wall
intake facility
avancamera
Prior art date
Application number
SU42450A
Other languages
Russian (ru)
Inventor
В.И. Петров
Original Assignee
В.И. Петров
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.И. Петров filed Critical В.И. Петров
Priority to SU42450A priority Critical patent/SU61897A1/en
Application granted granted Critical
Publication of SU61897A1 publication Critical patent/SU61897A1/en

Links

Landscapes

  • Breeding Of Plants And Reproduction By Means Of Culturing (AREA)

Description

Pcry.isipni.ni забор поды и.ч нч л,1  iipcMnpiisiriiii (lippiiraiuiOHiibiX. .rn/ipocn.iOBiii.x 11 др.) имеет oo/ibiiioe xoaniieTnoiiiioe значение. Однако в некоторых с.чуча х гидротехника не jiaeno.inraeT внодне р; циона,1Ы1Ыми конструкнн лп водозапора. С-ушестнующн конетрукцнн .пннь нрисноеабднгкпотс  is TOII ii/iii iinoii степени к режнмх реки н нередко работают неудо15.1етвор1Г1ч ;ьно. нес :отр  на их 3i-;a.4HTe, етоимость н бо.1ьн1гс iiKcii.iyaTauHoiiiibie затра.ты.Pcry.isipni.ni fence podi..ch nl l, 1 iipcMnpiisiriiii (lippiiraiuiOHiibiX. Rn / ipocn.iOBiii.x 11 others) has oo / ibiiioe xoaniieTnoiiiioe meaning. However, in some areas, hydraulic engineering is not jiaeno.inraeT outside the p; ration, 1 * 1 * design lp water intake. S-ushchestnuchn konetrukstsnn. Pnn nrisnoe abdngkpots is TOII ii / iii iinoii degree to the river and often work poorly 15.1 G1H; h. carried: rejected at their 3-; a.4HTe, etoimosti n bo.1n1gs iiKcii.iyaTauHoiiiibie costs.

Пред.1агаемое иодозабо;)ное еоорчженне нред 1аз 1ачено, в перпую оче|1ед|, Д.1Я нанбо.чее тр Д;1О1Ч) е., п именно. д,-1  Bepxieicj течени  горных рек, где нзвеетн1 1е тины o;iOHjiiieMHiii t)i; не дают доетаточнслч уф(|5екта i 6opij6e е наиоеамн н ii.ibiisyLiuiMii предметами нрн невысоких ii-.iOTiiiiax. В VTOM еоорхженнн нр.нмеисн, етепка. образующа  аванкл -iepy . Особенность ее состоит к том, что ,. часть стенки, с.тужали )  д;1; отк.юпенн  от нодонрне.м-пка донд-;|)1Х наносов, выиоднена CHJOHiHOH, а верхн   часть, предназначенна  дд  отк.юиенн  и.: ыву1лих .дереи.ьев i дрхтнх нодоб :ых Г1)едл1ет()в, соетоиг из коротких стенок, ()женных в виде жа.иозн под острым уг.чом к оси потока в ii.iane.The foregoing prediction is iodozabo;;) Noe Ordinated Nred 1az 1acheno, firstly | 1 ed |, E.1I nanoboe than tr D; 1O1C) e., N precisely. d, -1 Bepxieicj of the flow of mountain rivers, where nzevetn1 1 tines o; iOHjiiieMHiii t) i; Do not give doetaschnuv uv (| 5ekta i 6opij6e e naioamnn ii.ibiisyLiuiMii subjects nrn low ii-.iOTiiiiax. In VTOM, the company has a special avantl-iepyy. Its structure consists of an avancle-iepyi.) .tugal) d; 1; ♦ 1X sediment, produced by CHJOHiHOH, and the upper part, intended for the opening of the sediment, and: oyv1nih. derey.iev i dkhtnkh nodob: s G1) edl1et () v, ёetoig from the short walls () of women in the form of a female body at a sharp angle to the flow axis in ii.iane.

lla чертеже изображено 150д,он{)немное сооружение в н.тано с частичным разрезом.The lla drawing depicts 150d, it {) is a small structure in N. tano with a partial section.

.Аванкамера / неред входом в деривашк шп : кана.ч 2 нредстав;| ет co6oii пространство в jn-c.ie НКн, о1|шннче;1ное от нос,1едне | стенKoii . . Меиосредст.ченно входа в ,i расно. затвор т. которь;; не)ек|Млвает нролгывное отверстие аванкамер1Ы, В1 1ход 1цее в нижний бье(|) .J реки. От аванкаме)ы до нротнвонодожного берега реки расио ,.jo/KCiia ндотнна 6 д.И подн ти  горизонта .;и.; Г) BCJIXHC.M бьефе 7 .и. Часть н.ютины, примыкающа  к аванкамере, имеет отве 5сти , нере .,|)ытые затвором cS. От.метка норога ф.чютбета к отверсти х, иерскры; 1Х 3aTBOj)a.Mii -f и 8. одинакова.The avancamera / non-entrance to the w / w derivative: cana.h 2 nredstav; | em co6oii space in jn-c.ie NKN, o1 | snnche; 1noe from the nose, 1 day | wallKoii. . Entrance to the media, i rasno. shutter t. Kotor ;; not) ek | Blews the bottom hole of the avancamer, B1 1way 1tsee to the bottom bay (|) .J of the river. From the avancamera to the neurobodious bank of the river racio, .jo / KCiia 6 d.I. and raise the horizon; and .; D) BCJIXHC.M byide 7 .and. Part of N. yutin, adjacent to the avancamera, has a rste 5ste, nere., |) Aytye shutter cS. Ot.markka norm f.chyutbet to holes x, yerskry; 1X 3aTBOj) a.Mii -f and 8. are the same.

Перед, входо.м в канал 2 установлен порог .V высотой 0,8-,50 ,.;, коTopbiii легко нарастить установко шандоров; на нороге имеетс  рен1ет 61897 -ка д.ч  задср | ;111к  ii.uiiiaiouiit.x иредметои. Приы1)1Ксиош,а  к берегу часть аванкамеры укреплена подпорной стенкой 10. Оградительна  стенка 3 аванкамеры до высоты 1,00--1,50 м сделана снлон ной; всрх1;   часть стенкн состоит пз короткнх нерсгородок 11, расположенных в виде жалгози под острым углом к оси потока в плане, образу  вертикальные отверсти  12. Через ::)тн отверсти  вода из реки иод углом 155-130 к оси потока направл етс  новерх стенки в аваика.меру. Нижн  , глуха , часть стенки иреи тствует ноиадаиню донных наносов 1 аванкамеру, верхн  , реи1етчата  часть занцпцает аванкамеру от нлы ) НС реке предметов, которые нанравл ютс  в отверстие затвора Л плотины 6, легко скольз  вдоль отдельных нерегородок жалюзи.Before entering the channel 2, the threshold is set .V height 0.8–, 50,.;, To Topbiii it is easy to increase the installation of the sandor; on norog there is ren 6et 61897 -ka d.ch zadsr | ; 111c ii.uiiiaiouiit.x iredmetoi. Priya1) 1 Xiosh, and to the coast a part of the avancamera is reinforced with a retaining wall 10. The enclosing wall 3 of the avancamera is made inclined up to a height of 1.00--1.50 m; vsr1; a part of the walls consists of short short streets 11, located in the form of a jaw at an acute angle to the flow axis in the plan, forming vertical holes 12. Through: :) tons of holes water from the river iodine angle 155-130 to the flow axis goes top to side in avaika. measure The lower, deaf, part of the wall is agglomerated by noiadain of the sediment 1 by the anankamera, the upper, the third part is occupied by the anankamer from nla) NS of objects that are inserted into the opening of the bolt L of the dam 6, it is easy to slide along the separate blind suburbs.

Горный поток при больших расходах воды и болыиом количестве донных кр нпых наносов и илывун1нх деревьев, нодход  к и,лотиие с (лкрытым 8, проиосит дойные наносы стенки 3 в нижний бьеф 5. Плывущие деревь , .мегко скольз  вдоль решетчатой части стенки 3. также ироход т в отверстие затвора 8, имеюи ее достаточную ширину, чтоб1)Г их нроп)стнть. Промьплюй затвор 4 аванкамеры в то врем  закрьгг. Понадагогца  li аванкамеру через отверсти  Г2 между перегородкамн // вода идет в деривационный канал 2.A mountain stream with high water consumption and a large amount of bottom sediments and silt trees, but with a lotia (closed 8, pours sediment walls 3 into the lower reach 5. Floating trees, easily slipping along the latticed part of wall 3. also The opening is in the opening of the bolt 8, have its width wide enough so that 1) their sprout stint. Prompt shutter 4 avankemers at the time the squirt. Ponadogog li avankamera through the holes G2 between the partition walls // water goes into the diversion channel 2.

Разме 1ы отве)стий 12 ио с|)авиеиию с сечением дернвании настолько велики, что входна  скорость в этих отверсти х и скорость в аванкамере крайие малы. Это особеиио важно д.ч  нредотв)аш,ени  зат гивани  наносов через myxyjo часть стенки 3 и нодсасыва1П1  в аванка:Njepy нлыоупиьх но реке предметов. Гор1 ЗО1ггы воды в аваикахгере / и h бьефе 7 /ючти одииаковы.The sizes of the answers are 12 and with a cross section of the turf section so large that the input velocity in these holes and the velocity in the avant-chamber are extremely small. This is especially important for the hr, which is, the use of the myxyjo part of wall 3 and the nonsupply 1P1 per avanche: Njepy from the bottom of the river. Horus ZO1ggy water in avakikahgere / and h byfee 7 / yuhti odiyakovy.

Взвешенные иаиосы, попав в CHOKoiniyio воду аванкамеры, оседают и ней,-врем  от времени их .можно с.мыть в нижне бьеф реки, открыв :.атвор -/. В эти периоды резко сиижаетс  горизонт воды в аванкамере; верхнего бьефа с больнюй скоростью ностунает вода, интенсивно, взмучива  наносы и выиос  их в иижии|( бьеф.Suspended ionos, having got into the water of the CHOKoiniyio avant-chamber, they also settle down, - from time to time they can be washed in the downstream of the river, having opened:. During these periods, the water horizon in the avanchamber sharply shines; the upper reach with a sickly speed nostunet water, intensively, stirring up sediments and their sediments in izhii | (bye.

При средних расходах воды, нет и.лывущих деревьев, а имеечс  значите.пьиое количество донных нан(}сов, затвор 6 полуоткрыт и поддержнвает нужный в верхнем б1)ефе горизонт воды. Если бы часть донных наносов стала откладьизатьс  у сте.чкн ., то кj)aткoвpe.reпнlзIЛIИ полны.ми подн ти ми затвора люжио было бы ути наносы с.мыть.With average water consumption, there are no fallen trees, but a significant amount of groundwater (} ow, gate 6 is half-open and supports the water horizon needed in the upper stage). If a part of the bottom sediments began to be set aside at the stationary level, then j) akkovep.repnlIlIII full elevations of the Lyuzhio shutter would be able to remove the sediment from the washroom.

Болыиое нреимун ество нредставл ет предлагаемый водоприе.мник .зимой .чл  борьбы с донны.м .льдом и нуг()й. Зимой аванкамера быстро покрываетс  льдом, и кхла может ностуиат в нее через два - четыре ;,ониых окиа, устроенных к нижне части стенки 3 и не)екрытых .ч.лоски.ми ниггами. Затвор отверсти  (V, 11(х-чде)жива  некочорьп подпорный горизопт, создает тихую воду перед aiiain aMepoii и способст1Пет всилываимю niyrn на поверхность. Даже пе покр пмпа с  льдом авапкамера со cnoKoiinbi.M течением 311ач1Г1ч л1 ио спиз1гг поступ.ление И1уги в каиа;.A major problem is the proposed water intake in the winter months to combat the bottom with an almond and nougat (). In winter, the avancamera is quickly covered with ice, and the khla can nostuate into it after two to four; they are arranged to the lower part of the wall 3 and not covered with an open face. Niggs. The shutter of the aperture (V, 11 (x-chde)) is alive and retaining, creates calm water in front of aiiain aMepoii and facilitates niyrn spreading to the surface. kaia;

Одно из конетруктнвньгх libiHo.iiieiUiii ог1)адитс, стен1) южeл быть таким. Iia (|)уидаменте нирпной 2 м вык.ладывают i aме1П1ую на нементном растворе стенку ннрнной 1,50 л; н переменно -высоты; отверстие 8 возвып1аетс  над (хлютбетом па 1--1,5 м н пизовом п па 1,5--2 .-U в верхие.м конне, п|)им1лка1О цем к б(.регу. В каменную стенку втапливают в 1сокие пр моугольные металлические 13 из изогнутых ре.льсов или рамы, сваренные из более т же.лых прокатных профилей (двутавр, niiie.T.-iep). Рамы, выстунаюшпе над 11аив1)1сп1им ; одпорпым горизонтом (рассто нне между нх копнами- 1,10 м), расположены в плане, как показано па фигуре вверху. Повепх рам кре .л ют мета.итнческин (из рельсов или двутавров) служебный мостик 14 с дерев нным настилом.One of the congruent libiHo.iiieiUiii og1) adits, wall1) is supposed to be like that. Iia (|) identate 2 m of nirp is dispensed with i ami1P1uyu on nementno solution of the wall of nnrnnoy 1.50 l; n variable-height; Hole 8 is raised above (hlutbet pa 1-1-1,5 m n pizov p pa 1.5--2.-U in the upper m. conna, n |) itlac ce ce to b (. reg. In the stone wall is embedded in 1 rectangular metal 13 of curved roils or frames, welded from more heavy rolled profiles (I-section, niiie.T.-iep). Frames, stand over 11aiv1) 1sp1; The largest horizon (the distance between them is 1.10 m) is located in the plan, as shown in the figure above. Each of them is built with meta.ithnically (from rails or I-beams) service bridge 14 with wooden flooring.

Вертикальные перегородки 11 образуют из горизонтально уложен 1ых тонких бревен длиной 4,5-5,5 м, прикрепленных проволокой ,к cтo кa металлических рам.Vertical partitions 11 form horizontally laid 1st thin logs 4.5–5.5 m long, attached by wire, to one hundred metal frames.

Предмет и з о б р е т е и и  Subject and d on and e and

Водозаборное сооружение с применением стенки, образуюи ей аванкамеру, отличающеес  тем, что нижн   часть стенки, служа1ца  дл  отклонени  от водоприемника донны.х наносов, выполнена СПЛ01ННОЙ, а верхн   часть, иазиачеиие которой отклон ть плывущие деревь  п другие предметы, сделана из коротких нерегородок расположенных в виде жалюзы иод острым углом к, оси потока в плане.The water intake structure with the use of a wall that forms an anankamera, characterized in that the lower part of the wall, which serves to deflect the bottom sediments from the water intake, is made SPLAWN, and the upper part, which is designed to deflect the floating trees and other objects, is made of short non-city walls. in the form of zalozy iodine acute angle to, the axis of flow in the plan.

SU42450A 1941-04-08 1941-04-08 Water intake facility SU61897A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU42450A SU61897A1 (en) 1941-04-08 1941-04-08 Water intake facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU42450A SU61897A1 (en) 1941-04-08 1941-04-08 Water intake facility

Publications (1)

Publication Number Publication Date
SU61897A1 true SU61897A1 (en) 1941-11-30

Family

ID=48243198

Family Applications (1)

Application Number Title Priority Date Filing Date
SU42450A SU61897A1 (en) 1941-04-08 1941-04-08 Water intake facility

Country Status (1)

Country Link
SU (1) SU61897A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2560616C2 (en) * 2013-09-11 2015-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Донской государственный аграрный университет"(ФГБОУ ВПО ДГАУ) Device to protect bridges against floating trees
RU2664835C2 (en) * 2016-11-14 2018-08-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Донской государственный аграрный университет" Device for protection of hydrotechnical and bridge structures from floating trees

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2560616C2 (en) * 2013-09-11 2015-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Донской государственный аграрный университет"(ФГБОУ ВПО ДГАУ) Device to protect bridges against floating trees
RU2664835C2 (en) * 2016-11-14 2018-08-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Донской государственный аграрный университет" Device for protection of hydrotechnical and bridge structures from floating trees

Similar Documents

Publication Publication Date Title
SU61897A1 (en) Water intake facility
US2598389A (en) Hydrostatic weir, gate, and the like
Goel et al. Open channel flow measurement of water by using width contraction
Saadati et al. Experimental investigation of ridged collar effect on scour process on the periphery of circular pier in clear water condition
Bradley et al. Hydraulic Design of Stilling Basins: Small Basins for Pipe or Open Channel Outlets-No Tail Water Required (Basin VI)
De Mulder et al. Inlet sluices for flood control areas with controlled reduced tide in the Scheldt estuary: an overview
Bradley et al. Debris Control Structures-Evaluation and Countermeasures: Hydraulic Engineering Circular 9
Hager Cascades, drops and rough channels
CN208441211U (en) A kind of buried gully
Schoof et al. HYDROLOGIC EFFECTS OF THE FLOOD ABATEMENT PROGRAM IN SOUTHWESTERN OKLAHOMA 1
Simmons Hydraulic design of transitions for small canals
Khidirov et al. Calculation of strength of stilling basins and pressure in downstream water outlet structures
SU30622A1 (en) Shield valve for culverts of hydraulic structures
Allred-Coonrod Safety grates in supercritical channels
KHANOV et al. EXPERIMENTAL DESIGN JUSTIFICATION OF THE SHORT-SPAN SPILLWAY'S TAIL-WATER DEVICES
Katzer Feature. Clarifying Muddy Waters is Possible with Automatic System
Demissie et al. Hydrology and hydraulics of the Illinois River
KR100485721B1 (en) Pentagonal manhole capable of easily installing drainpipe in curve area
Farshidnia et al. Experimental Study on the Placement of the Angle and the Distance of Parallel Skimming Walls to Reduce Inlet Sediment in a Lateral Intake
Marshall The instrumentation of flat low-lying catchments for hydrological research
KR200306636Y1 (en) Pentagonal manhole capable of easily installing drainpipe in curve area
Balzer et al. Minimising persistent thermal stratification and algal blooms using improved flow velocity and discharge targets: Taskforce MER Plan: Project 08.5 Report
CN110042809A (en) A kind of biological migration facility of classification and its operation method
Bijankhan et al. PARALLEL JETS EMERGING FROM TWO PARALLEL GATES: DISTINGUISHING FLOW CONDITION
SU46825A1 (en) Sludge flushing device