1one
Изобретение относитс к строительству воздушных линий электропередачи и может быть использовано при строительстве трехфазных воздушных линий электропередачи 6-10-35 кВ с горизонтальным расположением проводов в гололедных районах и в районах с выпадением больших масс мокрого липкого снега .The invention relates to the construction of overhead transmission lines and can be used in the construction of three-phase overhead transmission lines of 6-10-35 kV with a horizontal arrangement of wires in icy areas and in areas with heavy precipitation of wet sticky snow.
Известна опора линии электропередачи 6- 10-35 кВ, содержаща стойку, траверсу дл горизонтальной подвески проводов, фиксатор, упор, укрепленный на стойке опоры, и пружину , закрепленную одним концом к траверсе, а другим - к стойке опоры 1. Однако эта опора не может быть использована дл трехфазной линии электропередачи.The 6–10–35 kV transmission line support is known, containing a rack, a traverse for the horizontal suspension of the wires, a retainer, an emphasis fixed on the support rack, and a spring fixed at the end of the support to the traverse, and the other end Can be used for three phase power line.
Целью изобретени вл етс заш,ита проводов от обрыва при гололеде путем сбрасывани нагрузки дл трехфазной линии электропередачи . В описываемой опоре это достигаетс тем, что в ней траверса закреплена на стойке с помощью оси, расположенной между точками креплени фазных проводов, так, что с одной стороны оси расположены провода двух фаз, а указанна пружина расположена у провода третьей фазы.The aim of the invention is to secure the wires from an ice break by shedding the load for a three-phase transmission line. In the described support, this is achieved by the fact that in it the traverse is fixed on the stand by means of an axis located between the points of attachment of the phase wires, so that on one side of the axis there are wires of two phases, and the specified spring is located on the wire of the third phase.
На фиг. 1 показана описываема опора, вид спереди; на фиг. 2 -то же, вид сверху.FIG. 1 shows the described support, front view; in fig. 2 is the same, top view.
Опора линии электропередачи включает стойку 1 и траверсу 2 дл подвески проводов Transmission line support includes post 1 and yoke 2 for hanging wires
3. Траверса закреплена на стойке посредством оси 4, на которой она может вращатьс до упора 5, и соединена с верхней частью смонтированной на стойке пружины 6, нижн часть которой укреплена на кронштейне 7.3. The traverse is fixed on the stand by means of an axis 4, on which it can rotate up to the stop 5, and is connected to the upper part of a spring 6 mounted on the stand, the lower part of which is fixed on the bracket 7.
Кроме того, траверса снабжена фиксатором 8 дл удержани ее в рабочем положении при нагрузке на нровода меньше заданной допустимой .In addition, the yoke is provided with a latch 8 for keeping it in the working position when the load on the wires is less than the specified allowable.
При гололеде нагрузка на провода увеличиваетс и, когда она достигает величины, большей заданной допустимой, фиксатор освобождает траверсу. Последн , враща сь, рывком опускаетс до упора. В результате этого рывка 11ро1 сходит встр хивание траверсы и проводов в двух пролетах - справа и слева от опоры. После вст хивани нагрузка ;;а траверсу н провода становитс меньше заданной допустимой, и траверса под действием пружины, враща сь, возвращаетс в исходное рабочее положение.In case of icy conditions, the load on the wires increases and, when it reaches a value greater than the set permissible, the clamp releases the traverse. Lastly, rotated, it jerks down as far as it will go. As a result of this jerk 11ro1, shaking the crossheads and wires in two spans, on the right and left of the support, comes off. After shaking, the load ;; and the traverse n of the wire becomes less than the specified allowable, and the traverse, under the action of the spring, rotates, returns to its original operating position.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7602342827A SU576375A1 (en) | 1976-04-05 | 1976-04-05 | Y.i.shevchenko's mast for power transmission lines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7602342827A SU576375A1 (en) | 1976-04-05 | 1976-04-05 | Y.i.shevchenko's mast for power transmission lines |
Publications (1)
Publication Number | Publication Date |
---|---|
SU576375A1 true SU576375A1 (en) | 1977-10-15 |
Family
ID=20655223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU7602342827A SU576375A1 (en) | 1976-04-05 | 1976-04-05 | Y.i.shevchenko's mast for power transmission lines |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU576375A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103032631A (en) * | 2012-12-20 | 2013-04-10 | 中国电力科学研究院 | Iced conductor supporting device |
CN108331419A (en) * | 2018-04-18 | 2018-07-27 | 深圳市晓控通信科技有限公司 | A kind of communication steel tower with anti-falling function based on Internet of Things |
-
1976
- 1976-04-05 SU SU7602342827A patent/SU576375A1/en active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103032631A (en) * | 2012-12-20 | 2013-04-10 | 中国电力科学研究院 | Iced conductor supporting device |
CN108331419A (en) * | 2018-04-18 | 2018-07-27 | 深圳市晓控通信科技有限公司 | A kind of communication steel tower with anti-falling function based on Internet of Things |
CN108331419B (en) * | 2018-04-18 | 2020-02-14 | 北京德汇伟业技术服务有限公司 | Communication tower with anti-falling function based on Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU576375A1 (en) | Y.i.shevchenko's mast for power transmission lines | |
RU96116588A (en) | CONIC CLAMPING DEVICE | |
RU94004661A (en) | ZOLOTKA ZAKOROTKA FOR THE AIR LINE OVER 1000 V | |
SU385019A1 (en) | ELECTRIC POWER SUPPORT | |
EP0044625B1 (en) | Lambda type suspension system for an overhead contact wire | |
SU752589A1 (en) | Apparatus for suspending divided-phase wires of air power-transmission lines | |
US1401999A (en) | Trolley device | |
SU586117A1 (en) | Device for mounting crosspieces on caps of supports for long construction elements | |
SU448526A1 (en) | Single-chain power line | |
SU823269A1 (en) | Device for hoisting long-sized structures | |
US444273A (en) | Swinging or drop arm for electric lamps | |
SU842181A1 (en) | Power transmission line | |
SU629096A1 (en) | Contact wire network insulated connection | |
SU1472987A1 (en) | Device for phase transposition of open electric transmission line | |
SU937690A1 (en) | Power transmission line support | |
RU92004350A (en) | SHOCK ABSORBING DEVICE | |
SU370088A1 (en) | ISOLATED CONTACT NETWORK CONNECTION | |
SU1011011A1 (en) | Suspension of split-phase conductors in overhead power transmission line | |
SU1535814A1 (en) | Cable drum | |
RU2076417C1 (en) | Supporting structure for high-voltage power transmission line | |
SU542281A1 (en) | High Voltage Single Column Support | |
SU878721A2 (en) | Cargo gripping apparatus | |
SU957330A1 (en) | Three-phase electric power line | |
SU818951A2 (en) | Arrangement for placing ship crane load hanger into travel position | |
SU646379A1 (en) | Tripole suspended disconnector |