SU606881A1 - Filling bell of blast furnace bell-and-hopper arrangement - Google Patents

Filling bell of blast furnace bell-and-hopper arrangement

Info

Publication number
SU606881A1
SU606881A1 SU762385658A SU2385658A SU606881A1 SU 606881 A1 SU606881 A1 SU 606881A1 SU 762385658 A SU762385658 A SU 762385658A SU 2385658 A SU2385658 A SU 2385658A SU 606881 A1 SU606881 A1 SU 606881A1
Authority
SU
USSR - Soviet Union
Prior art keywords
bell
blast furnace
filling
hopper arrangement
funnel according
Prior art date
Application number
SU762385658A
Other languages
Russian (ru)
Inventor
Владимир Петрович Тарасов
Василий Федорович Мазов
Юрий Константинович Мельник
Николай Антонович Шостак
Игорь Иосифович Дышлевич
Эрнст Николаевич Салий
Иван Григорьевич Крапко
Original Assignee
Ждановский металлургический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ждановский металлургический институт filed Critical Ждановский металлургический институт
Priority to SU762385658A priority Critical patent/SU606881A1/en
Application granted granted Critical
Publication of SU606881A1 publication Critical patent/SU606881A1/en

Links

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Description

ж«нием неподвижной части делител  2, поступают через выгрузочные окна 8 и 9 в распределительную воронку в точках, смещенных на 45 и 225° от оси наклонного моста. Затем подвижный делитель перемещаетс  в положение , обозначенное на фиг. 2 пунктиром, и материала из левого скипа попадают в распрецелительную воронку в точках, смещенных гга 90° по отношению к местам их ссыпани  из правого скипа (135 и 315°)., Передвижение пирамиды 3 в горизонтальной плоскости осуществл етс  по направл ющим, расположенным в нижней части приемной воронки 1, с помощью реечного толкател  или электропривода на специальных скатах передвижной тележки .In addition to the fixed part of the divider 2, they are fed through the discharge ports 8 and 9 to the distribution funnel at points offset 45 and 225 ° from the axis of the inclined bridge. The movable divider is then moved to the position indicated in FIG. 2 by a dotted line, and the materials from the left skip fall into the distribution funnel at points displaced by about 90 ° with respect to the places of their dumping from the right skip (135 and 315 °). The pyramid 3 moves in a horizontal plane along the guides located in the lower part of the receiving funnel 1, with the help of a rack pusher or electric drive on special slopes of a mobile cart.

В варианте с перекидной стенкой процесс загрузки осуществл етс  аналогично.In the flip wall version, the loading process is similar.

Внедрение изобретени  позвол ет улучщить распределение щихтовьгх материалов на колошнике доменной печи.The implementation of the invention makes it possible to improve the distribution of bulk materials in the top of the blast furnace.

Claims (3)

1.Приемна  воронка загрузочного устройства доменной печи, содержаща  корпус с расположенными внутри его делител ми потока1. A receiving hopper of the blast furnace charging device, comprising a housing with flow dividers located inside it. шихты и диаметрально противоположными выгрузочными окнами, отличающа с  тем, что, с целью улучшени  распределени  щихты, делитель выполнен из двух частей: верхних стационарных и нижней общей, подвижной в горизонтальной плоскости между неподвижными част ми.The charge and diametrically opposite discharge ports, characterized in that, in order to improve the distribution of the shields, the divider is made of two parts: the upper stationary and the lower common, movable in the horizontal plane between the fixed parts. 2.Воронка по п. 1, отличающа с  тем, что нижн   часть выполнена в виде перекидной стенки.2. A funnel according to claim 1, characterized in that the lower part is made in the form of a flip wall. 3.Воронка по п. 1, отличающа с  тем, что нижн   часть выполнена в виде конической3. Funnel according to claim 1, characterized in that the lower part is made in the form of a conical пирамиды.the pyramids. Источники информации, прин тые во внимание при экспертизе:Sources of information taken into account in the examination: 1. Авторское свидетельство СССР № 442213, кл. С 21 В 7/20, 1972.1. USSR author's certificate No. 442213, cl. From 21 to 7/20, 1972. Л-АLA
SU762385658A 1976-07-19 1976-07-19 Filling bell of blast furnace bell-and-hopper arrangement SU606881A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762385658A SU606881A1 (en) 1976-07-19 1976-07-19 Filling bell of blast furnace bell-and-hopper arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762385658A SU606881A1 (en) 1976-07-19 1976-07-19 Filling bell of blast furnace bell-and-hopper arrangement

Publications (1)

Publication Number Publication Date
SU606881A1 true SU606881A1 (en) 1978-05-15

Family

ID=20670385

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762385658A SU606881A1 (en) 1976-07-19 1976-07-19 Filling bell of blast furnace bell-and-hopper arrangement

Country Status (1)

Country Link
SU (1) SU606881A1 (en)

Similar Documents

Publication Publication Date Title
ZA75645B (en) An apparatus for charging coal hoppers
ZA762542B (en) A process for discharging bulk material from a silo
SU606881A1 (en) Filling bell of blast furnace bell-and-hopper arrangement
CA1030890A (en) Apparatus for extracting bulk material from dumps
GB1269617A (en) An electric arc furnace with charging equipment for sponge iron
SE7808832L (en) INJECTION DEVICE
YU47774A (en) Device for introducing material in a charging silo of an arc furnace
SU580003A1 (en) Device for charging a cone crusher
JPS5266806A (en) Control device of rotating chute for blast furnace
PH14781A (en) Apparatus for movement of charge within an electric smelting furnace
ZA751892B (en) Arrangement for moving the charge in a smelting furnace
CA942952A (en) Charging device for a blast furnace
SU947191A2 (en) Receiving funnel of charging device for blast furnace
SU603665A1 (en) Blast furnace charging device
SU913735A1 (en) Receiving funnel of charging arrangement for blast furnace
US3276756A (en) Open-hearth furnaces and charging means
ZA744595B (en) A dust-tight and gas-tight device for charging the furnace chambers of a battery of coke furnaces
JPS52128174A (en) Apparatus for measuring level of charging material in cupola
SU547627A2 (en) Device for loading the charge into the furnace
JPS5252812A (en) Equipment for measuring raw material level at furnace top part of blas t furnace
SU777065A1 (en) Method of dosing charge materials on conveyer hoist of blast furnace
RU25075U1 (en) BUNKER RADIATOR OF MELTING FURNACE
JPS54151501A (en) Detecting bridging of charged material in blast furnace top hopper
SU94325A1 (en) Metal sealing device
SU675155A1 (en) Device for discharging refuse from refuse chute