SU567825A1 - Method of filling-up undergrounf workings - Google Patents
Method of filling-up undergrounf workingsInfo
- Publication number
- SU567825A1 SU567825A1 SU7502096687A SU2096687A SU567825A1 SU 567825 A1 SU567825 A1 SU 567825A1 SU 7502096687 A SU7502096687 A SU 7502096687A SU 2096687 A SU2096687 A SU 2096687A SU 567825 A1 SU567825 A1 SU 567825A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- space
- pillars
- laying
- filling
- loaders
- Prior art date
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Description
(54) СПОСОБ ЗАКЛАДКИ ВЬГРАБОТАННОГО ПРОСТРАНСТВА(54) METHOD FOR LAYING A SCRAPTED SPACE
ства между двум ссхзецними нскуественнымн целвками (разрез фиг. 2).between the two national branches (section of FIG. 2).
Закладка выработанного пространства осуществл етс следующим образом.The laying of the goaf is as follows.
На период закладочных работ, вапрнмер при выемке калийЕсых пластов, передвижвые ленточвые перегружатели 1 собирают в транспортную линию, и по ней передают закладочный материал последовательно от одного питател к другому до тех пор, пока материал не будет направлен в приемное устройство I метател 2 с регулируемыми углами выброса материала, -, Будучи установлен против выработанног пространства, наход щегос между двум крайними искусственными целиками 3, выложенными нормально к линии очистног забо , метатель складирует IB нем определенное количество закладочного материала, оставл при этом часть пространства не заполненным .For the period of backfilling, vaprnmer when excavating potassic layers, mobile belt loaders 1 are collected in the transport line, and the filling material is transferred through it sequentially from one feeder to another until the material is directed to the receiving device I of the 2 placers with adjustable angles ejection of the material, - Being installed against the worked-out space, located between the two extreme artificial pillars 3, laid out normally to the side of the face, the thrower stores IB with his definite The second amount of filling material, while leaving part of the space is not filled.
После этого ближайший к мечтателю перегружатель убираетс в незаполненное пространство, а метатель перемещаетс на закладки, равный шагу целиков, и закладывает пространство между двум следующими целиками. .After that, the overloader closest to the dreamer is removed into the empty space, and the thrower moves to the bookmarks equal to the pillars' pitch and lays the space between the two following columns. .
Циклы повтор ютс до тех пор, пока не будет произведена закладка пространства между всеми целиками и все перегружатели не будут установлены между ними.The cycles are repeated until the space between all the pillars is tabbed and all the loaders are installed between them.
Незначительный вес, колесный |ход и наличие поворотного моста 4 обеспечивают легкость перемещени перегружателей.The low weight, wheel travel, and the presence of a rotary bridge 4 provide ease of movement for the material handlers.
Необходмые . маневры метател выполн ютс за счет собственной ходовой части. По окончании закладочных работ производ тс очистные работы с выкладкой искусственных целиков из пустой породы. Necessary. thrower maneuvers are performed by own running gear. At the end of the filling operations, cleaning works are performed with laying out artificial pillars from waste rock.
Применение предложенного способа за- кладки вы уаботанного пространства позвол ет полностью использовани выработанное пространство, предохраненное при помощи искуственных целиков от завала образуктимис сло ми кровли, дл размещени отходThe application of the proposed method of laying the interior of the space allows the complete use of the developed space, protected by artificial pillars from the obstruction of the roofing layers, to accommodate waste
обогатительных фабрик; снизить объем подготовительных работ в лаве, выполн екшх валовой выемкой; расширить область применени систем разработки с длинным очистным забоем по условию обеспечени прочности водозащитной толщи; повысить ёкоэффициент извлечени полезного ископаемого без.ущерба дл зданий и сооружений на поверхности .processing plants; reduce the amount of preparatory work in the lava, performed by gross excavation; to expand the scope of application of development systems with a long clearing face on the condition of ensuring the strength of the water-resistant thickness; improve the extraction of mineral resources without damage to buildings and structures on the surface.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7502096687A SU567825A1 (en) | 1975-01-15 | 1975-01-15 | Method of filling-up undergrounf workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU7502096687A SU567825A1 (en) | 1975-01-15 | 1975-01-15 | Method of filling-up undergrounf workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU567825A1 true SU567825A1 (en) | 1977-08-05 |
Family
ID=20607447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU7502096687A SU567825A1 (en) | 1975-01-15 | 1975-01-15 | Method of filling-up undergrounf workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU567825A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852551A (en) * | 2012-09-17 | 2013-01-02 | 扬州中矿建筑新材料科技有限公司 | Gob-side entry retaining method using high-water material filling columns |
CN103089298A (en) * | 2013-01-23 | 2013-05-08 | 中国矿业大学 | Structure and method for building side direction multicolumn gob-side entry retaining filling wall body |
CN103527196A (en) * | 2013-10-28 | 2014-01-22 | 中国矿业大学 | Method for recovery of room-type coal pillar through loess filling |
-
1975
- 1975-01-15 SU SU7502096687A patent/SU567825A1/en active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852551A (en) * | 2012-09-17 | 2013-01-02 | 扬州中矿建筑新材料科技有限公司 | Gob-side entry retaining method using high-water material filling columns |
CN103089298A (en) * | 2013-01-23 | 2013-05-08 | 中国矿业大学 | Structure and method for building side direction multicolumn gob-side entry retaining filling wall body |
CN103527196A (en) * | 2013-10-28 | 2014-01-22 | 中国矿业大学 | Method for recovery of room-type coal pillar through loess filling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lee et al. | Ground response to the construction of Shanghai metro tunnel-line 2 | |
US10036252B2 (en) | Method for removing hydraulic support for solid filling coal mining | |
IE791444L (en) | Excavating a trench under a pipe line on the sea bottom | |
SU567825A1 (en) | Method of filling-up undergrounf workings | |
RU2325528C1 (en) | Method to control hard-caving roof | |
JPS55159099A (en) | Method and device for setting up concrete lining in excavating underground cavity such as tunnel* adit or other pit by shield excavation method | |
CN111577283B (en) | Non-coal-pillar roadway retaining method based on mechanical cutting and composite blasting | |
SU676727A1 (en) | Method of excavating coal beds | |
SU1032840A1 (en) | Method of excavating steep ore bodies | |
SU1129354A1 (en) | Method of underground working of mineral deposits | |
SU605005A1 (en) | Method of preparing unit bottom | |
SU1612080A1 (en) | Method of mining ore pillars | |
SU625059A1 (en) | Method of conducting filling-up work | |
JPS52109708A (en) | Excavating machine for laying pipe underground | |
SU1134715A1 (en) | Method of strip-mining of bed deposits of minerals | |
SU756043A1 (en) | Method of filling-up underground working | |
SU1310520A1 (en) | Method of developing salt deposits | |
SU1461942A1 (en) | Method of mining thick ore deposits | |
SU920233A1 (en) | Method and unit of power roof support for filling-in an excavated space | |
SU1446309A1 (en) | Method of mining steep ore bodies | |
SU894196A1 (en) | Method of mining deposits of unstable ores | |
SU109991A1 (en) | The method of development of ore deposits by layer collapse | |
SU785499A1 (en) | Entry-driving machinery set | |
SU752002A1 (en) | Method and apparatus for mining sloping deposits | |
SU891925A1 (en) | Method of mining thick sloping coal beds |