SU60226A1 - Scaffolding for walls - Google Patents

Scaffolding for walls

Info

Publication number
SU60226A1
SU60226A1 SU22788A SU22788A SU60226A1 SU 60226 A1 SU60226 A1 SU 60226A1 SU 22788 A SU22788 A SU 22788A SU 22788 A SU22788 A SU 22788A SU 60226 A1 SU60226 A1 SU 60226A1
Authority
SU
USSR - Soviet Union
Prior art keywords
scaffolding
masonry
flooring
height
walls
Prior art date
Application number
SU22788A
Other languages
Russian (ru)
Other versions
SU10075A1 (en
Inventor
нкин Н.М. Орл
Н.С. Попов
Original Assignee
нкин Н.М. Орл
Н.С. Попов
Filing date
Publication date
Publication of SU10075A1 publication Critical patent/SU10075A1/en
Application filed by нкин Н.М. Орл, Н.С. Попов filed Critical нкин Н.М. Орл
Priority to SU22788A priority Critical patent/SU60226A1/en
Application granted granted Critical
Publication of SU60226A1 publication Critical patent/SU60226A1/en

Links

Description

Известны леса (подмости) дл  кладки стен, состо щие из поперечных рам, несущих настил, с применением переставных по высоте консолей , закрепл емых на стойках рам и поддерживающих щиты дл  рабочих площадок.There are scaffoldings (scaffoldings) for masonry walls, consisting of transverse frames that support the flooring, with the use of height-adjustable cantilevers attached to the frame uprights and supporting shields for work sites.

Отличительной особенностью предлагаемых лесов  вл етс  конструктивное их выполнение, заключающеес  в том, что верхние концы стоек рам выпущены выше горизонтальных элементов их. Эта особенность дает возможность укрепл ть консоли к вильчатому концу дл  установки щитов рабочей площадки на уровне основного настила.A distinctive feature of the proposed forests is their constructive implementation, which consists in the fact that the upper ends of the uprights of the frames are released above their horizontal elements. This feature makes it possible to fix the brackets to the forked end to install the platform shields at the level of the main deck.

На фиг. 1-4 изображены предложенные леса с различными положени ми консоли в зависимости от высоты кладки.FIG. Figures 1–4 show the proposed scaffolding with different positions of the console depending on the height of the laying.

Стойки / поперечных рам состо т из двух досок, сбитых гвозд ми. Между досками вставлены прокладки 2. Стойки имеют опорные башмаки 5 и св заны с горизонтальными элементами 4 рамы, на которые кладетс  основной рабочий настил 5. Горизонтальные элементы св зываютс  со стойками подкосами.Racks / transverse frames consist of two planks knocked down by nails. Gaskets 2 are inserted between the boards. The racks have support shoes 5 and 4 frames are connected to the horizontal elements on which the main working deck 5 is laid. The horizontal elements are connected to the struts by the struts.

К стойкам, расположенным ближе к стене, прикрепл ютс  переставные досчатые консоли 6, концы которых пропускаютс  в просвет между досками стоек. На концах консолей и в стойках сделаны отверсти , через которые пропускаютс  крепительные щтыри 7. На консоли кладутс  переносные щиты 8,  вл ющиес  рабочими площадками каменщиков. При наивысшем положении консоли конец ее горизонтального элемента пропускаетс  в просвет вильчатого конца стойки, выпущенного выше горизонтального элемента 4, и прикрепл етс  к этому концу штырем 7 (фиг. 4). Щит 8 в этом случае укладываетс  на одном уровне с основным настилом 5.The racks 6, the ends of which are passed into the gap between the boards of racks, are attached to the posts located closer to the wall. At the ends of the consoles and in the racks, holes are made through which the fastening pins 7 are passed. On the consoles there are portable shields 8, which are the working platforms of the bricklayers. At the highest position of the cantilever, the end of its horizontal member is passed into the lumen of the forked end of the post, extended above the horizontal member 4, and is attached to this end with a pin 7 (Fig. 4). The shield 8 in this case is laid flush with the main flooring 5.

Кладка с применением описанных лесов должна быть организована в основном по пор дку так, чтобы каменщики имели возможность возводить стену высотой в целый этаж без перемены рабочего места и без длительных перерывов.The laying with the use of the described forests should be organized mainly in order so that bricklayers have the opportunity to build a wall the height of a whole floor without changing the workplace and without long interruptions.

Этот пор док заключаетс  в следующем . Вместе со сборкой междуэтажного перекрыти  на половой настил его устанавливаютс  леса на рассто нии 60-70 см от выкладываемой стены. Основной настил лесов должен находитьс  на высоте, с которой легко и удобно было бы закончить кладку всего этажа.This order is as follows. Together with the interfloor overlap assembly, the scaffolding is installed on its flooring at a distance of 60-70 cm from the laid out wall. The main scaffolding should be at a height from which it would be easy and convenient to finish the laying of the entire floor.

Заблаговременно, а затем по ходу работы в тачках 9 завозитс  кирпич одновременно внизу под лесами поIn advance, and then, in the course of work, in 9 wheelbarrows, a brick is delivered simultaneously down below the forests along

347347

настилу 10 перекрыти  и вверху по настилу 5 лесов. Внизу материал складываетс  на высоте 60-70 см от пола, например, на козелки, перекрытые щита-ми, или на подлески, в виде небольших прикрепленных к стойкам 1 лесов рам //, служащих одновременно дл  устойчивости стоек и тоже перекрытых щитами. Раствор подвозитс  по настилу лесов и опускаетс  по желобу в  щики, установленные на подлесках.flooring 10 overlap and at the top of the flooring 5 forests. At the bottom, the material is folded at a height of 60-70 cm from the floor, for example, on trestles covered with boards, or on undergrowth, in the form of small frames / scaffolds attached to posts 1 that serve simultaneously for the stability of stands and also covered with boards. The solution is brought along the scaffolding and lowered along the chute into the drawers installed in the undergrowths.

Организовав таким образом посто нные места дл  снабжени  материалами дл  кладки всего этажа, остаетс  лишь в дальнейшем, по мере возведени  кладки, перемещать консольные плоп;адки дл  каменщиков .Having thus organized permanent places for the supply of materials for masonry of the entire floor, it remains only in the future, as the masonry is erected, to move the cantilever bed for masons.

Кладка ведетс  следующими этапами .The laying is carried out in the following steps.

I этап (фиг. I). С пола перекрыти  кладка возводитс  примерно на высоту 90 см материалами каменщики обеспечиваютс  с подлесков 11.Stage I (Fig. I). From the floor, masonry is erected approximately to a height of 90 cm with materials provided by bricklayers from the underbrush 11.

П этап {фиг. 2). Каменщики со щита .8, уложенного на консол х 6 на уровне подлесков, возвод т еще 90 см кладки; материалами снабжаютс  с тех же подлесков.P stage {FIG. 2). Bricklayers from the .8 shield, laid on the console x 6 at the level of the underbrush, erected another 90 cm of masonry; materials are supplied from the same undergrowth.

III этап (фиг. 3). Со щита, устанавливаемого ниже настила лесовStage III (Fig. 3). From the shield installed below the scaffolding

примерно на 70 см, выкладываетс  еще 90 см кладки; материалы берутс  уже с основного настила 5 лесов.approximately 70 cm, another 90 cm of masonry is laid out; materials are already taken from the main flooring of 5 forests.

IV этап (фиг. 4). Со щита, уложенного на уровне настила лесов, заканчиваетс  кладка этажа. Материалы берутс  с настила лесов.Stage IV (Fig. 4). From the shield laid at the level of the scaffolding the laying of the floor ends. Materials are taken from the scaffolding.

Таким образом, в результате обеспечени  материалами одновременно с двух  русов в процессе кладки переставл ютс  только консоли 6 и щиты 8, что осуществл етс  самими каменщиками или (в перерывах) плотниками; возведение всего этажа производитс  без перехода каменщиков на другие рабочие места (захватки).Thus, as a result of the provision of materials simultaneously from two Rus in the process of masonry, only consoles 6 and shields 8 are rearranged, which is carried out by the masons themselves or (in the intervals) by the carpenters; the entire floor is erected without masons moving to other workplaces (grabs).

Предмет изобретени Subject invention

Леса дл  кладки стен, состо щие из поперечных рам, несущих настил, с применением переставных по высоте консолей, закрепл емых на стойках рам, поддерживающих щиты дл  рабочих площадок, отличающиес  тем, что стойки рам выпущены выше горизонтальных элементов их, с целью получени  возможиости прикрепл ть консоли к вильчатому концу дл  установки щитов рабочей площадки на уровне основного н-астила.Scaffolding for masonry walls, consisting of transverse frames, supporting flooring, using height-adjustable consoles fixed on racks of frames, supporting shields for working platforms, characterized in that the frame stands are erected above their horizontal elements in order to obtain the possibility of attaching the console to the forked end for installing the shields of the working platform at the level of the main n-astil.

s:s:

5 у 5 y

4L4L

ж::чЛw :: hL

S ISi

L ±

Ь-Аг-1B-ar-1

ЖЬ..„1G .. .. 1

SU22788A 1939-03-26 Scaffolding for walls SU60226A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU22788A SU60226A1 (en) 1939-03-26 Scaffolding for walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU22788A SU60226A1 (en) 1939-03-26 Scaffolding for walls

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU2763A Addition SU71107A1 (en) 1947-02-19 1947-02-19 Conveyor, for example, for bast fiber carding machines

Publications (2)

Publication Number Publication Date
SU10075A1 SU10075A1 (en) 1929-06-29
SU60226A1 true SU60226A1 (en) 1941-06-30

Family

ID=

Similar Documents

Publication Publication Date Title
CA2718609C (en) Rail-guided self-climbing formwork system with climbing rail extension pieces
US20100122872A1 (en) Scaffold elevator
US3318414A (en) Scaffolding
US2575461A (en) Adjustable scaffold base
RU2011141929A (en) MOBILE MODULAR SCAFFOLDING SYSTEM FOR CONSTRUCTION WORKS AND METHOD OF ITS INSTALLATION
US2142651A (en) Scaffolding
FI87679C (en) Ställningsgolbottendel
US2237572A (en) Knockdown scaffold structure
SU60226A1 (en) Scaffolding for walls
US2893786A (en) Bracket type scaffolding, adjustable in height, slidingly, for concrete wall erection
US9212026B2 (en) Lifting platform and method for setting up a lifting platform
US2725125A (en) Steel scaffolding column
US3490559A (en) Knockdown scaffolding
SU626186A1 (en) Cradle scaffold
CN210316278U (en) Multifunctional safety protection stair
CN211114732U (en) Portable movable reinforcement operation platform
US1742236A (en) Bricklayer's scaffolding
SU622955A1 (en) Window-mounted scaffold
US3410365A (en) Scaffold structure
JP3865433B2 (en) L-type work table
RU1794162C (en) Suspending scaffold for erection of walls from small-piece material
EP1264056B1 (en) Method for erecting a scaffold, scaffold and parts therefor
SU631627A1 (en) Cantilever scaffold
CA2929064A1 (en) Scaffold hoist
SU83204A1 (en) Foldable construction undergrowths